CN208633993U CN201821410041.8U CN201821410041U CN208633993U CN 208633993 U CN208633993 U CN 208633993U CN 201821410041 U CN201821410041 U CN 201821410041U CN 208633993 U CN208633993 U CN 208633993U
Authority
CN
China
Prior art keywords
king
post
vertical bar
wind power
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821410041.8U
Other languages
Chinese (zh)
Inventor
林国汉
罗毅平
吴邦鸣
桂斌斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Institute of Engineering
Original Assignee
Hunan Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Institute of Engineering filed Critical Hunan Institute of Engineering
Priority to CN201821410041.8U priority Critical patent/CN208633993U/en
Application granted granted Critical
Publication of CN208633993U publication Critical patent/CN208633993U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a kind of novel wind power pylons, including pedestal, the base top is equipped with king-post, the king-post includes king-post unit and nodal point connecting, it is connected between the king-post unit by nodal point connecting, the king-post unit includes outer tube, concrete layer, inner tube, said inner tube is set in outer tube, the concrete layer is set between outer tube and inner tube, support frame is equipped in the concrete layer, the support frame includes vertical bar and brace, it is connected between the vertical bar by brace, the vertical bar includes vertical bar unit, concrete column, annular link block, the concrete column is set in vertical bar unit, pass through annular link block connection between the vertical bar unit, the nodal point connecting includes outer ring set and annular set, the outer ring is sheathed on outer tube outer wall, the novel wind power pylon uses concrete and metal Pipe is used in conjunction with each other, and has saved metal material, improves the support strength of wind power tower.

Description

A kind of novel wind power pylon
Technical field
The utility model relates to a kind of novel wind power pylons, belong to electrification component technical field.
Background technique
Wind-powered electricity generation is the abbreviation of wind power generation or wind-power electricity generation, belongs to renewable energy and clean energy resource, and wind-power electricity generation is The important form of wind energy utilization, wind power technology equipment are the important component of Wind Power Generation Industry and the base of Wind Power Generation Industry development Plinth and guarantee, existing wind power tower is by two kinds of forms, and one is the cylindrical-shaped structure made of Steel material, another kind is by steel The skeletal structure that material is built, since wind-powered electricity generation equipment has to withstand the test of wind-force, therefore it is required that pylon must be tied Structure is secured, it produces installation cost height to existing cylindrical-shaped structure, installs not enough securely between each section of steel construction.
Utility model content
The purpose of this utility model is to provide a kind of novel wind power pylons, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides the following technical solutions: a kind of novel wind power pylon, including pedestal, The base top is equipped with king-post, and the king-post includes king-post unit and nodal point connecting, passes through section between the king-post unit Point connector connection, the king-post unit include outer tube, concrete layer, inner tube, and said inner tube is set in outer tube, the concrete Layer is set between outer tube and inner tube, support frame is equipped in the concrete layer, the support frame includes vertical bar and brace, institute It states and is connected between vertical bar by brace, the vertical bar includes vertical bar unit, concrete column, annular link block, the concrete Cylinder is set in vertical bar unit, and by annular link block connection between the vertical bar unit, the nodal point connecting includes outer ring Shape set and annular set, the outer ring are sheathed on outer tube outer wall, and the annular is sheathed on inner tube wall, the outer ring set Side is equipped with fixing bolt, and the fixing bolt connects annular set through king-post.
Further, the pedestal side is connected with support rod by connecting rod, and described support rod one end is fixedly connected King-post.
Further, the king-post inner wall is equipped with ladder, and the ladder outer sheath is equipped with Anti-slip cover.
Further, the king-post outer wall is uniformly provided with reinforcing rib.
Further, the king-post outer wall is equipped with alert zone, and the alert zone is equipped with fluorescent sticker.
Further, lighting installation is equipped on the inside of the king-post.
The beneficial effects of the utility model are: a kind of novel wind power pylon involved in the utility model, structure is simple, if Meter rationally, by the way that king-post unit is arranged, by excessively long king-post segmentation production installation, reduces the difficult journey of wind power tower installation Degree strengthens the bonding strength between king-post unit, by the way that concrete layer is arranged, makes king-post list by the way that nodal point connecting is arranged An entirety is formed between member, enhances the intensity of king-post, by the way that support frame is arranged, is kept tower column structure more stable, is improved King-post supports ability to withstand strong wind, by the way that concrete main body is arranged, improves the bonding strength between vertical bar unit, improves support frame Support strength so that itself and king-post and ground is formed three-legged structure by the way that support rod is arranged, improve the support energy of wind power tower Power is combined with each other by setting metal material with concrete material, saved the cost produced, and effective solution is above-mentioned The problems in background technique.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel specific embodiment is used to explain the utility model together, does not constitute limitations of the present invention.
Fig. 1 is a kind of front view of novel wind power pylon of the utility model;
Fig. 2 is a kind of tower column structure schematic diagram of novel wind power pylon of the utility model;
Fig. 3 is a kind of structural schematic diagram of the support frame of novel wind power pylon of the utility model;
Fig. 4 is a kind of top view of the support frame of novel wind power pylon of the utility model
Figure label: 1, pedestal;2, king-post;3, king-post unit;4, nodal point connecting;5, outer tube;6, concrete layer;7, interior Pipe;8, support frame;9, vertical bar;10, brace;11, vertical bar unit;12, concrete column;13, annular link block;14, outer ring Shape set;15, annular set;16, fixing bolt;17, connecting rod;18, support rod;19, ladder;20, alert zone.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Fig. 1-Fig. 4 is please referred to, the utility model provides a kind of technical solution: a kind of novel wind power pylon, including pedestal 1, King-post 2 is equipped at the top of the pedestal 1, the king-post 2 includes king-post unit 3 and nodal point connecting 4, is easily installed king-post 2, described It is connected between king-post unit 3 by nodal point connecting 4, the king-post unit 3 includes outer tube 5, concrete layer 6, inner tube 7, described Inner tube 7 is set in outer tube 5, and the concrete layer 6 is set between outer tube 5 and inner tube 7, improves the intensity of king-post 2, the concrete It is equipped with support frame 8 in layer 6, improves the support strength of king-post 2, the support frame 8 includes vertical bar 9 and brace 10, described perpendicular It is connected between bar 9 by brace 10, makes to constitute three-legged structure between it, thus keep 8 structure of support frame more stable, it is described Vertical bar 9 includes vertical bar unit 11, concrete column 12, annular link block 13, and the concrete column 12 is set to vertical bar unit 11 It is interior, the intensity of support frame 8 is improved, is connected between the vertical bar unit 11 by annular link block 13, the nodal point connecting 4 Including outer ring set 14 and annular set 15, the outer ring set 14 is set to 5 outer wall of outer tube, and the annular set 15 is set to inner tube 7 inner walls, the outer ring covers 14 sides and is equipped with fixing bolt 16, and the fixing bolt 16 connects annular set through king-post 2 15, improve the bonding strength between king-post unit 3.
More specifically, 1 side of pedestal is connected with support rod 18, and 18 one end of the support rod by connecting rod 17 It is fixedly connected with king-post 2, is used to support king-post 2, improves the wind loading rating of king-post 2,2 inner wall of king-post is equipped with ladder 19, and 19 outer sheath of ladder is equipped with Anti-slip cover, detection wind power tower easy to repair, and 2 outer wall of king-post is uniformly provided with reinforcing rib, The intensity of king-post 2 is promoted, 2 outer wall of king-post is equipped with alert zone 20, and the alert zone 20 is equipped with fluorescent sticker, makes people It more easily notices wind power tower, is equipped with lighting installation on the inside of the king-post 2, enters Measuring error convenient for staff.
Utility model works principle: in use, 1 bottom end of pedestal is buried in underground, inner tube 7 is set on it, then Support frame 8 is set up on the outside of inner tube 7, outer tube 5 is being placed in 8 outside of support frame, after setting up proper height, to outer tube 5 The casting concrete between inner tube 7 is allowed to form concrete layer 6, and concrete column is formed in the vertical bar unit 11 in support frame 8 Then body 12 sets up support rod 18 again, and connecting rod 17 is embedded in underground, the construction to wind power tower can be completed.
The above are the preferable embodiment of the utility model, the utility model those skilled in the art can also be to upper It states embodiment to change and modify, therefore, the utility model is not limited to above-mentioned specific embodiment, all abilities Field technique personnel made any conspicuous improvement, replacement or modification on the basis of the utility model belong to practical Novel protection scope.

Claims (6)

1. a kind of novel wind power pylon, including pedestal (1), which is characterized in that king-post (2) are equipped at the top of the pedestal (1), it is described King-post (2) includes king-post unit (3) and nodal point connecting (4), is connected between the king-post unit (3) by nodal point connecting (4) It connects, the king-post unit (3) includes outer tube (5), concrete layer (6), inner tube (7), and said inner tube (7) is set in outer tube (5), institute It states concrete layer (6) to be set between outer tube (5) and inner tube (7), is equipped with support frame (8) in the concrete layer (6), the branch Support bone frame (8) includes vertical bar (9) and brace (10), is connected between the vertical bar (9) by brace (10), vertical bar (9) packet Vertical bar unit (11), concrete column (12), annular link block (13) are included, the concrete column (12) is set to vertical bar unit (11) it in, is connected between the vertical bar unit (11) by annular link block (13), the nodal point connecting (4) includes outer ring It covers (14) and annular set (15), the outer ring set (14) is set to outer tube (5) outer wall, and the annular set (15) is set to inner tube (7) inner wall, outer ring set (14) side are equipped with fixing bolt (16), and the fixing bolt (16) connects through king-post (2) Connect annular set (15).
2. a kind of novel wind power pylon according to claim 1, it is characterised in that: pedestal (1) side passes through connection Bar (17) is connected with support rod (18), and the support rod (18) one end is fixedly connected with king-post (2).
3. a kind of novel wind power pylon according to claim 1, it is characterised in that: king-post (2) inner wall is equipped with ladder (19), and the ladder (19) outer sheath is equipped with Anti-slip cover.
4. a kind of novel wind power pylon according to claim 1, it is characterised in that: king-post (2) outer wall is uniformly provided with Reinforcing rib.
5. a kind of novel wind power pylon according to claim 1, it is characterised in that: king-post (2) outer wall is equipped with police Show area (20), and the alert zone (20) is equipped with fluorescent sticker.
6. a kind of novel wind power pylon according to claim 1, it is characterised in that: be equipped with illumination on the inside of the king-post (2) Facility.
CN201821410041.8U 2018-08-30 2018-08-30 A kind of novel wind power pylon Expired - Fee Related CN208633993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821410041.8U CN208633993U (en) 2018-08-30 2018-08-30 A kind of novel wind power pylon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821410041.8U CN208633993U (en) 2018-08-30 2018-08-30 A kind of novel wind power pylon

Publications (1)

Publication Number Publication Date
CN208633993U true CN208633993U (en) 2019-03-22

Family

ID=65742227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821410041.8U Expired - Fee Related CN208633993U (en) 2018-08-30 2018-08-30 A kind of novel wind power pylon

Country Status (1)

Country Link
CN (1) CN208633993U (en)

Similar Documents

Publication Publication Date Title
CN202132187U (en) Guyed tower structure of wind generating set
CN101812842B (en) Tensionless filling pile structure
CN100545367C (en) The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
CN201546435U (en) Bolted stayed cantilever scaffold
CN102051995A (en) Hoisting method of hyperbolic water-tower water tank and hoisting device
CN104727620A (en) Self-supporting double-layer chimney
CN208633993U (en) A kind of novel wind power pylon
CN103321468B (en) Stay-supported triangular truss anemometer tower
CN209228542U (en) The tower and wind power generating set of wind power generating set
CN201649071U (en) Unstressing cast-in-place pile
CN205046920U (en) Steel pipe lattice formula framework lightning rod
CN208264028U (en) A kind of novel combination type carrier cable homing device
CN207609232U (en) A kind of holding pole structure and lamp stand communication tower
CN203297041U (en) Device for improving rigidity of wind machine tower
CN206768853U (en) Framework basis and power transmission tower frame
CN205979564U (en) Electric power steel pipe pole is used in city
CN104563554B (en) For the combined type lattice girder of 500kV transformer stations integrated form framework
CN210622987U (en) Stay cable type tower and wind generating set
CN102808742A (en) Connecting structure for tower cylinder and supporting tower frame of wind driven generator
CN206752292U (en) One kind provides prestressed tension string beam structure using deadweight
CN207620481U (en) A kind of 35 rice lamp shaft towers
CN206904367U (en) A kind of built-in type retractable cable support
CN214883825U (en) Modularized foundation structure of wind generating set
CN206829751U (en) A kind of energy-saving structure steel pipe pole
CN212867771U (en) Reinforced wind power base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20190830