CN208329810U - A kind of multicomponent high intensity single-pipe tower - Google Patents

A kind of multicomponent high intensity single-pipe tower Download PDF

Info

Publication number
CN208329810U
CN208329810U CN201820603713.0U CN201820603713U CN208329810U CN 208329810 U CN208329810 U CN 208329810U CN 201820603713 U CN201820603713 U CN 201820603713U CN 208329810 U CN208329810 U CN 208329810U
Authority
CN
China
Prior art keywords
tower tube
tower
unit
connector sleeve
high intensity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820603713.0U
Other languages
Chinese (zh)
Inventor
赵月新
王友勇
张路玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Runyuan Decorative Lighting Co Ltd
Original Assignee
Yangzhou Runyuan Decorative Lighting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Runyuan Decorative Lighting Co Ltd filed Critical Yangzhou Runyuan Decorative Lighting Co Ltd
Priority to CN201820603713.0U priority Critical patent/CN208329810U/en
Application granted granted Critical
Publication of CN208329810U publication Critical patent/CN208329810U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a kind of multicomponent high intensity single-pipe towers, including tower tube, the bottom of tower tube is equipped with fixing seat, the top of tower tube is equipped with support platform, the guardrail of support platform is equipped with signal frame, signal frame mounted antennas, the tower tube is formed by multiple tower tube unit spliceds, connector sleeve is equipped between adjacent tower tube unit, the both ends of connector sleeve are equipped with annular link slot, the end of the tower tube unit is extend into annular link slot, the end of connector sleeve is equipped with multiple fixing bolts, the end of fixing bolt extend into annular link slot and connect with tower tube unit, multiple tower tube units can be assembled into whole tower tube with free splicing, tower tube unit convenient transportation and carrying.

Description

A kind of multicomponent high intensity single-pipe tower
Technical field
The utility model relates to communication tower field, especially a kind of multicomponent high intensity single-pipe tower.
Background technique
Single-pipe tower belongs to tower technical field, the workbench including tower body and the connection setting of tower body top.Tower body bottom Tube wall opens up lower door opening, and the tube wall of workbench present position opens up door opening, and antenna holder is fixed on the fence of workbench On, in order to facilitate antenna installation and later maintenance, step ladder, the step ladder one in present tower tube generally can be all installed in tower tube As be all mounted in surface, this step ladder is exposed to the outer corrosion that gets rusty easily, and the later period, there are security risks, for this purpose, some tower tubes On step ladder will be installed in the inside of tower tube, all have when inside step ladder installation that construction space is small, difficult problem of constructing.
Utility model content
Purpose of the utility model is to solve defects of the existing technology, provide a kind of multicomponent high intensity single tube Tower.
To achieve the goals above, the technical solution adopted in the utility model is:
A kind of multicomponent high intensity single-pipe tower, including tower tube, the bottom of tower tube are equipped with fixing seat, and the top of tower tube is equipped with branch Platform is supportted, the guardrail of support platform is equipped with signal frame, and signal frame mounted antennas, the tower tube is by multiple tower tube unit spliceds It forms, connector sleeve is equipped between adjacent tower tube unit, the both ends of connector sleeve are equipped with annular link slot, the end of the tower tube unit Portion is extend into annular link slot, and the end of connector sleeve is equipped with multiple fixing bolts, and the end of fixing bolt extend into annular even It is connect in access slot with tower tube unit.
A kind of above-mentioned multicomponent high intensity single-pipe tower, the inner hollow of the tower tube, installation step ladder on the inner wall of tower tube, The terraced unit of a mating step in each tower tube unit, the inner wall of connector sleeve are equipped with suspension mechanism corresponding with step ladder unit.
A kind of above-mentioned multicomponent high intensity single-pipe tower, the suspension mechanism include two and are fixed on connector sleeve inner wall Fixed frame, fixed frame are linked up with equipped with arc, and the hanger bracket of the step ladder unit end is suspended on arc hook above and welds.
The bottom of a kind of above-mentioned multicomponent high intensity single-pipe tower, the tower tube is equipped with portal.
A kind of above-mentioned multicomponent high intensity single-pipe tower, multiple fixing bolts are uniformly arranged in the outside of connector sleeve.
The utility model has the following beneficial effects: the tower tube of the single-pipe tower is formed by multiple tower tube unit spliceds, adjacent tower Connector sleeve is equipped between pipe unit, the both ends of connector sleeve are equipped with annular link slot, and the end of the tower tube unit extend into annular In link slot, the end of connector sleeve is equipped with multiple fixing bolts, and the end of fixing bolt is extend into annular link slot and tower tube Unit connection, multiple tower tube units can be assembled into whole tower tube, tower tube unit convenient transportation and carrying with free splicing;
In addition, installation step is terraced inside tower tube for convenience, step ladder is installed on the inner wall of tower tube, is matched in each tower tube unit The terraced unit of a step is covered, the inner wall of connector sleeve is equipped with suspension mechanism corresponding with step ladder unit, and suspension mechanism includes two solid The fixed frame being scheduled on connector sleeve inner wall, fixed frame are linked up with equipped with arc, and the hanger bracket for walking terraced unit end is suspended on arc It on hook and welds, such structure design mainly facilitates each step ladder unit quickly to be assembled, moreover, it is outstanding to walk terraced unit After extension, it can be linked up with and tentatively fixed by arc before being welded and fixed, be suitble to the completion step ladder in smaller space single in this way The installation of member, it is easy for construction.
Detailed description of the invention
Fig. 1 is the schematic diagram of the utility model;
Fig. 2 is the schematic diagram of the utility model connector sleeve and tower tube unit;
Fig. 3 is the area the A enlarged drawing in Fig. 2.
Specific embodiment
As shown in Figure 1 to Figure 3, the bottom of a kind of multicomponent high intensity single-pipe tower, including tower tube 1, tower tube 1 is equipped with fixing seat 2, the top of tower tube 1 is equipped with support platform 3, and the guardrail of support platform 3 is equipped with signal frame 4,4 mounted antennas 5 of signal frame, tower Pipe 1 is spliced by multiple tower tube units 6, and connector sleeve 7 is equipped between adjacent tower tube unit 6, and the both ends of connector sleeve 7 are equipped with ring Shape link slot 8, the end of tower tube unit 6 are extend into annular link slot 8, and the end of connector sleeve 7 is equipped with multiple fixing bolts 9, The end of fixing bolt 9 extend into annular link slot 8 and connect with tower tube unit 6.
Further, the inner hollow of tower tube 1, installation step ladder on the inner wall of tower tube 1, mating one in each tower tube unit 6 Terraced unit 11 is walked, the inner wall of connector sleeve 7 is equipped with suspension mechanism corresponding with step ladder unit 11.
Suspension mechanism includes two fixed frames 12 being fixed on 7 inner wall of connector sleeve, and fixed frame 12 is linked up with equipped with arc 13, the hanger bracket 14 for walking 11 end of terraced unit is suspended on arc hook 13 and welds.
Further, tower tube is entered in order to facilitate personnel, the bottom of tower tube 1 is equipped with portal 15.
The tower tube 1 of the single-pipe tower is spliced by multiple tower tube units 6, and connector sleeve is equipped between adjacent tower tube unit 6 7, the both ends of connector sleeve 7 are equipped with annular link slot 8, and the end of tower tube unit 6 is extend into annular link slot 8, the end of connector sleeve 7 Portion is equipped with multiple fixing bolts 9, and the end of fixing bolt 9 extend into annular link slot 8 and connect with tower tube unit 6, Duo Geta Pipe unit 6 can be assembled into whole tower tube 1,6 convenient transportation of tower tube unit and carrying with free splicing;
In addition, installing step ladder inside tower tube for convenience, installation step is terraced on the inner wall of tower tube, in each tower tube unit 6 The terraced unit 11 of a mating step, the inner wall of connector sleeve 7 are equipped with suspension mechanism corresponding with step ladder unit 11.Suspension mechanism includes Two fixed frames 12 being fixed on 7 inner wall of connector sleeve, fixed frame 12 are equipped with arc hook 13, walk the outstanding of 11 end of terraced unit Hanger 14 is suspended on arc hook 13 and welds, and such structure design mainly facilitates each step ladder unit 11 to carry out quickly Assembling, moreover, can link up with 13 by arc after the terraced unit 11 of step is hung before being welded and fixed and tentatively fix, it is suitable in this way The installation for completing to walk terraced unit in smaller space is closed, it is easy for construction.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only the principles of the present invention, the utility model also has respectively on the premise of not departing from the spirit and scope of the utility model Kind changes and improvements, these changes and improvements are both fallen in the range of claimed invention.The requires of the utility model Protection scope defined by appended claims and its equivalent.

Claims (5)

1. a kind of multicomponent high intensity single-pipe tower, including tower tube, the bottom of tower tube is equipped with fixing seat, and the top of tower tube is equipped with support The guardrail of platform, support platform is equipped with signal frame, signal frame mounted antennas, which is characterized in that the tower tube is by multiple towers Pipe unit is spliced, and connector sleeve is equipped between adjacent tower tube unit, and the both ends of connector sleeve are equipped with annular link slot, the tower The end of pipe unit is extend into annular link slot, and the end of connector sleeve is equipped with multiple fixing bolts, and the end of fixing bolt is stretched Enter and is connect into annular link slot with tower tube unit.
2. a kind of multicomponent high intensity single-pipe tower according to claim 1, which is characterized in that in the inside of the tower tube Sky, installation step ladder on the inner wall of tower tube, the terraced unit of a mating step in each tower tube unit, the inner wall of connector sleeve equipped with and step The corresponding suspension mechanism of terraced unit.
3. a kind of multicomponent high intensity single-pipe tower according to claim 2, which is characterized in that the suspension mechanism includes two A fixed frame being fixed on connector sleeve inner wall, fixed frame are linked up with equipped with arc, and the step ladder unit is suspended on arc hook On.
4. a kind of multicomponent high intensity single-pipe tower according to claim 1, which is characterized in that the bottom of the tower tube is equipped with Portal.
5. a kind of multicomponent high intensity single-pipe tower according to claim 1, which is characterized in that multiple fixing bolts are connecting It uniformly arranges in the outside of set.
CN201820603713.0U 2018-04-25 2018-04-25 A kind of multicomponent high intensity single-pipe tower Expired - Fee Related CN208329810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820603713.0U CN208329810U (en) 2018-04-25 2018-04-25 A kind of multicomponent high intensity single-pipe tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820603713.0U CN208329810U (en) 2018-04-25 2018-04-25 A kind of multicomponent high intensity single-pipe tower

Publications (1)

Publication Number Publication Date
CN208329810U true CN208329810U (en) 2019-01-04

Family

ID=64778385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820603713.0U Expired - Fee Related CN208329810U (en) 2018-04-25 2018-04-25 A kind of multicomponent high intensity single-pipe tower

Country Status (1)

Country Link
CN (1) CN208329810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227801A (en) * 2020-08-24 2021-01-15 国家电网有限公司 Portable insulating crossing structure of 10kV overhead line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227801A (en) * 2020-08-24 2021-01-15 国家电网有限公司 Portable insulating crossing structure of 10kV overhead line
CN112227801B (en) * 2020-08-24 2024-02-06 国家电网有限公司 Portable insulating crossing frame for 10kV overhead line

Similar Documents

Publication Publication Date Title
CN208329810U (en) A kind of multicomponent high intensity single-pipe tower
CN205509403U (en) Cable testing bridge mounting structure
CN201874228U (en) Aloftwork operating platform for wire poles
CN108739574B (en) Copper alloy net equipment method for deep sea rigid frame supporting culture device and culture device thereof
CN111137416A (en) Mounting platform module of MARK III type enclosure system and hoisting rings thereof
CN203066591U (en) Tent
KR101772905B1 (en) A Supporter of a Mile Post and a Street Lamp
CN208850296U (en) Connection component and the greenhouse for using the connection component
CN201040938Y (en) Antenna concealed type iron tower
CN208329811U (en) A kind of high sealing single-pipe tower
CN105442873A (en) Lightweight steel structure awning of gas station
CN212012878U (en) Sectional type combination monitoring rod
CN212802772U (en) High-strength combined type communication 5G tower
CN205296908U (en) Filling station's lightweight steel construction awning
CN208253376U (en) A kind of efficient lamppost tower
CN209384752U (en) A kind of electric pole novel flange structure
CN210490089U (en) Section of thick bamboo section formula transformer substation constructs support
CN209244303U (en) A kind of mating splicing anti-drop net of high level exterior decoration hanging basket
CN114182868B (en) Steel structure frame system and construction method thereof
CN214246549U (en) Fabricated climbing frame for constructional engineering
CN218715609U (en) Overhead transmission line electric power tower
CN217481177U (en) Unit folding portable ladder for installation and maintenance of high formwork automatic detection equipment
CN216693308U (en) Open type light easy-to-dismount high-pole lamp panel
CN208633993U (en) A kind of novel wind power pylon
CN202500379U (en) Conical bowl buckle assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

Termination date: 20210425

CF01 Termination of patent right due to non-payment of annual fee