CN208294095U - It is a kind of for improving the device of steel strand wires piercing efficiency - Google Patents

It is a kind of for improving the device of steel strand wires piercing efficiency Download PDF

Info

Publication number
CN208294095U
CN208294095U CN201820436932.4U CN201820436932U CN208294095U CN 208294095 U CN208294095 U CN 208294095U CN 201820436932 U CN201820436932 U CN 201820436932U CN 208294095 U CN208294095 U CN 208294095U
Authority
CN
China
Prior art keywords
steel
fork
strand wires
steel strand
steel fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820436932.4U
Other languages
Chinese (zh)
Inventor
田春峰
陆鸣虎
吕静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGHONG CONSTRUCTION Co Ltd
Original Assignee
DONGHONG CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGHONG CONSTRUCTION Co Ltd filed Critical DONGHONG CONSTRUCTION Co Ltd
Priority to CN201820436932.4U priority Critical patent/CN208294095U/en
Application granted granted Critical
Publication of CN208294095U publication Critical patent/CN208294095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a kind of for improving the device of steel strand wires piercing efficiency, it is a kind of for improving the device of steel strand wires piercing efficiency, including the first steel fork, second steel fork, anchorage, steel strand wires, first steel fork and the second steel fork are identical, first steel fork includes handle and teeth, first steel fork and the second steel fork are intersected by horizontal and vertical direction respectively to be stacked on anchorage, one steel fork and the second steel fork intersect heap poststack teeth and staggeredly go out hole, steel strand wires are kept apart by horizontal and vertical direction across anchorage, the utility model simply makes, it is economical and practical, it can select according to actual needs, it is recycled for multiple times, the efficiency of perforation process before raising steel strand tension, it accurately can quickly ensure that steel strand wires punch position is uniform, prevent the cross winding of steel strand wires.

Description

It is a kind of for improving the device of steel strand wires piercing efficiency
Technical field
The utility model belongs to steel strand wires technical field more particularly to a kind of for improving the dress of steel strand wires piercing efficiency It sets.
Background technique
Steel strand wires be by the twisted steel product constituted of more steel wires, carbon steel surface can according to need increase zinc coat, Allumen layer, aluminium coating, copper plate, painting epoxy resin etc..Galvanized strand wires is often referred to for carrier cable, bracing wire, strengthening core Deng can also be used as the structure rope in the ground wire of overhead power transmission, the arrester wires of roadside or building structure.Prestress wire In common prestress wire be the low relaxed prestress steel strand without coating, also have it is zinc-plated, be usually used in bridge, building, Water conservancy, the energy and geotechnical engineering etc., un-bonded prestressed steel strand are usually used in floor, foundation engineering etc..In use, bridge steel Twisted wire often arrange in pairs or groups work anchor and one piece of moveable anchor and perforator use, due to the quality weight of work anchor and moveable anchor, and Steel strand wires hole count is more, and perforation process occupies a large amount of time before steel strand tension, greatly reduces working efficiency.
In application number CN201220722805.3, the applying date 20121225, patent name is a kind of for 900 tons of whole holes In the patent of the strand pulling machine of box beam steel strand wires perforation, a kind of strand pulling machine for the perforation of 900 tons of whole opening box girder steel strand wires is disclosed, Solve many deficiencies existing for " artificial process " in existing precast beam duct perforation work progress, and there are performances for existing strand pulling machine Not perfect, the problem of cannot improving work efficiency well and meeting steel strand wires wire length error requirements, this utility model subtracts significantly Light work intensity, improves production efficiency, reduces the offline error of manual control, has saved steel strand wires, controlled cost, mentioned High working efficiency.In the perforation of bridge construction steel strand wires, since the distance of traction is longer, the easy cross winding of steel strand wires, In addition the quality weight of work anchor and moveable anchor, and steel strand wires hole count is more, and perforation process occupies greatly before steel strand tension The time of amount, greatly reduce working efficiency.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to twist for improving steel The device of line piercing efficiency.
It is a kind of for improving the device of steel strand wires piercing efficiency, including the first steel fork 1, the second steel fork 2, anchorage 3, steel strand wires 4, first steel fork 1 and the second steel fork 2 are identical, and first steel fork 1 includes handle 101 and teeth 102, first steel fork 1 and second steel fork 2 intersect by horizontal and vertical direction be stacked on anchorage 3 respectively, a steel fork 1 and the second steel fork 2 intersect Heap poststack teeth staggeredly go out hole, and steel strand wires 4 are kept apart by horizontal and vertical direction across anchorage 3.
Preferably, first steel fork 1 and the second steel fork 2 are flat row fork.Flat row pitches when in use not It will appear mutual sliding transfer.
Preferably, the handle 101 of first steel fork 1 and teeth 102 are an integral structure.
The handle and teeth of integral structure steel fork are integrally formed, and seamless, in use, steel fork can be reinforced more, be not easy Fracture loosens, and guarantees using safe.
Preferably, the quantity of 1 teeth 102 of the first steel fork is no less than 3.
In actual use, according to anchorage hole count, the steel fork number of teeth required for determining.
Preferably, 102 shape of teeth of first steel fork 1 does not include cylindrical body.
Preferably, first steel fork 1 and the second steel fork 2 are stainless steel steel fork.
Preferably, the steel strand wires 4 include prestress wire.
The utility model has the beneficial effects that the utility model simply makes, and it is economical and practical, it can select according to actual needs It selects, can be recycled for multiple times, since the quality of work anchor and moveable anchor is big, and steel strand wires hole count is more, in steel strand wires Perforation process occupies a large amount of time before drawing, this utility model can improve working efficiency, improves the preceding perforator of steel strand tension The efficiency of sequence accurately can quickly ensure that steel strand wires punch position is uniform, and since the distance of traction is longer, steel strand wires length is long, The utility model can prevent the cross winding of steel strand wires.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the first steel fork.
In figure: the just handle of 101-;102- teeth.
Fig. 2 is the positional structure schematic diagram of steel fork and anchorage.
In figure: the first steel fork of 1-;The second steel fork of 2-;3- anchorage;5- anchorage hole.
Fig. 3 is a kind of for improving the structural schematic diagram of the device of steel strand wires piercing efficiency.
In figure: the first steel fork of 1-;The second steel fork of 2-;3- anchorage;4- steel strand wires;5- anchorage hole.
Specific embodiment
In conjunction with shown in attached drawing, the technical solution of the utility model is further described:
It is as shown in Fig. 3: a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: including the first steel fork 1, the second steel fork 2, anchorage 3, steel strand wires 4, first steel fork 1 and the second steel fork 2 are identical, and first steel fork 1 includes handle 101 and teeth 102, first steel fork 1 and the second steel fork 2 are intersected by horizontal and vertical direction respectively to be stacked on anchorage 3, institute It states a steel fork 1 and the second steel fork 2 intersects heap poststack teeth and staggeredly goes out hole, steel strand wires 4 are kept apart by horizontal and vertical direction to be worn Cross anchorage 3.The steel strand wires 4 include prestress wire.
As shown in Fig. 1, first steel fork 1 and the second steel fork 2 are flat row fork, the handle of first steel fork 1 101 and teeth 102 be an integral structure, the quantity of 1 teeth 102 of the first steel fork is no less than 3, in actual use, behaviour Work person can determine the steel fork number of teeth of needs and the size of steel fork according to the hole count of anchorage.The teeth 102 of first steel fork 1 Shape does not include cylindrical body.In material, first steel fork 1 and the second steel fork 2 are stainless steel steel fork.
In specific implementation, according to shown in attached drawing 3, operator first according to the distribution situation in anchorage hole, anchorage hole count with And anchorage size, steel strand wires size, two handle steel forks are made respectively, and two handle steel fork shape sizes are identical, the length and tooth of teeth Similarly according to the distribution situation in anchorage hole, anchorage hole count and anchorage size, steel strand wires size is determined for spacing between tooth Specific steel fork.The steel fork made is intersected at the top of anchorage by its horizontal and vertical direction respectively, when installing anchorage, uses steel fork Steel strand wires are opened by horizontal and vertical direction " isolation ", then steel strand wires are perforated respectively by corresponding position.
The hole count of anchorage is uniformly distributed, and when anchorage hole count is 25, then according to hole count, can make two handle steel fork teeth is 4, if anchorage is bigger, the spacing of teeth between any two can be increased, conversely, then reduce, while the width of teeth and Thickness can also do corresponding adjustment.In a particular application, operator will make corresponding adjustment according to the actual situation and change.
Finally, it should be noted that the above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although reference Above-described embodiment describes the invention in detail, those skilled in the art should understand that: it still can be to this hair Bright to be modified or replaced equivalently, without departing from the spirit and scope of the present invention, and appended claims are intended to fall into These modifications or equivalent replacement in spirit and scope of the invention.

Claims (7)

1. a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: including the first steel fork (1), the second steel fork (2), anchorage (3), steel strand wires (4), first steel fork (1) and the second steel fork (2) are identical, and first steel fork (1) includes handle Hand 101 and teeth 102, first steel fork (1) and the second steel fork (2) are intersected by horizontal and vertical direction respectively is stacked on anchorage (3) on, a steel fork 1 and the second steel fork (2) intersect heap poststack teeth and staggeredly go out hole, and steel strand wires (4) are horizontal and vertical Direction keeps apart across anchorage (3).
2. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel (1) and the second steel fork (2) are pitched as flat row fork.
3. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel The handle 101 and teeth 102 for pitching (1) are an integral structure.
4. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel The quantity of fork (1) teeth 102 is no less than 3.
5. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel 102 shape of teeth for pitching (1) does not include cylindrical body.
6. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel It pitches (1) and the second steel fork (2) is stainless steel steel fork.
7. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: the steel strand wires It (4) include prestress wire.
CN201820436932.4U 2018-03-28 2018-03-28 It is a kind of for improving the device of steel strand wires piercing efficiency Expired - Fee Related CN208294095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820436932.4U CN208294095U (en) 2018-03-28 2018-03-28 It is a kind of for improving the device of steel strand wires piercing efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820436932.4U CN208294095U (en) 2018-03-28 2018-03-28 It is a kind of for improving the device of steel strand wires piercing efficiency

Publications (1)

Publication Number Publication Date
CN208294095U true CN208294095U (en) 2018-12-28

Family

ID=64694968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820436932.4U Expired - Fee Related CN208294095U (en) 2018-03-28 2018-03-28 It is a kind of for improving the device of steel strand wires piercing efficiency

Country Status (1)

Country Link
CN (1) CN208294095U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680807A (en) * 2019-01-25 2019-04-26 华汇工程设计集团股份有限公司 Anchor structure and method of the pre-tensioning system Prefabricated superposed beam steel strand wires in bean column node
CN111472282A (en) * 2020-04-23 2020-07-31 乔磊 Prestressed anchorage utensil is used in road bridge construction
CN114592695A (en) * 2022-03-16 2022-06-07 威胜利工程有限公司 Method for installing anchorage at upper end of steel strand bundle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680807A (en) * 2019-01-25 2019-04-26 华汇工程设计集团股份有限公司 Anchor structure and method of the pre-tensioning system Prefabricated superposed beam steel strand wires in bean column node
CN111472282A (en) * 2020-04-23 2020-07-31 乔磊 Prestressed anchorage utensil is used in road bridge construction
CN111472282B (en) * 2020-04-23 2021-03-19 乔磊 Prestressed anchorage utensil is used in road bridge construction
CN114592695A (en) * 2022-03-16 2022-06-07 威胜利工程有限公司 Method for installing anchorage at upper end of steel strand bundle
CN114592695B (en) * 2022-03-16 2024-02-02 威胜利工程有限公司 The upper end of the steel strand bundle Anchor installation method

Similar Documents

Publication Publication Date Title
CN208294095U (en) It is a kind of for improving the device of steel strand wires piercing efficiency
CN111119161A (en) Ultra-deep ground wall-connected reinforcement cage lengthening sleeve butt joint construction method
CN207526643U (en) A kind of precast concrete tower section for Wind turbines mixing pylon
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN110683452A (en) Lower lifting point for integral lifting of steel structure corridor and use method thereof
CN202954490U (en) Reinforcement cage hoisting rolling type cushion block
CN204780955U (en) Three -dimensional afforestation with ecological bag of muscle is filled up
CN202689659U (en) Annular concrete pole tower equipped with ladder stand device
CN205822508U (en) A kind of steel plate lacing wire structure in shear wall
CN209384673U (en) A kind of new reinforcing steel bar lashing equipment
CN202550402U (en) Special tool for coiling pre-twisted wire of earth wire
CN205975609U (en) Novel anchor
CN201648966U (en) Low-retraction hoop prestressing force structure for anchorage zone of cable tower of railway cable stayed bridge
CN208907273U (en) A kind of assembled architecture prefabricated component convenient for positioning lifting
CN204198306U (en) A kind of device for purlin lifting in building operation
CN204754245U (en) Wear muscle construction appurtenance
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus
CN203403683U (en) Double-layer rib penetrating device
CN206878390U (en) A kind of bearing for long-distance cable machinery laying
CN201459715U (en) Anti-slide pile for vertical prestressing anchor rope
CN206127859U (en) Portable construction operation platform of drilled pile
CN205188409U (en) Draw sediment instrument
CN205663224U (en) Hoist and mount connecting piece suitable for building prefab
CN205000233U (en) Hollow slab bridge girder construction
CN202543809U (en) Steel strand pulling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228