CN208309566U - A kind of water-stopping steel sheet pile - Google Patents
A kind of water-stopping steel sheet pile Download PDFInfo
- Publication number
- CN208309566U CN208309566U CN201820852228.7U CN201820852228U CN208309566U CN 208309566 U CN208309566 U CN 208309566U CN 201820852228 U CN201820852228 U CN 201820852228U CN 208309566 U CN208309566 U CN 208309566U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- grouting pipe
- fore shaft
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 69
- 239000010959 steel Substances 0.000 title claims abstract description 69
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 11
- 230000000903 blocking effect Effects 0.000 claims abstract description 6
- 238000007569 slipcasting Methods 0.000 abstract description 14
- 238000010276 construction Methods 0.000 abstract description 7
- 238000007789 sealing Methods 0.000 abstract description 7
- 238000004064 recycling Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 229910000278 bentonite Inorganic materials 0.000 description 4
- 239000000440 bentonite Substances 0.000 description 4
- 239000002689 soil Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000003566 sealing material Substances 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000002904 solvent Substances 0.000 description 2
- 206010000060 Abdominal distension Diseases 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 208000024330 bloating Diseases 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 208000015181 infectious disease Diseases 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model belongs to architecture construction technical field, specially a kind of water-stopping steel sheet pile.Steel sheet pile is strip shape steel plate, and the fold curling of section both ends forms hook groove shape fore shaft;The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;In the fore shaft, steel sheet pile length direction is provided with Grouting Pipe;And when the fore shaft of two steel sheet piles links mutually, forms a cavity, Grouting Pipe is located in the cavity;The Grouting Pipe is equipped with spaced circumferential cutting mouth;Dismountable boring cover is arranged in the closing of Grouting Pipe bottom nozzle, top nozzle.The utility model has the advantages of simple structure, at low cost, sealing high reliablity.When steel sheet pile recycling simultaneously, it can easily extract and replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, Grouting Pipe still can be used after steel sheet pile recycling.
Description
Technical field
The utility model belongs to architecture construction technical field, and in particular to a kind of water-stopping steel sheet pile.
Background technique
Steel sheet pile is a kind of hot-rolled steel section with fore shaft, and there are straight panel shape, flute profile and Z-shaped etc. in section, there is all size ruler
Very little and interlocking form.It common are Ademilson formula of drawing, Lackawanna type etc..It is connected with each other and is engaged by fore shaft, form continuous steel plate
Piling wall is used to earth-retaining and water blocking;Its advantage are as follows: intensity is high, is easy to squeeze into hard soil layer;Can in deep subaqueous work, when necessary plus
Bearing diagonal becomes an inclosure.Waterproof performance is good;The cofferdam of various shapes can be formed as needed, and can be repeatedly used, because
This, it widely used.
But there are fore shafts between two pieces of steel sheet piles, bending deformation, Sloped rotating after steel sheet pile injection will lead to steel plate
Stake leakage.
To solve steel sheet pile fore shaft seepy question, have following two major classes method at present: a kind of way is in steel sheet pile fore shaft
It is inside coated in advance with sealing material, sealing material is mainly bloating tendency solvent, elastic sealing compound, resinae solvent and dilatancy rubber
Glue etc. is constituted;Or undisturbed soil is replaced with cement bentonite in the position grooving of steel sheet pile pile sinking in advance;It is pre- in steel sheet pile fore shaft position
First drilling, which is changed, fills out cement bentonite;It is changed in advance or after pile sinking near fore shaft and fills out the measures such as dilatancy sealing material progress manual seal
Fore shaft;This method is easy to happen leakage vulnerable to construction infection, and not easy to handle after discovery breakthrough.Another method is in steel
High-pressure rotary jet grouting pile is set after sheet pile or stirring pile water stopping curtain, this method cost are higher.
Summary of the invention
The purpose of this utility model is to provide a kind of structure is simple, at low cost, the higher steel plate for sealing water of sealing reliability
Stake.
Water-stopping steel sheet pile provided by the utility model, the steel sheet pile use market routine Larsen steel sheet pile, steel sheet pile
For strip shape steel plate, section is generally straight panel shape, flute profile and Z-shaped etc., and the fold curling of section both ends forms hook groove shape fore shaft 1;
The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;
In the fore shaft 1, steel sheet pile length direction is provided with Grouting Pipe 2;And when the fore shaft 1 of two steel sheet piles is mutual
It links, when forming a cavity 3, Grouting Pipe 2 is located in the cavity 3;
The Grouting Pipe 2 is equipped with spaced circumferential cutting mouth 4;The closing of 2 bottom nozzle of Grouting Pipe, top nozzle are set
Set dismountable boring cover 5.
In the utility model, 2 length of Grouting Pipe is greater than steel plate pile length, and 2 top nozzle of Grouting Pipe is higher than steel sheet pile.
