CN208333367U - Country rock excavation deformation overall process monitors system - Google Patents

Country rock excavation deformation overall process monitors system Download PDF

Info

Publication number
CN208333367U
CN208333367U CN201721474117.9U CN201721474117U CN208333367U CN 208333367 U CN208333367 U CN 208333367U CN 201721474117 U CN201721474117 U CN 201721474117U CN 208333367 U CN208333367 U CN 208333367U
Authority
CN
China
Prior art keywords
country rock
signal
radio positioner
overall process
detection system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721474117.9U
Other languages
Chinese (zh)
Inventor
马海曜
管清升
杨博
李为腾
李廷春
梅玉春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201721474117.9U priority Critical patent/CN208333367U/en
Application granted granted Critical
Publication of CN208333367U publication Critical patent/CN208333367U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

The utility model discloses a kind of country rock excavation deformation overall processes to monitor system, belongs to geotechnical engineering monitoring field.System mainly includes detection system and radio positioner two parts, detection system emits signal to the radio positioner for being embedded in different location in country rock, and the feedback signal of radio positioner reflection is received and calculated, determine the spatial position coordinate of each radio positioner.When use, radio positioner is mounted on designated position inside country rock by drilling before tunnel excavation, and it is fixed with Anchor Agent, then by excavating front and back repeatedly monitoring data comparison, the space coordinate variation for calculating radio positioner, to obtain the space displacement of radio positioner position country rock.The utility model is measured using wireless mode, can lay monitoring point inside country rock in advance, can obtain the data for excavating front and back overall process internal displacement for surrounding rock.

Description

Country rock excavation deformation overall process monitors system
Technical field
The present invention relates to geotechnical engineerings to monitor field, and specifically a kind of country rock excavation deformation overall process monitors system.
Background technique
With the development of China's economic society, tunnel, subway, underground mine, water power chamber etc. build it is more and more, more Engineering be in geological conditions complicated and changeable, the excavation faced therewith, support issues are also more and more prominent, for example soft rock is big The problems such as deformation, Stability Analysis of The Surrounding Rock and secondary supporting opportunity select.The surface of accurate measurement country rock and internal displacement, hold Surrouding rock deformation rule, is the important evidence for carrying out design of its support, extremely important for engineering safety.
In view of the above-mentioned problems, existing common processing method is to monitor internal displacement for surrounding rock, such as Shen using multipoint displacement meter Number a kind of coal mine roadway country rock deep multipoint displacement meter please be disclosed for 201610986473.2 patent of invention.But multiple spot Displacement meter comes with some shortcomings in use, and that more concentrates is embodied in following three points.(1) flexible deformation of country rock is being opened Instantaneous completion is dug, and multipoint displacement meter is buried after the completion of excavation, and the surrouding rock deformation data after the completion of excavating can only be measured, and It cannot record and excavate instantaneous surrouding rock deformation displacement;There are development blasting, whitewashing, the paving processes such as metal mesh in many engineerings, Since conventional multipoint displacement meter needs to install external observation mechanism, and the mechanism should avoid destroying caused by explosion and whitewashing, The laying of metal mesh cannot be influenced again, so the installation of conventional multipoint displacement meter can only further lag behind excavation;Above-mentioned two side Face determines that the data measured using conventional multipoint displacement meter lack Primary Stage Data, only excavates the portion for leading to surrouding rock deformation data Divide all, for problem analysis, there are limitations.(2) as the above analysis, to use conventional multipoint displacement meter Front of tunnel heading surrounding rock displacement caused by measurement is excavated then is even more and can not implement.(3) multipoint displacement meters can only measure one The displacement in direction is difficult to obtain the geometric distortion data of country rock.
Summary of the invention
For the defects in the prior art and insufficient, the present invention provides a kind of monitorings of country rock excavation deformation overall process to be System, the monitoring system and application method can accurately measure surrouding rock deformation displacement.To achieve the above object, the present invention is using such as Lower technical solution:
Country rock excavation deformation overall process monitors system, it is characterised in that: including radio positioner and detection system.
The radio positioner is the cylindrical elements for being equipped with microcircuit, and with battery.
The microcircuit has single number, can make particular feedback to the wireless signal that detection system is launched, Different radio locator is distinguished accordingly, and there is absolute identification.
The detection system includes: pedestal, signal projector, signal receiver, feeler arm, connection and host.
The pedestal is adjustable flat bed, for signal projector, feeler arm and signal receiver to be fixed on three feet On frame and leveled.
The signal projector is mounted in pedestal, positioned at the point of intersection of three feeler arms, capable of emitting wireless signal.
The feeler arm is mounted on the base, scalable, fold, three feeler arms fully open after in pairwise orthogonal shape State.
The signal receiver is fixed on feeler arm, is increased between three signal receivers by elongation feeler arm Distance.Signal receiver can receive the signal of the specific frequency of radio positioner feedback, and the three groups of data received pass through logical News line input host is handled.
The host has control, calculating and display function, can control signal projector and signal receiver, and utilize Three-point fix principle carries out analytical calculation to the three groups of wireless signals received, is thus accurately positioned the three of each radio positioner Coordinate is tieed up, and calculated result is presented over the display.Host matches charged, provides electric power for detection system.
The adjustable height of the tripod, guarantees in the measurement to same monitoring section radio positioner, pacifies every time Detector coordinates and absolute altitude are consistent after the completion of dress.
The present invention solves the technical solution of its technical problem further include: a kind of application method, comprising the following steps:
Step (1): radio positioner quantity and position needed for being calculated according to detection requirement and tunnel excavation face size;
Step (2): it is drilled according to step (1) calculated result in designated position and radio positioner is installed, between difference drilling Plane where after radio positioner is installed at same excavation face is parallel with excavation face;
Step (3): radio positioner blocks drilling with Anchor Agent after being installed;
Step (4): professional is chosen the fixed point for placing detection system by datum mark or control point, is guaranteed to same prison Survey section radio positioner measurement in, be installed rear detector coordinates every time and absolute altitude be consistent, avoid due to It is influenced caused by the factors such as construction, bottom distension;
Step (5): detection system is opened, obtains the initial coordinate of radio positioner first;Then tunnel excavation and after In continuous work progress, according to detection requirement, every driving certain distance acquires the coordinate of a radio positioner, to be calculated The displacement of each radio positioner position country rock.
The beneficial effects of the present invention are:
1. monitoring system is installed before excavation, can forward probe surrouding rock deformation, to excavating and operation overall process is supervised It surveys;
2. the available surrounding rock displacement of each locator is three-dimensional;
3. radio positioner can make particular feedback to the wireless signal received, there is absolute identification;
4. monitoring system, which can be not only used for construction site, can be used for laboratory again.
Detailed description of the invention
It, below will be to the present invention or the prior art in order to illustrate more clearly of the present invention or technical solution in the prior art Attached drawing needed in description is introduced.
Fig. 1 is the longitudinal profile that the present invention installs and uses in tunnel;
Fig. 2 is the cross-sectional view that the present invention installs and uses in tunnel;
Fig. 3 is A point detail drawing in Fig. 1;
Fig. 4 is that country rock excavation deformation overall process monitors system three-dimensional localization schematic diagram.
In figure: 1- radio positioner, 2- pedestal, 3- feeler arm, 4- signal projector, 5- signal receiver, 6- connection, 7- host, 8- tripod, 9- drilling, 10- Anchor Agent, 11- excavation face, 12- country rock.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings of the specification.
As shown in Figure 1, country rock excavation deformation overall process monitors system, it is characterised in that: including radio positioner 1 and detection System.
The radio positioner 1 is the cylindrical elements for being equipped with microcircuit, and with battery.
The microcircuit has single number, can make particular feedback to the wireless signal that detection system is launched, Different radio locator 1 is distinguished accordingly, and there is absolute identification.
The detection system includes: pedestal 2, signal projector 4, signal receiver 5, feeler arm 3, connection 6 and master Machine 7.
The pedestal 2 is adjustable flat bed, for signal projector 4, feeler arm 3 and signal receiver 5 to be fixed on On tripod 8 and leveled.
The signal projector 4 is mounted in pedestal 2, positioned at the point of intersection of three feeler arms 3, capable of emitting wireless communication Number.
The feeler arm 3 is mounted on pedestal 2, scalable, fold, three feeler arms 3 fully open after in two-by-two just Friendship state.
The signal receiver 5 is fixed on feeler arm 3, by elongation feeler arm 3 increase three signal receivers 5 it Between distance.Signal receiver 5 can receive the signal of the specific frequency of the feedback of radio positioner 1, the three groups of data received Host 7 is inputted by connection 6 to be handled.
The host 7 has control, calculating and display function, can control signal projector 4 and signal receiver 5, and Analytical calculation is carried out to the three groups of wireless signals received using three-point fix principle, is thus accurately positioned each radio positioner 1 three-dimensional coordinate, and calculated result is presented over the display.Host 7 matches charged, provides electric power for detection system.
The adjustable height of the tripod 8, guarantees in the measurement to same monitoring section radio positioner 1, every time The coordinate and absolute altitude for being installed rear base 2 are consistent.
Application method of the invention, comprising the following steps:
Step (1): 1 quantity of radio positioner and position needed for being calculated according to detection requirement and 11 size of tunnel excavation face;
Step (2): it is drilled according to step (1) calculated result in designated position and radio positioner 1, difference drilling 9 is installed Between plane where after radio positioner 1 is installed at same excavation face 11 it is parallel with excavation face 11;
Step (3): radio positioner 1 is blocked after being installed with 10 pairs of Anchor Agent drillings 9;
Step (4): professional is chosen the fixed point for placing detection system by datum mark or control point, is guaranteed to same prison It surveys in the measurement of section radio positioner 1, is installed rear 2 coordinate of detection system pedestal every time and absolute altitude is consistent, Avoid the influence as caused by the factors such as construction, bottom distension;
Step (5): detection system is opened, obtains the initial coordinate of radio positioner 1 first;Then tunnel excavation and after In continuous work progress, according to detection requirement, every driving certain distance acquires the coordinate of a radio positioner 1, to calculate To the displacement of each 1 position country rock of radio positioner.

Claims (6)

1. country rock excavation deformation overall process monitors system, it is characterised in that: including radio positioner and detection system, the nothing Line locator is the cylindrical elements for being equipped with microcircuit, and with battery is had, each microcircuit has single number, can Particular feedback is made to the wireless signal that detection system is launched, distinguishes different radio locator accordingly, there is absolute identification; The detection system includes: pedestal, signal projector, signal receiver, feeler arm, connection and host.
2. country rock excavation deformation overall process according to claim 1 monitors system, it is characterized in that pedestal levelling, being used for will Signal projector, feeler arm and signal receiver are fixed on tripod and are leveled.
3. country rock excavation deformation overall process according to claim 1 monitors system, it is characterized in that signal projector is mounted on In pedestal, positioned at the point of intersection of three feeler arms, capable of emitting wireless signal.
4. country rock excavation deformation overall process according to claim 1 monitors system, it is characterized in that feeler arm is mounted on pedestal On, it is scalable, fold, three feeler arms fully open after in pairwise orthogonal state.
5. country rock excavation deformation overall process according to claim 1 monitors system, it is characterized in that signal receiver is fixed on On feeler arm, the distance between three signal receivers are increased by elongation feeler arm, signal receiver can receive wireless location The signal of the specific frequency of device feedback, the three groups of data received input host by connection and are handled.
6. country rock excavation deformation overall process according to claim 1 monitors system, it is characterized in that host has control, calculates And display function, it can control signal projector and signal receiver, and wireless to three groups received using three-point fix principle Signal carries out analytical calculation, is thus accurately positioned the three-dimensional coordinate of each radio positioner, and calculated result is presented on display On device, host matches charged, provides electric power for detection system.
CN201721474117.9U 2017-11-08 2017-11-08 Country rock excavation deformation overall process monitors system Active CN208333367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721474117.9U CN208333367U (en) 2017-11-08 2017-11-08 Country rock excavation deformation overall process monitors system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721474117.9U CN208333367U (en) 2017-11-08 2017-11-08 Country rock excavation deformation overall process monitors system

Publications (1)

Publication Number Publication Date
CN208333367U true CN208333367U (en) 2019-01-04

Family

ID=64787785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721474117.9U Active CN208333367U (en) 2017-11-08 2017-11-08 Country rock excavation deformation overall process monitors system

Country Status (1)

Country Link
CN (1) CN208333367U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107702638A (en) * 2017-11-08 2018-02-16 山东科技大学 Country rock excavation deformation overall process monitoring system and application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107702638A (en) * 2017-11-08 2018-02-16 山东科技大学 Country rock excavation deformation overall process monitoring system and application method
CN107702638B (en) * 2017-11-08 2024-05-07 山东科技大学 Surrounding rock excavation deformation overall process monitoring system and application method

Similar Documents

Publication Publication Date Title
Li et al. An overview of ahead geological prospecting in tunneling
Jiang et al. Observe the temporal evolution of deep tunnel's 3D deformation by 3D laser scanning in the Jinchuan No. 2 Mine
CN104141483B (en) Digital drilling control method and system for open-pit deep hole blasting
CN104330838B (en) Method applied to fine detection of sudden water burst channel in underground engineering and evaluation of grouting and plugging effects of sudden water burst channel
CN103293560B (en) A kind of method of testing adopting triple stress court
CN108930539A (en) A method of it is controlled based on BIM Tunnel Overbreak & Underbreak
CN102213773B (en) Roadway multi-azimuth advance detection method
CN103389525B (en) The forecasting procedure of tunnel geology and system
CN107131828B (en) Special-shaped tunnel excavation measurement method
CN103389523B (en) The forecast of tunnel geology and the method and system of construction
CN110221341A (en) A kind of constructing tunnel unfavorable geology advanced prediction method
CN110221340A (en) A kind of set of tunneling construction method for forecasting advanced geology
CN107861159A (en) Double Electric Dipole ground well transient electromagnetic detecting methods
WO2021227236A1 (en) Multi-wavefield seismic detection method and system employing construction noise of shield tunneling machine
CN111119901B (en) Method for controlling settlement of existing structure
CN107884834A (en) Homologous more transient electromagnetic detecting methods
CN103399356A (en) Forecasting method and system for tunnel geology
CN107702638A (en) Country rock excavation deformation overall process monitoring system and application method
CN109238161A (en) A kind of observation device and observation method of tunnel surface absolute convergence amount
CN208333367U (en) Country rock excavation deformation overall process monitors system
CN108680965A (en) One kind being suitable for the quick method of prospecting of the shallow area of coverage of Gobi deserf
CN103389527A (en) Method and system for forecasting tunnel geology
CN101339087A (en) Rapid detector system for water stopping curtain seepage channel and detection method
CN110455171A (en) A kind of moveable measurement analog simulation roadway surrounding rock wall surface deformation monitoring method
CN103901503A (en) Comprehensive detection method for front unfavorable geologic bodies in mine underground roadway tunneling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant