CN208293531U - A kind of mini pile soil composite structure of controllable variance sedimentation - Google Patents

A kind of mini pile soil composite structure of controllable variance sedimentation Download PDF

Info

Publication number
CN208293531U
CN208293531U CN201820710588.3U CN201820710588U CN208293531U CN 208293531 U CN208293531 U CN 208293531U CN 201820710588 U CN201820710588 U CN 201820710588U CN 208293531 U CN208293531 U CN 208293531U
Authority
CN
China
Prior art keywords
dike
old
mini pile
new
bed course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820710588.3U
Other languages
Chinese (zh)
Inventor
何露
兰滔
王远明
王建
彭泽豹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Sanjiang Engineering Construction Authority
Hohai University HHU
Original Assignee
Heilongjiang Sanjiang Engineering Construction Authority
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Sanjiang Engineering Construction Authority, Hohai University HHU filed Critical Heilongjiang Sanjiang Engineering Construction Authority
Priority to CN201820710588.3U priority Critical patent/CN208293531U/en
Application granted granted Critical
Publication of CN208293531U publication Critical patent/CN208293531U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of mini pile soil composite structure of controllable variance sedimentation, including old dike, fill in old dike downstream slope and the new dike concordant with old dike, since new levee crown face downward through into old dike mini pile, roll be layed in Lao Di and new levee crown face and with fill on the mix bed course and mix bed course of mini pile close contact to the new levee crown layer of design altitude.The mix bed course rigidity that the utility model rolls laying is big, can not only bear certain pulling force, moreover it is possible to play certain restriction effect to the deformation of the top soil body;Dyke upper load, can be directly passed to old dike by the composite structure that mix bed course and mini pile are formed, and so as to improve the stress for widening the soil body, further achieved the purpose that control the relative settlement of levee crown face and prevented dike face from cracking.The structure is small to the disturbance destruction of old dike, can be reduced the use of geosynthetics, and draw materials conveniently;In addition it constructs more convenient, strong operability punishes significant effect.

Description

A kind of mini pile soil composite structure of controllable variance sedimentation
Technical field
The utility model relates to dyke building fields, and in particular to a kind of mini pile soil composite structure.
Background technique
In recent years, with the continuous improvement that flood control requires, country increases the strengthening reconstruction dynamics to dyke building, wherein One of effective measures taken are exactly to carry out heightening and thickening to dyke.Reference road widening project it is found that dyke through heightening and thickening Afterwards, due to the old and new's dyke and the difference of levee foundation soil solidifying degree, under the action of vehicular load and recent fill gravity, inevitable meeting It causes the old and new dyke faying face two sides to generate biggish relative settlement, and then new levee crown face is caused biggish sedimentation gradient occur. On the other hand, it mutates since levee crown face settles, will lead to levee crown face regional area soil body tension.It can according to soil mechanics knowledge Know, the soil body cannot bear pulling force, be easy to that levee crown face is caused to be cracked when soil body tension, this is endangered for adding training dyke It is huge.Because after the cracking of levee crown face the adhesive force of the old and new's dyke faying face can be weakened under the osmosis of rainwater, seriously When will cause new dike landslide etc., to influence the safe handling of dyke.
Currently, in actual dyke building, reference road widening project experiences most of for the control of relative settlement, Bench excavation such as is carried out in the slope surface of old dyke, adds geosynthetics in the old and new's dyke junction while having.This side Though method can effectively prevent the relative settlement of the old and new's dyke, the risk of pavement cracking is reduced, there is also certain limitation, For example not only need to excavate old dike, it is larger to the disturbance of old dike, it is also contemplated that how geosynthetics is layed in newly In old dyke, work progress is more complex.
Utility model content
Purpose of utility model: the purpose of this utility model is that in view of the deficiencies of the prior art, it is a kind of controllable poor to provide The mini pile soil composite structure of different sedimentation can be by new dike earth material gravity and road by mix bed course and mini pile efficient combination The vehicular load in face is directly transmitted to old dike, to be effectively improved the stress of the new dike soil body, it is poor to play the new levee crown face of control The effect of different sedimentation, structure is simple, constructing operation is more convenient, significant effect.
Technical solution: the utility model provides a kind of mini pile soil composite structure of controllable variance sedimentation, including old Dike, fill in old dike downstream slope and the new dike concordant with old dike, since new levee crown face downward through into old dike mini pile, Roll be layed in Lao Di and new levee crown face and filled on the mix bed course and mix bed course that are in close contact with mini pile to The new levee crown layer of design altitude.
Further, the mix bed course with a thickness of 20 ~ 30cm.
Further, the mix bed course is the mixture of white lime, sand and clay.
Further, pile cover is equipped between the mini pile and mix bed course.
Further, the pile cover is the concrete pile follower that section is square.
Further, the mini pile is located at the new dike concordant with old dike and widens in the middle part of the soil body, and the stake diameter of mini pile is 100 ~ 300mm, the depth for being pierced into old dike is 2 ~ 4m.
The utility model has the advantages that the mix bed course rigidity that the utility model rolls laying is big, certain pulling force can be not only born, also Certain restriction effect can be played to the deformation of the top soil body;The composite structure that mix bed course and mini pile are formed, can be by dike Anti- upper load is directly passed to old dike, so as to improve the stress for widening the soil body, further reaches control levee crown face difference The purpose for settling and preventing dike face from cracking.The structure is small to the disturbance destruction of old dike, can be reduced the use of geosynthetics, And it draws materials conveniently, institute is all conventional building material using material, cheap;In addition mix bed course and miniature pile construction are equal More convenient, strong operability punishes significant effect.
Detailed description of the invention
Fig. 1 is the cross-sectional view after the completion of the utility model construction.
Specific embodiment
Technical solutions of the utility model are described in detail below, but the protection scope of the utility model is not limited to The embodiment.
A kind of mini pile soil composite structure of controllable variance sedimentation, as shown in Figure 1, including old dike 1, filling in old dike 1 Downstream slope 2 and the new dike 3 concordant with old dike 1, since new 3 top surface of dike downward through into old dike 1 mini pile 7, roll paving It is filled on old dike 1 and new 3 top surface of dike and the mix bed course 5 and mix bed course 5 that are in close contact with mini pile 7 to setting Count the new levee crown layer 6 of elevation.
It is larger to roll 5 rigidity of mix bed course to be formed, certain pulling force can be born, when filling laying depth be taken as 20 ~ 30cm.By taking clay material dyke as an example, mix bed course 5 can be formed by three kinds of white lime, sand and clay material mixings, three Volume ratio be taken as 1:2:4 ~ 1:3:6.
Pile cover 4 is equipped between mini pile 7 and mix bed course 5, to prevent between stake and bed course due to rigidity and section Difference causes mini pile 7 to puncture bed course, and the section of pile cover 4 is square, side length 50cm, and thickness is taken as 15cm, the material of pile cover 4 Material uses concrete.
Mini pile 7 is located at the new dike 3 concordant with old dike 1 and widens in the middle part of the soil body, and the stake diameter of mini pile 7 is 100 ~ 300mm, The depth of old dike 1 is pierced into depending on old 1 soil strength of dike, is generally taken as 2 ~ 4m, the main material of mini pile 7 is cement slurry.
Specific construction process is as follows:
Firstly, carry out clear slope processing to old dike 1, after completion according to design requirement, design lift height, design compactness by Layer fills new 3 soil body of dike.When new 3 height of dike is flushed with old dike 1, surveying setting-out, determine mini pile 7 sets position.It is surveying Fixed location arrangements drilling machine simultaneously carries out vertical drilling operation, and bore diameter is 100 ~ 300mm, and the depth of drilling is according to pile body It is pierced into depending on the depth of old dike 1.It is inserted into steel pipe and Grouting Pipe after drilling, and passes through slip casing by pressure mechanical irrigation cement injection, when When slip casting is to 7 top of mini pile, the concrete bodies of 50cm*50cm*15cm are poured, complete the production of pile cover 4.
Secondly, production mix, white lime, sand are matched by volume with former stickiness earth material and are mixed and stirred, uniform mixing After fill in new, old dike 3,1 anti-top surface upper area, the pad is guaranteed to compactness is designed using cal rolling after the completion of construction Layer is effectively contacted with pile cover 4, and forms a composite structure by pile cover 4 and mini pile 7.
Finally, successively filling remaining each layer soil body as new levee crown by design requirement, design lift height, design compactness Layer 6.

Claims (6)

1. a kind of mini pile soil composite structure of controllable variance sedimentation, it is characterised in that: including old dike, fill in old levee back water Slope and the new dike concordant with old dike, since new levee crown face downward through into old dike mini pile, roll be layed in old dike with It fills on new levee crown face and the mix bed course and mix bed course that are in close contact with mini pile to the new levee crown of design altitude Layer.
2. the mini pile soil composite structure of controllable variance sedimentation according to claim 1, it is characterised in that: described to mix and stir Object bed course with a thickness of 20 ~ 30cm.
3. the mini pile soil composite structure of controllable variance sedimentation according to claim 1 or 2, it is characterised in that: described Mix bed course is the mixture of white lime, sand and clay.
4. the mini pile soil composite structure of controllable variance sedimentation according to claim 1, it is characterised in that: described miniature Pile cover is equipped between stake and mix bed course.
5. the mini pile soil composite structure of controllable variance sedimentation according to claim 4, it is characterised in that: the pile cover It is the concrete pile follower that section is square.
6. the mini pile soil composite structure of controllable variance sedimentation according to claim 1, it is characterised in that: described miniature Stake is located at the new dike concordant with old dike and widens in the middle part of the soil body, and the stake diameter of mini pile is 100 ~ 300mm, and the depth for being pierced into old dike is 2~4m。
CN201820710588.3U 2018-05-14 2018-05-14 A kind of mini pile soil composite structure of controllable variance sedimentation Expired - Fee Related CN208293531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820710588.3U CN208293531U (en) 2018-05-14 2018-05-14 A kind of mini pile soil composite structure of controllable variance sedimentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820710588.3U CN208293531U (en) 2018-05-14 2018-05-14 A kind of mini pile soil composite structure of controllable variance sedimentation

Publications (1)

Publication Number Publication Date
CN208293531U true CN208293531U (en) 2018-12-28

Family

ID=64727398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820710588.3U Expired - Fee Related CN208293531U (en) 2018-05-14 2018-05-14 A kind of mini pile soil composite structure of controllable variance sedimentation

Country Status (1)

Country Link
CN (1) CN208293531U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761126A (en) * 2019-12-04 2020-02-07 中铁二院工程集团有限责任公司 Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method
CN112982320A (en) * 2019-12-13 2021-06-18 中国电建集团华东勘测设计研究院有限公司 Construction method and structure of core-wall dam heightened concrete faced rockfill dam
CN113089584A (en) * 2021-03-18 2021-07-09 中国水利水电第九工程局有限公司 Construction method of soil dam heightening anti-seepage PVC geomembrane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761126A (en) * 2019-12-04 2020-02-07 中铁二院工程集团有限责任公司 Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method
CN110761126B (en) * 2019-12-04 2024-05-24 中铁二院工程集团有限责任公司 Rock foundation existing high-speed railway fine soil filling embankment side width structure and construction method
CN112982320A (en) * 2019-12-13 2021-06-18 中国电建集团华东勘测设计研究院有限公司 Construction method and structure of core-wall dam heightened concrete faced rockfill dam
CN112982320B (en) * 2019-12-13 2023-02-28 中国电建集团华东勘测设计研究院有限公司 Construction method and structure of core-wall dam heightened concrete faced rockfill dam
CN113089584A (en) * 2021-03-18 2021-07-09 中国水利水电第九工程局有限公司 Construction method of soil dam heightening anti-seepage PVC geomembrane

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN204608536U (en) A kind of high-fill roadbed structure
CN208605184U (en) Reinforcing structure of large-section tunnel underpass loose high-fill embankment
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN203174619U (en) Reverse raft concrete terrace
CN208293531U (en) A kind of mini pile soil composite structure of controllable variance sedimentation
CN103184734A (en) Implanted and grouted compound pile and construction method
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
WO2021004007A1 (en) Foundation reinforcement method for conventional building
CN103741670A (en) Negative skin friction (NSF) removing foundation treatment method
CN102877470B (en) Combined soil nailing construction method for supporting
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN103806433A (en) Foundation backfill reinforcement method
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN102839683A (en) Discrete pile-water permeability concrete pile novel binary composite foundation and treatment method of composite foundation
CN202672132U (en) Reinforcing structure for basement backfilling
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN102839647A (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN102605775B (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method
CN207159923U (en) A kind of compound soil-baffling structure of steel tube concrete clay model bag stake
CN207567570U (en) A kind of Foam lightweight soil railway bed transition section structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228