CN208362929U - A kind of steel pipe support support construction - Google Patents

A kind of steel pipe support support construction Download PDF

Info

Publication number
CN208362929U
CN208362929U CN201820947428.0U CN201820947428U CN208362929U CN 208362929 U CN208362929 U CN 208362929U CN 201820947428 U CN201820947428 U CN 201820947428U CN 208362929 U CN208362929 U CN 208362929U
Authority
CN
China
Prior art keywords
steel
pipe pile
connecting rod
pipe
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820947428.0U
Other languages
Chinese (zh)
Inventor
谯利锋
魏龙
钟宏
欧高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan First Boat Construction Engineering Co Ltd
Original Assignee
Sichuan First Boat Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan First Boat Construction Engineering Co Ltd filed Critical Sichuan First Boat Construction Engineering Co Ltd
Priority to CN201820947428.0U priority Critical patent/CN208362929U/en
Application granted granted Critical
Publication of CN208362929U publication Critical patent/CN208362929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of steel pipe support support constructions, belong to bridge construction supplementary structure field, it includes at least two steel-pipe piles, clamping element is clamped on steel-pipe pile, connecting rod is connected between clamping element on two adjacent steel-pipe piles, connecting rod is respectively arranged with limited block close to the both ends of steel-pipe pile, and the one side wall of limited block is arranged perpendicular to connecting rod and touches with steel-pipe pile.The clamping piece of connecting rod side is clamped on steel-pipe pile by operator, simultaneously limited block is touched with steel-pipe pile, the clamping element of the connecting rod other side is clamped on steel-pipe pile the distance between can limiting two adjacent steel-pipe piles by subsequent operator again, when the trend of steel-pipe pile run-off the straight, limited block and steel-pipe pile push against, steel-pipe pile support force is given, the probability of steel-pipe pile run-off the straight is reduced, reduce steel-pipe pile inclination influences caused by bridge construction.

Description

A kind of steel pipe support support construction
Technical field
The utility model relates to bridge construction supplementary structure field, in particular to a kind of steel pipe support support construction.
Background technique
With the continuous improvement of bridge technology, difficulty of construction is also increased with it, under different execution conditions, in order to guarantee Construction safety, the rack form of bridge can also make corresponding change.
Notification number is that the Chinese patent of CN206173806U discloses a kind of bridge construction supporting structure, including more battle arrays Underground is inserted into the bottom of the steel-pipe pile of column distribution, these steel-pipe piles, and the more load-bearing being parallel to each other are supported by steel-pipe pile Beam is supported by the more support frames being parallel to each other on spandrel girder, and the spandrel girder and support frame is mutually perpendicular to, every Distribution beam is all supported by a support frame, the top of distribution beam is supported by full framing by multiple full framing collets, and It is provided with bridging with what the full framing also matched, is then supported by multiple full framing jackings above full framing There are flitch and template.
It can not be directly only with full hall although the bridge construction is able to solve under the work condition environment of certain complexity with supporting structure Bracket or steel-pipe pile add what the mode of Bailey beam bracket carried out bracket to build caused problem, but when steel-pipe pile is longer, The phenomenon that inclination may be generated, may have an impact the construction of bridge so that deviation occurs in entire supporting structure stress.
Utility model content
The purpose of this utility model is to provide a kind of steel pipe support support constructions, have reduction steel-pipe pile run-off the straight existing As the advantages of.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of steel pipe support support Structure, including steel-pipe pile, the steel-pipe pile set at least to two, and clamping element is clamped on the steel-pipe pile, and two adjacent Steel-pipe pile on clamping element between be connected with connecting rod, connecting rod is respectively arranged with limited block close to the both ends of steel-pipe pile, described The one side wall of limited block is arranged perpendicular to connecting rod and touches with steel-pipe pile.
Implement above-mentioned technical proposal, after installing steel-pipe pile, the clamping piece of connecting rod side is clamped in steel pipe by operator In stake, while limited block is touched with steel-pipe pile, the clamping element of the connecting rod other side is clamped in steel again by subsequent operator The distance between two adjacent steel-pipe piles, when the trend of steel-pipe pile run-off the straight, limited block and steel-pipe pile can be limited on tubular pole It pushes against, gives steel-pipe pile support force, reduce the probability of steel-pipe pile run-off the straight, reduce steel-pipe pile inclination caused by bridge construction It influences.
Further, the connecting rod includes first crossbar, second crossbar and screw rod, and the middle section position of the screw rod is provided with Rotating block, screw thread of the screw rod in rotating block two sides is oppositely arranged, the both ends of the screw rod respectively with first crossbar and second Cross bar is threadedly coupled, and first crossbar, second crossbar and screw rod are collinearly arranged.
Implement above-mentioned technical proposal, when carrying out different constructions, the distance between adjacent steel-pipe pile might have difference, Operator, which rotates rotating block, at this time elongates or shortens connecting rod, and connecting rod is suitable for the different steel of spacing in a certain range Connection between tubular pole, so that the steel pipe support support construction can adapt to different operating conditions in a certain range.
Further, the rotating bar of screw axis is provided perpendicular on the rotating block, the rotating bar and rotating block are inserted It connects.
Implement above-mentioned technical proposal, when rotating rotating block, rotating bar is plugged on rotating block by operator, is grasped at this time Make personnel and pull rotating bar along rotating bar circumferential direction, connecting rod can be made to elongate or shorten at this time, when the length of connecting rod reaches To after designated length, operator separates rotating bar with rotating block;Rotating bar setting increases when being rotatablely connected block Torque, facilitates operator to rotate rotating block, and rotating bar and rotating block grafting make operator after adjusting rotation pole length The phenomenon that rotating bar being removed, reducing irrelevant personnel rotation rotating block, occurs.
Further, sliding sleeve is equipped with loop bar in the first crossbar and second crossbar, the length of the loop bar be greater than or Equal to rotating block at a distance from the one end of screw rod far from rotating block.
Implement above-mentioned technical proposal, half of screw is exposed in air after connecting rod elongation, when rainwater is contacted with screw rod The phenomenon that screw rod easily corrodes afterwards, can not rotate so as to cause screw rod;After connecting rod elongation, operator's movable sleeving Pipe makes casing block screw rod, reduces the exposed part of screw rod, reduces screw rod and contacting rain water, i.e. the phenomenon that reduction screw rod corrosion is sent out It is raw, extend the service life of connecting rod.
Further, the clamping element includes bolt, nut and gripping block, and the bolt, nut and gripping block are disposed as Two, the groove of axis vertical is offered on the side wall of two gripping block faces, the both ends of two gripping blocks pass through bolt It is connect with nut, steel-pipe pile is clamped in two grooves.
Implement above-mentioned technical proposal, when clamping steel-pipe pile, the mobile gripping block of operator keeps steel-pipe pile setting recessed at two At the position of slot face, simultaneously rotating nut finally supports nut with link block for the position on subsequent operator's fixing bolt head Touching, steel-pipe pile is fixed in groove at this time, completes clamping process;Clamping element is set as two gripping blocks, and by bolt with Nut connection, so that the installation and removal of gripping block are more convenient.
Further, shape mounting groove identical with the head of bolt, the bolt are offered in two gripping blocks Head and mounting groove be clamped.
Implement above-mentioned technical proposal, rotating nut when operator clamps steel-pipe pile, the setting of mounting groove is so that behaviour Make position when personnel clamp steel-pipe pile without independent fixing bolt, operator is facilitated to clamp steel-pipe pile.
Further, rubber pad is provided on the side wall of the groove.
Implement above-mentioned technical proposal, the setting of rubber pad increases the frictional force between gripping block and steel-pipe pile, so that steel pipe Stake is easier to be clamped, and the setting of rubber pad is so that gripping block after clamping steel-pipe pile, is not easy to leave catcher mark, reduction steel on steel-pipe pile The impaired phenomenon of tubular pole occurs.
Further, the clamping element is detachably connected with connecting rod.
Implement above-mentioned technical proposal, clamping element and connecting rod are detachably connected the storage for facilitating clamping element and connecting rod, when Can carry out single replacement after clamping element or connecting rod damage reduces the required cost of replacement.
In conclusion the utility model having the beneficial effect that in contrast to the prior art
One, the setting of the steel pipe support support construction reduces the probability of steel-pipe pile run-off the straight, reduces steel-pipe pile inclination It is influenced caused by bridge construction;
Two, connecting rod is scalable makes connecting rod be suitable for the connection between the different steel-pipe pile of spacing in a certain range, So that the steel pipe support support construction can adapt to different operating conditions in a certain range.
Detailed description of the invention
Fig. 1 is the whole structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of the clamping element of the utility model embodiment.
Appended drawing reference: 1, steel-pipe pile;2, clamping element;21, bolt;22, nut;23, gripping block;24, groove;25, it installs Slot;26, rubber pad;3, connecting rod;31, first crossbar;32, second crossbar;33, screw rod;34, rotating block;35, rotating bar;36, Loop bar;37, locating rod;4, limited block;41, fixed section;42, connecting section;43, adjusting rod.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Embodiment:
As shown in Figure 1, 2, a kind of steel pipe support support construction, including steel-pipe pile 1, steel-pipe pile 1 set at least to two, steel It is clamped with clamping element 2 on tubular pole 1, is removably connected with connecting rod 3 between the clamping element 2 on two adjacent steel-pipe piles 1.This reality It applies to be detachably connected in example and is set as grafting, screw thread is equipped with determining for position between fixed connecting rod 3 and clamping element 2 on clamping element 2 Position bar 37.Connecting rod 3 is respectively arranged with limited block 4 close to the both ends of steel-pipe pile 1, and the one side wall of limited block 4 is perpendicular to connecting rod 3 It is arranged and is touched with steel-pipe pile 1.
As shown in Figure 1, 2, connecting rod 3 includes first crossbar 31, second crossbar 32 and screw rod 33, the middle section position of screw rod 33 Be provided with rotating block 34, screw thread of the screw rod 33 in 34 two sides of rotating block is oppositely arranged, the both ends of screw rod 33 respectively with first crossbar 31 and second crossbar 32 be threadedly coupled, and first crossbar 31, second crossbar 32 and screw rod 33 are collinearly arranged.First crossbar 31 and Equal sliding sleeve is equipped with loop bar 36 on two cross bars 32, and the length of loop bar 36 is greater than or equal to rotating block 34 and screw rod 33 far from rotating block The distance of 34 one end.The rotating bar 35 of 33 axis of screw rod, rotating bar 35 and rotating block 34 are provided perpendicular on rotating block 34 Grafting.
As shown in Figure 1, 2, clamping element 2 includes bolt 21, nut 22 and gripping block 23, bolt 21, nut 22 and gripping block 23 are disposed as two, offer the groove 24 of axis vertical on the side wall of two 23 faces of gripping block, two gripping blocks 23 Both ends are connect by bolt 21 with nut 22, and steel-pipe pile 1 is clamped in two grooves 24.It is opened up in two gripping blocks 23 tangible Shape mounting groove 25 identical with the head of bolt 21, the head of bolt 21 and mounting groove 25 are clamped.It is all provided on the side wall of groove 24 It is equipped with rubber pad 26.
The process of the steel pipe support support construction is installed:
It is operated first personnel clamping element 2 is fixed on first steel-pipe pile 1, the mobile gripping block 23 of operator makes steel Tubular pole 1 is arranged at the position of two 24 faces of groove, and the head of bolt 21 is connected in mounting groove 25 by subsequent operator And rotating nut 22 finally contradicts nut 22 and link block, steel-pipe pile 1 is fixed in groove 24 at this time, and completion clamped Journey;
Secondly operator, which pulls rotating bar 35, rotates rotating block 34, and connecting rod 3 shortens at this time, and subsequent operator will Position after 23 grafting of one end and gripping block of connecting rod 3 between 37 fixed connecting rod 3 of rotational positioning bar and gripping block 23, this time limit Position block 4 is abutted with the first horizontal steel-pipe pile 1;Subsequent operator stretches the other side of connecting rod 3 and another 23 grafting of gripping block The length of long connecting rod 3, contradicts gripping block 23 and second steel-pipe pile 1, and operator's rotational positioning bar 37 is fixed at this time connects The position of extension bar 3 and gripping block 23;
Last operation personnel clamp second steel-pipe pile 1 using gripping block 23, and loop bar 36 is made to block 33 exposed section of screw rod Part installation can be completed.
When the trend of 1 run-off the straight of steel-pipe pile, limited block 4 and steel-pipe pile 1 are pushed against, and give steel-pipe pile 1 support force, are reduced The probability of 1 run-off the straight of steel-pipe pile, reduce the inclination of steel-pipe pile 1 influences caused by bridge construction.
Connecting rod 3 is scalable to make extension bar be suitable for the connection between the different steel-pipe pile 1 of spacing in a certain range, so that The steel pipe support support construction can adapt to different operating conditions in a certain range.
As shown in Fig. 2, the section of 24 level of the present embodiment further groove is obtuse triangle, and limited block 4 includes and connection The fixed section 41 and the connecting section 42 abutted with steel-pipe pile 1, fixed section 41 that bar 3 connects are slidably connected with connecting section 42, fixed section Screw thread is equipped with the axis adjusting rod 43 parallel with 42 direction of motion of connecting section, the one end of adjusting rod 43 far from fixed section 41 on 41 It is abutted with connecting section 42, adjusting rod 43 is parallel to the setting of connecting rod 3.
Groove 24 is set as obtuse triangle and groove 24 is enabled to be clamped in the different steel-pipe pile of a certain range interior diameter 1, after the diameter of steel-pipe pile 1 changes, rotation adjusting rod 43 is the position of changeable connecting section 42, so that limited block 4 begins It can be abutted eventually with steel-pipe pile 1.
The above is only the exemplary embodiment of the utility model, the protection model rather than limited the present invention It encloses, the protection scope of the utility model is determined by the attached claims.

Claims (8)

1. a kind of steel pipe support support construction, including steel-pipe pile (1), the steel-pipe pile (1) sets at least to two, and feature exists In being clamped with clamping element (2) on the steel-pipe pile (1), be connected between the clamping element (2) on two adjacent steel-pipe piles (1) Connecting rod (3), connecting rod (3) are respectively arranged with limited block (4) close to the both ends of steel-pipe pile (1), the side of the limited block (4) Wall is arranged perpendicular to connecting rod (3) and touches with steel-pipe pile (1).
2. a kind of steel pipe support support construction according to claim 1, which is characterized in that the connecting rod (3) includes the The middle section position of one cross bar (31), second crossbar (32) and screw rod (33), the screw rod (33) is provided with rotating block (34), described Screw thread of the screw rod (33) in rotating block (34) two sides is oppositely arranged, the both ends of the screw rod (33) respectively with first crossbar (31) and Second crossbar (32) is threadedly coupled, and first crossbar (31), second crossbar (32) and screw rod (33) are collinearly arranged.
3. a kind of steel pipe support support construction according to claim 2, which is characterized in that be arranged on the rotating block (34) There are the rotating bar (35) perpendicular to screw rod (33) axis, the rotating bar (35) and rotating block (34) grafting.
4. a kind of steel pipe support support construction according to claim 2, which is characterized in that the first crossbar (31) and the Equal sliding sleeve is equipped with loop bar (36) on two cross bars (32), and the length of the loop bar (36) is greater than or equal to rotating block (34) and screw rod (33) distance of one end far from rotating block (34).
5. a kind of steel pipe support support construction according to claim 1, which is characterized in that the clamping element (2) includes spiral shell Bolt (21), nut (22) and gripping block (23), the bolt (21), nut (22) and gripping block (23) are disposed as two, and two The groove (24) of axis vertical is offered on the side wall of a gripping block (23) face, the both ends of two gripping blocks (23) pass through Bolt (21) is connect with nut (22), and steel-pipe pile (1) is clamped in two grooves (24).
6. a kind of steel pipe support support construction according to claim 5, which is characterized in that on two gripping blocks (23) Shape mounting groove (25) identical with the head of bolt (21) is offered, the head and mounting groove (25) of the bolt (21) are blocked It connects.
7. a kind of steel pipe support support construction according to claim 5, which is characterized in that on the side wall of the groove (24) It is provided with rubber pad (26).
8. a kind of steel pipe support support construction according to claim 1, which is characterized in that the clamping element (2) with connect Bar (3) is detachably connected.
CN201820947428.0U 2018-06-19 2018-06-19 A kind of steel pipe support support construction Active CN208362929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820947428.0U CN208362929U (en) 2018-06-19 2018-06-19 A kind of steel pipe support support construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820947428.0U CN208362929U (en) 2018-06-19 2018-06-19 A kind of steel pipe support support construction

Publications (1)

Publication Number Publication Date
CN208362929U true CN208362929U (en) 2019-01-11

Family

ID=64929615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820947428.0U Active CN208362929U (en) 2018-06-19 2018-06-19 A kind of steel pipe support support construction

Country Status (1)

Country Link
CN (1) CN208362929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045291A (en) * 2022-06-28 2022-09-13 山东大学 Subway station foundation pit assembled tubular pile support and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045291A (en) * 2022-06-28 2022-09-13 山东大学 Subway station foundation pit assembled tubular pile support and construction method
CN115045291B (en) * 2022-06-28 2023-03-10 山东大学 Subway station foundation pit assembled tubular pile support and construction method

Similar Documents

Publication Publication Date Title
CN106677513A (en) Moveable fabricated construction operating platform mechanism and construction method thereof
CN208362929U (en) A kind of steel pipe support support construction
CN201786042U (en) Multifunctional supporting tool
CN101280625B (en) Non-welding assembly shuttering system
CN102619535B (en) Folding tunnel widening trolley
CN203334190U (en) Thin-wall hollow pillar integral elevation model turning device
JP5260709B2 (en) Bridge girder delivery method
CN209907531U (en) A support for rainwater pipeline construction
CN107642049B (en) Device for replacing main cable clamp of suspension bridge and installation method of device
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
JP4980257B2 (en) Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge
CN110847033A (en) Bridge guardrail steel bar positioning device
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN208966071U (en) A kind of architectural engineering combined type support shuttering
CN211420982U (en) Assembled railing of road engineering
CN203049462U (en) Pre-embedded sleeve locating mould of continuous beam
CN211228168U (en) Rolling adjusting structure of roller
CN219280504U (en) Construction bracket of bridge bent cap
CN113385795B (en) Positioning device for cutting elliptical groove of cable guide pipe
CN219825405U (en) Foundation pile reinforcing device
CN219045422U (en) U-shaped steel support with reinforced structure
CN220251615U (en) Forward and reverse bending test device for reinforcing steel bars
CN217419330U (en) Support structure of cast-in-place box girder template for green construction
CN220433907U (en) Connecting device of steel structure node
CN216201137U (en) Heavy pipeline bracket that multiple spot supported

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant