CN208363103U - A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation - Google Patents
A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation Download PDFInfo
- Publication number
- CN208363103U CN208363103U CN201820805548.7U CN201820805548U CN208363103U CN 208363103 U CN208363103 U CN 208363103U CN 201820805548 U CN201820805548 U CN 201820805548U CN 208363103 U CN208363103 U CN 208363103U
- Authority
- CN
- China
- Prior art keywords
- accumbency plate
- abdomen formula
- accumbency
- formula concrete
- concrete pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation, including pole anchor ear, pulley blocks, rope, two two shackles linked up with and be symmetrically disposed on accumbency plate being installed on horizontal abdomen formula concrete pillar, two hooks are each passed through two shackles and hook, and are combined and are attached by the pulley blocks and rope between the pole anchor ear and two hooks.By the way that the installation tool is arranged, only need two people that can operate on it, a people carries out handling operation to accumbency plate by pulley blocks, another person is responsible for adjusting the position of accumbency plate, it can be achieved that primary lifting can be installed in place, and saves manpower, it is easy to operate, it is high-efficient;In addition shackle is symmetrically set on accumbency plate, be can ensure that accumbency plate keeps balance during lifting, is facilitated installation, highly-safe.
Description
Technical field
The utility model relates to railway electrification project equipment technical field more particularly to a kind of horizontal abdomen formula concrete pillars
The new tool of accumbency plate installation.
Background technique
In general speed running railway line electrification innovation construction, when carrying out direct-burried concrete pillar accumbency plate installation exercise,
What industry generallyd use at present is artificial, it may be assumed that worker first lifts to accumbency plate with big rope near coal-mine, is then tied up using 2 big rope
Accumbency plate, 4 people lift by its accumbency plate, are slowly put into hole.There are the following problems for this process installation accumbency plate:
1. working efficiency is low: because accumbency plate is than heavier, needing that first accumbency plate is put into hole, 4 operators carry out two
Secondary lifting attaches it to position, wastes labour and time.
2. cheating interior operator during lifting accumbency plate twice and cable being easy to be pounded to injury.
3. friction can be generated between the big rope and crater wall of lifting accumbency plate, need to often replace, it is uneconomical.After big rope abrasion such as
It replaces not in time, easily initiation safety accident.
4. lift accumbency plate, the position for tying up accumbency plate is entirely empirically determined with worker, if the positional shift tied up exists
Accumbency plate is uneven during lifting, easily hanging belt is caused to skid, and steel column occurs and topples or even slips, causes considerable safety thing
Therefore.
Utility model content
Place, the utility model provide a kind of horizontal abdomen formula concrete pillar accumbency in view of the deficiency of the prior art
The new tool of plate installation carries out the horizontal abdomen formula concrete pillar accumbency of direct-burried in general fast running railway line electrification innovation construction
Plate uses when installing, low efficiency and unsafe when solving the problems, such as that accumbency plate is installed in the prior art.
The utility model provides a kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation, including is installed on cross
Pole anchor ear, pulley blocks, rope, two two hooks linked up with and be symmetrically disposed on accumbency plate on abdomen formula concrete pillar
Ring, two hooks are each passed through two shackles and hook, pass through between the pole anchor ear and two hooks
The pulley blocks and rope combination are attached.
The pulley blocks include a fixed pulley as a further improvement of the utility model, and a movable pulley is described fixed
Pulley is installed on the pole anchor ear, and two hooks are connected to the movable pulley bottom.
It is provided with and the free end extension side on the outside of the hook free end as a further improvement of the utility model,
To opposite barb, the hook rear end, which is provided with, can engage separable retaining ring with the barb.
It is as a further improvement of the utility model, symmetrical axisymmetric setting with center axis thereof on the accumbency plate
There is multiple groups location hole, the shackle is mounted in the location hole.
The shackle is connect by way of screw thread with the location hole as a further improvement of the utility model,.
It as a further improvement of the utility model, further include the whole bar for fixing the horizontal abdomen formula concrete pillar
Device, the anchor ear of the whole bar device are installed on the horizontal abdomen formula concrete pillar.
Horizontal abdomen formula concrete pillar: supporting in railway electrification project and hangs contact net equipment, and section is rectangular
Concrete pillar.
Accumbency plate: in the construction of railway electrification project direct-burried concrete pillar, it is installed on pillar stress side, section is in length
It is rectangular.
Compared with prior art, the utility model has the following beneficial effects: only needing two by the way that the installation tool is arranged
People can operate on it, and a people carries out handling operation to accumbency plate by pulley blocks, and another person is responsible for adjusting horizontal
, it can be achieved that primary lifting can be installed in place, saving manpower is easy to operate, high-efficient for the position of bodyboard;In addition shackle is symmetrical
It is set on accumbency plate, can ensure that accumbency plate keeps balance during lifting, facilitate installation, it is highly-safe.
Detailed description of the invention
Fig. 1 is the structural representation of the new tool of horizontal abdomen formula concrete pillar accumbency plate installation provided by the utility model
Figure.
Specific embodiment
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
As shown in Figure 1, the utility model discloses a kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation, packet
It includes the pole anchor ear 3 being installed on horizontal abdomen formula concrete pillar 1, pulley blocks, 5, two, rope hooks 6 and is symmetrically disposed on accumbency
Two shackles 21 on plate 2, two hooks 6 are each passed through two shackles 21 and hook, the pole anchor ear 3 and two
It is attached between a hook 6 by the pulley blocks and the combination of rope 5.
By the way that the installation tool is arranged, only need two people that can operate on it, a people is by pulley blocks to cross
Bodyboard 2 carries out handling operation, and another person is responsible for adjusting the position of accumbency plate 2, it can be achieved that primary lifting can be installed in place, and saves
Human-saving, it is easy to operate, it is high-efficient;In addition shackle 21 is symmetrically set on accumbency plate 2, can ensure that accumbency plate 2 in lifting
Balance is kept in the process, facilitates installation, it is highly-safe.
The pulley blocks include a fixed pulley 41, a movable pulley 42, and the fixed pulley 41 is installed on the pole and embraces
On hoop 3, two hooks 6 are connected to 42 bottom of movable pulley.
The barb opposite with the free end extending direction is provided on the outside of 6 free ends of the hook, after the hook 6
End, which is provided with, can engage separable retaining ring with the barb.After hooking shackle, retaining ring can be engaged with barb, be kept away
Exempt from during lifting that safety accident occurs because shaking and being detached from hook 6 with shackle 21, it, will after installing accumbency plate 2
Retaining ring and Barb portion from, so that it may hook 6 is separated with shackle 21.
It is symmetrically arranged with multiple groups location hole by symmetry axis of center axis thereof on the accumbency plate 2, the shackle 21 can
Disassembly is installed in the location hole, and in the present embodiment, the shackle 21 is connect by way of screw thread with the location hole.
The symmetrical location hole of multiple groups is set, preferably three groups in the present embodiment, the peace of shackle 21 can be selected according to the actual working conditions
Holding position, operation is finer when making to lift more convenient when accumbency plate 2 and installation accumbency plate 2, improves installation quality.
It further include the whole bar device (not shown) for fixing the horizontal abdomen formula concrete pillar 1, the whole bar device
Anchor ear is installed on the horizontal abdomen formula concrete pillar 1.Horizontal abdomen formula concrete pillar 1 is fixed on the positioning in whole bar device, prevents
When lifting installation accumbency plate 2, because horizontal abdomen formula concrete pillar 1 is made to generate inclination the reason of stress.
It, cannot the above content is specific preferred embodiment further detailed description of the utility model is combined
Assert that the specific implementation of the utility model is only limited to these instructions.For the ordinary skill of the utility model technical field
For personnel, without departing from the concept of the premise utility, a number of simple deductions or replacements can also be made, should all regard
To belong to the protection scope of the utility model.
Claims (6)
1. a kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation, it is characterised in that: mixed including being installed on horizontal abdomen formula
Pole anchor ear, pulley blocks, rope, two two shackles linked up with and be symmetrically disposed on accumbency plate on solidifying soil pillar, two
The hook is each passed through two shackles and hooks, and passes through the pulley between the pole anchor ear and two hooks
Group and rope combination are attached.
2. the new tool of horizontal abdomen formula concrete pillar accumbency plate installation according to claim 1, it is characterised in that: described
Pulley blocks include a fixed pulley, a movable pulley, and the fixed pulley is installed on the pole anchor ear, and two hooks connect
It is connected to the movable pulley bottom.
3. the new tool of horizontal abdomen formula concrete pillar accumbency plate installation according to claim 1, it is characterised in that: described
Hook is provided with the barb opposite with the free end extending direction on the outside of free end, the hook rear end be provided with it is described
Barb can engage separable retaining ring.
4. the new tool of horizontal abdomen formula concrete pillar accumbency plate installation according to claim 1, it is characterised in that: described
It is symmetrically arranged with multiple groups location hole by symmetry axis of center axis thereof on accumbency plate, the shackle is mounted at described
In location hole.
5. the new tool of horizontal abdomen formula concrete pillar accumbency plate installation according to claim 4, it is characterised in that: described
Shackle is connect by way of screw thread with the location hole.
6. the new tool of horizontal abdomen formula concrete pillar accumbency plate installation according to claim 1, it is characterised in that: also wrap
The whole bar device for fixing the horizontal abdomen formula concrete pillar is included, the anchor ear of the whole bar device is installed on the horizontal abdomen formula concrete
On pillar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820805548.7U CN208363103U (en) | 2018-05-28 | 2018-05-28 | A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820805548.7U CN208363103U (en) | 2018-05-28 | 2018-05-28 | A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208363103U true CN208363103U (en) | 2019-01-11 |
Family
ID=64930310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820805548.7U Expired - Fee Related CN208363103U (en) | 2018-05-28 | 2018-05-28 | A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208363103U (en) |
-
2018
- 2018-05-28 CN CN201820805548.7U patent/CN208363103U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103470093B (en) | Concrete chimney dismantling method | |
CN101830388B (en) | Installation method of counter-weight frame of elevator | |
CN209844409U (en) | Hoisting frame for power transmission line | |
CN104499723A (en) | Movable safety net and installation method thereof | |
KR950007007B1 (en) | Dismounting device for heavy load hoisting member | |
CN208363103U (en) | A kind of new tool of horizontal abdomen formula concrete pillar accumbency plate installation | |
CN202390075U (en) | Simple lifting device special for PHC (prestress high-strength concrete) tubular pile | |
JP2015054777A (en) | Hoisting accessory for jib | |
CN109969927B (en) | Hanging row and using method thereof | |
US20180140876A1 (en) | Grid mesh anchor | |
CN113264458A (en) | Tower crane system and method for removing attachment rod thereof | |
CN210885048U (en) | Large-scale equipment hoisting system | |
JP2003306291A (en) | Engagement implement for lifting heavy object such as steel plate | |
CN210855091U (en) | Simple movable heavy object vertical lifting equipment | |
CN210239195U (en) | Safety belt suspension system for subway deep foundation pit | |
CN211034868U (en) | Steel reinforcement cage hoist device | |
CN110171766B (en) | Steel bar transportation lifting appliance | |
CN210366599U (en) | Reinforcing steel bar transportation lifting appliance | |
CN208166512U (en) | A kind of descending frame for the installation of great diameter and long steel reinforcement cage | |
KR100812130B1 (en) | A safety net using lifesaving rope | |
CN221500558U (en) | Lifting appliance for opening well lid | |
KR101772568B1 (en) | Device for building ground subsidence | |
CN211393557U (en) | Wire rod reinforcing bar lifting device | |
CN203345920U (en) | Multifunctional lifting hook | |
CN213802534U (en) | Automatic unhooking device for steel support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190111 |
|
CF01 | Termination of patent right due to non-payment of annual fee |