CN206328671U - A kind of precast beam wet seam construction of Midspan sag or highway - Google Patents

A kind of precast beam wet seam construction of Midspan sag or highway Download PDF

Info

Publication number
CN206328671U
CN206328671U CN201621407980.8U CN201621407980U CN206328671U CN 206328671 U CN206328671 U CN 206328671U CN 201621407980 U CN201621407980 U CN 201621407980U CN 206328671 U CN206328671 U CN 206328671U
Authority
CN
China
Prior art keywords
steel plate
precast beam
wet seam
bar
highway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621407980.8U
Other languages
Chinese (zh)
Inventor
谢远方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621407980.8U priority Critical patent/CN206328671U/en
Application granted granted Critical
Publication of CN206328671U publication Critical patent/CN206328671U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of wet seam construction of the precast beam of Midspan sag or highway.It includes the precast beam structure (1) of both sides, it is arranged on the wet seam bar-mat reinforcement (3) in the gap between two precast beam structures (1), positioned at the connecting bottom board structure of wet seam bottom and by the connecting bottom board structure, precast beam structure (1), wet seam bar-mat reinforcement (3) pours the concrete being integrated, the connecting bottom board structure includes being embedded in one piece of steel plate C (7) of the precast beam structure bottom of every side, the steel plate C (7) is by connecting reinforcing bar together with the bar connecting in the side precast beam structure (1), the bottom welding of every piece of steel plate C (7) has one piece of steel plate A (5), welded together between two pieces of steel plate A (5) by steel plate B (6) overlap joints, the steel plate A (5), steel plate B (6) inner side is welded with connection reinforcing bar and is connected with the wet seam bar-mat reinforcement (3), the wet seam bar-mat reinforcement (3) and the bar connecting of the precast beam structure (1).

Description

A kind of precast beam wet seam construction of Midspan sag or highway
Technical field
The utility model is related to a kind of wet seam construction of the precast beam of Midspan sag or highway, belongs to bridge technology field.
Background technology
At present, highway, municipal bridge main will use Precast T-Beam or combined box beam structure, and its wet seam is cast-in-place concrete Structure.When being constructed above railway, wet seam bed die peace tears difficulty open, larger to railway impact.Existing most of constructions are using to drawing Bamboo slab rubber bed die, model sheetinstallat is difficult, and general busy railway can not be removed, larger to railway security hidden danger.
The content of the invention
For drawbacks described above present in prior art, the utility model provides a kind of new wet seam construction, and it is tied Structure intensity is high, and can effectively solve bed die peace present in the wet seam construction of the precast beam structure such as Midspan sag or busy highway and tear open Difficult the problem of.
The utility model is achieved by the following technical solution:A kind of precast beam wet seam of Midspan sag or highway Structure, it is characterized in that:Precast beam structure including both sides, the wet seam reinforcing bar in the gap being arranged between two precast beam structures Net, the connecting bottom board structure positioned at wet seam bottom and the connecting bottom board structure, precast beam structure, wet seam bar-mat reinforcement are poured The concrete being integrated is built, the connecting bottom board structure includes being embedded in one piece of steel plate C of the precast beam structure bottom of every side, The steel plate C is by connecting reinforcing bar together with the bar connecting in the side precast beam structure, every piece of steel plate C bottom weldering It is connected between one piece of steel plate A, two pieces of steel plate A and is welded together by steel plate B overlap joints, the steel plate A, steel plate B inner side is welded It is connected to connection reinforcing bar to be connected with the wet seam bar-mat reinforcement, the wet seam bar-mat reinforcement and the reinforcing bar of the precast beam structure connect Connect.
Further, to improve antiseptic property, the steel plate is zincizing steel plate.
Two-sided welding is used between bonding strength, the connected steel plate of connection reinforcing bar to improve.
Equally, in order to improve bonding strength, the reinforcing bar and the reinforcing bar of the precast beam structure of the wet seam bar-mat reinforcement are adopted Connected with overlapping mode.
In order to equally reach above-mentioned purpose, one is connected to by the way of overlap joint welding between the steel plate C and steel plate A Rise.
The utility model is by setting connecting bottom board structure and making the reinforcing bar of connecting bottom board structure and precast beam structure and wet Seam bar-mat reinforcement is firmly connected so that the wet seam construction after casting concrete is solidified as a whole, and its structural strength is high, and connects Base arrangement is closely connected with beam body, and connecting bottom board structure turns into a part for wet seam construction, without removing again, reduces bottom The process that mould is removed.The utility model is closed in work progress, influences small to railway, highway communication under bridge.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram of the steel plate A in the utility model;
Fig. 3 is the schematic diagram of the steel plate B in the utility model;
Fig. 4 is the schematic diagram of the steel plate C in the utility model;
Fig. 5 is connection diagrams of the steel plate C with being connected reinforcing bar in the utility model;
Fig. 6 is connection diagrams of the steel plate A with being connected reinforcing bar in the utility model;
In figure, 1 is precast beam structure, and 2 be the reinforcing bar of precast beam structure, and 3 be wet seam bar-mat reinforcement, and 31 be wet seam reinforcing bar The reinforcing bar of net, 4 be connection reinforcing bar, and 5 be steel plate A, and 6 be steel plate B, and 7 be steel plate C.
Embodiment
The utility model is further described below by non-limiting embodiment and with reference to accompanying drawing:
As shown in drawings, the wet seam construction of precast beam of a kind of Midspan sag or highway, it includes the precast beam knot of both sides Wet seam bar-mat reinforcement 3 in structure 1, the gap being arranged between two precast beam structures 1, the connecting bottom board knot positioned at wet seam bottom Structure and the connecting bottom board structure, precast beam structure 1, wet seam bar-mat reinforcement 3 are poured to the concrete being integrated, wherein, it is wet to connect Seam bar-mat reinforcement 3 is formed using routine techniques colligation, reinforcing bar 2 is configured with precast beam structure, its configuration reinforcement 2 is outside seam end Stretch, the connecting bottom board structure includes being embedded in one piece of steel plate C7, the steel plate C7 of the bottom of the precast beam structure 1 of every side Linked together by connecting reinforcing bar 4 with the reinforcing bar 2 in the side precast beam structure 1, every piece of steel plate C7 bottom welding has Welded together between one piece of steel plate A5, two pieces of steel plate A5 by steel plate B6 overlap joints so that steel plate A, steel plate B, steel plate C are connected as One, the steel plate A5, steel plate B6 inner side are welded with connection reinforcing bar 4 and are connected with the wet seam bar-mat reinforcement 3, described wet to connect The reinforcing bar 31 of seam bar-mat reinforcement 3 is connected with the overhanging end of the reinforcing bar 2 of the precast beam structure 1 using overlapping mode.
To improve antiseptic property, steel plate A5, steel plate B6, steel plate C7 are zincizing steel plate.
Two-sided welding is used between bonding strength, the connected steel plate of the connection reinforcing bar 4 to improve.Connect reinforcing bar Connecting portion between 4 and the reinforcing bar of precast beam structure and the reinforcing bar of wet seam bar-mat reinforcement 3 uses two-sided welding.
In order to equally reach above-mentioned purpose, also it is connected between the steel plate C7 and steel plate A5 by the way of overlap joint welding Together.
Other parts in the present embodiment use known technology, will not be repeated here.
Connecting bottom board structure, precast beam structure and wet seam bar-mat reinforcement in the utility model are securely joined together, and are poured Build the wet seam construction after concrete to be solidified as a whole, its structural strength is high, connecting bottom board structure turns into one of wet seam construction Point, without removing again, it is closed to reduce in the process that bed die is removed, work progress, and railway, highway communication under bridge are influenceed Small, application effect is obvious in the prefabricated beam bridges such as Midspan sag, highway, busy urban road, navigation channel, with very high Practicality.

Claims (5)

1. a kind of wet seam construction of the precast beam of Midspan sag or highway, it is characterized in that:Precast beam structure (1) including both sides, It is arranged on the wet seam bar-mat reinforcement (3) in the gap between two precast beam structures (1), the connecting bottom board knot positioned at wet seam bottom Structure and the connecting bottom board structure, precast beam structure (1), wet seam bar-mat reinforcement (3) are poured to the concrete being integrated, the company Connecing base arrangement includes being embedded in one piece of steel plate C (7) of the precast beam structure bottom of every side, and the steel plate C (7) passes through connection Reinforcing bar is together with the bar connecting in the side precast beam structure (1), and the bottom welding of every piece of steel plate C (7) has one block of steel Welded together between plate A (5), two pieces of steel plate A (5) by steel plate B (6) overlap joints, the steel plate A (5), steel plate B (6) inner side It is welded with connection reinforcing bar to be connected with the wet seam bar-mat reinforcement (3), the wet seam bar-mat reinforcement (3) and the precast beam structure (1) bar connecting.
2. the wet seam construction of the precast beam of Midspan sag according to claim 1 or highway, it is characterized in that:The steel plate is equal For zincizing steel plate.
3. the wet seam construction of the precast beam of Midspan sag according to claim 1 or highway, it is characterized in that:The connection steel Two-sided welding is used between the connected steel plate of muscle.
4. the wet seam construction of the precast beam of Midspan sag or highway according to claim 1 or 2 or 3, it is characterized in that:It is described The reinforcing bar of wet seam bar-mat reinforcement (3) is connected with the reinforcing bar of the precast beam structure (1) using overlapping mode.
5. the wet seam construction of the precast beam of Midspan sag or highway according to claim 1 or 2 or 3, it is characterized in that:It is described Linked together between steel plate C (7) and steel plate A (5) by the way of overlap joint welding.
CN201621407980.8U 2016-12-21 2016-12-21 A kind of precast beam wet seam construction of Midspan sag or highway Expired - Fee Related CN206328671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621407980.8U CN206328671U (en) 2016-12-21 2016-12-21 A kind of precast beam wet seam construction of Midspan sag or highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621407980.8U CN206328671U (en) 2016-12-21 2016-12-21 A kind of precast beam wet seam construction of Midspan sag or highway

Publications (1)

Publication Number Publication Date
CN206328671U true CN206328671U (en) 2017-07-14

Family

ID=59291263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621407980.8U Expired - Fee Related CN206328671U (en) 2016-12-21 2016-12-21 A kind of precast beam wet seam construction of Midspan sag or highway

Country Status (1)

Country Link
CN (1) CN206328671U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643036A (en) * 2018-05-21 2018-10-12 江苏省交通工程集团有限公司 A kind of wet seam construction of prefabricated case beam
CN110004822A (en) * 2019-04-23 2019-07-12 中铁十五局集团第五工程有限公司 The wet seam of precast concrete beam connects design
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643036A (en) * 2018-05-21 2018-10-12 江苏省交通工程集团有限公司 A kind of wet seam construction of prefabricated case beam
CN110004822A (en) * 2019-04-23 2019-07-12 中铁十五局集团第五工程有限公司 The wet seam of precast concrete beam connects design
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway
CN114263119B (en) * 2021-12-28 2024-04-23 中铁六局集团石家庄铁路建设有限公司 Bridge girder erection machine cross-railway girder erection construction method

Similar Documents

Publication Publication Date Title
CN206328671U (en) A kind of precast beam wet seam construction of Midspan sag or highway
CN207331428U (en) A kind of O-shaped reinforcing steel bar connecting device of concrete plate beam
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN108677685A (en) A kind of ultra-high performance concrete-part girder steel combination bent cap and its construction method
CN203821347U (en) Reinforced concrete prefabricated gallery structure of roller compacted concrete dam
CN206233413U (en) A kind of constructing structure of new shear wall vertical construction joint
CN103741577B (en) A kind of T-shaped beam bridge and construction method thereof that bottom lateral bracing is set
CN106948548A (en) A kind of precast concrete frame beam structure
CN109083003A (en) A kind of precast pier pier top connection structure and its construction method
CN204804057U (en) Beam column connecting device of prefabricated frame
CN105908638B (en) It is a kind of to turn rigid frame bridge steel box-girder and the construction method of concrete pier consolidation
CN205444169U (en) Variable cross section reinforced concrete precast pile of X -shaped cross -section and square cross -section combination
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN200999409Y (en) Prefabricated thin-plate cast-in-situs super-positioned hollow core floor slab
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN206752735U (en) Precast shear wall insert-type steel board connecting structure
CN207685681U (en) Precast beam cross-connecting apparatus
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN209568450U (en) A kind of connection structure for foundation pit assembled inner bracing member and crown beam
CN208917672U (en) A kind of prefabricated-cast-in-place combined reinforced bar concrete pier
CN207348280U (en) A kind of novel precast floor slab
CN103216085B (en) A kind of removable lining self-bearing type reinforcement bar truss mould plate
CN109537775A (en) The method for preparing assembly concrete shear wall using local corrugated thin-wall steel pipe
CN106087713B (en) Stiff skeleton is locked outside a kind of assembled closure section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714

Termination date: 20171221