CN208346970U - Standby pipe structure cavity configuration is hung under a kind of upper cover building - Google Patents

Standby pipe structure cavity configuration is hung under a kind of upper cover building Download PDF

Info

Publication number
CN208346970U
CN208346970U CN201820590795.XU CN201820590795U CN208346970U CN 208346970 U CN208346970 U CN 208346970U CN 201820590795 U CN201820590795 U CN 201820590795U CN 208346970 U CN208346970 U CN 208346970U
Authority
CN
China
Prior art keywords
pipe structure
upper cover
building
chamber
structure chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820590795.XU
Other languages
Chinese (zh)
Inventor
杨雷
郭劲松
刘力
温玉君
刘辉
樊玉萍
李尧
倪旭伟
姜爱荣
朱蓓玲
何宏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN201820590795.XU priority Critical patent/CN208346970U/en
Application granted granted Critical
Publication of CN208346970U publication Critical patent/CN208346970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to upper cover architectural design and technical field of construction, standby pipe structure cavity configuration is hung under especially a kind of upper cover building, it is characterized by: the lower surface on the plate ground is fixed in the pipe structure chamber suspension and the inside cavity space of the pipe structure chamber is used to carry the equipment installation of the upper cover building, it is mutually independent between the pipe structure chamber and building under the upper cover building and the lid.The utility model has the advantages that: 1) equipment installation needed for building for upper cover provides centralized arrangement space, convenient for the arrangement of equipment installation;2) make upper cover exploitation and build lower building from vertical direction spatial and pipeline arrangement, divide fine limit and do not interfere with each other, create complete exterior escape platform for upper cover groups of building;3) operable technical support is provided for upper cover exploitation;4) sinking foundation pit needed for can accommodating the installation equipment such as top exploitation staircase, improves space utilization rate;5) the overall structure load for reducing upper cover development architecture object, saves construction cost.

Description

Standby pipe structure cavity configuration is hung under a kind of upper cover building
Technical field
The utility model relates to upper cover architectural design and technical field of construction, hung under especially a kind of upper cover building Standby pipe structure cavity configuration, is especially applicable to depot of urban railway transit vehicles upper cover Estate Development engineering design.
Background technique
Currently, when upper cover building is developed in the top of building under the lid such as such as depot of urban railway transit vehicles, on Often the bottom of upper cover building or less is arranged in by the way of flood equipment interlayer in the equipment installation of lid building.At this point, Upper cover building is very big together with load of the flood equipment interlayer to its bottom plate, and the bottom plate is located at the upper of the lower building of lid Side, therefore with the increase of the service life, it is very easy to impact the safety of structure for building lower building.Simultaneously as Provided with flood equipment interlayer, the ground elevation that will lead to the upper cover building first floor improves again, not only considerably increases construction Cost, but also the use of upper cover building, such as the disengaging of people can be given to bring very big inconvenience.
Summary of the invention
The purpose of this utility model is provided and is hung under a kind of upper cover building according to above-mentioned the deficiencies in the prior art Standby pipe structure cavity configuration, the row of the equipment installation of lid building is put on by the following suspended tubes structure chamber of board bottom in upper cover building Cloth space greatly reduces the load covered above lower building and saves construction cost while guaranteeing safety of structure.
The utility model aim realization is completed by following technical scheme:
Standby pipe structure cavity configuration is hung under a kind of upper cover building, the upper cover building construction is described on plate ground The load for carrying to plate the upper cover building, the building in the case where the lower section on the plate ground is provided with lid, it is characterised in that: described The lower surface on the plate ground is fixed in the suspension of pipe structure chamber and the inside cavity space of the pipe structure chamber is used to carry the upper cover and build The equipment installation of object is built, it is mutually independent between the pipe structure chamber and building under the upper cover building and the lid.
The pipe structure chamber includes pipe structure chamber hanging screen, pipe structure bottom of chamber plate, and the pipe structure chamber hanging screen interval suspension is fixed on described The lower surface on plate ground, the both ends of pipe structure bottom of chamber plate are fixedly connected with the pipe structure chamber hanging screen respectively, the pipe structure chamber hanging screen It is the pipe structure chamber with the space that pipe structure bottom of chamber plate is enclosed.
If the pipe structure is intracavitary to be divided into several cavity areas by the way that main pipe structure chamber davit is arranged.
The manhole or equipment foundation pit being connected with the pipe structure chamber are offered on the ground in the plate.
A kind of application method for being related to hanging standby pipe structure cavity configuration under above-mentioned upper cover building, it is characterised in that: root According to the equipment installation of upper cover building needs are moved towards, is hung with below plate ground and matches with the trend of the equipment installation Pipe structure chamber, the intracavitary forceful electric power cable for being arranged in the pipe structure intracavitary arrangement upper cover building of the pipe structure, weak-current cable, One or both of feed pipe, sewage pipe and rain pipe and two or more combinations.
Fireproof blocking is arranged between the interface in length and breadth of the pipe structure chamber in being criss-cross arranged in the pipe structure chamber.
The pipe structure cavity wall is painted with water-repellent paint and carries out looking for slope drainage sunk well in pipe structure bottom of chamber plate, and in the pipe Structure is intracavitary to be arranged downpipe at a certain distance.
The utility model has the advantages that: 1) equipment installation needed for building for upper cover provides centralized arrangement space, is convenient for equipment The arrangement of pipeline;2) make upper cover exploitation and vehicle base from vertical direction spatial and pipeline arrangement, divide fine limit and do not interfere with each other, Complete exterior escape platform is created for upper cover groups of building;3) operable skill is provided for vehicle base upper cover Estate Development Art support;4) pipe structure is intracavitary accommodates sinking foundation pit needed for top exploitation staircase etc. installs equipment, improves space utilization rate;5) lead to Setting pipe structure chamber is crossed to substitute the flood equipment interlayer needed originally, greatly reduces the overall structure lotus of upper cover development architecture object It carries, saves construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the arragement construction schematic diagram of the utility model when in use;
Fig. 3 is the installation site structural schematic diagram of the utility model.
Specific embodiment
The utility model feature and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, In order to the understanding of technical staff of the same trade:
As shown in Figure 1-3, figure label 1-15 is respectively indicated are as follows: with covering lower building 1, pipe structure chamber 2, plate 3, upper cover building It is object 4, pipe structure chamber hanging screen 5, pipe structure bottom of chamber plate 6, pipe structure chamber davit 7, frame column 8, Vierendeel girder 9, inspection hole 10, feed pipe 11, strong Electrical cables 12, weak-current cable 13, rain pipe 14, sewage pipe 15.
Embodiment: it is built as shown in figure 3, hanging standby pipe structure cavity configuration in the present embodiment under upper cover building applied to upper cover Among the development engineering design for building object 4.Upper cover building 4 builds in plate 3 top.In plate 3 lower section is additionally provided with lid Lower building 1, building lower building 1 can be depot of urban railway transit vehicles.As shown in figure 3, the suspension of pipe structure chamber 2 is fixed on plate The lower surface on ground 3, for carrying the equipment installation of upper cover building 4.Pipe structure chamber 2 and upper cover building 4 and lid time building 1 it Between it is mutually independent, i.e., pipe structure chamber 2 this construct space and have a style of one's own, building 1 is not interfere with each other down with upper cover building 4 and lid.
As shown in Figure 1, pipe structure chamber 2 is constructed by pipe structure chamber hanging screen 5, pipe structure bottom of chamber plate 6, pipe structure chamber davit 7.Pipe structure chamber The setting of the interval of hanging screen 5 with being fixed at plate 3 lower surface, the both ends of the pipe structure bottom of chamber plate 6 pipe structure chamber hanging screen 5 with two sides respectively It is connected to a fixed, so that surrounding an enclosure space constitutes pipe structure chamber 2.The lower section of pipe structure chamber 2 plate is set 3, in plate under 3 Side is additionally provided with the Vierendeel girder 9 and frame column 8 for being used to support upper cover building 4.Pipe structure chamber 2 and Vierendeel girder 9 and frame column 8 it Between empty avoiding be arranged, avoid colliding between pipe structure chamber 2 and beam column construction.As shown in Figure 1, being also set up in the inside of pipe structure chamber 2 There are two root canal structure chamber davits 7, the top of pipe structure chamber davit 7 with plate 3 is connected to a fixed, and bottom end is connected with pipe structure bottom of chamber plate 6 It is fixed, so that pipe structure chamber 2 is divided into three subregions, in order to arrange the equipment pipe of different function type in three subregions Line to influence each other caused by avoiding between equipment installation, while being also convenient for the partition management of equipment installation, facilitates technology The subsequent Maintenance and Repair of personnel.
As shown in Fig. 2, in plate offering manhole 10 on 3, manhole 10 is for plate between 3 tops and pipe structure chamber 2 Connection, make construction personnel can by above manhole 10 from plate 3 reach pipe structure chamber 2 inside, thus to institute's cloth in pipe structure chamber 2 The equipment installation set is overhauled.
Hanging standby pipe structure cavity configuration in the present embodiment under upper cover building has following application method:
1) function the arrangement for the equipment installation of upper cover building 4: is respectively set not in three subregions of pipe structure chamber 2 Same equipment installation.As shown in Fig. 2, arranging feed pipe 11 in the left side subregion of pipe structure chamber 2, feed pipe 11 is built for upper cover The water supply of object 4;Forceful electric power cable 12 and weak-current cable 13, forceful electric power cable 12 and light current electricity are arranged in the intermediate partition of pipe structure chamber 2 Cable 13 is used for the power supply of upper cover building 4;Rain pipe 14, sewage pipe 15, rain pipe 14 are arranged in the right partition of pipe structure chamber 2 The draining of upper cover building 4 is used for sewage pipe 15.To sum up, by the pipe structure chamber davit 7 in pipe structure chamber 2 by pipe structure chamber Several subregions are separated into 2, so as to arrange the different equipment installation of function.For example, in order to avoid forceful electric power cable 12 and light current Adverse effect between cable 13, can be under the premise of guaranteeing structural strength and stability, in forceful electric power cable 12 and weak-current cable Pipe structure chamber davit 7 is added between 13, to realize the isolation subregion between strong and weak electricity.
2) sinking foundation pit needed for can accommodating the installation equipment such as staircase is provided for upper cover building 4: as shown in Fig. 2, such as Fig. 2 institute Show, manhole 10, for plate the connection between 3 tops and pipe structure chamber 2 of manhole 10 in plate are offered on 3.Manhole 10 The extending direction arranged for interval along pipe structure chamber 2, and in plate on 3 remaining position, can aperture to be installed as staircase etc. Sinking foundation pit needed for equipment, to improve space utilization rate.
3) create complete exterior escape platform for upper cover building 4: due to pipe structure chamber 2, this constructs space self-contained One is not interfere with each other with upper cover building 4 and lid time building 1, forming properties pure form complete plate ground safe escape face, Region is because that the reason of pipeline and equipment foundation pit becomes to isolate is imperfect with avoiding the plate of upper cover building 4.
The present embodiment is in the specific implementation: since pipe structure chamber 2 is the equipment installation for carrying upper cover building 4, It moves towards the arrangement requirement that should meet the equipment installation of upper cover building 4.Therefore, preferably targetedly structure is responsible in setting to pipe structure chamber 2 Chamber or collocation branch pipe structure chamber.In being criss-cross arranged between supervisor's structure chamber and branch pipe structure chamber, with the trends of design with equipment installation Match.The settable closure between supervisor's structure chamber and the interface in length and breadth of branch pipe structure chamber, so that the intensity of a fire is climing when preventing fire from occurring Prolong, by the control of fire in minimum limit, ensures the safety of the person and property as much as possible.
To guarantee the equipment installation of upper cover building 4 and covering the safety of lower building 1, standby pipe to plate need to be hung under 3 Structure chamber 3 itself carries out special fire protection design, it is proposed that the fire resistance limit of structure component of pipe structure chamber 2 is 2h, and pipe structure chamber davit 7 is cut Face size is not less than 300mmx300mm;Protective layer thickness is not less than 30mm, and flaw size is not more than 0.1mm;Pipe structure chamber hanging screen 5 Section thickness be not less than 150mm.
Since 3 lower sections are not outdoor state to pipe structure chamber 2 with being hung on plate, rainwater, sewage penetrate into the situation inside pipe structure chamber 2 It is few to occur.But to meet the standard of zero tolerance, the inside of pipe structure chamber 2 has also carried out water-proof drainage processing: to the inner wall powder of pipe structure chamber 2 Brush water-repellent paint, and slope drainage sunk well is looked in pipe structure bottom of chamber plate 6, floor drain is made every a distance, and fall along the setting of frame column 8 Water pipe is convenient for central drainage.
Although above embodiments are elaborated referring to conception and embodiment of the attached drawing to the utility model aim, But those skilled in the art will realize that still may be used in the case where no disengaging claim limits the precondition of range To make various modifications and variations to the utility model, therefore will not repeat them here.

Claims (4)

1. hanging standby pipe structure cavity configuration under a kind of upper cover building, the upper cover building construction is on plate ground, the plate Ground carries the load of the upper cover building, the building in the case where the lower section on the plate ground is provided with lid, it is characterised in that: the pipe The lower surface on the plate ground is fixed in the suspension of structure chamber and the inside cavity space of the pipe structure chamber is used to carry the upper cover building The equipment installation of object, it is mutually independent between the pipe structure chamber and building under the upper cover building and the lid.
2. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 1, it is characterised in that: the pipe Structure chamber includes pipe structure chamber hanging screen, pipe structure bottom of chamber plate, and the pipe structure chamber hanging screen interval suspension is fixed on the lower surface on the plate ground, institute The both ends for stating pipe structure bottom of chamber plate are fixedly connected with the pipe structure chamber hanging screen respectively, the pipe structure chamber hanging screen and pipe structure bottom of chamber plate The space enclosed is the pipe structure chamber.
3. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 2, it is characterised in that: the pipe If structure is intracavitary to be divided into several cavity areas by the way that main pipe structure chamber davit is arranged.
4. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 1, it is characterised in that: described Plate offers the manhole or equipment foundation pit being connected with the pipe structure chamber on the ground.
CN201820590795.XU 2018-04-24 2018-04-24 Standby pipe structure cavity configuration is hung under a kind of upper cover building Active CN208346970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820590795.XU CN208346970U (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration is hung under a kind of upper cover building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820590795.XU CN208346970U (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration is hung under a kind of upper cover building

Publications (1)

Publication Number Publication Date
CN208346970U true CN208346970U (en) 2019-01-08

Family

ID=64887145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820590795.XU Active CN208346970U (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration is hung under a kind of upper cover building

Country Status (1)

Country Link
CN (1) CN208346970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532740A (en) * 2018-04-24 2018-09-14 上海市隧道工程轨道交通设计研究院 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532740A (en) * 2018-04-24 2018-09-14 上海市隧道工程轨道交通设计研究院 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building

Similar Documents

Publication Publication Date Title
CN110030162B (en) Foundation building system for offshore wind turbine and method for installing offshore wind turbine
CN208346970U (en) Standby pipe structure cavity configuration is hung under a kind of upper cover building
CN111232143A (en) Showy formula intelligence leisure platform on water
CN102943534B (en) Electromagnetic radiation integral shielding structure for large space
CN203707632U (en) All-buried nonmetallic-box-body preloaded intelligent transformer substation
CN205841102U (en) Steel reinforced concrete combination type tower
CN108842616A (en) A kind of orbit traffic overhead section channel layout stracture
CN106193755A (en) A kind of multifunctional bionic tree tower
CA2553702C (en) Wind power plant
CN108532740A (en) Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building
CN201541073U (en) Environment-friendly nonmetal buried flood protection prefabricated box-type substation
CN202990148U (en) Electromagnetic radiation whole shielding structure suitable for large space
CN217500151U (en) Board-free tray type offshore substation upper module
CN105909006B (en) A kind of precast assembly prefabricated substation
CN206468084U (en) A kind of anti-climbing electric power pylon
CN104278689A (en) Foundation device shared by box-type transformer substation and wind power generation facility and construction method of foundation device
CN104810739A (en) Total-buried nonmetal casing prefabricated type intelligent transformer station
CN210658798U (en) Concrete partition wall for power distribution room
CN205976631U (en) But sled dressization mobility control room
CN207553713U (en) A kind of socket single-pipe tower
CN205565481U (en) Formula transformer substation is constructed in piping lane cabin
CN203866805U (en) Gravity-type offshore booster station
CN209344575U (en) The waterproof base of box-type substation
CN217720416U (en) Underground combined transformer of semi-buried transformer substation
CN206859415U (en) A kind of primary equipment cabin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant