CN208271285U - Converter station intelligent access control system - Google Patents

Converter station intelligent access control system Download PDF

Info

Publication number
CN208271285U
CN208271285U CN201821001152.3U CN201821001152U CN208271285U CN 208271285 U CN208271285 U CN 208271285U CN 201821001152 U CN201821001152 U CN 201821001152U CN 208271285 U CN208271285 U CN 208271285U
Authority
CN
China
Prior art keywords
converter station
station
base station
access control
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821001152.3U
Other languages
Chinese (zh)
Inventor
钱兵
杨媛
尹程臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenshan Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Wenshan Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenshan Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Wenshan Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201821001152.3U priority Critical patent/CN208271285U/en
Application granted granted Critical
Publication of CN208271285U publication Critical patent/CN208271285U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Selective Calling Equipment (AREA)
  • Alarm Systems (AREA)

Abstract

Converter station intelligent access control system is related to entrance guard device, especially a kind of to be suitable in converter station, strong antijamming capability, converter station intelligent access control system easy to use.The converter station intelligent access control system of the utility model is arranged in control room and converter station, it is characterised in that the system includes station level, process layer and application layer, is sequentially communicated by wireless signal between station level, process layer and application layer.The converter station intelligent access control system of the utility model, structure is simple, design science, it is easy to use, the positioning of indoor or outdoors small range is carried out using UWB technology, and signal transmission is carried out by cable and 5.8G frequency signal, the communication protocol of wireless signal uses 802.11ac standard, not only can effectively improve anti-interference ability, moreover it is possible to effectively compatible development of new techniques, service life is improved, replacement cost is reduced.

Description

Converter station intelligent access control system
Technical field
The utility model relates to entrance guard devices, and especially a kind of to be suitable in converter station, strong antijamming capability is easy to use Converter station intelligent access control system.
Background technique
The security protection of converter station/substation mainly includes manpower prevention, entity prevention, technological prevention.Manpower prevention, holds A kind of organized prevention behavior with corresponding quality personnel or personnel group of row safety precaution task, including people, tissue With management etc.;Entity prevention, for safety precaution purpose, can postpone risk case generation various entity preventive means, including Building, barrier, utensil, equipment, system etc.;Technological prevention forms system or network using various electronic information equipments to mention Height detection postpones, the safety precaution means of respond and safeguard function.
Preferable achievement is currently achieved at above-mentioned three aspect both at home and abroad, still, with converter station/substation's scale The problem of continuous enlargement, technical staff's shortage will be increasingly prominent, under the conditions of human resources are limited the problem by long-term existence, Future, which has only, is improved by technical precaution means to make up the insufficient short slab of human resources, and providing for limited safety precaution personnel can be same When to multiple substations carry out remote supervisory technology platform.
Summary of the invention
To be solved in the utility model is exactly existing converter station/substation because of scale continuous enlargement, technical staff's shortage Seriously, the problem of safety precaution is carried out by technological means is needed, one kind is provided and is suitable in converter station, strong antijamming capability, Converter station intelligent access control system easy to use.
The converter station intelligent access control system of the utility model is arranged in control room and converter station, it is characterised in that this is System includes station level, process layer and application layer, is sequentially carried out by wireless signal between station level, process layer and application layer Communication;Wherein:
Station level includes wireless controller, core switch and the main base station AP, wireless controller, core switch and master Pass through 6 type shielding twisted pair line connection networkings between the base station AP;
Process layer includes dividing the base station AP, POE interchanger and AP hot spot, is divided between the base station AP, POE interchanger and AP hot spot By 6 type shielding twisted pair line connections, the base station AP is divided to connect by wireless signal with the main base station AP, AP hot spot is arranged in converter station It is interior;
Application layer includes that entrance guard device, UWB equipment and UWB chip, entrance guard device are mounted on the door of converter station, UWB Equipment is mounted on the passageway in converter station and converter station inlet, and UWB chip is carried by staff, entrance guard device and UWB equipment passes through wireless signal and connect with AP hot spot, and UWB chip is connect by pulse signal with UWB equipment.
The wireless signal uses 5.8G frequency, and communication protocol 802.11ac can effectively improve anti-interference ability, Also ensure transmission rate.
Staff carries UWB chip close to the door of converter station, and by UWB chip emission pulse signal, UWB equipment receives To after pulse signal, the staff for carrying UWB chip is positioned by pulse signal, and the position data is passed through into AP Hot spot, POE interchanger divide the base station AP, the main base station AP, host exchange to be transferred to wireless controller, and wireless controller receives this Be analyzed and processed after location of personnel, when staff is when being located proximate to, then wireless controller by host exchange, The main base station AP divides the base station AP, POE interchanger, AP hot spot to be transferred to entrance guard device for signal is controlled, and entrance guard device is enabled to open the fan Door passes in and out convenient for staff;When there is no the personnel for carrying UWB chip close to door, due to being not received by pulse signal, then Wireless controller will not send a signal to entrance guard device, and entrance guard device remains off.
The converter station intelligent access control system of the utility model, structure is simple, design science, easy to use, utilizes UWB technology The positioning of indoor or outdoors small range is carried out, and signal transmission, the communication of wireless signal are carried out by cable and 5.8G frequency signal Agreement uses 802.11ac standard, not only can effectively improve anti-interference ability, moreover it is possible to which effectively compatible development of new techniques, raising make With the time limit, replacement cost is reduced.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Wherein, the base station AP 4 is divided in wireless controller 1, core switch 2, the main base station AP 3, POE interchanger 5, AP hot spot 6, Entrance guard device 7, UWB equipment 8, UWB chip 9.
Specific embodiment
Embodiment 1: a kind of converter station intelligent access control system is arranged in control room and converter station, which includes station control Layer, process layer and application layer, are sequentially communicated by wireless signal between station level, process layer and application layer;Wherein:
Station level includes wireless controller 1, core switch 2 and the main base station AP 3, wireless controller 1, core switch Pass through 6 type shielding twisted pair line connection networkings between 2 and the main base station AP 3;
Process layer includes dividing the base station AP 4, POE interchanger 5 and AP hot spot 6, divides the base station AP 4, POE interchanger 5 and AP heat By 6 type shielding twisted pair line connections between point 6, the base station AP 4 is divided to connect by wireless signal with the main base station AP 3, AP hot spot 6 is arranged In converter station;
Application layer includes entrance guard device 7, UWB equipment 8 and UWB chip 9, and entrance guard device 7 is mounted on the door of converter station, UWB equipment 8 is mounted on the passageway in converter station and converter station inlet, and UWB chip 9 is carried by staff, gate inhibition's dress Set 7 and UWB equipment 8 connect with AP hot spot 6 by wireless signal, UWB chip 9 passes through pulse signal and the company of UWB equipment 8 It connects.
Wireless signal uses 5.8G frequency, and communication protocol 802.11ac can effectively improve anti-interference ability, moreover it is possible to protect Demonstrate,prove transmission rate.
Staff carries UWB chip 9 close to the door of converter station, emits pulse signal, UWB equipment 8 by UWB chip 9 After receiving pulse signal, the staff for carrying UWB chip 9 is positioned by pulse signal, and by the position data By AP hot spot 6, POE interchanger 5, the base station AP 4, the main base station AP 3, host exchange is divided to be transferred to wireless controller 1, wireless control Device 1 is analyzed and processed after receiving the location of personnel, when staff is when being located proximate to, then wireless controller 1 By host exchange, the main base station AP 3, the base station AP 4, POE interchanger 5, AP hot spot 6 is divided to be transferred to entrance guard device 7 for signal is controlled, It enables entrance guard device 7 open the fan door, is passed in and out convenient for staff;When there is no the personnel for carrying UWB chip 9 close to door, due to It is not received by pulse signal, then wireless controller 1 will not send a signal to entrance guard device 7, and entrance guard device 7 remains turned-off shape State.

Claims (2)

1. a kind of converter station intelligent access control system is arranged in control room and converter station, it is characterised in that the system includes station control Layer, process layer and application layer, are sequentially communicated by wireless signal between station level, process layer and application layer;Wherein:
Station level includes wireless controller (1), core switch (2) and the main base station AP (3), and wireless controller (1), core are handed over It changes planes (2) between the main base station AP (3) through 6 type shielding twisted pair line connection networkings;
Process layer includes dividing the base station AP (4), POE interchanger (5) and AP hot spot (6), the base station AP, POE interchanger (5) and AP heat By 6 type shielding twisted pair line connections between point (6), the base station AP (4) is divided to connect by wireless signal with the main base station AP (3), AP heat Point (6) is arranged in converter station;
Application layer includes entrance guard device (7), UWB equipment (8) and UWB chip (9), and entrance guard device (7) is mounted on converter station Men Shang, UWB equipment (8) is mounted on the passageway in converter station and converter station inlet, and UWB chip (9) is taken by staff Band, entrance guard device (7) and UWB equipment (8) are connect by wireless signal with AP hot spot (6), and UWB chip (9) passes through pulse Signal is connect with UWB equipment (8).
2. converter station intelligent access control system as described in claim 1, it is characterised in that the wireless signal is using 5.8G frequency Rate, communication protocol 802.11ac, can effectively improve anti-interference ability, moreover it is possible to guarantee transmission rate.
CN201821001152.3U 2018-06-27 2018-06-27 Converter station intelligent access control system Expired - Fee Related CN208271285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821001152.3U CN208271285U (en) 2018-06-27 2018-06-27 Converter station intelligent access control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821001152.3U CN208271285U (en) 2018-06-27 2018-06-27 Converter station intelligent access control system

Publications (1)

Publication Number Publication Date
CN208271285U true CN208271285U (en) 2018-12-21

Family

ID=64690264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821001152.3U Expired - Fee Related CN208271285U (en) 2018-06-27 2018-06-27 Converter station intelligent access control system

Country Status (1)

Country Link
CN (1) CN208271285U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109920106A (en) * 2019-02-18 2019-06-21 云南电网有限责任公司文山供电局 Channel dynamic gate system and method based on 4G/5G

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109920106A (en) * 2019-02-18 2019-06-21 云南电网有限责任公司文山供电局 Channel dynamic gate system and method based on 4G/5G

Similar Documents

Publication Publication Date Title
WO2019095910A1 (en) Daily patrol working method and system in substation
CN104569657B (en) A kind of LTE radio communications intelligent substation mutual inductor simulating test device
CN101645612B (en) Interstation interlock control system for transmission line close operation and reflecting ground-switch state
CN205845244U (en) A kind of community intelligent safety and defence system
CN106026400B (en) A kind of substation's anti-misoperation locking device
CN105430648B (en) A kind of full system type pictorial mobile communication terminal intelligence managing and control system
CN202650090U (en) Electronic night watching system for Internet of Things based on ZigBee
CN204206474U (en) Mining wireless communication system
CN104792356A (en) Cable tunnel state monitoring system based on broadband leaky cable technology and design method thereof
CN208271285U (en) Converter station intelligent access control system
CN109831741A (en) Underground pipe gallery personnel location system
CN107180400A (en) A kind of intelligent control system applied to public security bureau
CN106920298A (en) A kind of access control method based on wireless communication technique, apparatus and system
CN206617193U (en) The constructing metro tunnel personnel location system implemented based on BIM
CN207164836U (en) A kind of noninductive equipment of checking card based on building trade
CN206611587U (en) Hydroenergy storage station hole indoor occupant wireless location system
CN202889386U (en) Safety protection system between electric power data communication network and electric power scheduling network
CN110278569B (en) Sharing system, device and sharing method for ubiquitous Internet of things indoor distribution
CN205986866U (en) Use electric information collection system based on middling pressure power line carrier
CN201365344Y (en) Apparatus and system with real-time import of remote SIM card data based on singlechip
CN210112054U (en) Utility tunnel security protection communication integration system based on wisdom line
CN106411361A (en) Electricity information collection system based on medium voltage power carrier and control method thereof
CN205490539U (en) A wireless communication device for cable tunnel monitored control system
CN106681256A (en) Monitoring method and system based on cloud computing
CN107942996A (en) A kind of existing platform door system part, overall upgrading control method and system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

Termination date: 20190627