CN208294499U - A kind of normal pressure shale gas water drainage gas production device - Google Patents
A kind of normal pressure shale gas water drainage gas production device Download PDFInfo
- Publication number
- CN208294499U CN208294499U CN201820806015.0U CN201820806015U CN208294499U CN 208294499 U CN208294499 U CN 208294499U CN 201820806015 U CN201820806015 U CN 201820806015U CN 208294499 U CN208294499 U CN 208294499U
- Authority
- CN
- China
- Prior art keywords
- oil pipe
- solvable ball
- drain
- normal pressure
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 22
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 10
- 239000007788 liquid Substances 0.000 claims abstract description 11
- 230000001012 protector Effects 0.000 claims abstract description 6
- 229910000838 Al alloy Inorganic materials 0.000 claims description 4
- GANNOFFDYMSBSZ-UHFFFAOYSA-N [AlH3].[Mg] Chemical compound [AlH3].[Mg] GANNOFFDYMSBSZ-UHFFFAOYSA-N 0.000 claims description 4
- 239000000956 alloy Substances 0.000 claims description 4
- 238000000926 separation method Methods 0.000 claims description 2
- 240000007594 Oryza sativa Species 0.000 claims 1
- 235000007164 Oryza sativa Nutrition 0.000 claims 1
- 235000009566 rice Nutrition 0.000 claims 1
- 238000010924 continuous production Methods 0.000 abstract 1
- 239000007921 spray Substances 0.000 description 7
- 239000012530 fluid Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000004090 dissolution Methods 0.000 description 4
- 239000000203 mixture Substances 0.000 description 3
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007654 immersion Methods 0.000 description 2
- BVPWJMCABCPUQY-UHFFFAOYSA-N 4-amino-5-chloro-2-methoxy-N-[1-(phenylmethyl)-4-piperidinyl]benzamide Chemical compound COC1=CC(N)=C(Cl)C=C1C(=O)NC1CCN(CC=2C=CC=CC=2)CC1 BVPWJMCABCPUQY-UHFFFAOYSA-N 0.000 description 1
- 241000191291 Abies alba Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of normal pressure shale gas water drainage gas production devices, belong to shale gas operation field.The utility model includes setting gradually from the bottom up: centralizer, screen casing, sensor, filter, motor, protector, liquid-gas separator, pump, power flat cable, oil pipe, solvable ball sliding sleeve, and solvable ball is later period ground investment.Use electric submersible pump drain the utility model early period, depth of setting is deep, and drain is high-efficient;In the drain later period, using solvable ball sliding sleeve, ground puts into solvable ball, realizes that oil pipe takes liquid continuous production.
Description
Technical field
The utility model relates to shale gas operation fields, and in particular to a kind of normal pressure shale gas water drainage gas production device.
Background technique
Normal pressure shale gas well is required to carry out reservoir reconstruction by extensive hydraulic fracturing at present, due to reservoir pressure coefficient
Low, most wells can not achieve self-spray production after open flow drain, need tripping in electric submersible pump or jet pump using oil pipe drain, casing
Gas production, ideal production capacity could be obtained by further decreasing flowing bottomhole pressure (FBHP).It is found by practice, single electric submersible pump or jet stream pump drainage
Gas production tubing string application after will appear gas lock, formation sand production blocking situations such as, not can effectively solve early period production in occur cannot
The problem of self-spray produces.
Utility model content
The purpose of the utility model is to overcome deficiency in the prior art, provide it is a kind of shale gas well liquid loading early period,
After draining to a certain extent, enable the normal pressure shale gas water drainage gas production device of oil pipe self-spray production.
The technical solution of the utility model is: a kind of normal pressure shale gas water drainage gas production device, including casing is being covered with setting
Oil pipe in pipe, the middle part of oil pipe are equipped with the solvable ball sliding sleeve for accommodating solvable ball, and the lower end of oil pipe connects electric submersible pump, electricity
Latent pump, liquid-gas separator, protector, motor, filter, sensor, screen casing, centralizer are sequentially connected from top to bottom, and are arranged
In casing, motor is connect by power flat cable with ground.
Further technical solution, solvable ball are the solvable magnesium-aluminium alloy material of nanometer.
The utility model has the beneficial effects that
1, the utility model depth of setting is deep, and maximum depth of setting reaches 3000 meters, increases drain depth, to greatest extent
Reduce production stream pressure.
2, in the utility model when electric submersible pump drain, lifting rate is controlled by ground frequency-conversion control cabinet, and drain is high-efficient, day
Maximum lifting rate is more than 100 sides, conducive to the quick row of returning of fracturing fluid, reduces fracturing fluid wound of the immersion to shale reservoir for a long time
Evil.In the drain later period, using solvable ball sliding sleeve, opening sliding sleeve is suppressed in ground pitching, links up oil jacket annulus, and it is continuous to realize that oil pipe takes liquid
Production does not need other auxiliary drain facilities.Wherein, solvable ball uses the solvable magnesium-aluminium alloy material of nanometer, and is added to it
His microelement, there is a good mechanical performance and stable rate of dissolution, solvable ball can with return after drain comes into full contact with one
Dissolution in all does not influence later period survey pressure and measure construction with drain discharge tubing string is returned.
3, the utility model construction technology is simple, and operating cost is low.It realizes in shale gas well liquid loading early period, draining to one
After determining degree, oil pipe can reach self-spray production, to extend the self-spray period of gas well, reduce operating cost, finally realize normal pressure
The Efficient Development of shale gas.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model,
Wherein, 1, centralizer, 2, screen casing, 3, sensor, 4, filter, 5, motor, 6, protector, 7, liquid-gas separator,
8, electric submersible pump, 9, power flat cable, 10, oil pipe, 11, solvable ball sliding sleeve.
Specific embodiment
Below by non-limiting embodiment, the utility model is further described, understands the utility model.
Such as Fig. 1, the utility model is a kind of normal pressure shale gas water drainage gas production device, including casing and is arranged in casing
Oil pipe 10, the middle part of oil pipe 10 are equipped with the solvable ball sliding sleeve 11 for accommodating solvable ball, and 10 lower end of oil pipe connects electric submersible pump 8,
8 lower end of electric submersible pump connects liquid-gas separator 7,7 lower end connection protector 6 of liquid-gas separator, and 6 lower end of protector connects motor 5, electricity
5 lower end of machine connects filter 4, and 4 lower end of filter connects sensor 3, and 3 lower end of sensor connects screen casing 2, the connection of 2 lower end of screen casing
Centralizer 1, power flat cable 9 are pierced by from motor 5 up to christmas tree is pierced by ground, and for the power supply of motor 5, power flat cable 9 connects
It is connected to sensor 3, acquire 3 signal of sensor and is delivered to ground.
The electric submersible pump liquid discharging gas producing stage: enter between oil pipe 10 and casing from the gas-liquid mixture of output in shale reservoir
Oil jacket annulus, gas, which enters after oil jacket annulus, passes through filter 4 into inside device by primary filtration by 2 aperture of screen casing
The impurity such as drop, bridge plug clast are filtered, then by 7 gas-liquid separation of liquid-gas separator, production fluid reaches in ground by the lifting of electric submersible pump 8
Face, shale gas enter ground gas production process by oil jacket annulus;When electric submersible pump drain, lifting rate passes through the control of ground frequency-conversion control cabinet
System, drain is high-efficient, day maximum lifting rate be more than 100 sides, conducive to the quick row of returning of fracturing fluid, reduction fracturing fluid long-time immersion
Injury to shale reservoir.
The self-spray liquid discharging gas producing stage: putting into solvable ball from ground in oil pipe, after ball falls into solvable ball sliding sleeve 11, ground
Clear water suppresses 5-7MPa, opens solvable ball sliding sleeve 11, ditch oil pipe 10 and oil jacket annulus channel, closes casing, gas-liquid mixture
Enter 10 self-spray drain of oil pipe production by the annular channel on solvable ball sliding sleeve 11, gas-liquid mixture reaches ground, into ground
Surface current journey.
Wherein, solvable ball uses the solvable magnesium-aluminium alloy material of nanometer, and is added to other microelements, there is good machine
Tool performance and stable rate of dissolution, solvable ball can with return the dissolution in one week after drain comes into full contact with, with returning drain discharge
Tubing string does not influence later period survey pressure and measure construction.
In conclusion the utility model construction technology is simple, operating cost is low.
Claims (2)
1. a kind of normal pressure shale gas water drainage gas production device, including casing and the oil pipe being arranged in casing, which is characterized in that described
The middle part of oil pipe is equipped with the solvable ball sliding sleeve for accommodating solvable ball, and the lower end of oil pipe connects electric submersible pump, electric submersible pump, the separation of liquid gas
Device, protector, motor, filter, sensor, screen casing, centralizer are sequentially connected from top to bottom, and are arranged in casing, motor
It is connect by power flat cable with ground.
2. a kind of normal pressure shale gas water drainage gas production device according to claim 1, which is characterized in that the solvable ball is to receive
The solvable magnesium-aluminium alloy material of rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820806015.0U CN208294499U (en) | 2018-05-29 | 2018-05-29 | A kind of normal pressure shale gas water drainage gas production device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820806015.0U CN208294499U (en) | 2018-05-29 | 2018-05-29 | A kind of normal pressure shale gas water drainage gas production device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208294499U true CN208294499U (en) | 2018-12-28 |
Family
ID=64727436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820806015.0U Active CN208294499U (en) | 2018-05-29 | 2018-05-29 | A kind of normal pressure shale gas water drainage gas production device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208294499U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939402A (en) * | 2020-01-19 | 2020-03-31 | 中国石油化工股份有限公司 | Jet pump tubular column with intubate bridging plug |
CN111779469A (en) * | 2020-01-07 | 2020-10-16 | 中国石油化工股份有限公司 | Horizontal well crawler perforating system and method |
-
2018
- 2018-05-29 CN CN201820806015.0U patent/CN208294499U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779469A (en) * | 2020-01-07 | 2020-10-16 | 中国石油化工股份有限公司 | Horizontal well crawler perforating system and method |
CN110939402A (en) * | 2020-01-19 | 2020-03-31 | 中国石油化工股份有限公司 | Jet pump tubular column with intubate bridging plug |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102953711B (en) | Device and method for horizontal gas well to drain liquid and produce gas | |
CN203285416U (en) | Downhole oil-water separation device of double electric submersible pump | |
CN208294499U (en) | A kind of normal pressure shale gas water drainage gas production device | |
CN105625483B (en) | A kind of underground engineering hydraulic pressure control method | |
CN111102209B (en) | Electric submersible pump backflow lifting device and backflow lifting method applied to low-yield well | |
MX2009013401A (en) | Hydrocarbons. | |
CN108894759A (en) | Downhole oil-water separation injection-production integrated device based on electric pulse and application method thereof | |
CN110984921B (en) | Artificial lifting device and artificial lifting method applied to low-yield well | |
CN202731870U (en) | Production-injection device for down-hole oil water separation | |
CN210066795U (en) | Foundation pit dewatering device | |
CN203584385U (en) | Double-helical-blade diversion underground cyclone desander | |
CN208830979U (en) | Injecting and extracting integrated device for underground oil-water separation based on electric pulse | |
CN206843300U (en) | A kind of oil-bearing sludge treatment equipment | |
CN207093043U (en) | Tubing string is adopted in a kind of coal bed gas and compact sandstone gas underground altogether | |
CN201835785U (en) | Oil-water well device capable of automatically controlling pressure relief and liquid discharge as well as pumping discharged liquid to production pipeline | |
CN211715114U (en) | Underground sand prevention type liquid-gas separator | |
CN201771477U (en) | Electric submersible pump production pipe string capable of filtering and discharging sand | |
CN203783533U (en) | Oil production system of waterpower oil-submerged pump | |
CN203412625U (en) | Underground coal mine drainage facility | |
CN208634046U (en) | A kind of river water extraction safety device | |
CN203223411U (en) | Automatic sand washing machine of electric submersible pump | |
CN204627567U (en) | Multifunctional assembled de-plugging infusion system | |
CN114961691B (en) | Oil gas gathering, transportation, extraction, metering and pressurizing device for shale oil development and method thereof | |
CN112824641B (en) | Integrated oil production process pipe column | |
CN105257266A (en) | Electric submersible pump same-well production-injection pipe column device and production-injection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191113 Address after: 100000 Beijing, Chaoyangmen, North Street, No. 22, No. Co-patentee after: Oil and gas China Petroleum Chemical Co in East China branch Patentee after: China Petrochemical Co., Ltd. Address before: 408400 Sinopec building, 10 media center, Chongqing South Road, Nanchuan District, Chongqing Patentee before: Pan Jia |