CN208346632U - Point band concrete guardrail build-in heightening device in biplate with quick-assembling function - Google Patents

Point band concrete guardrail build-in heightening device in biplate with quick-assembling function Download PDF

Info

Publication number
CN208346632U
CN208346632U CN201820861189.7U CN201820861189U CN208346632U CN 208346632 U CN208346632 U CN 208346632U CN 201820861189 U CN201820861189 U CN 201820861189U CN 208346632 U CN208346632 U CN 208346632U
Authority
CN
China
Prior art keywords
concrete
heightening device
guardrail
heightening
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820861189.7U
Other languages
Chinese (zh)
Inventor
洪旋
王诚
亢寒晶
王景奇
刘思源
黎敏
杨福宇
龚帅
吴国胜
马晴
高建雨
闫书明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hualuan Traffic Technology Co ltd
GUANGDONG MAOZHAN HIGHWAY Co.,Ltd.
Guangdong communication Planning and Design Institute Group Co Ltd
Original Assignee
Beijing Hualuan Traffic Technology Co Ltd
Guangdong Maozhan Expressway Co Ltd
Guangdong Province Communications Planning & Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hualuan Traffic Technology Co Ltd, Guangdong Maozhan Expressway Co Ltd, Guangdong Province Communications Planning & Design Institute Co Ltd filed Critical Beijing Hualuan Traffic Technology Co Ltd
Priority to CN201820861189.7U priority Critical patent/CN208346632U/en
Application granted granted Critical
Publication of CN208346632U publication Critical patent/CN208346632U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses in the biplate with quick-assembling function points of band concrete guardrail build-in heightening devices, including former concrete guardrail, concrete heightening device, bracing structure.The original concrete guardrail includes twice back to adjacent wall, the concrete heightening device is that the prefabricated section of reinforced concrete structure is assembled, the concrete heightening device is placed on the top surface of former concrete guardrail twice wall, the concrete heightening device is continuously arranged on former concrete guardrail, the bracing structure is prefabricated reinforced concrete structure, and the bracing structure is arranged between twice concrete heightening device.The utility model has the following beneficial effects: making former guard bar structure security protection ability be significantly improved with build-in by increasing for structure;Being transformed using the device can make full use of original structure to avoid waste of material simultaneously;It using prefabricated processing technology, constructs the convenient duration that improvement project is greatly shortened, while saving engineering cost.

Description

Point band concrete guardrail build-in heightening device in biplate with quick-assembling function
Technical field
The utility model relates in the biplate with quick-assembling function points of band concrete guardrail build-in heightening devices.
Background technique
The bridge on highway guardrail that early stage builds is mostly according to " expressway traffic safety facilities design and construction technology is advised Model " (JTJ 074-94) requirement design.In recent years, with the rapid development of domestic economy, automobile it is increasing so that Original freeway guardrail security protection ability has been unable to meet domestic present traffic safety demand, carries out upgrading and changes It makes.It needs to be arranged at Expressway Central Strip and meets point band guardrail in demand for security, in errant vehicle collision occurs Errant vehicle effectively can be intercepted and be oriented to when dividing band guardrail, reduces the hair for dividing band to rush at opposite lane situation in vehicles traverse It is raw.Some median barriers are set as the guardrail of twice concrete foundation, rebuild if removing completely, not only project amount is huge Greatly, while former guard bar structure is completely discarded, results in waste of resources, and some sections are transformed, but be related in engineering bar planting, The techniques such as weld, pour, step is more and construction is more complex, and needs to construct to twice guardrail, project amount it is same more and Construction period is longer.
Therefore, in the case where keeping former concrete wall structure completely motionless, in conjunction with prefabricating and constructing, propose have Point band concrete guardrail build-in heightening device in the biplate of quick-assembling function, it is mixed by increasing on original concrete wall top The mode of solidifying soil heightening device improves guardrail height and protective capacities, solves to apply in point band concrete guardrail transformation process in biplate The problems such as work is inconvenient, at high cost, long in time limit.
Utility model content
The purpose of the utility model is to provide in the biplate with quick-assembling function points of band concrete guardrail build-ins to increase Device, to solve the complex process, cost such as the insufficient brought dismounting of existing guardrail protective capacities at present and bar planting, cast in situs The deficiencies of high, long in time limit.
The utility model can be achieved through the following technical solutions:
Point band concrete guardrail build-in heightening device in biplate with quick-assembling function, including former concrete guardrail, Concrete heightening device, bracing structure.The original concrete guardrail includes twice back to adjacent wall, the concrete Heightening device is that the prefabricated section of reinforced concrete structure is assembled, and the concrete heightening device is placed on former concrete guardrail On the top surface of twice wall, the concrete heightening device is continuously arranged on former concrete guardrail, and the concrete increases dress Set to meet and hit face bottom equipped with embedded slot, the build-in groove bottom is bonded with former concrete guardrail top surface, the embedded slot side and Former concrete guardrail back fitting, the bracing structure are prefabricated reinforced concrete structure, the bracing structure It is arranged between twice concrete heightening device.
Further, when the concrete heightening device and bracing structure are an integral structure, the concrete Be arranged between every section prefabricated section of heightening device it is longitudinally connected, the concrete heightening device and bracing structure prefabricated plus It is poured in work as an entirety, the bracing structure includes two kinds of set-up modes, cross-brace knot described in mode one at this time Structure is continuously arranged on the length direction of concrete heightening device, and bracing structure described in mode two is in concrete heightening device It is interrupted setting on length direction.
Further, described longitudinally connected in the integral structure of the concrete heightening device and bracing structure Boss is arranged in prefabricated section both ends, and the integral type prefabricated section of the boss and the concrete heightening device and bracing structure is same For an entirety, comprising the concrete heightening device, bracing structure, boss prefabricated section on, boss institute direction The direction of traffic of the direction side road close for the boss.
Further, described longitudinally connected in the integral structure of the concrete heightening device and bracing structure Groove is arranged in prefabricated section both ends, and the small upper opening of the bottom portion of groove opening is big, two grooves being located next between two prefabricated sections Interior setting link block.
Further, described longitudinally connected in the integral structure of the concrete heightening device and bracing structure Prefabricated section one end is arranged the groove other end and boss is arranged, and boss described in two adjacent prefabricated section junctions is placed on the groove It is interior.
Further, described longitudinally connected in the integral structure of the concrete heightening device and bracing structure Anchor bolt is respectively set in prefabricated section both ends, and setting junction steel plate is mounted on the anchor bolt of two prefabricated sections, and every two is pre- Clamp dog adjacent is respectively provided with one piece of junction steel plate.
Further, when the concrete heightening device and bracing structure are separate structure, the concrete Heightening device and bracing structure distinguish prefabricated processing, and concrete heightening device back is oblique line shape, the concrete The small trapezoid space of the big lower openings of upper opening, the bracing structure two are formed between heightening device twice wall The plane of side and the face paste at concrete heightening device back are closed, and the bracing structure is in concrete heightening device length direction Upper interruption setting.
Further, when the connecting sewing between the every section prefabricated section of the concrete heightening device is in former concrete guardrail twice Position is identical on wall length direction, and the company between the every section prefabricated section of concrete heightening device is arranged in the bracing structure Seam crossing;When the connecting sewing between the every section prefabricated section of the concrete heightening device is in former concrete guardrail twice wall length side Upward position is staggered, and the bracing structure is arranged at the connecting sewing between the every section prefabricated section of concrete heightening device;When Connecting sewing between the every section prefabricated section of the concrete heightening device position on former concrete guardrail twice wall length direction It is identical, it is arranged between every section prefabricated section of the concrete heightening device longitudinally connected.
Further, the concrete heightening device, which meets to be arranged or be not provided with to hinder at the top of face of hitting, climbs bank.
After adopting the above technical scheme, the utility model have it is following the utility model has the advantages that by structure increase and build-in Former guard bar structure security protection ability is set to be significantly improved;Being transformed using the device can make full use of original structure to avoid material Material waste is simultaneously;Using prefabricated processing technology, construct the convenient duration that improvement project is greatly shortened, at the same save engineering at This.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the one of the utility model A little embodiments for those of ordinary skill in the art without creative efforts, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is one concrete heightening device of embodiment and bracing structure top view;
Fig. 2 is two concrete heightening device of embodiment and bracing structure top view;
Fig. 3 is three concrete heightening device of embodiment and bracing structure top view;
Fig. 4 is example IV concrete heightening device and bracing structure top view;
Fig. 5 is five concrete heightening device of embodiment and bracing structure top view;
Fig. 6 is the Section A-A figure of embodiment one, two, three;
Fig. 7 is the sectional view of the entire embodiment of Section A-A of embodiment one, two, three;
Fig. 8 is the section B-B figure of embodiment one, two, three;
Fig. 9 is the sectional view of the entire embodiment of section B-B of embodiment one, two, three;
Figure 10 is the C-C sectional view of example IV;
Figure 11 is the sectional view of the entire example IV in the section C-C of example IV;
Figure 12 is the D-D sectional view of example IV;
Figure 13 is the sectional view of the entire example IV in the section D-D of example IV;
Figure 14 is the E-E sectional view of embodiment five;
Figure 15 is the sectional view of the entire embodiment five in the section E-E of embodiment five;
Figure 16 is that the six concrete heightening device of embodiment optimized on the basis of Fig. 5 and bracing structure are overlooked Figure;
Figure 17 is that embodiment six includes the prefabricated section top view including concrete heightening device, bracing structure, boss;
Figure 18 is that the seven concrete heightening device of embodiment optimized on the basis of Fig. 5 and bracing structure are overlooked Figure;
Figure 19 is that embodiment seven includes the prefabricated section top view including concrete heightening device, bracing structure, groove;
Figure 20 is the side view of Figure 19;
Figure 21 is that the eight concrete heightening device of embodiment optimized on the basis of Fig. 5 and bracing structure are overlooked Figure;
Figure 22 is that embodiment eight is bowed comprising the prefabricated section including concrete heightening device, bracing structure, boss, groove View;
Figure 23 is that the nine concrete heightening device of embodiment optimized on the basis of Fig. 5 and bracing structure are overlooked Figure;
Figure 24 is that the ten concrete heightening device of embodiment optimized on the basis of Fig. 5 and bracing structure are overlooked Figure.
In figure:
1, concrete heightening device;2, longitudinally connected;3, former concrete guardrail;4, lateral stull;5, bank is climbed in resistance;6, build-in Slot;7, boss;8, groove;9, link block;10, anchor bolt;11, junction steel plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model It clearly and completely describes, it is clear that described embodiment is only the utility model a part of the embodiment, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art's all other embodiment obtained, belongs to The range of the utility model protection.
Fig. 1 is the top view of one concrete heightening device 1 and bracing structure 4 of the utility model embodiment, and Fig. 6 is figure 1 Section A-A figure, Fig. 7 are the sectional views of the entire embodiment one of Section A-A, and Fig. 8 is the section B-B figure of Fig. 1, and Fig. 9 is B-B The sectional view of the entire embodiment one in section.It include former concrete guardrail 3, concrete heightening device 1, laterally branch in embodiment one Support structure 4.The original concrete guardrail 3 includes twice back to adjacent wall, and the concrete heightening device 1 is reinforced concrete The prefabricated section of soil structure is assembled, and the concrete heightening device 1 is placed on the top surface of former 3 twice wall of concrete guardrail On, the concrete heightening device 1 is continuously arranged on former concrete guardrail 3, and the concrete heightening device 1, which is met, hits face bottom Equipped with embedded slot 6,6 bottom surface of embedded slot is bonded with 3 top surface of former concrete guardrail, 6 side of embedded slot and former concrete The fitting of 3 back of guardrail, the bracing structure 4 are prefabricated reinforced concrete structure, and the setting of bracing structure 4 exists Between twice concrete heightening device 1.
Concrete heightening device 1 described in embodiment one and bracing structure 4 are separate structure, and the two needs to distinguish Prefabricated processing.1 back of concrete heightening device is oblique line shape, is formed on one between the concrete heightening device 1 of twice wall Portion is open the small trapezoid space of big lower openings, and bracing structure 4 is placed in the space, and the plane and concrete of two sides The face paste at 1 back of heightening device is closed, and the bracing structure 4 described in the longitudinal direction is in 1 length direction of concrete heightening device Upper interruption setting.Connecting sewing between the every section prefabricated section of the concrete heightening device 1 is long in former 3 twice wall of concrete guardrail Position is staggered on degree direction, and the connecting sewing between the every section prefabricated section of concrete heightening device 1 is arranged in the bracing structure 4 Place.
Fig. 2 is the top view of two concrete heightening device 1 and bracing structure 4 of the utility model embodiment, and Fig. 6 is The Section A-A figure of Fig. 2, Fig. 7 are also the sectional view of the entire embodiment two of the Section A-A of Fig. 2, and Fig. 8 is the section B-B of same Fig. 2 Figure, Fig. 9 is both the sectional view of the entire embodiment two of the section B-B of Fig. 2.Compared to embodiment one, embodiment two it is described mixed It is identical to coagulate the position on former 3 twice wall length direction of concrete guardrail of the connecting sewing between the every section prefabricated section of soil heightening device 1, Bracing structure 4 is arranged at the connecting sewing between the every section prefabricated section of concrete heightening device 1, cross-brace in width direction Structure 4 is arranged between 1 back of twice concrete heightening device.
Fig. 3 is the top view of three concrete heightening device 1 and bracing structure 4 of the utility model embodiment, and Fig. 6 is The Section A-A figure of Fig. 3, Fig. 7 are also the sectional view of the entire embodiment three of the Section A-A of Fig. 3, and Fig. 8 is the section B-B of same Fig. 3 Figure, Fig. 9 is both the sectional view of the entire embodiment three of the section B-B of Fig. 3.Compared to embodiment one, embodiment three it is described mixed It is identical to coagulate the position on former 3 twice wall length direction of concrete guardrail of the connecting sewing between the every section prefabricated section of soil heightening device 1, And longitudinally connected 2 are arranged between every section prefabricated section, the bracing structure 4 is arranged at 1 back of twice concrete heightening device Between.
Fig. 4 is the top view of four concrete heightening device 1 and bracing structure 4 of the utility model embodiment, Tu10Shi The C-C sectional view of Fig. 4, Figure 11 are the sectional views of the entire example IV in the section C-C, and Figure 12 is the D-D sectional view of Fig. 4, Figure 13 It is the sectional view of the entire example IV in the section D-D.Concrete heightening device described in example IV 1 and bracing structure 4 It is an integral structure, is arranged longitudinally connected 2 between every section prefabricated section of the concrete heightening device 1, concrete heightening device 1 It is poured in prefabricated processing with bracing structure 4 as an entirety, and bracing structure 4 is long in concrete heightening device 1 It spends and is interrupted setting on direction.
Fig. 5 is the top view of five concrete heightening device 1 and bracing structure 4 of the utility model embodiment, Tu14Shi The E-E sectional view of Fig. 5, Figure 15 are the sectional views of the entire embodiment five in the section E-E.Concrete described in embodiment five increases dress It sets 1 to be an integral structure with bracing structure 4, with example IV the difference is that the bracing structure 4 is mixed Continuously it is arranged on the length direction of solidifying soil heightening device 1.
Embodiment six shown in Figure 16, Figure 17 are obtained by optimization longitudinally connected 2 on the basis of embodiment five.It is described vertical It is that boss 7 is set at the integral structure prefabricated section both ends of the concrete heightening device 1 and bracing structure 4 to connection 2, The integral type prefabricated section of the boss 7 and the concrete heightening device 1 and bracing structure 4 is all an entirety, is being wrapped Containing the concrete heightening device 1, bracing structure 4, boss 7 prefabricated section on, the directions of 7 directions of boss is the boss The direction of traffic of 7 close side roads.Figure 16 arrow direction is direction of traffic.
Embodiment seven shown in Figure 18, Figure 19, Figure 20 are obtained by optimization longitudinally connected 2 on the basis of embodiment five, Longitudinally connected 2 is in the integral structure prefabricated section both ends setting grooves of the concrete heightening device 1 and bracing structure 4 8, the small upper opening of 8 bottom opening of groove is big, and link block 9 is arranged in two grooves 8 being located next between two prefabricated sections.
Embodiment eight shown in Figure 21, Figure 22, Zong Xianglian are obtained by optimization longitudinally connected 2 on the basis of embodiment five It is another for groove 8 is arranged in integral structure prefabricated section one end of the concrete heightening device 1 and bracing structure 4 to connect 2 Boss 7 is arranged in end, and boss 7 described in two adjacent prefabricated section junctions is placed in the groove 8.
Embodiment nine shown in Figure 23 are obtained by optimization longitudinally connected 2 on the basis of embodiment five, longitudinally connected 2 are Anchor bolt 10 is respectively set at the integral structure prefabricated section both ends of the concrete heightening device 1 and bracing structure 4, Junction steel plate 11 is arranged to be mounted on the anchor bolt 10 of two prefabricated sections, every two prefabricated section adjacent is respectively provided with one piece of connection Steel plate 11.
Embodiment ten shown in Figure 24 is compared with embodiment nine the difference is that the arrangement mode of anchor bolt 10 is different.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (9)

1. point band concrete guardrail build-in heightening device in the biplate with quick-assembling function, including former concrete guardrail (3), Concrete heightening device (1), bracing structure (4), it is characterised in that: the original concrete guardrail (3) include twice back to Adjacent wall, the concrete heightening device (1) are that the prefabricated section of reinforced concrete structure is assembled, and the concrete adds High device (1) is placed on the top surface of former concrete guardrail (3) twice wall, and the concrete heightening device (1) is in former coagulation Continuously it is arranged on native guardrail (3), the concrete heightening device (1), which is met, hits face bottom equipped with embedded slot (6), the embedded slot (6) bottom surface is bonded with former concrete guardrail (3) top surface, and embedded slot (6) side is bonded with former concrete guardrail (3) back, The bracing structure (4) is prefabricated reinforced concrete structure, and the bracing structure (4) is arranged in twice concrete Between heightening device (1).
2. point band concrete guardrail build-in heightening device in the biplate according to claim 1 with quick-assembling function, It is characterized by: when the concrete heightening device (1) and bracing structure (4) are an integral structure, the concrete It is arranged longitudinally connected (2) between every section prefabricated section of heightening device (1), the concrete heightening device (1) and cross-brace knot Structure (4) is poured in prefabricated processing as an entirety, and the bracing structure (4) includes two kinds of set-up modes, mode at this time One bracing structure (4) is continuously arranged on the length direction of concrete heightening device (1), laterally props up described in mode two Support structure (4) is interrupted setting on concrete heightening device (1) length direction.
3. point band concrete guardrail build-in heightening device in the biplate according to claim 2 with quick-assembling function, It is characterized by: described longitudinally connected (2) are the integral type in the concrete heightening device (1) and bracing structure (4) Boss (7) are arranged in structure prefabricated section both ends, the boss (7) and the concrete heightening device (1) and bracing structure (4) Integral type prefabricated section be all an entirety, including the concrete heightening device (1), bracing structure (4), boss (7) on prefabricated section, the direction of traffic of the direction of boss (7) institute direction side road close for the boss (7).
4. point band concrete guardrail build-in heightening device in the biplate according to claim 2 with quick-assembling function, It is characterized by: described longitudinally connected (2) are the integral type in the concrete heightening device (1) and bracing structure (4) Groove (8) are arranged in structure prefabricated section both ends, and the small upper opening of groove (8) bottom opening is big, is located next between two prefabricated sections Two grooves (8) in be arranged link block (9).
5. point band concrete guardrail build-in heightening device in the biplate according to claim 2 with quick-assembling function, It is characterized by: described longitudinally connected (2) are the integral type in the concrete heightening device (1) and bracing structure (4) Structure prefabricated section one end is arranged groove (8) other end and boss (7) is arranged, boss (7) described in two adjacent prefabricated section junctions It is placed in the groove (8).
6. point band concrete guardrail build-in heightening device in the biplate according to claim 2 with quick-assembling function, It is characterized by: described longitudinally connected (2) are the integral type in the concrete heightening device (1) and bracing structure (4) Structure prefabricated section both ends are respectively set anchor bolt (10), and setting junction steel plate (11) is mounted on the anchor bolt of two prefabricated sections (10) on, every two prefabricated section adjacent is respectively provided with one piece of junction steel plate (11).
7. point band concrete guardrail build-in heightening device in the biplate according to claim 1 with quick-assembling function, It is characterized by: when the concrete heightening device (1) and bracing structure (4) are separate structure, the concrete Heightening device (1) and bracing structure (4) prefabricated processing respectively, concrete heightening device (1) back are oblique line shape, institute It states and forms the small trapezoid space of the big lower openings of upper opening, the cross between concrete heightening device (1) twice wall The face paste of plane and concrete heightening device (1) back to support construction (4) two sides is closed, and the bracing structure (4) exists It is interrupted setting on concrete heightening device (1) length direction.
8. point band concrete guardrail build-in heightening device in the biplate according to claim 7 with quick-assembling function, It is characterized by: when the connecting sewing between the every section prefabricated section of concrete heightening device (1) is in former concrete guardrail (3) twice Position is identical on wall length direction, the bracing structure (4) setting the every section prefabricated section of concrete heightening device (1) it Between connecting sewing at;When the connecting sewing between the every section prefabricated section of concrete heightening device (1) is in former concrete guardrail (3) two Position is staggered on road wall length direction, and the bracing structure (4) is arranged in the every section prefabricated section of concrete heightening device (1) Between connecting sewing at;When the connecting sewing between the every section prefabricated section of concrete heightening device (1) is in former concrete guardrail (3) Position is identical on twice wall length direction, is arranged between every section prefabricated section of the concrete heightening device (1) longitudinally connected (2).
9. point band concrete guardrail build-in heightening device in the biplate according to claim 1 with quick-assembling function, It is characterized by: the concrete heightening device (1), which meets to be arranged or be not provided with to hinder at the top of face of hitting, climbs bank (5).
CN201820861189.7U 2018-06-05 2018-06-05 Point band concrete guardrail build-in heightening device in biplate with quick-assembling function Active CN208346632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820861189.7U CN208346632U (en) 2018-06-05 2018-06-05 Point band concrete guardrail build-in heightening device in biplate with quick-assembling function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820861189.7U CN208346632U (en) 2018-06-05 2018-06-05 Point band concrete guardrail build-in heightening device in biplate with quick-assembling function

Publications (1)

Publication Number Publication Date
CN208346632U true CN208346632U (en) 2019-01-08

Family

ID=64892405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820861189.7U Active CN208346632U (en) 2018-06-05 2018-06-05 Point band concrete guardrail build-in heightening device in biplate with quick-assembling function

Country Status (1)

Country Link
CN (1) CN208346632U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593170A (en) * 2019-09-12 2019-12-20 苏州交通工程集团有限公司 Formwork supporting device of reinforced concrete guardrail and construction process thereof
CN112663541A (en) * 2020-12-22 2021-04-16 浙江交工集团股份有限公司 Installation and construction method for ecological prefabricated guardrail of central separation zone
CN116084274A (en) * 2023-01-05 2023-05-09 湖南省高速公路集团有限公司 Bridge guardrail heightening structure and construction transformation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593170A (en) * 2019-09-12 2019-12-20 苏州交通工程集团有限公司 Formwork supporting device of reinforced concrete guardrail and construction process thereof
CN112663541A (en) * 2020-12-22 2021-04-16 浙江交工集团股份有限公司 Installation and construction method for ecological prefabricated guardrail of central separation zone
CN112663541B (en) * 2020-12-22 2022-10-21 浙江交工集团股份有限公司 Installation and construction method for ecological prefabricated guardrail of central separation zone
CN116084274A (en) * 2023-01-05 2023-05-09 湖南省高速公路集团有限公司 Bridge guardrail heightening structure and construction transformation method
CN116084274B (en) * 2023-01-05 2023-12-05 湖南省高速公路集团有限公司 Bridge guardrail heightening structure and construction transformation method

Similar Documents

Publication Publication Date Title
CN208346632U (en) Point band concrete guardrail build-in heightening device in biplate with quick-assembling function
CN106869017B (en) A kind of the precast assembly bridge pier-cushion cap node connection type and its practice of pier bottom setting flexible layer
CN106245544B (en) A kind of assembled steel reinforced concrete guard wall type general channels hole of L-type
CN208072124U (en) A kind of expanded joint structure applied to continuous reinforced concrete pavement
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN208830183U (en) A kind of bridge tunnel one hangar tunnel
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN206328671U (en) A kind of precast beam wet seam construction of Midspan sag or highway
CN210658442U (en) Roof plate upturning beam structure of subway station
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN108677712A (en) A kind of connecting structure and its construction method of Steel Bridge Deck concrete anti-collision guard bar
CN208309459U (en) A kind of corrugated beam barrier encapsulating reinforcement structure
CN208328594U (en) A kind of assembly concrete temporary pavement plate
CN209024966U (en) Meet the median strip concrete wall type guard rail connection structure of double width bridge differential settlement
CN208430685U (en) A kind of large span assembled integral steel concrete combined hollow floor construction
CN207525862U (en) A kind of monoblock type double side wings marginal zone strangles transversal trench cover
CN209353288U (en) Active service dyke dam crest road upgradeable architecture
CN106759857A (en) Steel tube regeneration monolith assembling structure
CN206956607U (en) A kind of overhead road of city median barrier
CN206843992U (en) A kind of post and beam concrete guardrail encapsulates reinforcement structure
CN214168756U (en) Bridge guardrail
CN205822924U (en) Concrete guardrail longitudinal connection structure
CN108824110A (en) A kind of T-junction road of simplified traffic organization
CN217438700U (en) UHPC strip beam type single-slit modulus expansion device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.22 Xinghua Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee after: Guangdong transportation planning and Design Institute Group Co.,Ltd.

Patentee after: GUANGDONG MAOZHAN HIGHWAY Co.,Ltd.

Patentee after: BEIJING HUALUAN TRAFFIC TECHNOLOGY Co.,Ltd.

Address before: No.22 Xinghua Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG PROVINCE COMMUNICATIONS PLANNING & DESIGN INSTITUTE Co.,Ltd.

Patentee before: GUANGDONG MAOZHAN HIGHWAY Co.,Ltd.

Patentee before: BEIJING HUALUAN TRAFFIC TECHNOLOGY Co.,Ltd.