CN208309536U - Wave energy power generation diversion unit installation - Google Patents

Wave energy power generation diversion unit installation Download PDF

Info

Publication number
CN208309536U
CN208309536U CN201820410310.4U CN201820410310U CN208309536U CN 208309536 U CN208309536 U CN 208309536U CN 201820410310 U CN201820410310 U CN 201820410310U CN 208309536 U CN208309536 U CN 208309536U
Authority
CN
China
Prior art keywords
several
diversion
joint chair
conduit
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820410310.4U
Other languages
Chinese (zh)
Inventor
余运锠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820410310.4U priority Critical patent/CN208309536U/en
Application granted granted Critical
Publication of CN208309536U publication Critical patent/CN208309536U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/30Energy from the sea, e.g. using wave energy or salinity gradient

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model is a kind of wave energy power generation diversion unit installation, including several diversion units, a water tower, once joint chair on joint chair and one, link each diversion unit, upper joint chair and water tower by the lower joint chair for being located at seabed to sea level, and constituting diversion and providing position can generate electricity the equipment that uses of operating, the impact that can effectively support each diversion unit, upper joint chair to resist wave of the sea with water tower will not be toppled over, it provides and carries out stable power generation operating, tool is preferably reached using progressive.

Description

Wave energy power generation diversion unit installation
Technical field
The utility model relates to the technical field of generating equipment more particularly to a kind of wave energy power generation diversion unit installations.
Background technique
Current general power source is green to take second place based on waterpower, fire coal, nuclear energy, recently due to the universal antinucleus of the common people And determine to seal core four up for safekeeping, government actively promotes energy transition, announces nuclear-free homeland target in 2025, combustion gas accounting reaches within 2025 50%, coal-fired up to the 30%, renewable sources of energy 20%;And air pollution is disliked very much because of the common people at present, coal-burning power plant at For the target of public criticism, local government also operates on by coal-burning power plant repeatedly, it is desirable that amount of money feedback.
When " non-core " " subtracts coal " again, it is bound to that natural gas power specific gravity can only be improved.But generated electricity with big so gas, Not only cost will be greatly improved and not said;Natural gas is also not there will be no risk, and gas explosion disaster occurs repeatly in countries in the world See not fresh, or even advanced country not can avoid yet.Moreover, the use of natural gas will have safety stock, regulation is 15 days at present, Summer spike only has 7 days;Civil dealer's worry, under global each plunder gas source competition, the grasp of the following gas source is also It is a test.
In other energy schemes, although solar energy and a kind of clean and lasting energy, it is no it is resistance to its using being above dependent on day Be limited to weather according to number, and can not duration the supply energy;Wind-power electricity generation is then limited to wind field and seasonal, Ye Feichi The energy source of continuous property;Although hydroelectric generation efficiency is very high, watershed must be taken into consideration, and Recent study is found, waterpower hair Power plant can generate serious destruction for local landforms, ecology.
So seeking new energy substitution scheme, actually very urgent, in the renewable sources of energy, wave is in marine energy The most abundant renewable sources of energy of reserves, twenty four hours can be used;And power generation process is clean, will not destroy ecology, safety Property it is high.Currently, platform electricity has formula wave electric power system on the bank in Lanyu, and ITRI also has release pump type wave electric power system.
In addition, as TaiWan, China announces No. M520072 " being power generation application framework in the collection drainage facility in sea area " patent Case, the patent is as described in its claim 1: " 1. it is a kind of be power generation application framework in the collection drainage facility in sea area, comprising: at least one Diversion system module, the first foundation pile group including squeezing into seabed rock stratum;It is respectively arranged at first part's base of the first foundation pile group Stake is to draw the wave priming device for drawing seawater;Structure is organized in the top of first part's foundation pile of the first foundation pile group and is located at sea Above diversion platform;It is installed on above the diversion platform and receives the water that the wave priming device draws the seawater drawn Tower.".
First part's foundation pile that the first foundation pile group in existing patent includes supporting and retaining system wave priming device is taken off on however, with And the second part foundation pile of support generator platform, upper end is only all connected and fixed on by the diversion platform being located on sea level , and arrived under sea level between every bottom all without under the support of any transverse structure, hence it is evident that each wave diversion can not be supported to fill It sets, the huge weight of water tower and generator platform, and the surging sea beat of sea surface reverberation can not be resisted, and have the possibility toppled over With danger.
So how for link several wave diversion units, water tower and be fixedly attached in same sea area to constitute The support construction of power generating equipment lacks support being located at part of the sea level between seabed, and each wave can not be supported to draw The huge weight of water installations, water tower and generating equipment, and the disadvantages of impetuous, heaving waves impacts under sea level can not be resisted, and Innovation improvement is carried out, is problem to be solved in the utility model.
Utility model content
Technical problem underlying to be solved in the utility model is, overcomes drawbacks described above of the existing technology, and mentions For a kind of wave energy power generation diversion unit installation comprising several diversion units, a water tower, once on joint chair and one joint chair group It closes, links each diversion unit, upper joint chair and water tower by the lower joint chair for being located at seabed to sea level, and diversion and offer are provided Position can generate electricity the equipment that uses of operating, can effectively support each diversion unit, upper joint chair and water tower resistance wave of the sea impact not Cause is toppled over, and provides and carries out stable power generation operating, and tool is preferably reached using progressive.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of wave energy power generation diversion unit installation, including several diversion units, a water tower, once joint chair on joint chair and one, Wherein:
The lower joint chair is located at seabed to sea level, which includes several lower standing tubes and connect on the one of each lower standing tube Bracket and several lower brackets, the upper bracket include several lateral cross bars and the several inner supporting rods for connecting each lateral cross bar, should Several lower brackets, which separately include, several horizontal connects outer bar and several interior extension bars.
Joint chair is located above sea level and is connected the lower joint chair with lower end on this, and joint chair includes several upper risers on this, With the several external upper booms, several external lower beams, several inscribed crossbars for connecting each upper riser, and each upper riser is connected to respectively Lower each lower standing tube upper end of joint chair.
The water tower is located at the top of upper joint chair, and connects each diversion unit.
Several water diversion machine groups are respectively provided with the several lower linking tubes for connecting lower joint chair and the several upper connecting tubes for connecting upper joint chair, Several lower linking tubes be connected to a lower joint chair wherein lower bracket it is several it is horizontal connect outer bar and be firmly combined, which connects Be connected to the external upper boom of joint chair, external lower beam and be firmly combined, support each diversion unit with respect to wave stroke stablizing and To the water tower of connection, providing power generator below water tower and carrying out position can generate electricity use for diversion.
According under the above-mentioned description for the utility model, the utility model is further technically characterized in that, each lower branch Several interior extension bars of frame are arranged in each horizontal structure for connecing outer bar middle section and being constituted inscribed rectangle respectively with both ends, connect to be formed down The reinforcing support of holder structure.
According under the above-mentioned description for the utility model, the utility model is further technically characterized in that, is connect under this Seat is further equipped with positioned at the horizontal several crossed longitudinally bars connect between outer bar, and under each crossed longitudinally bar both ends connection adjacent two Standpipe.
According under the above-mentioned description for the utility model, the utility model is further technically characterized in that, is connect on this Seat further has several external crossbars between each external upper boom, external lower beam, and each external crossbar both ends connect Connect adjacent two lower standing tube.
According under the above-mentioned description for the utility model, the utility model is further technically characterized in that, this is several Water diversion machine group includes a floating drum respectively, and wears the diversion conduit and several bailing pipes of the floating drum, several bailing pipes Circular row is connected to the diversion conduit on the outside of the diversion conduit and with upper end, and sets respectively inside the diversion conduit and several bailing pipes There is the drawing water structure interlocked with floating drum, the diversion conduit upper end of each diversion unit is connected to the water tower, each diversion unit jointly Several lower linking tubes connect the diversion conduit and lower joint chair respectively with both ends, and several upper connecting tubes of each diversion unit are respectively with two End connects the diversion conduit and upper joint chair, to support each diversion unit moving up and down by the opposite wave stroke of floating drum, and Diversion conduit and the drawing water structure diversion in several bailing pipes to the water tower being connected to diversion conduit upper end are driven accordingly.
The utility model has the beneficial effects that it includes several diversion units, a water tower, once joint chair on joint chair and one Combination links each diversion unit, upper joint chair and water tower by the lower joint chair for being located at seabed to sea level, and constitutes diversion and mention It can generate electricity the equipment that uses of operating for position, each diversion unit, upper joint chair and water tower can effectively be supported to resist the impact of wave of the sea It will not topple over, provide and carry out stable power generation operating, tool is preferably reached using progressive.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the Three-dimensional combination diagram of the utility model.
Fig. 2 is the perspective exploded view of the utility model.
Fig. 3 is the lower joint chair stereoscopic schematic diagram of the utility model.
Fig. 4 is the floor map of the lower joint chair front angle of the utility model.
Fig. 5 is the floor map of the lower joint chair flank angle of the utility model.
Fig. 6 is the diagrammatic cross-section of line VI -- VI section shown in Fig. 4.
Fig. 7 is the upper joint chair stereoscopic schematic diagram of the utility model.
Fig. 8 is the upper joint chair depression angle floor map of the utility model.
Fig. 9 provides the several wave diversion units of connection, water tower for the utility model and is fixedly attached in sea area to constitute The floor map of power generating equipment.
Figure label explanation:
1 diversion unit, 11 floating drum
12 diversion conduit, 121 lower linking tube
122 upper connecting tube, 13 bailing pipe
The lower joint chair of 2 water towers 3
31 lower standing tube, 32 upper bracket
321 lateral cross bar, 322 inner supporting rod
33 lower brackets 331 are horizontal to connect outer bar
The crossed longitudinally bar of extension bar 34 in 332
41 upper riser of joint chair on 4
The 42 external lower beams of external upper boom 43
The 44 external crossbars of inscribed crossbar 45
The seabed the A sea level B
Specific embodiment
Please refer to a kind of wave energy power generation diversion unit installation of the utility model shown in Fig. 1 to Fig. 9, including several diversion units 1, a water tower 2, once joint chair 4 on joint chair 3 and one, in which:
The lower joint chair 3 is located at seabed A to sea level B, which includes several lower standing tubes 31 and connect each lower standing tube 31 upper bracket 32 and several lower brackets 33, the upper bracket 32 include several lateral cross bars 321 with connect each lateral cross Several inner supporting rods 322 of bar 321, which, which separately includes, several horizontal connects outer bar 331 and several interior extension bars 332.
Joint chair 4 is located at sea level B or more and is connected the lower joint chair 3 with lower end on this, and joint chair 4 includes several vertical on this Pipe 41, and several external upper booms 42, several external lower beams 43, several inscribed crossbars 44 for connecting each upper riser 41, and it is each on Standpipe 41 is connected to each 31 upper end of lower standing tube of lower joint chair 3 respectively.
The water tower 2 is located at the top of upper joint chair 4, and connects each diversion unit 1.
Several diversion units 1 are respectively provided with the several lower linking tubes 121 for connecting lower joint chair 3 and connect the several of upper joint chair 4 Upper connecting tube 122, several horizontal outer bars 331 that connect which is connected to a lower joint chair 3 wherein lower bracket 33 are securely tied It closes, which is connected to the external upper boom 42 of joint chair 4, external lower beam 43 is firmly combined, each to stablize support Diversion unit 1 with respect to wave stroke and diversion to connection the water tower 2, provide positioned at the lower section of water tower 2 power generator (in figure not Show) it carries out position and can generate electricity use.
In the feature of the lower each component for further carefully stating the utility model, in above-mentioned Fig. 1 into Fig. 9, each lower bracket 33 Several interior extension bars 332 be arranged in each horizontal structure for connecing 331 middle section of outer bar and being constituted inscribed rectangle respectively with both ends, to be formed The reinforcing support of lower 3 structure of joint chair.Secondly, the lower joint chair 3 is further equipped with positioned at the horizontal several longitudinal directions connect between outer bar 331 Crossbar 34, and each 34 both ends of crossed longitudinally bar connect adjacent two lower standing tube 31.Furthermore joint chair 4 further has and is located on this Several external crossbars 45 between each external upper boom 42, external lower beam 43, and each 45 both ends of external crossbar connection adjacent two Lower standing tube 31.Moreover, several diversion units 1 have separately included a floating drum 11, and wear a diversion conduit of the floating drum 11 12 in 12 outside of diversion conduit and are connected to the diversion conduit with several bailing pipes 13, several 13 circular rows of bailing pipe with upper end 12, and the drawing water structure (not shown) interlocked with floating drum 11 is respectively equipped with inside diversion conduit 12 and several bailing pipes 13, respectively 12 upper end of diversion conduit of diversion unit 1 is connected to the water tower 2 jointly, several lower linking tubes 121 of each diversion unit 1 respectively with Both ends connect the diversion conduit 12 and lower joint chair 3, and several upper connecting tubes 122 of each diversion unit 1 connect this respectively with both ends and draw Water conduit 12 and upper joint chair 4, to support each diversion unit 1 moving up and down by the opposite wave stroke of floating drum 11, and accordingly The water tower 2 for driving diversion conduit 12 to connect with the drawing water structure diversion in several bailing pipes 13 to 12 upper end of diversion conduit.
As shown in figure 9, i.e. the utility model provide several diversion units 1 and its connection water tower 2 firm connection support and Be mounted on the floor map that power generating equipment is constituted in a sea area, the utility model by include several lower standing tubes 31 with even The lower joint chair 3 of the structure compositions such as a upper bracket 32 and the several lower brackets 33 of each lower standing tube 31 is connect, and under several lower standing tubes 31 The seabed A in a sea area is squeezed at end;Cooperation includes several upper risers 41, several external upper booms 42 of each upper riser 41 of connection, number Joint chair 4 on one composed by a external lower beam 43, and it is connected to each upper riser 41 respectively on each lower standing tube 31 of lower joint chair 3 End;Several diversion units 1 can be provided accordingly and be connected to lower joint chair 3 and upper joint chair 4, which separately includes There is floating drum 11, wear the diversion conduit 12 and several bailing pipes 13 of the floating drum 11, and makes the floating drum 11 of each several diversion units 1 Float on sea level B.
In Fig. 9, several 13 circular rows of bailing pipe in 12 outside of the diversion conduit and with upper end be connected to the diversion conduit 12, and each 12 upper end of diversion conduit is connected to the water tower 2 jointly, and sets respectively inside each diversion conduit 12 and several bailing pipes 13 There is the drawing water structure (not shown) interlocked with floating drum 11;Moreover, the diversion conduit 12 of each diversion unit 1 is respectively under several Adapter tube 121 be connected to a lower joint chair 3 wherein lower bracket 33 it is several it is horizontal connect the firm connection of outer bars 331, separately with several upper connecting tubes 122 It is connected to the external upper boom 42 of joint chair 4, external lower beam 43 is firmly combined.And the stable several water diversion machine groups 1 of support can lead to accordingly Crossing floating drum 11, hollow arrow moves up and down with respect to wave stroke and along figure, and drives diversion conduit 12 and several bailing pipes 13 The water tower 2 that interior drawing water structure diversion is connected to 12 upper end of diversion conduit is provided under water tower 2 as shown by arrows in figure The power generator (not shown) of side, which carries out position, can generate electricity use.
It include as described above several diversion units 1, a water tower 2, once joint chair 4 on joint chair 3 and one by the utility model Combination, link each diversion unit 1, upper joint chair 4 and water tower 2 by the lower joint chair 3 positioned at seabed A to sea level B, and constitute Diversion and it position is provided can generate electricity the equipment that uses of operating, each diversion unit 1, upper joint chair 4 and water tower 2 can effectively be supported to resist sea The impact of wave will not be toppled over, and provide and carry out stable power generation operating.
The above descriptions are merely preferred embodiments of the present invention, and not appointing to the utility model work can be formal Limitation, it is made by the above technical examples according to the technical essence of the present invention it is any it is simple modification, equivalent variations with Modification, is still within the scope of the technical solutions of the present invention.
In conclusion the utility model designs, in structure using on practicability and cost-effectiveness, industry development is complied fully with It is required, and revealed structure is also to have unprecedented innovative structure, has novelty, creativeness, practicability, meeting has The regulation of utility model patent important document is closed, therefore lifts application in accordance with the law.

Claims (6)

1. a kind of wave energy power generation diversion unit installation, which is characterized in that including several diversion units, a water tower, once joint chair and Joint chair on one, in which:
The lower joint chair is located at seabed to sea level, which includes several lower standing tubes and the upper bracket for connecting each lower standing tube And several lower brackets, the upper bracket include several lateral cross bars and the several inner supporting rods for connecting each lateral cross bar, this is several Lower bracket, which separately includes, several horizontal connects outer bar and several interior extension bars;
Joint chair is located above sea level and is connected the lower joint chair with lower end on this, and joint chair includes several upper risers on this, with company The several external upper booms, several external lower beams, several inscribed crossbars of each upper riser are connect, and each upper riser is connected under this respectively Each lower standing tube upper end of joint chair;
The water tower is located at the top of upper joint chair, and connects each diversion unit;
Several water diversion machine groups are respectively provided with the several lower linking tubes for connecting lower joint chair and the several upper connecting tubes for connecting upper joint chair, the number A lower linking tube be connected to a lower joint chair wherein lower bracket it is several it is horizontal connect outer bar and be firmly combined, which is connected to The external upper boom of upper joint chair, external lower beam are simultaneously firmly combined, and support each diversion unit diversion with respect to wave stroke to stablize To the water tower of connection, carrying out position for being located at the power generator below water tower can generate electricity use.
2. wave energy power generation diversion unit installation according to claim 1, which is characterized in that each lower bracket it is several in Extension bar is arranged in each horizontal structure for connecing outer bar middle section and being constituted inscribed rectangle respectively with both ends, to form the benefit of lower joint chair structure Strong support.
3. wave energy power generation diversion unit installation according to claim 1, which is characterized in that the lower joint chair, which further connects, to be set Have and be located at the horizontal several crossed longitudinally bars connect between outer bar, and each crossed longitudinally bar both ends connect adjacent two lower standing tube.
4. wave energy power generation diversion unit installation according to claim 2, which is characterized in that the lower joint chair, which further connects, to be set Have and be located at the horizontal several crossed longitudinally bars connect between outer bar, and each crossed longitudinally bar both ends connect adjacent two lower standing tube.
5. wave energy power generation diversion unit installation according to any one of claim 1 to 4, which is characterized in that connect on described Seat further has several external crossbars between each external upper boom, external lower beam, and each external crossbar both ends connect Connect adjacent two lower standing tube.
6. wave energy power generation diversion unit installation according to claim 5, which is characterized in that several water diversion machine group difference Include a floating drum, and wear the diversion conduit and several bailing pipes of the floating drum, several bailing pipe circular rows are in the diversion It is connected to the diversion conduit on the outside of conduit and with upper end, and is respectively equipped with inside the diversion conduit and several bailing pipes and is interlocked with floating drum Drawing water structure, the diversion conduit upper end of each diversion unit is connected to the water tower, several lower linking tubes of each diversion unit jointly The diversion conduit and lower joint chair are connected with both ends respectively, and several upper connecting tubes of each diversion unit connect the diversion respectively with both ends Conduit and upper joint chair to support each diversion unit moving up and down by the opposite wave stroke of floating drum, and drive diversion accordingly The water tower that conduit is extremely connected to diversion conduit upper end with the drawing water structure diversion in several bailing pipes.
CN201820410310.4U 2018-03-26 2018-03-26 Wave energy power generation diversion unit installation Expired - Fee Related CN208309536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820410310.4U CN208309536U (en) 2018-03-26 2018-03-26 Wave energy power generation diversion unit installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820410310.4U CN208309536U (en) 2018-03-26 2018-03-26 Wave energy power generation diversion unit installation

Publications (1)

Publication Number Publication Date
CN208309536U true CN208309536U (en) 2019-01-01

Family

ID=64721730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820410310.4U Expired - Fee Related CN208309536U (en) 2018-03-26 2018-03-26 Wave energy power generation diversion unit installation

Country Status (1)

Country Link
CN (1) CN208309536U (en)

Similar Documents

Publication Publication Date Title
CN204794820U (en) Photovoltaic support is floated to float -type
CN106416056A (en) Floating structures of floating photovoltaic apparatus and method for inter-connecting structures
EP3071755B1 (en) Power platform
CN109418184A (en) Far-reaching sea aquaculture net cage
US20070057518A1 (en) Reservoirs in the air and reservoirs on the water
WO2021218596A1 (en) Energy-gathered type sea wave weighted power generation system and offshore ecological platform
CN105871309A (en) Floating type overwater photovoltaic power generation system
CN112701994A (en) Ocean resource three-dimensional development structure based on wind, light and fish complementation
KR102258811B1 (en) Method and system apparatus for installing solar cell panel on mud-flat.
CN109653960B (en) Wind energy and wave energy combined power generation device based on jacket foundation
CN111391987A (en) Floating type fan equipment in medium-depth water area
WO2017118998A1 (en) Floating solar platform
US9702335B2 (en) Hydraulic wave energy converter
AU2011279562B2 (en) Extracting energy from flowing fluids
CN201813323U (en) Complementary wind-solar power generating device for bridge
CN215684226U (en) Marine electric platform foundation structure of coupling aquaculture net case
CN105141245B (en) Offshore chinampa type photovoltaic power generation system
CN208309536U (en) Wave energy power generation diversion unit installation
CN205841084U (en) Wave energy generating set
CN211442693U (en) Offshore flexible self-floating photovoltaic power generation system
CN102128126A (en) Device capable of converting lumpy high-low water head potential energy difference into mechanical kinetic energy
KR101075064B1 (en) Sea wind power generating facility for making inclosing net
CN103790760A (en) Device for using waves formed by open sea pulse energy for power generation
CN212373618U (en) Floating type fan equipment in medium-depth water area
WO2022213225A1 (en) Offshore floating-type wave energy power generation combined apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

Termination date: 20200326

CF01 Termination of patent right due to non-payment of annual fee