CN208331435U - A kind of plumbing installation - Google Patents
A kind of plumbing installation Download PDFInfo
- Publication number
- CN208331435U CN208331435U CN201820782662.2U CN201820782662U CN208331435U CN 208331435 U CN208331435 U CN 208331435U CN 201820782662 U CN201820782662 U CN 201820782662U CN 208331435 U CN208331435 U CN 208331435U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- track
- loop wheel
- wheel machine
- plumbing installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of plumbing installation, the track including being set to conduit upper, track are equipped with the delivery platform of conveying pipeline to be installed, pier body and loop wheel machine.The utility model further includes a kind of pipe installation method.The utility model one side structure is simple, installs time saving and energy saving, save the cost;On the other hand, installation period can be greatly shortened.
Description
Technical field
The utility model relates to pipe installation technology field, especially a kind of plumbing installation.
Background technique
Existing aerial pipes generally use following manner and are installed: first placing each pier body according to a fixed spacing
It is good, then each pipeline is placed in by target position by loop wheel machine, it is overlapped.In this way, just being needed if loop wheel machine is set on ground
Higher loop wheel machine is wanted to lift pipeline, it is higher to the structural requirement of loop wheel machine.
In addition, existing bridge formation mode is that lower nose girder is removed to Bridge Erector using Bridge Erector, beam car is in place, along
Beam to be installed is delivered to Bridge Erector lifting region by the track on mounting rail, and Bridge Erector send beam to be installed to adjacent two piers body
Between, that is, complete installation;Bridge Erector is moved forward again, the sliding part of Bridge Erector along lower nose girder move forwards to next pier body across
Between it is fixed, then Bridge Erector by this across lower nose girder be moved rearwardly into again it is next across, beam car is continued to move along, frame
Bridge machine by the beam to be installed on beam car lift to where Bridge Erector across, so repeat before the step of, complete entire bridge
The overlap joint of beam.However, can have the disadvantage in that (1) can only be first by pier body if installed using the Bridge Erector for aerial pipes
It all installs, then carries out pipeline transportation and installation, cannot carry out simultaneously, so as to cause installation, the device is complicated, and installation period is permanent,
And increase manpower and material resources cost;(2) it since Bridge Erector is moved along lower nose girder, needs first to be moved to along lower nose girder every time
Pier body across, then by lower nose girder be moved to it is next beam to be installed could be lifted across because the track on mounting rail only
Can be mobile for beam car, it must just increase another shipping platform, it is mobile for Bridge Erector, the set-up time is not only wasted, also makes to tie
Structure complicates, and greatly improves cost;(3) Bridge Erector self weight is larger, will increase the burden of pier body.
Utility model content
It is a kind of time saving and energy saving to provide the purpose of the utility model is to overcome the above-mentioned insufficient of the prior art, and structure is simple,
The short plumbing installation of installation period.
The technical solution of the utility model is:
A kind of plumbing installation, the top of the pipeline are equipped with track, and track is equipped with conveying pipeline to be installed, pier body
And the delivery platform of loop wheel machine.
Above scheme has the advantage that track is set to the top of pipeline by (1), makes pipe to be installed by delivery platform
Road, pier body and loop wheel machine can move in orbit, in this way, the pier body and pipeline to be installed of supporting pipeline can all pass through delivery platform
It is conveyed and is installed, that is, be not necessarily to first all set up pier body, then pipe laying, the utility model can be installed simultaneously,
It is not only time saving and energy saving, structure is also simplified, more equipment is not necessarily to, delivery platform and loop wheel machine is only needed to can be completed.(2) it hangs
Machine also can be moved to any position by shipping platform, and pipeline or the pier body to be installed in corresponding region is lifted by crane and pacified
Dress, and no setting is required other shipping platform, can carry out on the track of pipeline, be not only simple in structure, low in cost, moreover it is possible to
Accelerate erection schedule.(3) for the corresponding Bridge Erector of loop wheel machine, lighter in weight can orbit, and pass through boom energy
It is enough that pipeline to be installed is hung to next pier body across, without next across as in the prior art first moving to Bridge Erector, then lift
Pipeline, effectively save time.
It can be said that the application track is set on pipeline, and pipeline to be installed, pier body just can be achieved at the same time by shipping platform
With the movement and installation of loop wheel machine, this is that those skilled in the art are not thinkable.
The pipeline of the utility model can be vacuum pipe, long-distance sand transport pipeline or fuel gas transportation pipeline etc..This reality
It can be the trolley on track with novel shipping platform, the driving wheel of trolley passes through motor control;Shipping platform can also
To be direct setting wheel body or be slide block structure, can directly slide in orbit.Pipeline, pier body and loop wheel machine institute to be installed
The shipping platform structure used may be the same or different.Such as pipeline to be installed, pier body use small vehicle-mounted running;Loop wheel machine is straight
It connects using wheel body movement, wheel body can be directly arranged in the bottom of loop wheel machine, or set in orbit.It can be said that the utility model is not right
The structure of shipping platform is specifically limited.
Further, the track is fixed on the two sides of pipeline.Track can directly be connect with pipeline, can also pass through connecting plate
It is connect with pipeline.It is connected by connecting plate, the stress surface between track and pipeline can be increased, in particular for relatively thin tube wall,
To reduce track to the pressure of pipeline.
Further, multiple reinforcing ribs are equipped between the track and pipeline.Reinforcing rib plays raising track and connect with pipeline
The effect of intensity.Due to the structure for needing carrying pipeline, loop wheel machine, this weight of pier body big on track, the utility model is preferred
Will be densely arranged between each reinforcing rib, reduce the spacing between reinforcing rib, to improve the support force of track.
Further, the loop wheel machine is equipped with the hole that pipeline to be installed can be made to pass through.Hole can be convenient for pipeline to be installed
It is passed through with pier body, when such loop wheel machine slings pipeline or pier body, is able to carry out and moves horizontally, with regard to without making boom carry out other angles
Movement, greatly reduce the load of boom, and accelerate erection schedule.
Further, the boom of the loop wheel machine is equipped with multiple moveable suspension hooks, and the top of pipeline is equipped with mutually fits with suspension hook
The lifting lug matched.
Further, the suspension hook passes through its movement of motor control.
Further, the track is equipped with for offsetting the gap expanded with heat and contract with cold.The pipeline of some materials can be by environment temperature
The variation generation of degree is expanded with heat and contract with cold, and therefore, it is necessary to which expansion joint is arranged between adjacent channel, expansion joint can change and phase with pipeline
It should change, so that it is guaranteed that pipeline is completely embedded.If the track on pipeline links into an integrated entity or closely connects, when heat occurs for pipeline
When swollen shrinkage, track can be deformed, and delivery platform cannot operate normally.Therefore gap, energy is arranged in the utility model in orbit
Enough there is the leeway expanded with heat and contract with cold.
A kind of pipe installation method, comprising the following steps: by pipeline to be installed by the delivery platform on track, be delivered to
The lifting region of loop wheel machine, loop wheel machine drives pipeline to be installed mobile to target direction, and after reaching installation site, loop wheel machine is by pipe to be installed
Road is put down, and is attached with pipe laying.
Further, pier body to be installed is delivered to the lifting region of loop wheel machine by the delivery platform on track, loop wheel machine drives
Pier body to be installed is mobile to target direction, and after reaching installation site, loop wheel machine puts pier body to be installed to pier base.
Further, after the installation for completing pipeline or pier body, loop wheel machine continues to move forward along track, shipping platform conveying it is next to
Pipe laying or pier body are to lifting region.
The utility model has the beneficial effects that one side structure is simple, time saving and energy saving, save the cost is installed;On the other hand, energy
Enough greatly shorten installation period.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment 1;
Fig. 2 is the side view of pipeline and loop wheel machine in embodiment illustrated in fig. 11;
Fig. 3 is the portion the A structure enlargement diagram of embodiment illustrated in fig. 21.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.
Embodiment 1
As described in Fig. 1 ~ Fig. 3: a kind of plumbing installation, the top of pipeline 1 are equipped with track 2, track 2 be equipped with conveying to
The delivery platform of pipe laying 11, pier body 3 and loop wheel machine 4.
Specifically, track 2 is fixed on the top two sides of pipeline 1, can be welding, is spirally connected.Between track 2 and pipeline 1
Equipped with reinforcing rib 5, dense arrangement between adjacent said rib 5, to improve the support force of track 2.Shipping platform is set on track 2,
Including the first shipping platform 6 and the second shipping platform 7, the first shipping platform 6 is vehicle structure, for transporting pipeline 11 to be installed
Or pier body 3, including driving wheel 61 and driven wheel, wherein driving wheel is driven by motor.Second shipping platform 7 is roller structure, and
It arranges between adjacent rollers more intensive, driving wheel 71 is driven by motor 72, the movement for loop wheel machine.
The loop wheel machine 4 of the present embodiment is tower crane structure.Loop wheel machine 4 is equipped with the hole 41 that pipeline to be installed can be made to pass through.Hole
41 size is greater than the outer diameter of pipeline to be installed and pier body.
The boom 42 of loop wheel machine 4 is equipped with multiple moveable suspension hooks 43, and the top of pier body 3 and pipeline to be installed is equipped with and hangs
The compatible lifting lug 8 of hook.Suspension hook 43 passes through its movement of motor control.Since motor control suspension hook has been mature technology, herein not
It repeats again.Part rope item at the top of loop wheel machine is connect with boom, and another part rope item 44 is connected and fixed with pier body 3, to stablize loop wheel machine,
Shaking will not be generated.
It is equipped between the track 2 of adjacent channel for offsetting the gap expanded with heat and contract with cold.The cross sectional shape of pipeline is circle.
A kind of pipe installation method, comprising the following steps:
(1) pipeline 11 to be installed is delivered to the lifting region of loop wheel machine 4, is hung by the first delivery platform 6 on track 2
The suspension hook 43 of machine 4 is moved under the drive of the motor at the lifting lug 8 of pipeline 11 to be installed, is sling, and pipeline 11 to be installed is worn
The hole 41 for crossing loop wheel machine is delivered between adjacent two piers body, that is, completes the installation of the pipeline;
(2) loop wheel machine 4 is moved forward along the second delivery platform 7, to install the pier body 4 for supporting next pipeline, pier to be installed
Body is delivered to the lifting region of loop wheel machine 4 by the first delivery platform 6 on track 2, and the suspension hook of loop wheel machine 4 slings pier body, will be by
It puts to pier base, the staff at pier base is installed fixation;
(3) above-mentioned pier body after the installation is completed, again place next pipeline by loop wheel machine, so repeats, to complete pier
Body and pipeline are staggered installation of.
Embodiment 2
The difference from embodiment 1 is that the first shipping platform and the second shipping platform structure are identical, it is all made of idler wheel knot
Structure, idler wheel include driving wheel and driven wheel, and driving wheel is driven by motor.
Other structures are the same as embodiment 1.
Embodiment 3
The difference from embodiment 1 is that loop wheel machine be equipped at least two holes, can be used for across different height pipeline or
Pier body.
Other structures are the same as embodiment 1.
Embodiment 4
The difference from embodiment 1 is that the cross sectional shape of pipeline is hexagon.
Other structures are the same as embodiment 1.
Embodiment 5
The difference from embodiment 1 is that track is fixed on the two sides of pipeline by connecting plate.
Other structures are the same as embodiment 1.
Embodiment 6
The difference from embodiment 1 is that the pipeline is vacuum pipe, can be open to traffic in vacuum pipe.
Other structures are the same as embodiment 1.
Obviously, it is practical without departing from this can to carry out various modification and variations to the utility model by those skilled in the art
Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and
Within the scope of its equivalent technology, then the utility model also includes these modifications and variations.
Claims (7)
1. a kind of plumbing installation, which is characterized in that the top of pipeline is equipped with track, and track, which is equipped with, conveys pipe to be installed
The delivery platform in road, pier body and loop wheel machine.
2. plumbing installation according to claim 1, which is characterized in that the track is fixed on the two sides of pipeline.
3. plumbing installation according to claim 1, which is characterized in that be equipped with multiple add between the track and pipeline
Strengthening tendons.
4. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the loop wheel machine, which is equipped with, can make wait pacify
The hole that tubulature road passes through.
5. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the boom of the loop wheel machine is equipped with more
The top of a moveable suspension hook, pipeline is equipped with lifting lug compatible with suspension hook.
6. plumbing installation according to claim 5, which is characterized in that the suspension hook passes through its movement of motor control.
7. plumbing installation according to claim 1 or 2 or 3, which is characterized in that the track is equipped with for offsetting
The gap expanded with heat and contract with cold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820782662.2U CN208331435U (en) | 2018-05-24 | 2018-05-24 | A kind of plumbing installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820782662.2U CN208331435U (en) | 2018-05-24 | 2018-05-24 | A kind of plumbing installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208331435U true CN208331435U (en) | 2019-01-04 |
Family
ID=64775231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820782662.2U Active CN208331435U (en) | 2018-05-24 | 2018-05-24 | A kind of plumbing installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208331435U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108561626A (en) * | 2018-05-24 | 2018-09-21 | 张跃 | A kind of plumbing installation and method |
-
2018
- 2018-05-24 CN CN201820782662.2U patent/CN208331435U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108561626A (en) * | 2018-05-24 | 2018-09-21 | 张跃 | A kind of plumbing installation and method |
CN108561626B (en) * | 2018-05-24 | 2023-11-28 | 张跃 | Pipeline installation device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202936736U (en) | Cable-stayed bridge composite beam construction bridge floor crane | |
CN207774633U (en) | Prefabricated piping lane fast hoisting construction system | |
CN102220811B (en) | Truss arching-erecting splicing method of extra-large-pan steel pipe | |
CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
CN104612061A (en) | Suspended and open type novel hanging basket device and construction method thereof | |
CN105398953A (en) | Horizontal conveying construction method for underground pipe gallery and pipeline | |
CN105672638B (en) | A kind of scaffold and rack installation method of band support sliding | |
CN103882812A (en) | Construction method for midspan main beams of cable-stayed bridge | |
CN104499417A (en) | Gravity self-balance type emergency rehabilitation rapid self-erection bridge | |
CN102433844B (en) | Method for erecting prefabricated beam of bridge deck | |
CN104060835A (en) | Lifting-sliding construction method for single plane truss | |
CN110510527A (en) | A kind of installation system and its construction method of high slope variable cross-section side slope prefabricated section | |
CN104032967A (en) | Hoisting construction method for prefabricated assembly-type frame structure members | |
CN208331435U (en) | A kind of plumbing installation | |
CN108561626A (en) | A kind of plumbing installation and method | |
CN105256728A (en) | Cable-stayed bridge warren steel truss cantilever erection method | |
CN101774092A (en) | Large steel tube technology and equipment | |
CN105019364A (en) | Method for slipping and vertically swinging steel tower | |
CN107313356B (en) | A kind of fortune beam method that double-decker bridge is built | |
CN205421022U (en) | Suspension bridge stiffening beam handing equipment that slides | |
CN110468734A (en) | Steel lagging jack pushing tow system and steel lagging jack push construction method | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN104895336A (en) | Method for installing steel beam of stiff hybrid structure in place | |
CN205526359U (en) | Prefab conveyer | |
CN108221512A (en) | Adjustable track laying machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |