CN208280023U - Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form - Google Patents
Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form Download PDFInfo
- Publication number
- CN208280023U CN208280023U CN201820783843.7U CN201820783843U CN208280023U CN 208280023 U CN208280023 U CN 208280023U CN 201820783843 U CN201820783843 U CN 201820783843U CN 208280023 U CN208280023 U CN 208280023U
- Authority
- CN
- China
- Prior art keywords
- tensioning
- frustum
- covering anchorage
- steel strand
- prestressed concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses a kind of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified forms, including baffle and multiple tensioning frustums, tensioning frustum be it is multiple, all tensioning frustums are fixed on the trailing flank of baffle, and the position of all tensioning frustums and spacing are corresponding with the steel strand wires position of beam-ends;The end face of tensioning frustum is vertical with steel strand tension direction;Corresponding position of first steel strand wires across hole, baffle and the first steel strand wires across hole is offered on tensioning frustum offers the second steel strand wires across hole.The utility model has the following beneficial effects: ensure that the quality of sealing off and covering anchorage concrete;Conducive to later period sealing off and covering anchorage operation;There is no connect stubble for the end of prefabricated beam body;Construction cost is saved;Installation, convenient disassembly are laborsaving, and speed of application is fast.
Description
Technical field
The utility model relates to post stretching prefabrication of beam field of engineering technology in road and bridge construction, and in particular to a kind of post stretching
Prestressing force beam body beam-ends sealing off and covering anchorage typified form.
Background technique
Traditional sealing off and covering anchorage method causes the beam-ends spillage mould phenomenon that rises commonplace due to using template more, fixed difficult,
Concrete is difficult to vibration compacting, and new-old concrete joint treatment is bad, presentation quality is poor.
Utility model content
The purpose of this utility model is to provide a kind of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified forms, to solve
The existing above problem.
To achieve the above object, the technical solution of the utility model is
A kind of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form, including baffle and multiple tensioning frustums, in which:
The tensioning frustum be it is multiple, all tensioning frustums are fixed on the trailing flank of the baffle, all
The position of the tensioning frustum and spacing are corresponding with the steel strand wires position of beam-ends;
The end face of the tensioning frustum is vertical with steel strand tension direction;
The first steel strand wires are offered on the tensioning frustum passes through hole across hole, the baffle and first steel strand wires
Corresponding position offers the second steel strand wires across hole.
Preferably, the left and right sides of the baffle offer multiple fixation holes parallel to each other, and all is described solid
The axis for determining hole is vertical with the axis of the tensioning frustum.
Preferably, the quantity of the tensioning frustum is identical as the quantity of beam-ends anchorage.
Preferably, the root of the tensioning frustum and the end face of the tensioning frustum are provided with rounding off.
Preferably, the tensioning frustum is hollow structure.
Further, the height of the tensioning frustum reduces along dimension linear from the top down.
Preferably, the baffle and the tensioning frustum are integrally formed.
Preferably, the baffle and tensioning frustum casting are structure as a whole.
The utility model has the advantages that
When prefabricated beam body, the end of prefabricated beam body is arranged in using post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form,
And make baffle concordant with the section of the beam body after sealing off and covering anchorage towards the side of prefabricated beam body, so that baffle and prefabricated beam body
Between space (remove the occupied space of tensioning frustum) precast to come simultaneously with beam body, to ensure that sealing off and covering anchorage concrete
Total quality;
By the setting of tensioning frustum, the tensioning that the both ends of prefabricated beam body form the equipment of tensioning such as installation jack is recessed
Slot meets the construction requirement of post stretching;
Beam-ends connects stubble there is no concrete to (on the length direction along beam) along bridge after the prefabricated prefabrication of beam such as T-type beam,
To substantially increase prefabricated beam body overall appearance image;
When sealing off and covering anchorage, concreting only is carried out to the corresponding tensioning groove of tensioning frustum, greatly reduces sealing off and covering anchorage workload,
Sealing off and covering anchorage working efficiency is improved, while only using area lesser flat-die when sealing off and covering anchorage, has saved construction cost;
Flexibly compared to the assembly and disassembly of traditional anchor sealing template, easy to operate, fast power-saving, speed of application faster than traditional anchor sealing 7 are torn in spelling open
~8 times (traditional anchor sealing will prop up vertical bed die, two side forms and four pieces of end head formwork;Carrying out sealing off and covering anchorage using the utility model only need to be two
Hold Zhi Liyi block).
Detailed description of the invention
The main view of Fig. 1 one embodiment of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form described in the utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is to be shown using the structure of the prefabricated prefabricated beam body of the post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form of Fig. 1
It is intended to;
Fig. 4 is the main view of the post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form of a prior art;
Fig. 5 is to be shown using the structure of the prefabricated prefabricated beam body of the post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form of Fig. 4
It is intended to.
In figure: 1, baffle;11, the second steel strand wires pass through hole;12, fixation hole;2, tensioning frustum;21, the first steel strand wires are worn
Via hole;22, upside;23, downside;24, root;25, end face;3, prefabricated beam body;31, tensioning groove;32, existing sealing off and covering anchorage range.
Specific embodiment
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
Embodiment 1
A kind of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form, referring to figure 1, figure 2 and figure 3 comprising baffle 1 and more
A tensioning frustum 2, in which:
Tensioning frustum 2 be it is multiple, all tensioning frustums 2 are fixed on the trailing flank of baffle 1, all tensioning frustums 2
Position and spacing it is corresponding with beam-ends steel strand wires position;
The end face of tensioning frustum 2 is vertical with steel strand tension direction;
Corresponding position of first steel strand wires across hole 21, baffle 1 and the first steel strand wires across hole is offered on tensioning frustum 2
The second steel strand wires are offered across hole 11.
When prefabricated beam body 3, the end of prefabricated beam body 3 is arranged in using post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form
Portion, and make baffle 1 concordant with the section of the beam body after sealing off and covering anchorage towards the side of prefabricated beam body 3, so that baffle 1 and pre-
Space (removing the occupied space of tensioning frustum 2) between beam body 3 processed precasts to come simultaneously with beam body, to ensure that sealing off and covering anchorage
The total quality of concrete;
By the setting of tensioning frustum 2, the both ends of prefabricated beam body 3 form the tensioning of the equipment of tensioning such as installation jack
Groove 31 meets the construction requirement of post stretching;
Beam-ends connects stubble there is no concrete to (on the length direction along beam) along bridge after the prefabricated beam body 3 such as T-type beam is prefabricated,
To substantially increase T beam overall appearance image;
When sealing off and covering anchorage, concreting only is carried out to the corresponding tensioning groove 31 of tensioning frustum 2, greatly reduces sealing off and covering anchorage work
Amount, improves sealing off and covering anchorage working efficiency, while only using area lesser flat-die when sealing off and covering anchorage, has saved construction cost;
Compared to existing sealing off and covering anchorage template, referring to fig. 4 and Fig. 5, assembly and disassembly are flexibly, easy to operate, and fast power-saving, construction speed are torn in spelling open
Degree (props up vertical bed die, two side forms and four pieces of end head formwork than fast 7~8 times of traditional anchor sealing when traditional anchor sealing;Using the utility model
Carrying out sealing off and covering anchorage only need to be in both ends Zhi Liyi block).Fig. 4 section line region is existing sealing off and covering anchorage range 32.Hatching in Fig. 3
Region is the sealing off and covering anchorage range of the utility model.
In addition, the width of frustum is gradually reduced along the direction of the root 24 far from frustum by the tensioning frustum 2 of setting,
So that tensioning frustum 2 is deviate from out of tensioning groove 31, conducive to precast beam after demoulding, ensure that higher construction effect
Rate.
Embodiment 2
On the basis of embodiment 1, the left and right sides of baffle 1 offer multiple fixation holes 12 parallel to each other, institute
The axis of some fixation holes 12 is vertical with the axis of tensioning frustum 2.In order to guarantee the intensity of precast beam, usually it is cast in prefabricated
The steel strand wires of cluster in beam slab are arranged along a straight line, when post-stretching process carries out, by tensioning equipments such as jack to cluster
Steel strand wires carry out tensioning, need to reserve at this time to fill the tensioning groove 31 of jack, therefore, the position of tensioning groove 31 should
With cluster, the position of steel strand wires that is arranged along a straight line it is corresponding, and tensioning groove 31 is shape when being poured by tensioning frustum 2
At, therefore tensioning frustum 2 is set in above-mentioned position, meet the construction needs of post stretching;In addition the end face 25 of tensioning frustum 2 is hung down
Straight steel strand wires, the i.e. vertical steel strand wires of tensioning groove 31, so that of the tensioning equipments such as jack being mounted in tensioning groove 31
Draw direction consistent with the tensioning direction of steel strand wires.
Penetrate fixation hole 12 by fixing pieces such as bolts, can by baffle 1 and basis, prefabricated beam body 3 web templates and
Wing plate template etc. is fixed, and is easy for installation and removal.
In addition, the position of the quantity of tensioning frustum 2 tensioning according to actual needs is flexibly set, to guarantee extensively applicable model
It encloses, as shown in figure 3, the quantity of tensioning frustum 2 is three.
In addition, the root 24 of tensioning frustum 2 and the end face 25 of tensioning frustum 2 are provided with rounding off.With further benefit
Deviate from out of tensioning groove 31 in tensioning frustum 2, guarantees again while to guarantee the concrete pouring quality at tensioning groove 31
High construction efficiency.
In addition, weight is larger, sets hollow knot for tensioning frustum 2 at this time since 2 height of tensioning frustum is big
Structure alleviates the volume and weight of the utility model to reduce the use of material, facilitates construction, further improves construction effect
Rate.
Embodiment 3
On the basis of embodiment 2, the height of tensioning frustum 2 reduces along dimension linear from the top down.The setting so that
The end face of tensioning frustum 2, the bottom of tensioning groove 31 are inclined-plane, draw frustum 2 high in use, the utility model installation is supported
Side is located above, when the utility model demoulds, the small knot between tensioning groove 31 of the contact area of the downside of tensioning frustum 2
Resultant force is smaller, and binding force of the contact area of the upside 22 of tensioning frustum 2 greatly between tensioning groove 31 is larger, and this is practical new
Type itself has certain weight, and under its own weight, the upside 22 of tensioning frustum 2 can easily separate, and under tensioning frustum 2
Side 23 is due to being set smaller than tensioning cone for the height of the downside 23 of tensioning frustum 2 by the relatively bad separation of Gravitative Loads
The height of the upside 22 of platform 2 is deviate from out of tensioning groove 31 to be conducive to tensioning frustum 2, avoids damaging tensioning when abjection
The concrete of groove 31 guarantees in turn ensure high construction efficiency while the concrete pouring quality at tensioning groove 31.
In addition, baffle 1 and tensioning frustum 2 are integrally formed.Since post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form needs
Have certain intensity, thus it is common to use steel is made, when adopt be made of a steel when, in order to prepare conveniently, by baffle 1 and tensioning
Frustum 2 is prepared using integrally formed technique.
As a kind of above-mentioned integrally formed mode: baffle 1 and the casting of tensioning frustum 2 are structure as a whole.
Although above having made detailed description to the utility model with generality explanation and specific embodiment,
On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art
's.Therefore, these modifications or improvements on the basis of without departing from the spirit of the present invention, belong to the utility model and want
Seek the range of protection.
Claims (8)
1. a kind of post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form, which is characterized in that including baffle and multiple tensioning frustums,
Wherein:
The tensioning frustum be it is multiple, all tensioning frustums are fixed on the trailing flank of the baffle, and all is described
The position of tensioning frustum and spacing are corresponding with the steel strand wires position of beam-ends;
The end face of the tensioning frustum is vertical with steel strand tension direction;
The first steel strand wires are offered on the tensioning frustum across hole, the baffle passes through the corresponding of hole with first steel strand wires
Position offers the second steel strand wires across hole.
2. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 1, which is characterized in that the baffle
Left and right sides offer multiple fixation holes parallel to each other, the axis of all fixation holes and the tensioning frustum
Axis it is vertical.
3. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 1, which is characterized in that the tensioning
The quantity of frustum is identical as the quantity of beam-ends anchorage.
4. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 1, which is characterized in that the tensioning
The root of frustum and the end face of the tensioning frustum are provided with rounding off.
5. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 1, which is characterized in that the tensioning
Frustum is hollow structure.
6. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to any one of claims 1-5, feature exist
In the height of the tensioning frustum reduces along dimension linear from the top down.
7. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 6, which is characterized in that the baffle
It is integrally formed with the tensioning frustum.
8. post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form according to claim 7, which is characterized in that the baffle
It is structure as a whole with tensioning frustum casting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820783843.7U CN208280023U (en) | 2018-05-24 | 2018-05-24 | Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820783843.7U CN208280023U (en) | 2018-05-24 | 2018-05-24 | Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208280023U true CN208280023U (en) | 2018-12-25 |
Family
ID=64730771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820783843.7U Active CN208280023U (en) | 2018-05-24 | 2018-05-24 | Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208280023U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111906903A (en) * | 2020-07-16 | 2020-11-10 | 五冶集团上海有限公司 | End plugging template suitable for steel strand capable of being worn in production of pre-tensioning precast beam |
CN113957890A (en) * | 2021-12-15 | 2022-01-21 | 中庆建设有限责任公司 | Communicated deep anchor grouting construction structure and construction process |
-
2018
- 2018-05-24 CN CN201820783843.7U patent/CN208280023U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111906903A (en) * | 2020-07-16 | 2020-11-10 | 五冶集团上海有限公司 | End plugging template suitable for steel strand capable of being worn in production of pre-tensioning precast beam |
CN113957890A (en) * | 2021-12-15 | 2022-01-21 | 中庆建设有限责任公司 | Communicated deep anchor grouting construction structure and construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102294741B (en) | Construction method for prefabricating hollow slab beams using hinged draw type steel internal mould | |
CN208280023U (en) | Post tentioned prestressed concrete girder body beam-ends sealing off and covering anchorage typified form | |
CN107905111B (en) | A kind of rigid frame-continuous girder end bay construction technology | |
CN107152104B (en) | Assembled cavity shear wall horizontal joint tooth socket rotating vane type connection structure | |
CN103437285B (en) | Full space support cast-in-place box beam construction technology | |
CN106607989A (en) | Rail transit post-stressed U-shaped beam construction technique | |
CN113846746A (en) | Basement structure beneficial to efficient construction and construction method | |
CN206844444U (en) | A kind of steel bar girder concrete hollow building roof based on non-dismantling formwork | |
CN113481944A (en) | Dam surface hole connection girder supporting structure and construction method | |
CN205637578U (en) | Roof beam increase cross -section combination steel form | |
CN102303351B (en) | Method for manufacturing once pouring-molded T-shaped beam | |
CN109898423B (en) | Main tower lower crossbeam prestress tensioning method and structure | |
CN106567330A (en) | Sectional anchoring structure for box girder internal prestressing tendon | |
CN110524675A (en) | A kind of pre-tensioning system precast H-beam and its construction method | |
CN205024584U (en) | Pre -stressed reinforcement's segmentation anchor structure in case roof beam | |
CN202117319U (en) | End formwork | |
CN110318557B (en) | Prestressed concrete hollow slab reinforcing device and method | |
CN210622367U (en) | Prestressed concrete hollow slab reinforcing device | |
CN208009742U (en) | A kind of embedded rib superimposed sheet of band and laminated structure member | |
CN208701705U (en) | It is a kind of one concrete revetment pour mold | |
CN207348880U (en) | A kind of tunnel center gutter formed molding board | |
CN106437771B (en) | Coal mine inclined shaft working face construction formwork device | |
CN203066264U (en) | Water stopping piece for concrete post-cast strip | |
CN216864836U (en) | Cast-in-place section template of boundary span handing-over mound department | |
CN205399830U (en) | Easy plane is plastics split heads for reinforcing bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |