CN208362915U - Off-load corrosion area tunnel anchorage with antiskid key - Google Patents

Off-load corrosion area tunnel anchorage with antiskid key Download PDF

Info

Publication number
CN208362915U
CN208362915U CN201720384512.1U CN201720384512U CN208362915U CN 208362915 U CN208362915 U CN 208362915U CN 201720384512 U CN201720384512 U CN 201720384512U CN 208362915 U CN208362915 U CN 208362915U
Authority
CN
China
Prior art keywords
anchor body
antiskid key
antiskid
corrosion area
key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720384512.1U
Other languages
Chinese (zh)
Inventor
樊小伟
俞武华
王启淼
丁志威
张峻峰
宗振希
陈立新
杨胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Consultants Co Ltd
Original Assignee
CCCC Second Harbor Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Consultants Co Ltd filed Critical CCCC Second Harbor Consultants Co Ltd
Priority to CN201720384512.1U priority Critical patent/CN208362915U/en
Application granted granted Critical
Publication of CN208362915U publication Critical patent/CN208362915U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of off-load corrosion area tunnel anchorage with antiskid key, a kind of off-load corrosion area tunnel anchorage with antiskid key, including anchor body, pommel room and rear saddle room are provided with the antiskid key of evagination on the downside of anchor body bottom.The utility model preferably resolves the problem of off-load corrosion area tunnel anchorage anchor body need to carry out extensive karst cave treatment, anchor body breakout capacity can be effectively increased, with save engineering material, construct convenient, low cost, short time limit, it is applied widely, mechanical property is good the features such as.

Description

Off-load corrosion area tunnel anchorage with antiskid key
Technical field
It is molten more specifically to a kind of off-load with antiskid key the utility model relates to off-load corrosion area tunnel anchorage Lose area's tunnel anchorage.
Background technique
Currently, having built a large amount of suspension bridge projects, suspension bridge in great rivers with the fast development of economic construction of China Anchor system generallys use gravity anchor and bridge anchorage, as a kind of relatively new bridge bearing structure, tunnel anchorage compared with Gravity anchor has significant economic advantages, by more and more extensive use.Some projects are in karsts developing area region, due to rock mass structure Concealment, uncertainty and Spatial-Temporal Variability, during the design are difficult to verify solution cavity distribution situation completely, therefore the later period is commonly present need Anchor body exception processes are lengthened, but lengthens anchor body and brings a series of problems, such as project amount is big, economy is poor, constructional difficulties.
Utility model content
The technical problem to be solved by the present invention is to providing a kind of can effectively improve anchor body withdrawal resistance, and engineering Measure the off-load corrosion area tunnel anchorage that small, good economy performance, simple structure, construction easily have antiskid key.
The technical scheme adopted by the utility model to solve the technical problem is as follows: it is molten to construct a kind of off-load with antiskid key Area's tunnel anchorage, including anchor body, pommel room and rear saddle room are lost, the antiskid key of evagination is provided on the downside of anchor body bottom.
According to the above scheme, the antiskid key is made of the impervious armored concrete of C30 microdilatancy polypropylene fibre, described anti- Feather key pouring molding together with anchor body.
According to the above scheme, chamfering is set between the antiskid key and anchor body.
According to the above scheme, the antiskid key height h is not less than the 1/6 of institute's anchor body height H.
According to the above scheme, the antiskid key length L is 2 times of antiskid key height h.
According to the above scheme, the antiskid key and anchor body is of same size.
The off-load corrosion area tunnel anchorage with antiskid key for implementing the utility model, has the advantages that
Compared to more past corrosion area, need to lengthen anchor body, project amount is big, and economical difference, construction period is long, and lengthens anchor Know from experience and new geological problem occur, the utility model can increase withdrawal resistance using antiskid key, can evade above-mentioned a series of ask Topic.The utility model project amount is small, good economy performance, simple structure, construction are convenient, reduces project cost.
Detailed description of the invention
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the structural schematic diagram of off-load corrosion area tunnel anchorage of the utility model with antiskid key.
Specific embodiment
For a clearer understanding of the technical features, objectives and effects of the utility model, now control attached drawing is detailed Illustrate specific embodiment of the present utility model.
As shown in Figure 1, the off-load corrosion area tunnel anchorage with antiskid key of the utility model includes anchor body 1,2 and of pommel room Saddle room 3 afterwards.
The antiskid key 4 of evagination is provided on the downside of the bottom of anchor body 1, antiskid key 4 is using C30 microdilatancy polypropylene fibre Impervious armored concrete, when pouring with anchor body 1 together pouring molding.Chamfering is set between antiskid key 4 and anchor body 1, to disappear Except the concentration of local stress, increase fastness.4 height h of antiskid key is not less than the 1/6 of 1 height H of anchor body.4 length L of antiskid key is set It is set to 2 times of 4 height h of antiskid key.The width of antiskid key 4 is of same size with anchor body 1.
The embodiments of the present invention are described above in conjunction with attached drawing, but the utility model is not limited to The specific embodiment stated, the above mentioned embodiment is only schematical, rather than restrictive, this field it is common Technical staff is not departing from the utility model aims and scope of the claimed protection situation under the enlightenment of the utility model Under, many forms can be also made, these are belonged within the protection of the utility model.

Claims (1)

1. a kind of off-load corrosion area tunnel anchorage with antiskid key, including anchor body pommel room and rear saddle room, which is characterized in that described The antiskid key of evagination is provided on the downside of anchor body bottom, the antiskid key uses the impervious reinforced concrete of C30 microdilatancy polypropylene fibre Soil is made, and chamfering, the antiskid key is arranged in antiskid key pouring molding together with anchor body between the antiskid key and anchor body Height h is not less than the 1/6 of institute's anchor body height H, and the antiskid key length L is 2 times of antiskid key height h, the antiskid key and anchor Body it is of same size.
CN201720384512.1U 2017-04-13 2017-04-13 Off-load corrosion area tunnel anchorage with antiskid key Expired - Fee Related CN208362915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720384512.1U CN208362915U (en) 2017-04-13 2017-04-13 Off-load corrosion area tunnel anchorage with antiskid key

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720384512.1U CN208362915U (en) 2017-04-13 2017-04-13 Off-load corrosion area tunnel anchorage with antiskid key

Publications (1)

Publication Number Publication Date
CN208362915U true CN208362915U (en) 2019-01-11

Family

ID=64912504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720384512.1U Expired - Fee Related CN208362915U (en) 2017-04-13 2017-04-13 Off-load corrosion area tunnel anchorage with antiskid key

Country Status (1)

Country Link
CN (1) CN208362915U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519530A (en) * 2020-04-30 2020-08-11 中铁大桥勘测设计院集团有限公司 Pier head type tunnel anchor and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519530A (en) * 2020-04-30 2020-08-11 中铁大桥勘测设计院集团有限公司 Pier head type tunnel anchor and construction method

Similar Documents

Publication Publication Date Title
CN203475429U (en) Combined type anchor rod suitable for loess side slope
CN107476277A (en) Huge karst cavity ruggedized construction and construction method in Railway Tunnel
CN206448269U (en) A kind of expansion bolt hollow anchor bar
CN202595731U (en) High-bearing-capacity multistage enlarged bore pile convenient to construct
CN207295685U (en) Huge karst cavity ruggedized construction in Railway Tunnel
CN208362915U (en) Off-load corrosion area tunnel anchorage with antiskid key
CN205936640U (en) Interior tub leading deep pre -reinforcing secant pile supporting construction in tunnel of canopy core that establishes
CN106930769A (en) One kind is for specific region direction and location grouting strengthening method in the huge talus loose media of macroporosity
CN205558930U (en) Thick liquid slip casting pipe is prevented running in segmentation of underground works top slip casting
CN202850048U (en) High cantilever combination retaining wall structure
CN205475257U (en) A composite pile anchor supporting construction for deepening excavation
CN205296186U (en) Side slope cling compound retaining structure
CN201474703U (en) Bearing structure of consolidated ring of hydraulic tunnel
CN202483084U (en) Reinforced cushion block
CN204326072U (en) A kind of anti-float anchor rod node
CN205876364U (en) Cavity intelligence slip casting stock
CN205934938U (en) Concrete bank protection structure is built to empty window formula anchor wire mould
CN208502792U (en) A kind of advanced double-deck ductule of crushed zone tunnel advanced support
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN204385748U (en) Novel tunnel structure
CN204000846U (en) Floral tube slip casting uplift pile
CN204326071U (en) A kind of non-metallic rock
CN206034423U (en) Concrete pile
CN205604239U (en) Prefabricated bamboo formula dado structure in stake hole
CN205422778U (en) Anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190111