CN208331435U - A kind of plumbing installation - Google Patents

A kind of plumbing installation Download PDF

Info

Publication number
CN208331435U
CN208331435U CN201820782662.2U CN201820782662U CN208331435U CN 208331435 U CN208331435 U CN 208331435U CN 201820782662 U CN201820782662 U CN 201820782662U CN 208331435 U CN208331435 U CN 208331435U
Authority
CN
China
Prior art keywords
pipeline
track
loop wheel
wheel machine
plumbing installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820782662.2U
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820782662.2U priority Critical patent/CN208331435U/en
Application granted granted Critical
Publication of CN208331435U publication Critical patent/CN208331435U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of plumbing installation, the track including being set to conduit upper, track are equipped with the delivery platform of conveying pipeline to be installed, pier body and loop wheel machine.The utility model further includes a kind of pipe installation method.The utility model one side structure is simple, installs time saving and energy saving, save the cost;On the other hand, installation period can be greatly shortened.

Description

A kind of plumbing installation
Technical field
The utility model relates to pipe installation technology field, especially a kind of plumbing installation.
Background technique
Existing aerial pipes generally use following manner and are installed: first placing each pier body according to a fixed spacing It is good, then each pipeline is placed in by target position by loop wheel machine, it is overlapped.In this way, just being needed if loop wheel machine is set on ground Higher loop wheel machine is wanted to lift pipeline, it is higher to the structural requirement of loop wheel machine.
In addition, existing bridge formation mode is that lower nose girder is removed to Bridge Erector using Bridge Erector, beam car is in place, along Beam to be installed is delivered to Bridge Erector lifting region by the track on mounting rail, and Bridge Erector send beam to be installed to adjacent two piers body Between, that is, complete installation;Bridge Erector is moved forward again, the sliding part of Bridge Erector along lower nose girder move forwards to next pier body across Between it is fixed, then Bridge Erector by this across lower nose girder be moved rearwardly into again it is next across, beam car is continued to move along, frame Bridge machine by the beam to be installed on beam car lift to where Bridge Erector across, so repeat before the step of, complete entire bridge The overlap joint of beam.However, can have the disadvantage in that (1) can only be first by pier body if installed using the Bridge Erector for aerial pipes It all installs, then carries out pipeline transportation and installation, cannot carry out simultaneously, so as to cause installation, the device is complicated, and installation period is permanent, And increase manpower and material resources cost;(2) it since Bridge Erector is moved along lower nose girder, needs first to be moved to along lower nose girder every time Pier body across, then by lower nose girder be moved to it is next beam to be installed could be lifted across because the track on mounting rail only Can be mobile for beam car, it must just increase another shipping platform, it is mobile for Bridge Erector, the set-up time is not only wasted, also makes to tie Structure complicates, and greatly improves cost;(3) Bridge Erector self weight is larger, will increase the burden of pier body.
Utility model content
It is a kind of time saving and energy saving to provide the purpose of the utility model is to overcome the above-mentioned insufficient of the prior art, and structure is simple, The short plumbing installation of installation period.
The technical solution of the utility model is:
A kind of plumbing installation, the top of the pipeline are equipped with track, and track is equipped with conveying pipeline to be installed, pier body And the delivery platform of loop wheel machine.
Above scheme has the advantage that track is set to the top of pipeline by (1), makes pipe to be installed by delivery platform Road, pier body and loop wheel machine can move in orbit, in this way, the pier body and pipeline to be installed of supporting pipeline can all pass through delivery platform It is conveyed and is installed, that is, be not necessarily to first all set up pier body, then pipe laying, the utility model can be installed simultaneously, It is not only time saving and energy saving, structure is also simplified, more equipment is not necessarily to, delivery platform and loop wheel machine is only needed to can be completed.(2) it hangs Machine also can be moved to any position by shipping platform, and pipeline or the pier body to be installed in corresponding region is lifted by crane and pacified Dress, and no setting is required other shipping platform, can carry out on the track of pipeline, be not only simple in structure, low in cost, moreover it is possible to Accelerate erection schedule.(3) for the corresponding Bridge Erector of loop wheel machine, lighter in weight can orbit, and pass through boom energy It is enough that pipeline to be installed is hung to next pier body across, without next across as in the prior art first moving to Bridge Erector, then lift Pipeline, effectively save time.
It can be said that the application track is set on pipeline, and pipeline to be installed, pier body just can be achieved at the same time by shipping platform With the movement and installation of loop wheel machine, this is that those skilled in the art are not thinkable.
The pipeline of the utility model can be vacuum pipe, long-distance sand transport pipeline or fuel gas transportation pipeline etc..This reality It can be the trolley on track with novel shipping platform, the driving wheel of trolley passes through motor control;Shipping platform can also To be direct setting wheel body or be slide block structure, can directly slide in orbit.Pipeline, pier body and loop wheel machine institute to be installed The shipping platform structure used may be the same or different.Such as pipeline to be installed, pier body use small vehicle-mounted running;Loop wheel machine is straight It connects using wheel body movement, wheel body can be directly arranged in the bottom of loop wheel machine, or set in orbit.It can be said that the utility model is not right The structure of shipping platform is specifically limited.
Further, the track is fixed on the two sides of pipeline.Track can directly be connect with pipeline, can also pass through connecting plate It is connect with pipeline.It is connected by connecting plate, the stress surface between track and pipeline can be increased, in particular for relatively thin tube wall, To reduce track to the pressure of pipeline.
Further, multiple reinforcing ribs are equipped between the track and pipeline.Reinforcing rib plays raising track and connect with pipeline The effect of intensity.Due to the structure for needing carrying pipeline, loop wheel machine, this weight of pier body big on track, the utility model is preferred Will be densely arranged between each reinforcing rib, reduce the spacing between reinforcing rib, to improve the support force of track.
Further, the loop wheel machine is equipped with the hole that pipeline to be installed can be made to pass through.Hole can be convenient for pipeline to be installed It is passed through with pier body, when such loop wheel machine slings pipeline or pier body, is able to carry out and moves horizontally, with regard to without making boom carry out other angles Movement, greatly reduce the load of boom, and accelerate erection schedule.
Further, the boom of the loop wheel machine is equipped with multiple moveable suspension hooks, and the top of pipeline is equipped with mutually fits with suspension hook The lifting lug matched.
Further, the suspension hook passes through its movement of motor control.
Further, the track is equipped with for offsetting the gap expanded with heat and contract with cold.The pipeline of some materials can be by environment temperature The variation generation of degree is expanded with heat and contract with cold, and therefore, it is necessary to which expansion joint is arranged between adjacent channel, expansion joint can change and phase with pipeline It should change, so that it is guaranteed that pipeline is completely embedded.If the track on pipeline links into an integrated entity or closely connects, when heat occurs for pipeline When swollen shrinkage, track can be deformed, and delivery platform cannot operate normally.Therefore gap, energy is arranged in the utility model in orbit Enough there is the leeway expanded with heat and contract with cold.
A kind of pipe installation method, comprising the following steps: by pipeline to be installed by the delivery platform on track, be delivered to The lifting region of loop wheel machine, loop wheel machine drives pipeline to be installed mobile to target direction, and after reaching installation site, loop wheel machine is by pipe to be installed Road is put down, and is attached with pipe laying.
Further, pier body to be installed is delivered to the lifting region of loop wheel machine by the delivery platform on track, loop wheel machine drives Pier body to be installed is mobile to target direction, and after reaching installation site, loop wheel machine puts pier body to be installed to pier base.
Further, after the installation for completing pipeline or pier body, loop wheel machine continues to move forward along track, shipping platform conveying it is next to Pipe laying or pier body are to lifting region.
The utility model has the beneficial effects that one side structure is simple, time saving and energy saving, save the cost is installed;On the other hand, energy Enough greatly shorten installation period.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment 1;
Fig. 2 is the side view of pipeline and loop wheel machine in embodiment illustrated in fig. 11;
Fig. 3 is the portion the A structure enlargement diagram of embodiment illustrated in fig. 21.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.
Embodiment 1
As described in Fig. 1 ~ Fig. 3: a kind of plumbing installation, the top of pipeline 1 are equipped with track 2, track 2 be equipped with conveying to The delivery platform of pipe laying 11, pier body 3 and loop wheel machine 4.
Specifically, track 2 is fixed on the top two sides of pipeline 1, can be welding, is spirally connected.Between track 2 and pipeline 1 Equipped with reinforcing rib 5, dense arrangement between adjacent said rib 5, to improve the support force of track 2.Shipping platform is set on track 2, Including the first shipping platform 6 and the second shipping platform 7, the first shipping platform 6 is vehicle structure, for transporting pipeline 11 to be installed Or pier body 3, including driving wheel 61 and driven wheel, wherein driving wheel is driven by motor.Second shipping platform 7 is roller structure, and It arranges between adjacent rollers more intensive, driving wheel 71 is driven by motor 72, the movement for loop wheel machine.
The loop wheel machine 4 of the present embodiment is tower crane structure.Loop wheel machine 4 is equipped with the hole 41 that pipeline to be installed can be made to pass through.Hole 41 size is greater than the outer diameter of pipeline to be installed and pier body.
The boom 42 of loop wheel machine 4 is equipped with multiple moveable suspension hooks 43, and the top of pier body 3 and pipeline to be installed is equipped with and hangs The compatible lifting lug 8 of hook.Suspension hook 43 passes through its movement of motor control.Since motor control suspension hook has been mature technology, herein not It repeats again.Part rope item at the top of loop wheel machine is connect with boom, and another part rope item 44 is connected and fixed with pier body 3, to stablize loop wheel machine, Shaking will not be generated.
It is equipped between the track 2 of adjacent channel for offsetting the gap expanded with heat and contract with cold.The cross sectional shape of pipeline is circle.
A kind of pipe installation method, comprising the following steps:
(1) pipeline 11 to be installed is delivered to the lifting region of loop wheel machine 4, is hung by the first delivery platform 6 on track 2 The suspension hook 43 of machine 4 is moved under the drive of the motor at the lifting lug 8 of pipeline 11 to be installed, is sling, and pipeline 11 to be installed is worn The hole 41 for crossing loop wheel machine is delivered between adjacent two piers body, that is, completes the installation of the pipeline;
(2) loop wheel machine 4 is moved forward along the second delivery platform 7, to install the pier body 4 for supporting next pipeline, pier to be installed Body is delivered to the lifting region of loop wheel machine 4 by the first delivery platform 6 on track 2, and the suspension hook of loop wheel machine 4 slings pier body, will be by It puts to pier base, the staff at pier base is installed fixation;
(3) above-mentioned pier body after the installation is completed, again place next pipeline by loop wheel machine, so repeats, to complete pier Body and pipeline are staggered installation of.
Embodiment 2
The difference from embodiment 1 is that the first shipping platform and the second shipping platform structure are identical, it is all made of idler wheel knot Structure, idler wheel include driving wheel and driven wheel, and driving wheel is driven by motor.
Other structures are the same as embodiment 1.
Embodiment 3
The difference from embodiment 1 is that loop wheel machine be equipped at least two holes, can be used for across different height pipeline or Pier body.
Other structures are the same as embodiment 1.
Embodiment 4
The difference from embodiment 1 is that the cross sectional shape of pipeline is hexagon.
Other structures are the same as embodiment 1.
Embodiment 5
The difference from embodiment 1 is that track is fixed on the two sides of pipeline by connecting plate.
Other structures are the same as embodiment 1.
Embodiment 6
The difference from embodiment 1 is that the pipeline is vacuum pipe, can be open to traffic in vacuum pipe.
Other structures are the same as embodiment 1.
Obviously, it is practical without departing from this can to carry out various modification and variations to the utility model by those skilled in the art Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and Within the scope of its equivalent technology, then the utility model also includes these modifications and variations.

Claims (7)

1. a kind of plumbing installation, which is characterized in that the top of pipeline is equipped with track, and track, which is equipped with, conveys pipe to be installed The delivery platform in road, pier body and loop wheel machine.
2. plumbing installation according to claim 1, which is characterized in that the track is fixed on the two sides of pipeline.
3. plumbing installation according to claim 1, which is characterized in that be equipped with multiple add between the track and pipeline Strengthening tendons.
4. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the loop wheel machine, which is equipped with, can make wait pacify The hole that tubulature road passes through.
5. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the boom of the loop wheel machine is equipped with more The top of a moveable suspension hook, pipeline is equipped with lifting lug compatible with suspension hook.
6. plumbing installation according to claim 5, which is characterized in that the suspension hook passes through its movement of motor control.
7. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the track is equipped with for offsetting The gap expanded with heat and contract with cold.
CN201820782662.2U 2018-05-24 2018-05-24 A kind of plumbing installation Active CN208331435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820782662.2U CN208331435U (en) 2018-05-24 2018-05-24 A kind of plumbing installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820782662.2U CN208331435U (en) 2018-05-24 2018-05-24 A kind of plumbing installation

Publications (1)

Publication Number Publication Date
CN208331435U true CN208331435U (en) 2019-01-04

Family

ID=64775231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820782662.2U Active CN208331435U (en) 2018-05-24 2018-05-24 A kind of plumbing installation

Country Status (1)

Country Link
CN (1) CN208331435U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561626A (en) * 2018-05-24 2018-09-21 张跃 A kind of plumbing installation and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561626A (en) * 2018-05-24 2018-09-21 张跃 A kind of plumbing installation and method
CN108561626B (en) * 2018-05-24 2023-11-28 张跃 Pipeline installation device and method

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN207774633U (en) Prefabricated piping lane fast hoisting construction system
CN102220811B (en) Truss arching-erecting splicing method of extra-large-pan steel pipe
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN104612061A (en) Suspended and open type novel hanging basket device and construction method thereof
CN105398953A (en) Horizontal conveying construction method for underground pipe gallery and pipeline
CN105672638B (en) A kind of scaffold and rack installation method of band support sliding
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN104499417A (en) Gravity self-balance type emergency rehabilitation rapid self-erection bridge
CN102433844B (en) Method for erecting prefabricated beam of bridge deck
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN110510527A (en) A kind of installation system and its construction method of high slope variable cross-section side slope prefabricated section
CN104032967A (en) Hoisting construction method for prefabricated assembly-type frame structure members
CN208331435U (en) A kind of plumbing installation
CN108561626A (en) A kind of plumbing installation and method
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN101774092A (en) Large steel tube technology and equipment
CN105019364A (en) Method for slipping and vertically swinging steel tower
CN107313356B (en) A kind of fortune beam method that double-decker bridge is built
CN205421022U (en) Suspension bridge stiffening beam handing equipment that slides
CN110468734A (en) Steel lagging jack pushing tow system and steel lagging jack push construction method
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN205526359U (en) Prefab conveyer
CN108221512A (en) Adjustable track laying machine

Legal Events

Date Code Title Description
GR01 Patent grant