CN208309583U - Suspension hook for prefabricated tubular pile - Google Patents

Suspension hook for prefabricated tubular pile Download PDF

Info

Publication number
CN208309583U
CN208309583U CN201820695408.9U CN201820695408U CN208309583U CN 208309583 U CN208309583 U CN 208309583U CN 201820695408 U CN201820695408 U CN 201820695408U CN 208309583 U CN208309583 U CN 208309583U
Authority
CN
China
Prior art keywords
hook
tubular pile
prefabricated tubular
bolt lock
shackle bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820695408.9U
Other languages
Chinese (zh)
Inventor
庞卫涛
于海申
胡居中
徐军伟
刁玉春
张泽山
王磊
米艳鹏
毛春燕
孙麒智
陆镜明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820695408.9U priority Critical patent/CN208309583U/en
Application granted granted Critical
Publication of CN208309583U publication Critical patent/CN208309583U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of suspension hook for prefabricated tubular pile, and the suspension hook for prefabricated tubular pile is hung by lifting rope connects the prefabricated tubular pile, and the suspension hook includes: hook body, shackle bolt lock and tricing line.Hook portion is defined between the bill portion and hook root of the hook body, for the one ends wound of the lifting rope on the prefabricated tubular pile, the other end of the lifting rope places the hook portion, and is wrapped in the hook body;Hingedly the hook root, the other end of the shackle bolt lock can connect with the bill portion and seal the opening of the hook portion for one end of the shackle bolt lock;Enable the affixed shackle bolt lock in one end of the tricing line that can connect the end in the bill portion, the other end of the tricing line extends in worker's hand on ground.The utility model controls shackle bolt lock by using tricing line, solves people the technical issues of ground can not be by suspension hook uncoupling just in handling tubular pole, achievees the purpose that facilitate uncoupling.

Description

Suspension hook for prefabricated tubular pile
Technical field
The utility model relates to technical field of building construction, relate in particular to a kind of suspension hook for prefabricated tubular pile.
Background technique
Concrete pre-stress tubular pole is constructed frequently with hammering method.According to hammer-impact construction feature, concrete is answered in advance It, must be in the air to the hook progress uncoupling at suspension centre after power is lifted by crane and lifted by crane in place.But since hook position is in sky In, operator can not open the insurance of suspension hook, according to open hook, break off relations then existing at any time during handling tubular pole Situation, security risk are big.Therefore, need to improve to piling machine suspension hook makes operator complete suspension hook aerial operation on ground.
Utility model content
In view of the foregoing, the utility model provides a kind of suspension hook for prefabricated tubular pile, the shackle bolt lock of the suspension hook One end is rotatably articulated on hook root, and the other end of shackle bolt lock is by being butted in bill portion and sealing opening for hook portion Mouthful, by the way that the other end of one end of tricing line and shackle bolt lock is affixed, the other end of tricing line is enabled to be controlled to traction suspension hook Insurance recesses bill portion and opens hook portion, and solving people can not just will ask in the technology of the suspension hook uncoupling of handling tubular pole on ground Topic, achievees the purpose that conveniently to unlock suspension hook.
To achieve the above object, the technical scheme adopted by the utility model is that: a kind of suspension hook for prefabricated tubular pile is provided, The suspension hook for prefabricated tubular pile is hung by lifting rope connects the prefabricated tubular pile, and the suspension hook for prefabricated tubular pile includes: Hook body, shackle bolt lock and tricing line.The hook body includes that bill portion, hook root and both ends are separately connected the hook The hook body portion of tip and the hook root has defined hook between the bill portion of the hook body, hook root and hook body portion Portion, for the one ends wound of the lifting rope on the prefabricated tubular pile, the other end of the lifting rope places the hook portion, and twines It is wound in the hook body portion of the hook body;One end of the shackle bolt lock is rotatably articulated on the hook root, institute State opening of the other end of shackle bolt lock by being butted in the bill portion and sealing the hook portion;One end of the tricing line with The other end of the shackle bolt lock is affixed, enable the other end of the tricing line be controlled to draw the shackle bolt lock recess it is described Simultaneously open the hook portion in bill portion.
The utility model for prefabricated tubular pile suspension hook further improvement lies in that, the suspension hook for prefabricated tubular pile is also Including fixed structure, the fixed structure is configured to coil structures and is sheathed in the hook body portion of the hook body, the control The top of rope is fixed in the hook body portion of the hook body by the fixed structure.
Further improvement of the utility model for the suspension hook of prefabricated tubular pile is that the top of the tricing line is configured to Bifurcation structure, enabling the bifurcation structure is respectively the first fork and the second fork, first fork and second furcation Extend respectively from the opposite sides of the hook body and binds the shackle bolt lock.
Further improvement of the utility model for the suspension hook of prefabricated tubular pile is that the side of the fixed structure is fixed There is annulus, and the side of the fixed structure is also provided with circular hole, first fork places the annulus and is fixed on described On fixed structure, second fork places the circular hole and is fixed on the fixed structure.
The utility model due to use above technical scheme, make it have it is following the utility model has the advantages that
(1) one end of shackle bolt lock is rotatably articulated on hook root, and the other end of shackle bolt lock is by being butted on bill It in portion and seals the opening of hook portion, by the way that the other end of one end of tricing line and shackle bolt lock is affixed, enables the another of tricing line One end is controlled to traction shackle bolt lock and recesses bill portion and open hook portion, and solving people can not will be just in handling pipe on ground The technical issues of suspension hook uncoupling of stake, achieve the purpose that conveniently to unlock suspension hook.
(2) by being arranged the top of the fixed tricing line of fixed structure in hook body, by hook body and tricing line From top clamping.
(3) tricing line carries out binding connection by annulus, circular hole and the shackle bolt lock on fixed structure respectively, enhances steady It is qualitative.
Detailed description of the invention
Structural schematic diagram when Fig. 1 is the closing of the utility model shackle bolt lock.
Fig. 2 is structural schematic diagram when the utility model shackle bolt lock is opened.
Structural schematic diagram when Fig. 3 is the utility model lifting prefabricated tubular pile.
Drawing reference numeral explanation:
Hook body 10;Bill portion 11;Hook root 12;Hook portion 13;Hook body portion 14;Shackle bolt lock 20;Tricing line 30;The One fork 31;Second fork 32;Fixed structure 40;Annulus 41;Circular hole 42;Lifting rope 50;Prefabricated tubular pile 60.
Specific embodiment
For the benefit of to the understanding of the utility model, it is illustrated with reference to the accompanying drawings and embodiments.
It please refers to Fig.1 to Fig.3, the utility model provides a kind of suspension hook for prefabricated tubular pile, described to be used for prefabricated tubular pile Suspension hook hang by lifting rope 50 and connect the prefabricated tubular pile 60, the suspension hook for prefabricated tubular pile includes hook body 10, hangs Hook insurance 20 and tricing line 30.Wherein:
As shown in figures 1 and 3, the hook body 10 includes that bill portion 11, hook root 12 and both ends are separately connected hook The hook body portion 14 of tip 11 and hook root 12 defines between the bill portion 11 of hook body 10, hook root 12 and hook body portion 14 There is hook portion 13, for the one ends wound of lifting rope 50 on prefabricated tubular pile 60, the other end of lifting rope 30 places hook portion 13, and twines It is wound in the hook body portion 14 of hook body 10.
As depicted in figs. 1 and 2, one end of the shackle bolt lock 20 is rotatably articulated on hook root 12, and suspension hook is protected Opening of the other end of danger 20 by being butted in bill portion 11 and sealing hook portion 13.
As shown in figures 1 and 3, one end of the tricing line 30 and the other end of shackle bolt lock 20 are affixed, enable tricing line 30 The other end be controlled to traction shackle bolt lock 20 recess bill portion 11 and open hook portion 13.In this way, solving people on ground Just the suspension hook uncoupling of handling tubular pole the technical issues of, it will can not achieve the purpose that conveniently to unlock suspension hook.
As depicted in figs. 1 and 2, the suspension hook for prefabricated tubular pile further includes fixed structure 40, and fixed structure 40 shapes It for coil structures and is sheathed in the hook body portion 14 of hook body 10, suspension hook is fixed on by fixed structure 40 in the top of tricing line 30 In the hook body portion 14 of ontology 10, in this way, by being arranged the fixed tricing line of fixed structure 40 in the hook body portion 14 of hook body 10 30 top, by hook body 10 and tricing line 30 from top clamping.Preferably, the side of fixed structure 40 is installed with annulus 41, the side of fixed structure 40 offers circular hole 42.In a preferred embodiment of the utility model, such as Fig. 1 and Fig. 2 institute Showing, the top of tricing line 30 is configured to bifurcation structure, and enabling the bifurcation structure is respectively the first fork 31 and the second fork 32, and One fork 31 places annulus 41 and is fixed on fixed structure 40, and the second fork 32 places circular hole 42 and is fixed on fixed structure 40 On.Tricing line 30 increases respectively by annulus 41 on fixed structure 40 and circular hole 42 to carry out binding connection with shackle bolt lock 20 Strong stability.
Combine accompanying drawings and embodiments that the utility model is described in detail above, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, certain details in embodiment should not be constituted to this reality With novel restriction, the utility model will be using the range that the appended claims define as the protection scope of the utility model.

Claims (4)

1. a kind of suspension hook for prefabricated tubular pile, the suspension hook for prefabricated tubular pile is hung by lifting rope connects the prefabricated pipe Stake, which is characterized in that the suspension hook for prefabricated tubular pile includes:
Hook body, the hook body include that bill portion, hook root and both ends are separately connected the bill portion and the hook The hook body portion of root has defined hook portion, the lifting rope between the bill portion of the hook body, hook root and hook body portion One ends wound on the prefabricated tubular pile, the other end of the lifting rope places the hook portion, and is wrapped in the suspension hook In the hook body portion of ontology;
Shackle bolt lock, one end of the shackle bolt lock are rotatably articulated on the hook root, the shackle bolt lock it is another Opening of the one end by being butted in the bill portion and sealing the hook portion;
Tricing line, one end of the tricing line and the other end of the shackle bolt lock are affixed, enable the other end quilt of the tricing line Control recesses the bill portion and opens the hook portion to draw the shackle bolt lock.
2. the suspension hook according to claim 1 for prefabricated tubular pile, which is characterized in that the suspension hook for prefabricated tubular pile It further include fixed structure, the fixed structure is configured to coil structures and is sheathed in the hook body portion of the hook body, the control The top of rope making is fixed in the hook body portion of the hook body by the fixed structure.
3. the suspension hook according to claim 2 for prefabricated tubular pile, which is characterized in that the top of the tricing line is configured to Bifurcation structure, enabling the bifurcation structure is respectively the first fork and the second fork, and first fork and second fork are divided Do not extend from the opposite sides of the hook body and binds the shackle bolt lock.
4. the suspension hook according to claim 3 for prefabricated tubular pile, which is characterized in that the side of the fixed structure is fixed There is annulus, and the side of the fixed structure is also provided with circular hole, first fork places the annulus and is fixed on described On fixed structure, second fork places the circular hole and is fixed on the fixed structure.
CN201820695408.9U 2018-05-10 2018-05-10 Suspension hook for prefabricated tubular pile Active CN208309583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820695408.9U CN208309583U (en) 2018-05-10 2018-05-10 Suspension hook for prefabricated tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820695408.9U CN208309583U (en) 2018-05-10 2018-05-10 Suspension hook for prefabricated tubular pile

Publications (1)

Publication Number Publication Date
CN208309583U true CN208309583U (en) 2019-01-01

Family

ID=64710937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820695408.9U Active CN208309583U (en) 2018-05-10 2018-05-10 Suspension hook for prefabricated tubular pile

Country Status (1)

Country Link
CN (1) CN208309583U (en)

Similar Documents

Publication Publication Date Title
CN108442361B (en) Reinforced cage barb type anti-floating device for bored concrete pile and use method
CN203319514U (en) Box girder lifting appliance
CN103953217B (en) A kind of electric pole installs pulling machine
CN206767425U (en) A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage
CN106698188B (en) It is a kind of new to avoid sliding tower crane hook structure
CN208309583U (en) Suspension hook for prefabricated tubular pile
CN206941595U (en) Rotary digging stake irrigates concrete catheter connection device
CN206590757U (en) A kind of pile tube vertical lifting device
CN103381994B (en) Precast pile pile hanging method
CN203269351U (en) Forceps clip used on crane and used for lifting barrel-shaped objects
CN203755786U (en) Telegraph pole installation pulling machine
CN207844841U (en) A kind of great diameter and long pile cages decentralization suspender
CN206667233U (en) A kind of steel wire rope, steel pipe, buckle combine detachable hangs muscle
CN104358261B (en) A kind of cartridge type hangs a device
CN104692241B (en) Multi purpose partal crane quick-replaceable suspension hook group
CN208792792U (en) Prefabricated components hoisting structure and prefabricated components
CN208561446U (en) Large scale prefabricated concrete component lifts anticreep constructing device
CN204778368U (en) A upright hoist turns over that is used for harmless lifting of hydraulic pressure headstock gear hydro -cylinder to hang
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN203429559U (en) Suspension bridge anchor system steel anchor rod hoisting tool
CN202687780U (en) Pipeline hoisting clamp
CN206857962U (en) The boom hoisting of excavator
CN206570833U (en) A kind of composite pile for improving foundation bearing capacity
CN209052267U (en) A kind of steel reinforcement cage lifting device
CN205917853U (en) Large -scale, simple and easy, portable factory building of detachable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant