CN208309566U - A kind of water-stopping steel sheet pile - Google Patents

A kind of water-stopping steel sheet pile Download PDF

Info

Publication number
CN208309566U
CN208309566U CN201820852228.7U CN201820852228U CN208309566U CN 208309566 U CN208309566 U CN 208309566U CN 201820852228 U CN201820852228 U CN 201820852228U CN 208309566 U CN208309566 U CN 208309566U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
grouting pipe
fore shaft
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820852228.7U
Other languages
Chinese (zh)
Inventor
李敏
吴建强
李文兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Original Assignee
Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd filed Critical Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Priority to CN201820852228.7U priority Critical patent/CN208309566U/en
Application granted granted Critical
Publication of CN208309566U publication Critical patent/CN208309566U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to architecture construction technical field, specially a kind of water-stopping steel sheet pile.Steel sheet pile is strip shape steel plate, and the fold curling of section both ends forms hook groove shape fore shaft;The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;In the fore shaft, steel sheet pile length direction is provided with Grouting Pipe;And when the fore shaft of two steel sheet piles links mutually, forms a cavity, Grouting Pipe is located in the cavity;The Grouting Pipe is equipped with spaced circumferential cutting mouth;Dismountable boring cover is arranged in the closing of Grouting Pipe bottom nozzle, top nozzle.The utility model has the advantages of simple structure, at low cost, sealing high reliablity.When steel sheet pile recycling simultaneously, it can easily extract and replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, Grouting Pipe still can be used after steel sheet pile recycling.

Description

A kind of water-stopping steel sheet pile
Technical field
The utility model belongs to architecture construction technical field, and in particular to a kind of water-stopping steel sheet pile.
Background technique
Steel sheet pile is a kind of hot-rolled steel section with fore shaft, and there are straight panel shape, flute profile and Z-shaped etc. in section, there is all size ruler Very little and interlocking form.It common are Ademilson formula of drawing, Lackawanna type etc..It is connected with each other and is engaged by fore shaft, form continuous steel plate Piling wall is used to earth-retaining and water blocking;Its advantage are as follows: intensity is high, is easy to squeeze into hard soil layer;Can in deep subaqueous work, when necessary plus Bearing diagonal becomes an inclosure.Waterproof performance is good;The cofferdam of various shapes can be formed as needed, and can be repeatedly used, because This, it widely used.
But there are fore shafts between two pieces of steel sheet piles, bending deformation, Sloped rotating after steel sheet pile injection will lead to steel plate Stake leakage.
To solve steel sheet pile fore shaft seepy question, have following two major classes method at present: a kind of way is in steel sheet pile fore shaft It is inside coated in advance with sealing material, sealing material is mainly bloating tendency solvent, elastic sealing compound, resinae solvent and dilatancy rubber Glue etc. is constituted;Or undisturbed soil is replaced with cement bentonite in the position grooving of steel sheet pile pile sinking in advance;It is pre- in steel sheet pile fore shaft position First drilling, which is changed, fills out cement bentonite;It is changed in advance or after pile sinking near fore shaft and fills out the measures such as dilatancy sealing material progress manual seal Fore shaft;This method is easy to happen leakage vulnerable to construction infection, and not easy to handle after discovery breakthrough.Another method is in steel High-pressure rotary jet grouting pile is set after sheet pile or stirring pile water stopping curtain, this method cost are higher.
Summary of the invention
The purpose of this utility model is to provide a kind of structure is simple, at low cost, the higher steel plate for sealing water of sealing reliability Stake.
Water-stopping steel sheet pile provided by the utility model, the steel sheet pile use market routine Larsen steel sheet pile, steel sheet pile For strip shape steel plate, section is generally straight panel shape, flute profile and Z-shaped etc., and the fold curling of section both ends forms hook groove shape fore shaft 1; The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;
In the fore shaft 1, steel sheet pile length direction is provided with Grouting Pipe 2;And when the fore shaft 1 of two steel sheet piles is mutual It links, when forming a cavity 3, Grouting Pipe 2 is located in the cavity 3;
The Grouting Pipe 2 is equipped with spaced circumferential cutting mouth 4;The closing of 2 bottom nozzle of Grouting Pipe, top nozzle are set Set dismountable boring cover 5.
In the utility model, 2 length of Grouting Pipe is greater than steel plate pile length, and 2 top nozzle of Grouting Pipe is higher than steel sheet pile.
In the utility model, the spacing distance of the cutting mouth 4 is 300mm ~ 600mm, preferably 400mm.
In the utility model, the Grouting Pipe 2 is round tube, and the size incision of the cutting mouth 4 is 100 ° ~ 140 °, preferably 120°。
When the utility model is used, Grouting Pipe is fixed in the fore shaft of steel sheet pile, and makes the Grouting Pipe place of cutting open in face of outer The cavity that side, fore shaft are formed.Construction, several steel sheet piles are connected in turn, are squeezed into ground;Between two steel sheet piles It is connected by fore shaft, fore shaft hooks together mutually, the bending section of each fore shaft groove is formed to interconnection similar to groove shape Another fore shaft groove opening portion is blocked, and makes to form cavity among groove and groove, Grouting Pipe is just in cavity.
After excavation of foundation pit, such as find that there is percolating water situation in the fore shaft junction of steel sheet pile, opens the Grouting Pipe at percolating water Boring cover, in time to carrying out slip casting in Grouting Pipe.In Grouting Pipe when slip casting, since injecting paste material is clay-bentonite slurry, Under certain pressure effect, it can fill up within a short period of time cavity by being permeated at Grouting Pipe cutting mouth to cavity and solidify, reach To fore shaft position water-stagnating effect.
Due to construction site environment complexity, steel sheet pile is driven underground by machinery, so will appear some fore shaft deformations Or soil etc. falls into the situation in the cavity of fore shaft formation;If direct slip casting cavity is not it is possible that slip casting is complete, blocking Deng.So introduce Grouting Pipe can more preferably more evenly slip casting filling fore shaft formed cavity, reach sealing effect.
The utility model has the advantages of simple structure, at low cost, sealing high reliablity.When steel sheet pile recycling simultaneously, can easily it extract And replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, Grouting Pipe still can be used after steel sheet pile recycling.
Detailed description of the invention
Fig. 1 is the utility model embodiment overall structure diagram.
Fig. 2 is the utility model knot Grouting Pipe facade structures diagram.
Fig. 3 is that embodiment steel sheet pile is sequentially connected plan structure diagram.
Figure label: 1 is fore shaft, and 2 be Grouting Pipe, and 3 be cavity, and 4 be cutting mouth, and 5 be boring cover.
Specific embodiment
In the utility model, there are straight panel shape, flute profile and Z-shaped etc. in the section of steel sheet pile, there is full range of sizes and interlocking shape Formula.
U-shaped steel sheet pile is now selected, the fold curling of section both ends forms hook groove shape fore shaft 1, as shown in Figure 1.
The Grouting Pipe 2 uses rubber material, round tube, and circumferential cutting mouth 4 is alongst arranged at Grouting Pipe 2 On;The spacing distance of cutting mouth 4 is 400mm;Cutting mouth 4 is that the sector formed centered on the circular hollow section center of circle intersects with tube wall Intersecting lens, it is 120 ° that define size incision, which be fan-shaped angle,.
Dismountable boring cover 5 is arranged in 2 bottom nozzle of the Grouting Pipe closing, top nozzle.
The Grouting Pipe 2 is set in fore shaft 1 along steel sheet pile length direction;And when the fore shaft 1 of two steel sheet piles is mutual It links, when forming a cavity 3, Grouting Pipe 2 is located in the cavity 3.As shown in Figure 3.
The cavity that Grouting Pipe is fixed in the fore shaft of steel sheet pile, and forms the Grouting Pipe place of cutting open in face of outside, fore shaft. Construction, several steel sheet piles are connected in turn, are squeezed into ground vertically;It is connected between two steel sheet piles by fore shaft, Fore shaft hooks mutually together similar to groove shape, hooks and forms cavity among slot and hook slot, Grouting Pipe is just in cavity;Foundation pit is opened After digging, such as find that there is percolating water situation in the fore shaft junction of steel sheet pile, opens the boring cover of the Grouting Pipe at percolating water, in time to note Slip casting is carried out in slurry pipe.In Grouting Pipe when slip casting, since injecting paste material is clay-bentonite slurry, under certain pressure effect, It can fill up within a short period of time cavity by being permeated at Grouting Pipe cutting mouth into cavity and solidify, reach fore shaft position and stop Water effect, while when steel sheet pile recycling, it can easily extract and replace Grouting Pipe.If the non-leak of steel sheet pile carries out slip casting, slip casting Pipe still can be used after steel sheet pile recycling.
Due to construction site environment complexity, steel sheet pile is driven underground by machinery, so will appear some fore shaft deformations Or soil etc. falls into the situation in the cavity of fore shaft formation;If direct slip casting cavity is not it is possible that slip casting is complete, blocking Deng.So introduce Grouting Pipe can more preferably more evenly slip casting filling fore shaft formed cavity, reach sealing effect.

Claims (4)

1. a kind of water-stopping steel sheet pile, steel sheet pile is strip shape steel plate, and the fold curling of section both ends is formed hook groove shape fore shaft (1); The fore shaft of steel sheet pile successively links, and forms the steel plate wall of water blocking earth-retaining;
It is characterized in that, being provided with Grouting Pipe (2) along steel sheet pile length direction in the fore shaft (1);And when two steel sheet piles Fore shaft (1) link mutually, when forming a cavity (3), it is interior that Grouting Pipe (2) is located at the cavity (3);
The Grouting Pipe (2) is equipped with spaced circumferential cutting mouth (4);The closing of Grouting Pipe (2) bottom nozzle, top nozzle Dismountable boring cover (5) are set.
2. water-stopping steel sheet pile as described in claim 1, which is characterized in that Grouting Pipe (2) length is greater than steel plate pile length, Grouting Pipe (2) top nozzle is higher by steel sheet pile.
3. water-stopping steel sheet pile as claimed in claim 1 or 2, which is characterized in that the spacing distance of the cutting mouth (4) is 300mm~600mm。
4. water-stopping steel sheet pile as claimed in claim 1 or 2, which is characterized in that the Grouting Pipe (2) is round tube, cutting mouth (4) Size incision be 100 ° ~ 140 °.
CN201820852228.7U 2018-06-04 2018-06-04 A kind of water-stopping steel sheet pile Expired - Fee Related CN208309566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820852228.7U CN208309566U (en) 2018-06-04 2018-06-04 A kind of water-stopping steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820852228.7U CN208309566U (en) 2018-06-04 2018-06-04 A kind of water-stopping steel sheet pile

Publications (1)

Publication Number Publication Date
CN208309566U true CN208309566U (en) 2019-01-01

Family

ID=64709483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820852228.7U Expired - Fee Related CN208309566U (en) 2018-06-04 2018-06-04 A kind of water-stopping steel sheet pile

Country Status (1)

Country Link
CN (1) CN208309566U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501800A (en) * 2020-05-23 2020-08-07 深圳市东深工程有限公司 Sluice gate foundation steel sheet pile seepage prevention structure
CN112709244A (en) * 2020-12-30 2021-04-27 上海园林(集团)有限公司 Gardens waterfront cofferdam
CN113373941A (en) * 2021-06-10 2021-09-10 浙江鹏盛建设集团有限公司 Sheet pile foundation pit support structure and waterproof construction method thereof
CN115478549A (en) * 2022-08-23 2022-12-16 中交第二航务工程局有限公司 Construction method of strong permeable stratum lock catch steel pipe pile and steel sheet pile combined cofferdam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501800A (en) * 2020-05-23 2020-08-07 深圳市东深工程有限公司 Sluice gate foundation steel sheet pile seepage prevention structure
CN112709244A (en) * 2020-12-30 2021-04-27 上海园林(集团)有限公司 Gardens waterfront cofferdam
CN113373941A (en) * 2021-06-10 2021-09-10 浙江鹏盛建设集团有限公司 Sheet pile foundation pit support structure and waterproof construction method thereof
CN115478549A (en) * 2022-08-23 2022-12-16 中交第二航务工程局有限公司 Construction method of strong permeable stratum lock catch steel pipe pile and steel sheet pile combined cofferdam

Similar Documents

Publication Publication Date Title
CN208309566U (en) A kind of water-stopping steel sheet pile
CN102536253A (en) Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding
CN208650073U (en) Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN204530730U (en) The novel closed cutting off water system of a kind of water rich strata foundation ditch
CN202194149U (en) Water-proof curtain
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN104695456A (en) Construction method novel vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain
CN104695457B (en) The construction method of a kind of Novel silo horizontal jet grouting pile foundation hole back cover water barrier
CN108166532A (en) A kind of groutable underground continuous wall connector and its construction method
CN103061348B (en) Sand-bag and steel sheet pile combined cofferdam for hard formation and construction method of cofferdam
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN206800431U (en) A kind of sealing bottom type caisson wall
CN206844192U (en) The soft waterproof Special digging groove device of deep basal pit
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN101586341B (en) Water sealing method for civil engineering groundwork
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN103114602B (en) Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN204266164U (en) Concrete veneer and grill-shaped cement soil wall combined type bank protection structure
CN203066089U (en) Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101