CN208310570U - A kind of protection door for construction elevator - Google Patents

A kind of protection door for construction elevator Download PDF

Info

Publication number
CN208310570U
CN208310570U CN201820597963.8U CN201820597963U CN208310570U CN 208310570 U CN208310570 U CN 208310570U CN 201820597963 U CN201820597963 U CN 201820597963U CN 208310570 U CN208310570 U CN 208310570U
Authority
CN
China
Prior art keywords
door leaf
door
sleeve
clamp ring
construction elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820597963.8U
Other languages
Chinese (zh)
Inventor
杨松
杨晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guangshengda Construction Co Ltd
Original Assignee
Shenzhen Guangshengda Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guangshengda Construction Co Ltd filed Critical Shenzhen Guangshengda Construction Co Ltd
Priority to CN201820597963.8U priority Critical patent/CN208310570U/en
Application granted granted Critical
Publication of CN208310570U publication Critical patent/CN208310570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

The utility model discloses a kind of protection door for construction elevator, it is intended to provide a kind of protective door reused convenient for turnover, its key points of the technical solution are that include door leaf and the scaffold for installing door leaf, door leaf setting there are two and respectively first door leaf and the second door leaf;It further include two connecting tubes, two door leafs are rotationally connected with two connecting tubes respectively, and the connecting tube is fixedly installed steel pipe far from the outer wall of door leaf;The scaffold includes vertical pole, and the steel pipe is equipped with the bail for being socketed on vertical pole and clamping vertical pole;The bail includes the first clamp ring for being fixed on steel pipe and the second clamp ring for being rotationally connected with the first clamp ring, and the free end of second clamp ring is fixed by the cooperation of screw bolt and nut with the first clamp ring;The inner wall of the bail is equipped with non-slip mat;The limit clip for being connected to bail lower end is also nested and fixed in the vertical pole.The protective door is reused convenient for disassembling from scaffold convenient for turnover.

Description

A kind of protection door for construction elevator
Technical field
The utility model relates to technical field of building construction, more specifically, it relates to a kind of protection door for construction elevator.
Background technique
High-rise construction lift is as a kind of vertical transport tool, since its performance is stable, safety of structure is high, uses economy The features such as be widely used in engineering construction.For security needs, it is desirable that entered and left to the elevator of each constructing operation layer Mouth is protected, therefore protection door for construction elevator is common protective device in high-building construction.
Currently, the protection door for construction elevator in engineering generally rides upon on scaffold, using the shape of doorframe and steel-pipe welding Formula.
However, the prior art is not easy to dismantling protective door into separation from scaffold, leads to protective door not after construction It is reused convenient for turnover.
Utility model content
In view of the deficiencies of the prior art, the purpose of the utility model is to provide a kind of protection door for construction elevator, the protective doors With the effect that can easily disassemble from scaffold, and then be reused convenient for turnover.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of construction elevator protection Door, the scaffold including door leaf and for installing door leaf, door leaf setting there are two and respectively first door leaf and second Door leaf;It further include two connecting tubes, two door leafs are rotationally connected with two connecting tubes respectively, and the connecting tube is far from door leaf Outer wall be fixedly installed steel pipe;The scaffold includes vertical pole, and the steel pipe is equipped with the folder for being socketed on vertical pole and clamping vertical pole Lock ring;The bail includes the first clamp ring for being fixed on steel pipe and the second clamp ring for being rotationally connected with the first clamp ring, described The free end of second clamp ring is fixed by the cooperation of screw bolt and nut with the first clamp ring;The inner wall of the bail is equipped with anti-skidding Pad, the non-slip mat are equipped with anti-skid chequer;The limit clip for being connected to bail lower end is also nested and fixed in the vertical pole.
By using above-mentioned technical proposal, the second clamp ring is rotationally connected with the first clamp ring, and by bolts and nuts by the Two clamp rings are fixed, and the first clamp ring and the second clamp ring are clamped in outside vertical pole, and non-slip mat increases the stiction of bail and vertical pole, It is more steady that anti-skid chequer clamps bail by vertical pole;In addition, limiting card hoop is clamped in outside vertical pole and the lower end with bail It abuts, so that bail is more not easy to glide, connecting tube and door leaf are stably fixed on vertical pole;After construction, energy Bail and limit clip are easily unclamped, the process that protective door is dismantled from scaffold is convenient and efficient, and then is convenient for protective door Turnover reuse.
Preferably, the anti-skid chequer is in S bent.
By using above-mentioned technical proposal, keep the antiskid effect of non-slip mat more preferable, and then protective door is fixed on scaffold It is more firm.
Preferably, limit clip second garter spring that includes the first garter spring and matched with the first garter spring, described the The both ends of one garter spring and the second garter spring are fixed by screw bolt and nut.
By using above-mentioned technical proposal, screw bolt and nut is firmly clamped in limit clip outside vertical pole, and convenient for pine Screw bolt and nut is opened, and then removes limit clip.
Preferably, the free end of the first door leaf is equipped with first sleeve, there are two the free end of second door leaf is set Second sleeve, the first sleeve and second sleeve, which run through, the same locking bar, and the locking bar and first sleeve and second set Cylinder is flexibly connected;The side of the locking bar is equipped with the holding rod being located between two second sleeves, the holding rod and separate first set When the second sleeve of cylinder abuts against, locking bar is detached from first sleeve.
By using above-mentioned technical proposal, holding rod is located between two second sleeves, so that locking bar is not easily disconnected from second Fan, and then the stability that locking bar closes protective door is improved, and locking bar is not easy to lose;Locking bar, which is penetrated first sleeve, can facilitate province Close protective door to power.
Preferably, the free end of the first door leaf and the free end of second door leaf are provided with determining of being mutually attracted Position magnet, when the locking bar penetrates first sleeve, the positioning magnet of first door leaf is mutually abutted with the positioning magnet of the second door leaf It is attracted.
By using above-mentioned technical proposal, when closing protective door, need the freedom of first door leaf and the second door leaf first End alignment, the mutual the suction-combining force for positioning magnet can be more quick and be automatically aligned the free end of two door leafs, close protection The faster convenience of process of door.
Preferably, the door leaf includes the steel wire being located above and underlying warning panel.
By using above-mentioned technical proposal, steel wire is convenient for daylighting in construction elevator;Caution slogan is sticked in warning panel, is mentioned Awake construction personnel takes care, to keep working security higher.
Preferably, the warning panel is galvanized steel plain sheet.
By using above-mentioned technical proposal, galvanized steel plain sheet is not easy to corrode, and warning panel is more durable.
Preferably, the connecting tube is square tube, and the wall thickness of the connecting tube is 3mm, the cross section side length of the connecting tube For 30mm.
By using above-mentioned technical proposal, square tube has the advantages that quality is lighter, and connecting thickness of pipe wall is 3mm, cross section Side length is 30mm, has both guaranteed the intensity of connecting tube, has also saved manufacture material.
Preferably, the diameter of the steel pipe is 48mm, and the wall thickness of the steel pipe is 3.6mm.