In the utility model, the spacing distance of the cutting mouth 4 is 300mm ~ 600mm, preferably 400mm.
In the utility model, the Grouting Pipe 2 is round tube, and the size incision of the cutting mouth 4 is 100 ° ~ 140 °, preferably
120°。
When the utility model is used, Grouting Pipe is fixed in the fore shaft of steel sheet pile, and makes the Grouting Pipe place of cutting open in face of outer
The cavity that side, fore shaft are formed.Construction, several steel sheet piles are connected in turn, are squeezed into ground;Between two steel sheet piles
It is connected by fore shaft, fore shaft hooks together mutually, the bending section of each fore shaft groove is formed to interconnection similar to groove shape
Another fore shaft groove opening portion is blocked, and makes to form cavity among groove and groove, Grouting Pipe is just in cavity.
After excavation of foundation pit, such as find that there is percolating water situation in the fore shaft junction of steel sheet pile, opens the Grouting Pipe at percolating water
Boring cover, in time to carrying out slip casting in Grouting Pipe.In Grouting Pipe when slip casting, since injecting paste material is clay-bentonite slurry,
Under certain pressure effect, it can fill up within a short period of time cavity by being permeated at Grouting Pipe cutting mouth to cavity and solidify, reach
To fore shaft position water-stagnating effect.
Due to construction site environment complexity, steel sheet pile is driven underground by machinery, so will appear some fore shaft deformations
Or soil etc. falls into the situation in the cavity of fore shaft formation;If direct slip casting cavity is not it is possible that slip casting is complete, blocking
Deng.So introduce Grouting Pipe can more preferably more evenly slip casting filling fore shaft formed cavity, reach sealing effect.
The utility model has the advantages of simple structure, at low cost, sealing high reliablity.When steel sheet pile recycling simultaneously, can easily it extract
And replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, Grouting Pipe still can be used after steel sheet pile recycling.
Detailed description of the invention
Fig. 1 is the utility model embodiment overall structure diagram.
Fig. 2 is the utility model knot Grouting Pipe facade structures diagram.
Fig. 3 is that embodiment steel sheet pile is sequentially connected plan structure diagram.
Figure label: 1 is fore shaft, and 2 be Grouting Pipe, and 3 be cavity, and 4 be cutting mouth, and 5 be boring cover.
Specific embodiment
In the utility model, there are straight panel shape, flute profile and Z-shaped etc. in the section of steel sheet pile, there is full range of sizes and interlocking shape
Formula.
U-shaped steel sheet pile is now selected, the fold curling of section both ends forms hook groove shape fore shaft 1, as shown in Figure 1.
The Grouting Pipe 2 uses rubber material, round tube, and circumferential cutting mouth 4 is alongst arranged at Grouting Pipe 2
On;The spacing distance of cutting mouth 4 is 400mm;Cutting mouth 4 is that the sector formed centered on the circular hollow section center of circle intersects with tube wall
Intersecting lens, it is 120 ° that define size incision, which be fan-shaped angle,.
Dismountable boring cover 5 is arranged in 2 bottom nozzle of the Grouting Pipe closing, top nozzle.
The Grouting Pipe 2 is set in fore shaft 1 along steel sheet pile length direction;And when the fore shaft 1 of two steel sheet piles is mutual
It links, when forming a cavity 3, Grouting Pipe 2 is located in the cavity 3.As shown in Figure 3.
The cavity that Grouting Pipe is fixed in the fore shaft of steel sheet pile, and forms the Grouting Pipe place of cutting open in face of outside, fore shaft.
Construction, several steel sheet piles are connected in turn, are squeezed into ground vertically;It is connected between two steel sheet piles by fore shaft,
Fore shaft hooks mutually together similar to groove shape, hooks and forms cavity among slot and hook slot, Grouting Pipe is just in cavity;Foundation pit is opened
After digging, such as find that there is percolating water situation in the fore shaft junction of steel sheet pile, opens the boring cover of the Grouting Pipe at percolating water, in time to note
Slip casting is carried out in slurry pipe.In Grouting Pipe when slip casting, since injecting paste material is clay-bentonite slurry, under certain pressure effect,
It can fill up within a short period of time cavity by being permeated at Grouting Pipe cutting mouth into cavity and solidify, reach fore shaft position and stop
Water effect, while when steel sheet pile recycling, it can easily extract and replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, slip casting
Pipe still can be used after steel sheet pile recycling.
Due to construction site environment complexity, steel sheet pile is driven underground by machinery, so will appear some fore shaft deformations
Or soil etc. falls into the situation in the cavity of fore shaft formation;If direct slip casting cavity is not it is possible that slip casting is complete, blocking
Deng.So introduce Grouting Pipe can more preferably more evenly slip casting filling fore shaft formed cavity, reach sealing effect.
Claims (4)
1. a kind of water-stopping steel sheet pile, steel sheet pile is strip shape steel plate, and the fold curling of section both ends is formed hook groove shape fore shaft (1);
The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;
It is characterized in that, being provided with Grouting Pipe (2) along steel sheet pile length direction in the fore shaft (1);And when two steel sheet piles
Fore shaft (1) link mutually, when forming a cavity (3), it is interior that Grouting Pipe (2) is located at the cavity (3);
The Grouting Pipe (2) is equipped with spaced circumferential cutting mouth (4);The closing of Grouting Pipe (2) bottom nozzle, top nozzle
Dismountable boring cover (5) are set.
2. water-stopping steel sheet pile as described in claim 1, which is characterized in that Grouting Pipe (2) length is greater than steel plate pile length,
Grouting Pipe (2) top nozzle is higher by steel sheet pile.
3. water-stopping steel sheet pile as claimed in claim 1 or 2, which is characterized in that the spacing distance of the cutting mouth (4) is
300mm~600mm。
4. water-stopping steel sheet pile as claimed in claim 1 or 2, which is characterized in that the Grouting Pipe (2) is round tube, cutting mouth (4)
Size incision be 100 ° ~ 140 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820852228.7U CN208309566U (en) | 2018-06-04 | 2018-06-04 | A kind of water-stopping steel sheet pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820852228.7U CN208309566U (en) | 2018-06-04 | 2018-06-04 | A kind of water-stopping steel sheet pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208309566U true CN208309566U (en) | 2019-01-01 |
Family
ID=64709483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820852228.7U Expired - Fee Related CN208309566U (en) | 2018-06-04 | 2018-06-04 | A kind of water-stopping steel sheet pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208309566U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501800A (en) * | 2020-05-23 | 2020-08-07 | 深圳市东深工程有限公司 | Sluice gate foundation steel sheet pile seepage prevention structure |
CN112709244A (en) * | 2020-12-30 | 2021-04-27 | 上海园林(集团)有限公司 | Gardens waterfront cofferdam |
CN113373941A (en) * | 2021-06-10 | 2021-09-10 | 浙江鹏盛建设集团有限公司 | Sheet pile foundation pit support structure and waterproof construction method thereof |
CN115478549A (en) * | 2022-08-23 | 2022-12-16 | 中交第二航务工程局有限公司 | Construction method of strong permeable stratum lock catch steel pipe pile and steel sheet pile combined cofferdam |
-
2018
- 2018-06-04 CN CN201820852228.7U patent/CN208309566U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501800A (en) * | 2020-05-23 | 2020-08-07 | 深圳市东深工程有限公司 | Sluice gate foundation steel sheet pile seepage prevention structure |
CN112709244A (en) * | 2020-12-30 | 2021-04-27 | 上海园林(集团)有限公司 | Gardens waterfront cofferdam |
CN113373941A (en) * | 2021-06-10 | 2021-09-10 | 浙江鹏盛建设集团有限公司 | Sheet pile foundation pit support structure and waterproof construction method thereof |
CN115478549A (en) * | 2022-08-23 | 2022-12-16 | 中交第二航务工程局有限公司 | Construction method of strong permeable stratum lock catch steel pipe pile and steel sheet pile combined cofferdam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208309566U (en) | A kind of water-stopping steel sheet pile | |
CN102536253A (en) | Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding | |
CN208650073U (en) | Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction | |
CN204253056U (en) | A kind of shield machine export & import reinforcing structure | |
CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
CN206916753U (en) | A kind of water sealing structure of diaphram wall and its seam crossing | |
CN202626978U (en) | Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group | |
CN107023026A (en) | A kind of sealing bottom type caisson wall and construction method | |
CN204530730U (en) | The novel closed cutting off water system of a kind of water rich strata foundation ditch | |
CN202194149U (en) | Water-proof curtain | |
CN107653889A (en) | A kind of shaped steel pressure is poured water the construction method of soil curtain support pile | |
CN104695456A (en) | Construction method novel vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain | |
CN104695457B (en) | The construction method of a kind of Novel silo horizontal jet grouting pile foundation hole back cover water barrier | |
CN108166532A (en) | A kind of groutable underground continuous wall connector and its construction method | |
CN103061348B (en) | Sand-bag and steel sheet pile combined cofferdam for hard formation and construction method of cofferdam | |
CN104988914A (en) | Cast-in-situ bored pile breakage processing method under water area environment | |
CN206800431U (en) | A kind of sealing bottom type caisson wall | |
CN206844192U (en) | The soft waterproof Special digging groove device of deep basal pit | |
CN203939036U (en) | A kind of steel sheet pile cofferdam structure that is applicable to river course | |
CN101586341B (en) | Water sealing method for civil engineering groundwork | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
CN103114602B (en) | Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method | |
CN108360542A (en) | Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method | |
CN204266164U (en) | Concrete veneer and grill-shaped cement soil wall combined type bank protection structure | |
CN203066089U (en) | Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190101 |