CN208294095U - It is a kind of for improving the device of steel strand wires piercing efficiency - Google Patents
It is a kind of for improving the device of steel strand wires piercing efficiency Download PDFInfo
- Publication number
- CN208294095U CN208294095U CN201820436932.4U CN201820436932U CN208294095U CN 208294095 U CN208294095 U CN 208294095U CN 201820436932 U CN201820436932 U CN 201820436932U CN 208294095 U CN208294095 U CN 208294095U
- Authority
- CN
- China
- Prior art keywords
- steel
- fork
- strand wires
- steel strand
- steel fork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 135
- 239000010959 steel Substances 0.000 title claims abstract description 135
- 239000010935 stainless steel Substances 0.000 claims description 3
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000011295 pitch Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 6
- 238000004804 winding Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model discloses a kind of for improving the device of steel strand wires piercing efficiency, it is a kind of for improving the device of steel strand wires piercing efficiency, including the first steel fork, second steel fork, anchorage, steel strand wires, first steel fork and the second steel fork are identical, first steel fork includes handle and teeth, first steel fork and the second steel fork are intersected by horizontal and vertical direction respectively to be stacked on anchorage, one steel fork and the second steel fork intersect heap poststack teeth and staggeredly go out hole, steel strand wires are kept apart by horizontal and vertical direction across anchorage, the utility model simply makes, it is economical and practical, it can select according to actual needs, it is recycled for multiple times, the efficiency of perforation process before raising steel strand tension, it accurately can quickly ensure that steel strand wires punch position is uniform, prevent the cross winding of steel strand wires.
Description
Technical field
The utility model belongs to steel strand wires technical field more particularly to a kind of for improving the dress of steel strand wires piercing efficiency
It sets.
Background technique
Steel strand wires be by the twisted steel product constituted of more steel wires, carbon steel surface can according to need increase zinc coat,
Allumen layer, aluminium coating, copper plate, painting epoxy resin etc..Galvanized strand wires is often referred to for carrier cable, bracing wire, strengthening core
Deng can also be used as the structure rope in the ground wire of overhead power transmission, the arrester wires of roadside or building structure.Prestress wire
In common prestress wire be the low relaxed prestress steel strand without coating, also have it is zinc-plated, be usually used in bridge, building,
Water conservancy, the energy and geotechnical engineering etc., un-bonded prestressed steel strand are usually used in floor, foundation engineering etc..In use, bridge steel
Twisted wire often arrange in pairs or groups work anchor and one piece of moveable anchor and perforator use, due to the quality weight of work anchor and moveable anchor, and
Steel strand wires hole count is more, and perforation process occupies a large amount of time before steel strand tension, greatly reduces working efficiency.
In application number CN201220722805.3, the applying date 20121225, patent name is a kind of for 900 tons of whole holes
In the patent of the strand pulling machine of box beam steel strand wires perforation, a kind of strand pulling machine for the perforation of 900 tons of whole opening box girder steel strand wires is disclosed,
Solve many deficiencies existing for " artificial process " in existing precast beam duct perforation work progress, and there are performances for existing strand pulling machine
Not perfect, the problem of cannot improving work efficiency well and meeting steel strand wires wire length error requirements, this utility model subtracts significantly
Light work intensity, improves production efficiency, reduces the offline error of manual control, has saved steel strand wires, controlled cost, mentioned
High working efficiency.In the perforation of bridge construction steel strand wires, since the distance of traction is longer, the easy cross winding of steel strand wires,
In addition the quality weight of work anchor and moveable anchor, and steel strand wires hole count is more, and perforation process occupies greatly before steel strand tension
The time of amount, greatly reduce working efficiency.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to twist for improving steel
The device of line piercing efficiency.
It is a kind of for improving the device of steel strand wires piercing efficiency, including the first steel fork 1, the second steel fork 2, anchorage 3, steel strand wires
4, first steel fork 1 and the second steel fork 2 are identical, and first steel fork 1 includes handle 101 and teeth 102, first steel fork
1 and second steel fork 2 intersect by horizontal and vertical direction be stacked on anchorage 3 respectively, a steel fork 1 and the second steel fork 2 intersect
Heap poststack teeth staggeredly go out hole, and steel strand wires 4 are kept apart by horizontal and vertical direction across anchorage 3.
Preferably, first steel fork 1 and the second steel fork 2 are flat row fork.Flat row pitches when in use not
It will appear mutual sliding transfer.
Preferably, the handle 101 of first steel fork 1 and teeth 102 are an integral structure.
The handle and teeth of integral structure steel fork are integrally formed, and seamless, in use, steel fork can be reinforced more, be not easy
Fracture loosens, and guarantees using safe.
Preferably, the quantity of 1 teeth 102 of the first steel fork is no less than 3.
In actual use, according to anchorage hole count, the steel fork number of teeth required for determining.
Preferably, 102 shape of teeth of first steel fork 1 does not include cylindrical body.
Preferably, first steel fork 1 and the second steel fork 2 are stainless steel steel fork.
Preferably, the steel strand wires 4 include prestress wire.
The utility model has the beneficial effects that the utility model simply makes, and it is economical and practical, it can select according to actual needs
It selects, can be recycled for multiple times, since the quality of work anchor and moveable anchor is big, and steel strand wires hole count is more, in steel strand wires
Perforation process occupies a large amount of time before drawing, this utility model can improve working efficiency, improves the preceding perforator of steel strand tension
The efficiency of sequence accurately can quickly ensure that steel strand wires punch position is uniform, and since the distance of traction is longer, steel strand wires length is long,
The utility model can prevent the cross winding of steel strand wires.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the first steel fork.
In figure: the just handle of 101-;102- teeth.
Fig. 2 is the positional structure schematic diagram of steel fork and anchorage.
In figure: the first steel fork of 1-;The second steel fork of 2-;3- anchorage;5- anchorage hole.
Fig. 3 is a kind of for improving the structural schematic diagram of the device of steel strand wires piercing efficiency.
In figure: the first steel fork of 1-;The second steel fork of 2-;3- anchorage;4- steel strand wires;5- anchorage hole.
Specific embodiment
In conjunction with shown in attached drawing, the technical solution of the utility model is further described:
It is as shown in Fig. 3: a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: including the first steel fork
1, the second steel fork 2, anchorage 3, steel strand wires 4, first steel fork 1 and the second steel fork 2 are identical, and first steel fork 1 includes handle
101 and teeth 102, first steel fork 1 and the second steel fork 2 are intersected by horizontal and vertical direction respectively to be stacked on anchorage 3, institute
It states a steel fork 1 and the second steel fork 2 intersects heap poststack teeth and staggeredly goes out hole, steel strand wires 4 are kept apart by horizontal and vertical direction to be worn
Cross anchorage 3.The steel strand wires 4 include prestress wire.
As shown in Fig. 1, first steel fork 1 and the second steel fork 2 are flat row fork, the handle of first steel fork 1
101 and teeth 102 be an integral structure, the quantity of 1 teeth 102 of the first steel fork is no less than 3, in actual use, behaviour
Work person can determine the steel fork number of teeth of needs and the size of steel fork according to the hole count of anchorage.The teeth 102 of first steel fork 1
Shape does not include cylindrical body.In material, first steel fork 1 and the second steel fork 2 are stainless steel steel fork.
In specific implementation, according to shown in attached drawing 3, operator first according to the distribution situation in anchorage hole, anchorage hole count with
And anchorage size, steel strand wires size, two handle steel forks are made respectively, and two handle steel fork shape sizes are identical, the length and tooth of teeth
Similarly according to the distribution situation in anchorage hole, anchorage hole count and anchorage size, steel strand wires size is determined for spacing between tooth
Specific steel fork.The steel fork made is intersected at the top of anchorage by its horizontal and vertical direction respectively, when installing anchorage, uses steel fork
Steel strand wires are opened by horizontal and vertical direction " isolation ", then steel strand wires are perforated respectively by corresponding position.
The hole count of anchorage is uniformly distributed, and when anchorage hole count is 25, then according to hole count, can make two handle steel fork teeth is
4, if anchorage is bigger, the spacing of teeth between any two can be increased, conversely, then reduce, while the width of teeth and
Thickness can also do corresponding adjustment.In a particular application, operator will make corresponding adjustment according to the actual situation and change.
Finally, it should be noted that the above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although reference
Above-described embodiment describes the invention in detail, those skilled in the art should understand that: it still can be to this hair
Bright to be modified or replaced equivalently, without departing from the spirit and scope of the present invention, and appended claims are intended to fall into
These modifications or equivalent replacement in spirit and scope of the invention.
Claims (7)
1. a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: including the first steel fork (1), the second steel fork
(2), anchorage (3), steel strand wires (4), first steel fork (1) and the second steel fork (2) are identical, and first steel fork (1) includes handle
Hand 101 and teeth 102, first steel fork (1) and the second steel fork (2) are intersected by horizontal and vertical direction respectively is stacked on anchorage
(3) on, a steel fork 1 and the second steel fork (2) intersect heap poststack teeth and staggeredly go out hole, and steel strand wires (4) are horizontal and vertical
Direction keeps apart across anchorage (3).
2. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel
(1) and the second steel fork (2) are pitched as flat row fork.
3. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel
The handle 101 and teeth 102 for pitching (1) are an integral structure.
4. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel
The quantity of fork (1) teeth 102 is no less than 3.
5. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel
102 shape of teeth for pitching (1) does not include cylindrical body.
6. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: first steel
It pitches (1) and the second steel fork (2) is stainless steel steel fork.
7. as described in claim 1 a kind of for improving the device of steel strand wires piercing efficiency, it is characterised in that: the steel strand wires
It (4) include prestress wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820436932.4U CN208294095U (en) | 2018-03-28 | 2018-03-28 | It is a kind of for improving the device of steel strand wires piercing efficiency |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820436932.4U CN208294095U (en) | 2018-03-28 | 2018-03-28 | It is a kind of for improving the device of steel strand wires piercing efficiency |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208294095U true CN208294095U (en) | 2018-12-28 |
Family
ID=64694968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820436932.4U Expired - Fee Related CN208294095U (en) | 2018-03-28 | 2018-03-28 | It is a kind of for improving the device of steel strand wires piercing efficiency |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208294095U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680807A (en) * | 2019-01-25 | 2019-04-26 | 华汇工程设计集团股份有限公司 | Anchor structure and method of the pre-tensioning system Prefabricated superposed beam steel strand wires in bean column node |
CN111472282A (en) * | 2020-04-23 | 2020-07-31 | 乔磊 | Prestressed anchorage utensil is used in road bridge construction |
CN114592695A (en) * | 2022-03-16 | 2022-06-07 | 威胜利工程有限公司 | Method for installing anchorage at upper end of steel strand bundle |
-
2018
- 2018-03-28 CN CN201820436932.4U patent/CN208294095U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680807A (en) * | 2019-01-25 | 2019-04-26 | 华汇工程设计集团股份有限公司 | Anchor structure and method of the pre-tensioning system Prefabricated superposed beam steel strand wires in bean column node |
CN111472282A (en) * | 2020-04-23 | 2020-07-31 | 乔磊 | Prestressed anchorage utensil is used in road bridge construction |
CN111472282B (en) * | 2020-04-23 | 2021-03-19 | 乔磊 | Prestressed anchorage utensil is used in road bridge construction |
CN114592695A (en) * | 2022-03-16 | 2022-06-07 | 威胜利工程有限公司 | Method for installing anchorage at upper end of steel strand bundle |
CN114592695B (en) * | 2022-03-16 | 2024-02-02 | 威胜利工程有限公司 | The upper end of the steel strand bundle Anchor installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208294095U (en) | It is a kind of for improving the device of steel strand wires piercing efficiency | |
CN111119161A (en) | Ultra-deep ground wall-connected reinforcement cage lengthening sleeve butt joint construction method | |
CN207526643U (en) | A kind of precast concrete tower section for Wind turbines mixing pylon | |
CN204266133U (en) | A kind of pier stud reinforcing cage whole lifting structure | |
CN110683452A (en) | Lower lifting point for integral lifting of steel structure corridor and use method thereof | |
CN202954490U (en) | Reinforcement cage hoisting rolling type cushion block | |
CN204780955U (en) | Three -dimensional afforestation with ecological bag of muscle is filled up | |
CN202689659U (en) | Annular concrete pole tower equipped with ladder stand device | |
CN205822508U (en) | A kind of steel plate lacing wire structure in shear wall | |
CN209384673U (en) | A kind of new reinforcing steel bar lashing equipment | |
CN202550402U (en) | Special tool for coiling pre-twisted wire of earth wire | |
CN205975609U (en) | Novel anchor | |
CN201648966U (en) | Low-retraction hoop prestressing force structure for anchorage zone of cable tower of railway cable stayed bridge | |
CN208907273U (en) | A kind of assembled architecture prefabricated component convenient for positioning lifting | |
CN204198306U (en) | A kind of device for purlin lifting in building operation | |
CN204754245U (en) | Wear muscle construction appurtenance | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN203403683U (en) | Double-layer rib penetrating device | |
CN206878390U (en) | A kind of bearing for long-distance cable machinery laying | |
CN201459715U (en) | Anti-slide pile for vertical prestressing anchor rope | |
CN206127859U (en) | Portable construction operation platform of drilled pile | |
CN205188409U (en) | Draw sediment instrument | |
CN205663224U (en) | Hoist and mount connecting piece suitable for building prefab | |
CN205000233U (en) | Hollow slab bridge girder construction | |
CN202543809U (en) | Steel strand pulling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181228 |