Also make the production cost of steel pipe more under the premise of guaranteeing steel pipe tensile strength by using above-mentioned technical proposal It is low.
In conclusion the utility model has the following beneficial effects:
1, after construction, bail and clip can be easily unclamped, the process side of protective door is dismantled from scaffold Just quick, and then reused convenient for the turnover of protective door;
2, it when closing protective door, needs first to be aligned the free end of first door leaf and the second door leaf, positions the phase of magnet Mutual the suction-combining force can be more quick and be automatically aligned the free end of two door leafs, closes the faster convenience of process of protective door.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the enlarged drawing of part A in Fig. 1;
Fig. 3 is the enlarged drawing of part B in Fig. 1;
Fig. 4 is the attachment structure schematic diagram of steel pipe and bail in the utility model embodiment.
In figure: 1, first door leaf;2, the second door leaf;3, connecting tube;4, steel pipe;5, vertical pole;6, bail;61, the first folder Ring;62, the second clamp ring;7, non-slip mat;8, anti-skid chequer;9, clip is limited;91, the first garter spring;92, the second garter spring;10, first set Cylinder;11, second sleeve;12, locking bar;13, holding rod;14, magnet is positioned;15, steel wire;16, warning panel.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of protection door for construction elevator, as shown in Figure 1, including that door leaf and the scaffold for installing door leaf, door leaf are set It sets there are two and respectively first door leaf 1 and the second door leaf 2, two door leafs is split door leaf;Further include two along the vertical direction The connecting tube 3 of setting, two door leafs are rotationally connected with two connecting tubes 3 by hinge respectively.
As depicted in figs. 1 and 2, connecting tube 3 is fixed with horizontally disposed steel pipe 4 far from the outer wall of door leaf.Foot hand Frame includes the vertical pole 5 being arranged along the vertical direction;Steel pipe 4 is provided with the bail 6 for being socketed on vertical pole 5 and clamping vertical pole 5.In conjunction with figure 4, bail 6 is including being welded in the first clamp ring 61 of steel pipe 4 and being rotationally connected with the second clamp ring 62 of the first clamp ring 61, and second The free end of clamp ring 62 is fixed by the cooperation of screw bolt and nut and the first clamp ring 61.Bail 6 clamps vertical pole 5, makes to connect Pipe 3 and door leaf are stably fixed on vertical pole 5.
In conjunction with Fig. 4, the inner wall of bail 6 is fixed with non-slip mat 7, and 7 processing sets up of non-slip mat has anti-skid chequer 8, and anti-skid chequer 8 is in S bent;Non-slip mat 7 increases the stiction of bail 6 and vertical pole 5, and the setting of anti-skid chequer 8 further makes bail 6 will The clamping of vertical pole 5 is more steady.
The limit clip 9 for being connected to 6 lower end of bail is also nested and fixed in vertical pole 5, so that bail 6 is more not easy down Sliding, fixation is more steady on protective door vertical pole 5.Limit clip 9 include the first garter spring 91 and matched with the first garter spring 91 second The both ends of garter spring 92, the first garter spring 91 and the second garter spring 92 are fixed by screw bolt and nut.
After construction, bail 6 and limit clip 9 can be easily unclamped, the mistake of protective door is dismantled from scaffold Journey is convenient and efficient, and then reuses convenient for the turnover of protective door.
As shown in figures 1 and 3, the free end of first door leaf 1 is fixedly installed with first sleeve 10, the freedom of the second door leaf 2 End is fixed there are two second sleeve 11, and first sleeve 10 and second sleeve 11 are horizontally disposed and be located at sustained height; First sleeve 10 and second sleeve 11, which run through, the same locking bar 12, and locking bar 12 and first sleeve 10 and 11 activity of second sleeve Connection.The side of locking bar 12 is welded with the holding rod 13 between two second sleeves 11, holding rod 13 and separate first sleeve 10 Second sleeve 11 when abutting against, locking bar 12 is detached from first sleeve 10.
Holding rod 13 is located between two second sleeves 11, so that locking bar 12 is not easily disconnected from the second door leaf 2, and then improves lock Bar 12 closes the stability of protective door, and locking bar 12 is not easy to lose;Locking bar 12, which is penetrated first sleeve 10, to close convenient and strength-savingly Close protective door.
The free end of first door leaf 1 and the free end of the second door leaf 2 are fixedly installed with the positioning magnet 14 being mutually attracted, When locking bar 12 penetrates first sleeve 10, the positioning magnet 14 of first door leaf 1 mutually abuts suction with the positioning magnet 14 of the second door leaf 2 It closes.
When closing protective door, need first to be aligned the free end of first door leaf 1 and the second door leaf 2, then by locking bar 12 Penetrate first sleeve 10.The mutual the suction-combining force for positioning magnet 14 can free end pair that is more quick and automatically making two door leafs Together, the faster convenience of process of protective door is closed.
Fig. 1 is reviewed, specifically, door leaf includes the steel wire 15 being located above and underlying warning panel 16.Steel wire Net 15 is convenient for daylighting in construction elevator;Caution slogan is sticked in warning panel 16, reminds construction personnel to take care, to make to construct Safety is higher.On the other hand, warning panel 16 is galvanized steel plain sheet, so that warning panel 16 is not easy to corrode, it is more durable.
Connecting tube 3 is square tube, and square tube has the advantages that quality is lighter.The wall thickness of connecting tube 3 is 3mm, and its cross section side A length of 30mm had both guaranteed the intensity of connecting tube 3, also saved manufacture material.
The diameter of steel pipe 4 is 48mm, and the wall thickness of steel pipe 4 is that 3.6mm also makes under the premise of guaranteeing 4 tensile strength of steel pipe The production cost of steel pipe 4 is lower.
Above-described embodiment is only the explanation to the utility model, is not limitations of the present invention, this field Technical staff can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but only It will be in the scope of the claims of the utility model all by the protection of Patent Law.

Claims (9)

1. a kind of protection door for construction elevator, the scaffold including door leaf and for installing door leaf, it is characterized in that: the door leaf is set Set there are two and respectively first door leaf (1) and the second door leaf (2);It further include two connecting tubes (3), two door leaf difference Two connecting tubes (3) are rotationally connected with, the connecting tube (3) is fixedly installed steel pipe (4) far from the outer wall of door leaf;The foot hand Frame includes vertical pole (5), and the steel pipe (4) is equipped with the bail (6) for being socketed on vertical pole (5) and clamping vertical pole (5);The bail (6) including being fixed on the first clamp ring (61) of steel pipe (4) and being rotationally connected with the second clamp ring (62) of the first clamp ring (61), institute The free end for stating the second clamp ring (62) is fixed by the cooperation of screw bolt and nut and the first clamp ring (61);The bail (6) Inner wall is equipped with non-slip mat (7), and the non-slip mat (7) is equipped with anti-skid chequer (8);The vertical pole (5), which is also nested and fixed, is connected to folder The limit clip (9) of lock ring (6) lower end.
2. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the anti-skid chequer (8) is in S bent.
3. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the limit clip (9) includes first Garter spring (91) and the second garter spring (92) matched with the first garter spring (91), first garter spring (91) and the second garter spring (92) Both ends fixed by screw bolt and nut.
4. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the free end of the first door leaf (1) Equipped with first sleeve (10), the free end of second door leaf (2) is set there are two second sleeve (11), the first sleeve (10) Running through with second sleeve (11) has the same locking bar (12), and the locking bar (12) and first sleeve (10) and second sleeve (11) It is flexibly connected;The side of the locking bar (12) is equipped with the holding rod (13) being located between two second sleeves (11), the holding rod (13) when abutting against with the second sleeve (11) far from first sleeve (10), locking bar (12) is detached from first sleeve (10).
5. a kind of protection door for construction elevator according to claim 4, it is characterized in that: the free end of the first door leaf (1) And the free end of second door leaf (2) is provided with the positioning magnet (14) being mutually attracted, the locking bar (12) penetrates first When sleeve (10), the positioning magnet (14) of first door leaf (1) mutually abuts actuation with the positioning magnet (14) of the second door leaf (2).
6. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the door leaf includes the steel being located above Silk screen (15) and underlying warning panel (16).
7. a kind of protection door for construction elevator according to claim 6, it is characterized in that: the warning panel (16) is galvanized steel Plate.
8. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the connecting tube (3) is square tube, it is described The wall thickness of connecting tube (3) is 3mm, and the cross section side length of the connecting tube (3) is 30mm.
9. a kind of protection door for construction elevator according to claim 1, it is characterized in that: the diameter of the steel pipe (4) is 48mm, The wall thickness of the steel pipe (4) is 3.6mm.
CN201820597963.8U 2018-04-23 2018-04-23 A kind of protection door for construction elevator Expired - Fee Related CN208310570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820597963.8U CN208310570U (en) 2018-04-23 2018-04-23 A kind of protection door for construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820597963.8U CN208310570U (en) 2018-04-23 2018-04-23 A kind of protection door for construction elevator

Publications (1)

Publication Number Publication Date
CN208310570U true CN208310570U (en) 2019-01-01

Family

ID=64713245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820597963.8U Expired - Fee Related CN208310570U (en) 2018-04-23 2018-04-23 A kind of protection door for construction elevator

Country Status (1)

Country Link
CN (1) CN208310570U (en)

Similar Documents

Publication Publication Date Title
CN208594768U (en) A kind of detachable girder steel horizontal protective device
CN207245138U (en) Boat scaffold adjustable in pitch
CN208310570U (en) A kind of protection door for construction elevator
CN107938853A (en) A kind of friction antiskid bearing and its operating method applied to steel construction
CN202098968U (en) Dedicated lifting appliance for balance beam of gantry crane
CN206942160U (en) Steel bar truss floor support plate lifting device
CN205778937U (en) A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate
CN105858460A (en) Clamp for I beam
CN206539044U (en) Safety belt suspension device for i-steel component
CN210713906U (en) Guardrail bar is prevented to prefabricated assembled
CN205555875U (en) Stone tongs for engineering
CN201560576U (en) Diagonal rod for steel pipe scaffold
CN208280568U (en) A kind of suspension type aerial work platform below girder steel
CN209367673U (en) A kind of door machine radix saposhnikoviae zipper easy to use
CN209760855U (en) Safety belt fastening and hanging device for balcony part construction
CN202788018U (en) Storey near edge temporary guard rail
CN203308339U (en) Finalized protective door of elevator shaft opening
CN108060782B (en) The installation method and auxiliary mounting tool of girder steel element
CN201753241U (en) Safety device for tower lifting arm
CN204847756U (en) Special lifting device of box transformer
CN205243053U (en) Horizontal safety net fastener
CN205740045U (en) A kind of I-beam clamp
CN205591545U (en) Instrument is consolidated to log template
CN205777615U (en) Face hole, limit action shield
CN204607461U (en) Spring floor lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

Termination date: 20190423

CF01 Termination of patent right due to non-payment of annual fee