CN206859415U - A kind of primary equipment cabin - Google Patents
A kind of primary equipment cabin Download PDFInfo
- Publication number
- CN206859415U CN206859415U CN201720627643.8U CN201720627643U CN206859415U CN 206859415 U CN206859415 U CN 206859415U CN 201720627643 U CN201720627643 U CN 201720627643U CN 206859415 U CN206859415 U CN 206859415U
- Authority
- CN
- China
- Prior art keywords
- chassis
- primary equipment
- nacelle
- bulkhead
- upper frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Wind Motors (AREA)
Abstract
The utility model discloses a kind of primary equipment cabin, primary equipment cabinet including nacelle and in nacelle, nacelle includes chassis, the bulkhead being fixed on the chassis and the top cover being covered on bulkhead successively from top to bottom, chassis is welded by H profile steel and rectangular steel pipe, one layer of bottom plate is fixed with chassis, antistatic floor is equipped with bottom plate, is overhead cable routing layer between antistatic floor and bottom plate;Bulkhead includes fiber cement board, steel plate, keel shoe and battenboard successively from outside to inside, and keel shoe is fixedly connected with chassis;Top cover is located at the cover plate on upper frame with lid for double slopes structure, including upper frame, and upper frame is fixedly connected with the keel shoe of bulkhead;Nacelle is provided with the current door of equipment and the current door of personnel, and the current door of personnel is provided with emergent life-saving lock.The utility model can complete the work such as installation, the debugging of cabin inside points primary equipment in factory, whole Transporting to engineering site, avoid normal station civil engineering and intersect with electrically installation, shorten the construction period.
Description
Technical field
It the utility model is related to transformer station's electrical primary equipment and install and use field, and in particular to a kind of primary equipment cabin.
Background technology
Either usual transforming plant primary equipment is installed outdoors, or canyon is positioned in cabinet, so one
A little primary equipments must carry out installation and debugging when can just be marched into the arena after the completion of civil engineering, and live civil engineering workload is big,
Cycle is grown, and influences wiring and the debugging efforts of the equipment of transformer station first and second, so causing that integral installation quantities is big, and progress is slow.
The content of the invention
The utility model solve technical problem be:Existing part primary equipment is arranged in substation equipment room, installation
Progress is limited to civil engineering progress, and carries inconvenience.
To solve the above problems, the concrete technical scheme that the utility model uses is as follows:A kind of primary equipment cabin, including cabin
Body and the primary equipment cabinet in nacelle, the nacelle include chassis, the bulkhead being fixed on the chassis successively from top to bottom
With the top cover being covered on bulkhead, the chassis is welded by H profile steel and rectangular steel pipe, and one layer of bottom plate is fixed with chassis,
Antistatic floor is equipped with bottom plate, is overhead cable routing layer between antistatic floor and bottom plate;The bulkhead from outside to
Inside include fiber cement board, steel plate, keel shoe and battenboard successively, keel shoe is fixedly connected with chassis;The top cover is double slopes
Structure, including upper frame and lid are located at the cover plate on upper frame, and upper frame is fixedly connected with the keel shoe of bulkhead;The nacelle is provided with equipment
Current door and the current door of personnel, the current door of personnel are provided with emergent life-saving lock.
Further, cable tray is installed in the cable routing layer between antistatic floor and bottom plate, for laying cable,
Play a part of regular cable and protection cable.
Further, suspended ceiling framework is installed below top cover, suspended ceiling framework is fixedly connected by suspension rod with the upper frame of top cover,
Aluminium-plastic panel is equipped with suspended ceiling framework.Implement furred ceiling in cabin, the line equipment being laid on top cover can be blocked, while also function to one
Fixed function of heat insulation, ceiling board use aluminium-plastic panel, and light weight is little to the weight in one piece cabin, and price
Cheaply.
Further, rock cotton board is equipped between aluminium-plastic panel and top cover, increases heat insulating effect.
Further, the chassis is provided with 4-8 hanger.Correspondingly set according to the size of nacelle and center of gravity on chassis
Hanger, it is easy to lift.
The beneficial effects of the utility model:The utility model primary equipment cabin, cabin inside points can be completed once in factory
The work such as the installation of equipment, debugging, whole Transporting to engineering site, are arranged near remaining primary equipment nearby, complete and its
The connection and debugging of remaining primary equipment, avoid normal station civil engineering and intersect with electrically installation, shorten the construction period, improve work
Journey construction quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Marked in figure:
1. nacelle, 2. chassis, 3. bulkheads, 4. top covers, 5. equipment pass through door, and 6. personnel pass through door, 61. emergent life-saving locks,
7. hanger.
Embodiment
As shown in figure 1, a kind of primary equipment cabin, including nacelle 1, the nacelle 1 include chassis 2, consolidated successively from top to bottom
Due to the bulkhead 3 on the chassis 2 and the top cover 4 being covered on bulkhead 3.The chassis is welded by H profile steel and rectangular steel pipe,
Covered with one layer of bottom plate on chassis, the bilge is set to possess water-proof function, bottom plate is tied preferably by galvanized steel plain sheet using welding here
The technique for closing gluing is fixed on chassis.Antistatic floor is equipped with bottom plate, is overhead between antistatic floor and bottom plate
Cable routing layer, the utility model use bottom incoming mode, and antistatic floor can at any time be opened, be easy to safeguard.The bulkhead 3
Using composite insulation wall, include fiber cement board, steel plate, keel shoe and battenboard, keel shoe and chassis successively from outside to inside
It is fixedly connected, there is preferable heat insulating effect.The top cover 4 is double slopes structure, including upper frame and lid are located on upper frame
Cover plate, upper frame are fixedly connected with the keel shoe of bulkhead, and the slope of roof of double slope structures is not less than 5%, is advantageous to draining.Here push up
The cover plate of lid has good Corrosion Protection preferably by stainless steel plate.The skeleton of whole upper frame and bulkhead is welded as one
Individual entirety, there is good wind resistance snow ability.The nacelle is provided with the current door 5 of equipment and the current door 6 of personnel, and personnel pass through on door
Provided with emergent life-saving lock 61, it is ensured that can open door in cabin in any case.Here doorframe and door are preferably by galvanized steel
The annex such as plate, door lock, hinge, screw uses stainless steel material, it is ensured that antiseptic property.
Further, cable tray is installed in the cable routing layer between antistatic floor and bottom plate, for laying cable,
Play a part of regular cable and protection cable.
Further, suspended ceiling framework is installed below top cover, suspended ceiling framework is fixedly connected by suspension rod with the upper frame of top cover,
Aluminium-plastic panel is equipped with suspended ceiling framework.Implement furred ceiling in cabin, the line equipment being laid on top cover can be blocked, while also function to one
Fixed function of heat insulation, ceiling board use aluminium-plastic panel, and light weight is little to the weight in one piece cabin, and price
Cheaply.
Further, rock cotton board is equipped between aluminium-plastic panel and top cover, increases heat insulating effect.
Further, the chassis is provided with 4-8 hanger 7.Correspondingly set according to the size of nacelle and center of gravity on chassis
Hanger is put, is easy to lift.
Claims (5)
1. a kind of primary equipment cabin, including nacelle and the primary equipment cabinet in nacelle, the nacelle are wrapped successively from top to bottom
Include chassis, the bulkhead being fixed on the chassis and the top cover being covered on bulkhead, it is characterised in that the chassis by H profile steel and
Rectangular steel pipe is welded, and one layer of bottom plate is fixed with chassis, antistatic floor, antistatic floor and bottom plate are equipped with bottom plate
Between be overhead cable routing layer;The bulkhead includes fiber cement board, steel plate, keel shoe and sandwich successively from outside to inside
Plate, keel shoe are fixedly connected with chassis;The top cover is located at the cover plate on upper frame, upper frame with lid for double slopes structure, including upper frame
It is fixedly connected with the keel shoe of bulkhead;The nacelle is provided with the current door of equipment and the current door of personnel, and personnel pass through door provided with tight
Anxious escape lock.
2. primary equipment cabin according to claim 1, it is characterised in that the cable routing between antistatic floor and bottom plate
Cable tray is installed in layer.
3. primary equipment cabin according to claim 1 or 2, it is characterised in that suspended ceiling framework is provided with below top cover, is hung
Parietal bone frame is fixedly connected by suspension rod with the upper frame of top cover, and aluminium-plastic panel is equipped with suspended ceiling framework.
4. primary equipment cabin according to claim 3, it is characterised in that rock cotton board is equipped between aluminium-plastic panel and top cover.
5. primary equipment cabin according to claim 1, it is characterised in that the chassis is provided with 4-8 hanger.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720627643.8U CN206859415U (en) | 2017-05-31 | 2017-05-31 | A kind of primary equipment cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720627643.8U CN206859415U (en) | 2017-05-31 | 2017-05-31 | A kind of primary equipment cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206859415U true CN206859415U (en) | 2018-01-09 |
Family
ID=60825835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720627643.8U Expired - Fee Related CN206859415U (en) | 2017-05-31 | 2017-05-31 | A kind of primary equipment cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206859415U (en) |
-
2017
- 2017-05-31 CN CN201720627643.8U patent/CN206859415U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107227870A (en) | A kind of transformer station spliced by prefabricated components builds | |
CN107060152B (en) | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor | |
CN201474092U (en) | Combined living space module for offshore platform | |
CN206859415U (en) | A kind of primary equipment cabin | |
CN107476439A (en) | A kind of retractable flexible encapsulated net canopy of new large span | |
CN105863068A (en) | Box-type modular building and building method thereof | |
CN105909006B (en) | A kind of precast assembly prefabricated substation | |
CN207063610U (en) | A kind of transformer station by prefabricated components splicing builds | |
CN206279860U (en) | A kind of awning module and awning component | |
CN207039120U (en) | A kind of cable testing bridge dedicated leveling is curved | |
CN206128370U (en) | Integrated wallboard and equipment room | |
CN205976631U (en) | But sled dressization mobility control room | |
CN104847044B (en) | Precast concrete steel wire net rack sandwich curtain wall and its installation method | |
CN204463985U (en) | A kind of prefabrication type melt pit assembly based on Covered transformer | |
CN208235717U (en) | A kind of modularization assembling integrated house structure | |
RU132629U1 (en) | COMPLETE DISTRIBUTION DEVICE FOR OUTDOOR INSTALLATION OF MOBILE EXECUTION | |
CN210714100U (en) | Prefabricated assembled prevents hot wall | |
CN206220611U (en) | A kind of diameter Silo plane roof | |
CN207588296U (en) | A kind of new waterproof electric power cabinet | |
CN207919877U (en) | A kind of prefabricated GRC assembled wall boards | |
CN215645684U (en) | Railway is with basis that intelligent assembled case becomes | |
CN202645872U (en) | Wind, light diesel and storage integrated off-network power supply system | |
CN206452476U (en) | A kind of portable LAN in job site is laid and monitoring integrated apparatus | |
CN203983787U (en) | A kind of pre-installed transformer sub-station body structure | |
CN206034630U (en) | Integrated transformer substation of 110kV steel construction prepackage type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Primary equipment cabin Effective date of registration: 20180627 Granted publication date: 20180109 Pledgee: Bank of Nanjing Limited by Share Ltd. Nanjing branch Pledgor: JIANGSU GUANTONG ELECTRICAL TECHNOLOGY Co.,Ltd. Registration number: 2018320000091 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 |
|
CF01 | Termination of patent right due to non-payment of annual fee |