CN208310778U - A kind of shield launching transverse passage-way and unearthed tunnel plugging structure - Google Patents

A kind of shield launching transverse passage-way and unearthed tunnel plugging structure Download PDF

Info

Publication number
CN208310778U
CN208310778U CN201820299137.5U CN201820299137U CN208310778U CN 208310778 U CN208310778 U CN 208310778U CN 201820299137 U CN201820299137 U CN 201820299137U CN 208310778 U CN208310778 U CN 208310778U
Authority
CN
China
Prior art keywords
transverse passage
way
tunnel
unearthed
shield launching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820299137.5U
Other languages
Chinese (zh)
Inventor
杨祥亮
蔡志勇
张亮
薛春苗
李海峰
王涛
杨海健
郭玉海
王牧月
张晟源
陈雪峰
李星晨
吕金彪
陈恺
杨扬
张涛
王英波
苏世宗
石文正
王越
张建珍
李文新
庞梦月
姜宁宁
李丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201820299137.5U priority Critical patent/CN208310778U/en
Application granted granted Critical
Publication of CN208310778U publication Critical patent/CN208310778U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of shield launching transverse passage-way and unearthed tunnel plugging structures, including anchor tube, the inside and outside double-deck mesh sheet and closure grid, shield launching transverse passage-way thickness 350mm, and be unearthed tunnel thickness 300mm, and the inside and outside double-deck mesh sheet is arranged, and closure grid isThe double-deck mesh sheet inside and outside 22 500 dowels, blocks and sets 40 × 2.75 anchor tube of Ф inside grid, L=2m, spacing 1m is quincunx to be laid in each layer pilot tunnel top bar;Transverse passage-way, which is excavated, is constructed using CRD and unearthed tunnel excavation using CD method, therefore each pilot tunnel will successively reach design terminal mileage according to pilot drive sequence, and each pilot tunnel should be blocked respectively, and step is simple, design is reasonable and easy for construction, and investment construction cost is lower;Simple structure and reasonable design and easy for construction, it is lower to put into construction cost, the shield launching transverse passage-way of construction molding and unearthed tunnel structure using effect is good and supporting status safety, reliable, permanently blocks after can ensure that shield launching transverse passage-way and unearthed tunnel excavation to design mileage.

Description

A kind of shield launching transverse passage-way and unearthed tunnel plugging structure
Technical field
The utility model relates to technical field of tunnel construction, specifically a kind of shield launching transverse passage-way and unearthed tunnel are blocked Structure.
Background technique
Subway tunnel is constructed for cut and cover method using shallow burial hidden digging, has that removal cost is low, traffic impact is small The advantages that, relative to shield construction, there is stronger adaptability to stratum, be suitable for various sectional forms, there is low cost, throw Enter the advantages that small.As China carries out Construction of Urban Rail Traffic on a large scale, Dryopteris sublaetaChing et Hsu is constructed in city underground engineering In status will be further important, the especially construction technology of bored tunnel passing through building, structures need to control into hole tunnel Stability indicator and ground settlement figureofmerit.
It is blocked after transverse passage-way (unearthed tunnel) is excavated to design mileage, this time blocks and blocked to be permanent, currently, When shield launching widened section is excavated using the construction of CRD method, need to block each pilot tunnel respectively, and pre-buried company as requested Connect muscle.Therefore, it is necessary to a kind of shield launching widened section plugging structures to meet the construction demand permanently blocked.
Utility model content
The purpose of this utility model is to provide a kind of shield launching transverse passage-way and unearthed tunnel plugging structures, on solving State the problem of proposing in background technique.
To achieve the above object, the utility model provides the following technical solutions:
A kind of shield launching transverse passage-way and unearthed tunnel plugging structure, including anchor tube, the inside and outside double-deck mesh sheet and closure grid, Shield launching transverse passage-way thickness 350mm, be unearthed tunnel thickness 300mm, and the inside and outside double-deck mesh sheet is arranged, and closure grid is diameter With length 500mm dowel in the inside and outside double-deck setting, blocks and set diameter Ф 40mm and length 2.75m anchor inside grid Pipe, anchor tube, which is set, gos deep into length L=2m, and spacing 1m is quincunx to be laid in each layer pilot tunnel top bar.
As a further solution of the present invention: the shield launching transverse passage-way is sealed after being excavated to design mileage It is stifled, it this time blocks and is blocked to be permanent.
As a further solution of the present invention: being blocked after the unearthed tunnel excavation to design mileage, this time It blocks and is blocked to be permanent.
As a further solution of the present invention: the shield launching section is temporarily sealed after being excavated to design mileage It is stifled, it is blocked by glass fiber-reinforced polymer, inside and outside double layer bar, thickness 600mm is set.
Compared with prior art, the utility model has the beneficial effects that transverse passage-way, which excavates, uses CRD and unearthed tunnel excavation Constructed using CD method, therefore each pilot tunnel will successively reach design terminal mileage according to pilot drive sequence, each pilot tunnel should respectively into Row blocks, and step is simple, design is reasonable and easy for construction, and investment construction cost is lower;Simple structure and reasonable design and construction party Just, investment construction cost is lower, the shield launching transverse passage-way of construction molding and unearthed tunnel structure using effect is good and supporting shape State is safe and reliable, permanently blocks after can ensure that shield launching transverse passage-way and unearthed tunnel excavation to design mileage.
Detailed description of the invention
Fig. 1 is that the unearthed tunnel of the utility model blocks schematic diagram.
Fig. 2 is the anchor tube structural schematic diagram that unearthed tunnel blocks in the utility model.
Fig. 3 is that the transverse passage-way of the utility model blocks schematic diagram.
Fig. 4 is the anchor tube structural schematic diagram that transverse passage-way blocks in the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~4, in the utility model embodiment, a kind of shield launching transverse passage-way and unearthed tunnel plugging structure, Including anchor tube, the inside and outside double-deck mesh sheet and grid is blocked, shield launching transverse passage-way is blocked after being excavated to design mileage, is this time sealed It blocks up permanently to block, thickness 350mm, the inside and outside double-deck mesh sheet is set, blocks grid and uses diameterWith length 500mm Dowel blocks in the inside and outside double-deck setting and sets diameter Ф 40mm and length 2.75m anchor tube inside grid, anchor tube sets deep length L=2m is spent, spacing 1m is quincunx to be laid in each layer pilot tunnel top bar.
The tunnel excavation that is unearthed is blocked to after designing mileage, is this time blocked as permanent closure, thickness 300mm.
It is constructed using CRD and unearthed tunnel excavation using CD method since transverse passage-way is excavated, each pilot tunnel will be according to pilot tunnel Sequence of excavation successively reaches design terminal mileage, and each pilot tunnel should be blocked respectively, but should pre-buried dowel as requested, connection Muscle gets rid of length and meets welding conditions requirement, welds and uses for adjacent pilot tunnel dowel.
Further, shield launching section carries out temporary plugging after being excavated to design mileage, is blocked using glass fiber-reinforced polymer, if Set inside and outside double layer bar, thickness 600mm.
The utility model is not limited to above-described embodiment, on the basis of technical solution disclosed by the utility model, this For the technical staff in field according to disclosed technology contents, not needing creative labor can be special to some of which technology Sign makes some simple modification, equivalent change and modifications, is all within the scope of the technical scheme of the utility model.

Claims (4)

1. a kind of shield launching transverse passage-way and unearthed tunnel plugging structure, including anchor tube, the inside and outside double-deck mesh sheet and closure grid, It is characterized in that, shield launching transverse passage-way thickness 350mm, be unearthed tunnel thickness 300mm, and the inside and outside double-deck mesh sheet is arranged, blocks grid For diameterWith length 500mm dowel in the inside and outside double-deck setting, blocks and set diameter Ф 40mm and length inside grid 2.75m anchor tube, anchor tube, which is set, gos deep into length L=2m, and spacing 1m is quincunx to be laid in each layer pilot tunnel top bar.
2. a kind of shield launching transverse passage-way according to claim 1 and unearthed tunnel plugging structure, which is characterized in that described Shield launching transverse passage-way is blocked after being excavated to design mileage, is this time blocked and is blocked to be permanent.
3. a kind of shield launching transverse passage-way according to claim 1 and unearthed tunnel plugging structure, which is characterized in that described The tunnel excavation that is unearthed is blocked to after designing mileage, is this time blocked as permanent closure.
4. a kind of shield launching transverse passage-way according to claim 1 and unearthed tunnel plugging structure, which is characterized in that described Shield launching section carries out temporary plugging after being excavated to design mileage, is blocked by glass fiber-reinforced polymer, and inside and outside double layer bar is arranged, Thickness 600mm.
CN201820299137.5U 2018-03-05 2018-03-05 A kind of shield launching transverse passage-way and unearthed tunnel plugging structure Expired - Fee Related CN208310778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820299137.5U CN208310778U (en) 2018-03-05 2018-03-05 A kind of shield launching transverse passage-way and unearthed tunnel plugging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820299137.5U CN208310778U (en) 2018-03-05 2018-03-05 A kind of shield launching transverse passage-way and unearthed tunnel plugging structure

Publications (1)

Publication Number Publication Date
CN208310778U true CN208310778U (en) 2019-01-01

Family

ID=64720387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820299137.5U Expired - Fee Related CN208310778U (en) 2018-03-05 2018-03-05 A kind of shield launching transverse passage-way and unearthed tunnel plugging structure

Country Status (1)

Country Link
CN (1) CN208310778U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080296A (en) * 2019-04-29 2019-08-02 中铁四局集团有限公司 A kind of unilateral glass muscle-reinforcement cage structure for tunnel shielding portal ground-connecting-wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080296A (en) * 2019-04-29 2019-08-02 中铁四局集团有限公司 A kind of unilateral glass muscle-reinforcement cage structure for tunnel shielding portal ground-connecting-wall
CN110080296B (en) * 2019-04-29 2021-02-02 中铁四局集团有限公司 A unilateral glass muscle-steel reinforcement cage structure for shield tunnel portal ground is wall even

Similar Documents

Publication Publication Date Title
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN109723085B (en) Deep foundation pit division construction rib wall support replacing structure and construction method thereof
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN105736001B (en) A kind of construction method using prefabricated parts subway station
CN101769154A (en) Excavation supporting method for tunnel construction
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN103334761B (en) Method of constructing shallow tunnel underground passage variable-cross section cross mid-partition wall
CN102913249B (en) Inclined shaft transverse-through positive hole single horn lifting construction method
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN105065009A (en) Method for shield expanding construction of subway station
CN208310778U (en) A kind of shield launching transverse passage-way and unearthed tunnel plugging structure
CN108979663B (en) Subway station main body structure construction method adopting temporary middle column support
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN104963693A (en) Construction method for rectangular parallel top pipe connection channel
US11821316B1 (en) System and construction method of single-layer lining tunnel structure based on mine-tunnelling method
CN104091516A (en) Teaching model for construction external-prevention internal-bonded method of underground structure
CN208106458U (en) A kind of support construction of ultra-shallow earth-covered rectangle big cross section
CN208310779U (en) A kind of shield launching widened section plugging structure
CN207750084U (en) The closely connected construction supporting structure for passing through existing building of newly-built underground engineering
CN203689815U (en) Teaching simulation body for tunnel micro-step method technology
CN109577998A (en) A kind of construction method that the backfill of shield section piston air duct is missed the stop
CN211038701U (en) Mine method subway interval air shaft with shield first and well second
CN204941552U (en) A kind of subway station of parallel shield method enlarging construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101