CN205509403U - Cable testing bridge mounting structure - Google Patents

Cable testing bridge mounting structure Download PDF

Info

Publication number
CN205509403U
CN205509403U CN201620336363.7U CN201620336363U CN205509403U CN 205509403 U CN205509403 U CN 205509403U CN 201620336363 U CN201620336363 U CN 201620336363U CN 205509403 U CN205509403 U CN 205509403U
Authority
CN
China
Prior art keywords
cable
testing bridge
steel tube
cable testing
rectangular steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620336363.7U
Other languages
Chinese (zh)
Inventor
孟晓宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201620336363.7U priority Critical patent/CN205509403U/en
Application granted granted Critical
Publication of CN205509403U publication Critical patent/CN205509403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a cable testing bridge mounting structure belongs to the cable laying field, including the cable testing bridge, the cable testing bridge includes the two opposite side difference fixedly connected with curb plate of cable laying face, cable laying face, still include square steel tube and connecting piece, be equipped with the opening that runs through the pipe wall on square steel tube's pipe wall, the opening link up square steel tube on square steel tube's extending direction, connecting piece one end is passed the opening and is linked to each other with square steel tube, and the other end links to each other with the cable testing bridge, and square steel tube is on a parallel with the cable laying face. This cable testing bridge mounting structure, the installation cable testing bridge need not the input of a large amount of trailing arms and gallows to square steel tube is vertical place alright make that the cable testing bridge is vertical to be installed in the crane span structure corridor, practiced thrift the space, avoided the cable to stack again, the cable has been protected in the ventilation and the heat dissipation of reinforcing cable.

Description

A kind of cable testing bridge mounting structure
Technical field
This utility model belongs to cable laying field, particularly a kind of cable testing bridge mounting structure.
Background technology
Along with the use of various electrified equipment, engineering circuit becomes increasingly complex, and cable testing bridge is as its peace of supporting body of cable Dress construction is also essential.Existing cable crane span structure is based on horizontal positioned, and the China such as Application No. 201410016579.0 is special Profit application, discloses a kind of method for mounting cable bridge, is installed on the steel plate of suspension bracket by the base plate of cable testing bridge, i.e. cable bridge Frame horizontal positioned.Cable bridge horizontal is placed, and multi-cable stacks, and water, dust, chip, pollutant are easy to build up, logical Wind and heat radiation are poor, and energy consumption is big, and breaking out of fire or cable fault probability increase.Many for pipe gallery inside and process pipe, Pipeline length, the place that crane span structure corridor is narrow, the input of a large amount of suspension brackets, make construction, maintenance more difficult.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of cable testing bridge mounting structure, its simple in construction, it is simple to narrow Narrow space mounting crane span structure.
The technical solution adopted in the utility model is: a kind of cable testing bridge mounting structure, including cable testing bridge, and described cable testing bridge Including cable laying face, two opposite side in cable laying face have been respectively fixedly connected with side plate;Also include rectangular steel tube and connector;? The tube wall of rectangular steel tube is provided with the opening running through tube wall, and described opening is through rectangular steel tube on the bearing of trend of rectangular steel tube; Described connector one end is connected through opening with rectangular steel tube, and the other end is connected with cable testing bridge, and rectangular steel tube is parallel to cable Paved surface.
Further, described connector includes top board, lower platen and connecting bolt;Described top board is provided with and runs through top board Unthreaded hole;Described lower platen is provided with screwed hole;Described connecting bolt sequentially passes through unthreaded hole, opening and screwed hole, and top board is positioned at Outside rectangular steel tube, lower platen is positioned at inside rectangular steel tube, and cable testing bridge is held between top board and rectangular steel tube.
Further, at least side at cable bridge rack side board is provided with the flanging extended to side, place, cable laying face;Described flanging It is held between rectangular steel tube and top board.
Further, the lower surface of described top board is provided with impression, and the upper surface of described lower platen is provided with impression.
Further, including spring, described spring one end is fixed on the lower surface of lower platen, and the other end leans the interior of rectangular steel tube Surface.
The beneficial effects of the utility model are: this one cable testing bridge mounting structure, by connector by cable testing bridge and square bar After pipe is assembled into entirety, by square steel pipe welded built-in fitting in crane span structure corridor or steel structure column, just complete cable bridge The installation of frame, it is not necessary to a large amount of trailing arms and the input of suspension bracket, and rectangular steel tube vertically places and cable testing bridge just can be made to be vertically installed at In crane span structure corridor, save space, turn avoid cable and stack, strengthened ventilation and the heat radiation of cable, protect cable.
Accompanying drawing explanation
Fig. 1 is this utility model structure chart.
Fig. 2 is the A direction view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
Fig. 4 is partial enlarged drawing at the C of Fig. 3.
In figure, cable testing bridge 1, cable laying face 100, side plate 110, flanging 120, rectangular steel tube 2, opening 200, upper pressure Plate 3, lower platen 4, connecting bolt 5, spring 6.
Detailed description of the invention
This utility model is described further as follows with embodiment below in conjunction with the accompanying drawings:
A kind of cable testing bridge mounting structure as Figure 1-Figure 4, including cable testing bridge 1, described cable testing bridge 1 includes cable Paved surface 100, two opposite side in cable laying face 100 have been respectively fixedly connected with side plate 110;Also include rectangular steel tube 2 and connector; Being provided with the opening 200 running through tube wall on the tube wall of rectangular steel tube 2, described opening 200 is on the bearing of trend of rectangular steel tube 2 Through rectangular steel tube 2;Described connector one end is connected through opening 200 with rectangular steel tube 2, the other end and cable testing bridge 1 phase Connect, and rectangular steel tube 2 is parallel to cable laying face 100.
The opening 200 of rectangular steel tube 2 is for facilitating the installation of connector, and connector one end passes opening 200, the other end and electricity Cable crane span structure 1 is connected, thus is linked together with rectangular steel tube 2 by cable testing bridge 1.During use, by cable testing bridge 1 with square After steel pipe 2 is assembled into entirety, rectangular steel tube 2 is welded on the built-in fitting in crane span structure corridor or steel structure column, just completes The installation of cable testing bridge 1, it is not necessary to a large amount of trailing arms and the input of suspension bracket.And rectangular steel tube 2 is parallel to cable laying face 100, that , rectangular steel tube 2 is vertically welded on the built-in fitting in crane span structure corridor or steel structure column, and cable testing bridge 1 just can be made vertically to pacify It is contained in crane span structure corridor, and the vertically-mounted space of having saved of cable testing bridge 1, turn avoid cable stacks, and strengthens the ventilation of cable And heat radiation, protect cable.
Connector in above-mentioned embodiment can be steel wire rope, by steel wire rope binding cable testing bridge 1 and rectangular steel tube 2;Also Can be connecting rod, connecting rod two ends be welded with cable testing bridge 1 and rectangular steel tube 2 respectively.But, steel wire rope binding to meet Fastness requirement, is lost manpower;And being welded by connecting rod, fragile cable testing bridge 1, and inefficiency.As preferably side Formula, described connector includes top board 3, lower platen 4 and connecting bolt 5;Described top board 3 is provided with the light running through top board 3 Hole;Described lower platen 4 is provided with screwed hole;Described connecting bolt 5 sequentially passes through unthreaded hole, opening 200 and screwed hole, and upper pressure Plate 3 is positioned at outside rectangular steel tube 2, and lower platen 4 is positioned at inside rectangular steel tube 2, and cable testing bridge 1 is held on top board 3 and side Between shape steel pipe 2.The inner side of rectangular steel tube 2 refers to the encirclement district of tube wall, and the region that tube wall surrounds beyond district is rectangular steel tube The outside of 2.By the connecting bolt 5 through opening 200, and the top board 3 that is set on connecting bolt 5 and lower platen 4 Clamping cable testing bridge 1 and rectangular steel tube 2, realize the assembling of cable testing bridge 1 and rectangular steel tube 2, facilitate disassembly and assembly.
In the above-described embodiment, can be by top board 3 and lower platen 4 clamping square steel pipe 2 and the electricity of cable testing bridge 1 Cable paved surface 100 to realize the connection of cable testing bridge 1 and rectangular steel tube 2, but, this kind of mode takies cable laying face 100, Affect cable to lay on cable laying face 100.It is preferred that, it is provided with at least side of cable testing bridge 1 side plate 110 The flanging 120 extended to side, place, cable laying face 100;Described flanging 120 is held between rectangular steel tube 2 and top board 3. By top board 3 and lower platen 4 clamping square steel pipe 2 and flanging 120, neither affect cable laying, be easy to again rectangular steel tube 2 Connection with cable testing bridge 1.
In order to prevent, between the flanging 120 of top board 3 and cable testing bridge 1, sliding occurs, occur between lower platen 4 and rectangular steel tube 2 Sliding, it is preferred that, the lower surface of described top board 3 is provided with impression, and the upper surface of described lower platen 4 is provided with impression. Impression increases between the lower surface of top board 3 and the flanging 120 of cable testing bridge 1, the upper surface of lower platen 4 and rectangular steel tube 2 Between coefficient of friction, play certain anti-skidding effect.
In bolt looseness or screwing operations, in order to prevent lower platen 4 landing.Further, including spring 6, described spring 6 The lower surface of lower platen 4 is fixed in one end, and the other end leans the inner surface of rectangular steel tube 2.Lower platen 4 is leaned by spring 6 Lower surface, shared partial pressure, protected connecting bolt 5, prevented lower platen 4 landing.

Claims (5)

1. a cable testing bridge mounting structure, including cable testing bridge (1), described cable testing bridge (1) includes cable laying face (100), Two opposite side in cable laying face (100) have been respectively fixedly connected with side plate (110);It is characterized in that: also include rectangular steel tube (2) And connector;Being provided with the opening (200) running through tube wall on the tube wall of rectangular steel tube (2), described opening (200) is square Through rectangular steel tube (2) on the bearing of trend of steel pipe (2);Described connector one end is through opening (200) and rectangular steel tube (2) Being connected, the other end is connected with cable testing bridge (1), and rectangular steel tube (2) is parallel to cable laying face (100).
2. cable testing bridge mounting structure as claimed in claim 1 a kind of, it is characterised in that: described connector include top board (3), Lower platen (4) and connecting bolt (5);Described top board (3) is provided with the unthreaded hole running through top board (3);Described lower platen (4) it is provided with screwed hole;Described connecting bolt (5) sequentially passes through unthreaded hole, opening (200) and screwed hole, and top board (3) Being positioned at rectangular steel tube (2) outside, lower platen (4) is positioned at rectangular steel tube (2) inner side, and cable testing bridge (1) is held on pressure Between plate (3) and rectangular steel tube (2).
3. a kind of cable testing bridge mounting structure as claimed in claim 2, it is characterised in that: at cable testing bridge (1) side plate (110) At least side be provided with to cable laying face (100) side, place extend flanging (120);Described flanging (120) side of being held on Between shape steel pipe (2) and top board (3).
4. a kind of cable testing bridge mounting structure, it is characterised in that: described top board (3) Lower surface is provided with impression, and the upper surface of described lower platen (4) is provided with impression.
5. a kind of cable testing bridge mounting structure, it is characterised in that: include spring (6), institute Stating spring (6) one end and be fixed on the lower surface of lower platen (4), the other end leans the inner surface of rectangular steel tube (2).
CN201620336363.7U 2016-04-20 2016-04-20 Cable testing bridge mounting structure Active CN205509403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620336363.7U CN205509403U (en) 2016-04-20 2016-04-20 Cable testing bridge mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620336363.7U CN205509403U (en) 2016-04-20 2016-04-20 Cable testing bridge mounting structure

Publications (1)

Publication Number Publication Date
CN205509403U true CN205509403U (en) 2016-08-24

Family

ID=56706188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620336363.7U Active CN205509403U (en) 2016-04-20 2016-04-20 Cable testing bridge mounting structure

Country Status (1)

Country Link
CN (1) CN205509403U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106981854A (en) * 2017-04-19 2017-07-25 中铁第四勘察设计院集团有限公司 Support for the interval cable laying in track traffic underground
CN107147059A (en) * 2017-07-16 2017-09-08 镇江市神龙电器管件有限公司 A kind of frame body for aluminum cable tray
CN107154603A (en) * 2017-07-16 2017-09-12 镇江市神龙电器管件有限公司 A kind of aluminum cable tray of perfect heat-dissipating
CN107968365A (en) * 2017-12-19 2018-04-27 无锡优耐特能源科技有限公司 Cable line winder

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106981854A (en) * 2017-04-19 2017-07-25 中铁第四勘察设计院集团有限公司 Support for the interval cable laying in track traffic underground
CN106981854B (en) * 2017-04-19 2018-10-16 中铁第四勘察设计院集团有限公司 Holder for the section cable laying of rail traffic underground
CN107147059A (en) * 2017-07-16 2017-09-08 镇江市神龙电器管件有限公司 A kind of frame body for aluminum cable tray
CN107154603A (en) * 2017-07-16 2017-09-12 镇江市神龙电器管件有限公司 A kind of aluminum cable tray of perfect heat-dissipating
CN107968365A (en) * 2017-12-19 2018-04-27 无锡优耐特能源科技有限公司 Cable line winder

Similar Documents

Publication Publication Date Title
CN205509403U (en) Cable testing bridge mounting structure
CN103437283B (en) A kind of hanging basket truss of energy rapid-assembling
CN202577686U (en) Connection system for transverse material and vertical material of glass curtain wall
CN201874228U (en) Aloftwork operating platform for wire poles
CN201284551Y (en) Suspension type simple platform for work high above ground
CN205397785U (en) Construction elevator attaches wall interval superelevation subassembly
CN204006613U (en) A kind of collector lifting fixed support
CN206148852U (en) Post insulators and arrester maintenance safety belt stores pylon
CN205822923U (en) A kind of detachable safety cover bar
CN205257771U (en) Torch integral hoisting support
CN209261345U (en) A kind of detachable isolation guardrail
CN207201484U (en) Novel agricultural big-canopy framework
CN202574215U (en) Pedal of composite material metro evacuating platform
CN202324676U (en) Pipe joint device and guardrail
CN206774919U (en) A kind of switch cubicle fixing device for mutual inductor and the switch cubicle using the device
CN105594513A (en) Steel structure greenhouse
CN205908008U (en) Dish knot formula scaffold external safety net coupling assembling of frame external corner and external safety net device
CN206908220U (en) A kind of cable testing bridge being easily installed
CN205276658U (en) Glass furred ceiling that can two -wayly install
CN103485440A (en) Outer wall connecting seat
CN205076619U (en) Single hoisting point double -deck elevator hanging flower basket
CN205355709U (en) Metal cable combination pipeline
CN203176920U (en) Building high-altitude safety lighting lamp
CN207909509U (en) A kind of bending column cooling tripod
CN209510165U (en) A kind of steel core safety guard net for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant