CN208266929U - Prefabricated assembled concrete aproll component system - Google Patents

Prefabricated assembled concrete aproll component system Download PDF

Info

Publication number
CN208266929U
CN208266929U CN201820018354.2U CN201820018354U CN208266929U CN 208266929 U CN208266929 U CN 208266929U CN 201820018354 U CN201820018354 U CN 201820018354U CN 208266929 U CN208266929 U CN 208266929U
Authority
CN
China
Prior art keywords
aproll
plate
building
general
sketch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820018354.2U
Other languages
Chinese (zh)
Inventor
钱杰
雷文洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AEROSPACE WANYUAN BUILDING ENGINEERING Co Ltd
Original Assignee
BEIJING AEROSPACE WANYUAN BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEROSPACE WANYUAN BUILDING ENGINEERING Co Ltd filed Critical BEIJING AEROSPACE WANYUAN BUILDING ENGINEERING Co Ltd
Priority to CN201820018354.2U priority Critical patent/CN208266929U/en
Application granted granted Critical
Publication of CN208266929U publication Critical patent/CN208266929U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled concrete aproll component system, including parameterizes and demoulding mould, general aproll on-gauge plate, aproll sketch plate, gusset and with non-slip groove ramp plate may be reversed;The side of aproll on-gauge plate and aproll sketch plate is equipped with flashing platform, and the side of the flashing platform of the general aproll on-gauge plate and the aproll sketch plate is parallel with external wall insulating layer to be linked;The gusset is arranged at corners of building, is connected with the general aproll on-gauge plate and the aproll sketch plate, constitutes first of aproll layer, and a circle band non-slip groove ramp plate is placed in periphery;Utility model has the advantages that solving traditional aproll system is easy cracking, sinking, freezing up and other issues, meanwhile, the duration by seasonal effect, is not saved in construction site;Construction quality is reliable, can effectively avoid cracking, and uniform color is consistent, has saved the live duration, has not been influenced by seasonal construction;It avoids getting damp;Quick drainage;Pipe and trench cover board can be also served as.

Description

Prefabricated assembled concrete aproll component system
Technical field
The utility model relates to a kind of concrete apron component system, specifically a kind of prefabricated assembled concrete dissipates Water component system belongs to concrete apron component system regions.
Background technique
The aproll system currently built uses poured in place concrete formula construction method, meanwhile, it constructs tight by seasonal effect Weight, if encountering bad weather will affect the construction time, and after cast-in-place aproll system long-time use, be easy to appear cracking, under Heavy, freezing up and other issues.Meanwhile after the completion of traditional cast-type aproll system, at turning intersection all can there are gaps, when long Between use can seep water at sinking, especially the foot of a wall, breakthrough easy to form at the buildings waterproof closing in underground waterproof coiled material.
Summary of the invention
To solve the above-mentioned problems, the utility model devises a kind of prefabricated assembled concrete aproll component system, solution Traditional aproll system of having determined is easy cracking, sinking, freezing up and other issues, meanwhile, work by seasonal effect, is not saved in construction site Phase;Construction quality is reliable, can effectively avoid cracking, and surface color uniformity has saved the live duration, not by seasonal construction It influences;It avoids getting damp;Quick drainage;Pipe and trench cover board can be also served as.
The technical solution of the utility model are as follows:
Prefabricated assembled concrete aproll component system, including general aproll on-gauge plate, aproll sketch plate, gusset and with anti- Sliding slot ramp plate;The general aproll on-gauge plate, aproll sketch plate, gusset and with non-slip groove ramp plate, are prefabricated assembled Demoulding mould may be reversed after factory or in-situ precast by parameterizing in concrete component, transports work surface combination installation;Institute The aproll on-gauge plate stated and sketch plate lean on the pre-formed integrated flashing platform in wall side, the general aproll on-gauge plate and described The described of aproll sketch plate links by wall side flashing platform Shunping County vertical with external wall insulating layer (or other architectural surfaces);It is described Gusset is arranged in exterior walls of buildings corner, is connected with the general aproll on-gauge plate and the aproll sketch plate, the band Non-slip groove ramp plate is placed in building entrance, joins with the general aproll on-gauge plate and the aproll sketch plate phase piece It connects.
Further, the general aproll on-gauge plate includes platysome, and the platysome is rectangular parallelepiped structure, leans on wall side Equipped with aproll flashing platform, the aproll flashing platform is connected with building wall, and the aproll flashing platform is connect with the platysome Place is more convenient aproll at radian, seamless connection.
Further, the aproll sketch plate includes plate body, and the plate body is cuboid design, and wherein long side side is equipped with Rectangle flashing platform, the aproll sketch plate and the plate body junction facilitate aproll at radian, in the aproll sketch plate Between be equipped with splash pan, the water flowed out in building drainpipe is flowed on ground by splash pan.During the i.e. described aproll sketch plate is Between be equipped with splash pan general aproll on-gauge plate.
Further, the aproll on-gauge plate and the aproll sketch plate are the integrated design.
Further, the flashing platform of the aproll on-gauge plate and the aproll sketch plate after the wall with decoration of exterior wall system Face forms flush joint connection.
Further, the gusset is cube structure, is divided into external corner plate and inner corner trim plate, is separately mounted to the sun of building Angle and inner corner trim set bossed ridge cable architecture among the external corner plate, for two sides Fen Shui, the external corner plate setting to be built Build the external corner of object;Concave is equipped among the inner corner trim plate, two sides inwardly at inverted-triangular, are used for inside polywater, the inner corner trim plate The inner corner trim of building is set.
Further, the band non-slip groove ramp plate is cuboid shelving structure, high on one side, low on one side, and slope surface is equipped with horizontal To anti-skid chequer, be mounted on the doorway of building, left and right is connected with the aproll on-gauge plate and the aproll sketch plate.
Further, the general aproll on-gauge plate, aproll sketch plate, gusset and with precast concretes such as non-slip groove ramp plates Component matches reinforcing bar using carbon fibre bar band substitution tradition is interior in tension face.
Utility model has the advantages that solving traditional aproll system is easy cracking, sinking, freezing up and other issues, Meanwhile the duration is saved not by seasonal effect in construction site;Construction quality is reliable, can effectively avoid cracking, and uniform color is consistent, The live duration has been saved, has not been influenced by seasonal construction;It avoids getting damp;Quick drainage;Pipe and trench cover board can be also served as.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the general aproll on-gauge plate of the utility model embodiment;
Fig. 2 is the structural schematic diagram of the utility model embodiment aproll sketch plate;
Fig. 3 is the structural schematic diagram of the utility model embodiment external corner plate;
Fig. 4 is the structural schematic diagram of the utility model embodiment inner corner trim plate;
Fig. 5 is structural schematic diagram of the utility model embodiment with non-slip groove ramp plate.
Specific embodiment
The preferred embodiment of the utility model is illustrated below, it should be understood that preferred embodiment described herein It is only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment 1
As shown in Figs. 1-5, a kind of prefabricated assembled concrete aproll component system, including the general aproll on-gauge plate 1, Aproll sketch plate 2, gusset 3 and with non-slip groove ramp plate 4;The general aproll on-gauge plate, aproll sketch plate, gusset and with anti-skidding Demoulding mould may be reversed after factory (or scene) is prefabricated by described parameterize in slot ramp plate, transports field combinations installation, The side of the aproll on-gauge plate and aproll sketch plate is equipped with flashing platform 5, and the general aproll on-gauge plate and the aproll are different The side of the flashing platform of shape plate is parallel with external wall insulating layer to be linked;The gusset is arranged in building quadrangle, the band Non-slip groove ramp plate is arranged on building doorway, is connected with the general aproll on-gauge plate and the aproll sketch plate, constitutes Aproll layer plays the role of building aproll.
Prefabricated assembled concrete aproll component system will be designed into Building Design, in structure foundation Top Position Design one parallel to the ground is small-sized to choose bracket, for placing this system.
The general aproll on-gauge plate is prefabricated, can by parametrization using the preceding design according to architectural design drawing Demoulding mould mass production is overturn, is cuboid, wherein there is rectangle flashing platform in long side side, for being connected with building wall It connects.
The length of the general aproll on-gauge plate: 3000-4000mm;Width: 800-1000mm;Highly: 90-100mm.
The centre of the aproll sketch plate 2 is equipped with splash pan 21 and passes through ginseng using the preceding design according to architectural design drawing Demoulding mould mass production may be reversed in numberization, and the aproll sketch plate is cuboid design, flows out in building drainpipe Water is flowed on ground by splash pan.
It is round between the flashing platform and the aproll on-gauge plate and the flashing platform facade and horizontal plane of aproll sketch plate Corner structure has certain radian, is convenient for aproll.
Demoulding mould mass may be reversed by parameterizing using the preceding design according to architectural design drawing in the gusset Production is divided into the external corner plate 3 and the inner corner trim plate 4, is separately mounted to the external corner and inner corner trim of building for cube structure, Bossed 31 structure of ridge line is set among the external corner plate, for two sides Fen Shui, building to be arranged in the external corner plate External corner;Concave 41 is equipped among the inner corner trim plate, two sides inwardly at inverted-triangular, are used for inside polywater, the inner corner trim plate setting In the inner corner trim of building.
The band non-slip groove ramp plate 5 is cuboid shelving structure, low inside and high outside, and slope surface is equipped with lateral anti-skid chequer 51, It is mounted on building doorway, is connected with the aproll on-gauge plate and aproll sketch plate.
The height of the aproll plate flashing platform is 50-80mm, thickness is about 50mm, is hung down after wall with decoration of exterior wall system Lateral knot.
It the general aproll on-gauge plate, aproll sketch plate, gusset and can be turned over non-slip groove ramp plate by the parametrization Turn demoulding mould after factory (or scene) is prefabricated, transports field combinations installation, the general aproll on-gauge plate and described Aproll sketch plate proportionally by with the flashing platform side it is parallel with external wall insulating layer link, the gusset is being built Object four corners, the band non-slip groove ramp plate is at building doorway, with the general aproll on-gauge plate and aproll abnormity Plate is connected, and constitutes aproll layer, plays the role of building aproll.

Claims (7)

1. prefabricated assembled concrete aproll component system, it is characterised in that: including general aproll on-gauge plate, aproll sketch plate, Gusset and with non-slip groove ramp plate prefabrication concrete building subassembly;The aproll on-gauge plate and aproll sketch plate leans on wall side Equipped with flashing platform, the flashing platform side of the general aproll on-gauge plate and the aproll sketch plate and decoration of exterior wall layer hang down and put down Connection;The gusset is arranged in building quadrangle, is connected with the general aproll on-gauge plate and the aproll sketch plate, described Band non-slip groove ramp plate, is placed in building doorway, mutually splices with the general aproll on-gauge plate and the aproll sketch plate.
2. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: the general aproll On-gauge plate is rectangular parallelepiped structure, and wherein long side side is equipped with rectangle flashing platform, is connected with building wall, the rectangle Flashing platform and plate body junction are at radian.
3. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: the aproll abnormity Plate is the intermediate general aproll on-gauge plate for being equipped with splash pan, and the water flowed out in building drainpipe flows to ground by the splash pan On face.
4. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: the flashing platform with It is rounded structure between the horizontal plane of the aproll on-gauge plate and aproll sketch plate.
5. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: the gusset is positive Cube structure is divided into external corner plate and inner corner trim plate, is separately mounted to the external corner and inner corner trim of building, is equipped among the external corner plate grand The ridge cable architecture risen, for two sides Fen Shui, the external corner of building to be arranged in the external corner plate;It is equipped among the inner corner trim plate Concave, two sides inwardly at inverted-triangular, are used for inside polywater, and the inner corner trim of building is arranged in the inner corner trim plate.
6. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: the band non-slip groove Ramp plate be cuboid shelving structure, on one side it is high, on one side low, slope surface equipped with transverse direction anti-skid chequer, be mounted on the door of building Mouthful, left and right is mutually spliced with the aproll on-gauge plate and the aproll sketch plate.
7. prefabricated assembled concrete aproll component system according to claim 1, it is characterised in that: described is general scattered Water quality standard plate, aproll sketch plate, gusset and the prefabricated components with non-slip groove ramp plate prefabrication concrete building subassembly are in prefabricated mistake Aproll tension face side is pasted on using carbon fibre bar band in journey.
CN201820018354.2U 2018-01-05 2018-01-05 Prefabricated assembled concrete aproll component system Expired - Fee Related CN208266929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820018354.2U CN208266929U (en) 2018-01-05 2018-01-05 Prefabricated assembled concrete aproll component system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820018354.2U CN208266929U (en) 2018-01-05 2018-01-05 Prefabricated assembled concrete aproll component system

Publications (1)

Publication Number Publication Date
CN208266929U true CN208266929U (en) 2018-12-21

Family

ID=64672567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820018354.2U Expired - Fee Related CN208266929U (en) 2018-01-05 2018-01-05 Prefabricated assembled concrete aproll component system

Country Status (1)

Country Link
CN (1) CN208266929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062363A (en) * 2021-03-30 2021-07-02 中国二十二冶集团有限公司 Winter outdoor water-dispersing construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062363A (en) * 2021-03-30 2021-07-02 中国二十二冶集团有限公司 Winter outdoor water-dispersing construction method

Similar Documents

Publication Publication Date Title
CN107059917B (en) Split component prefabricated comprehensive pipe gallery and construction method thereof
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN107476491A (en) Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation
CN101629440A (en) Integrally prefabricated composite external wall panel and manufacturing method thereof
CN106245817A (en) A kind of fabricated shear wall vertical connection structure and installation method thereof
CN207998860U (en) A kind of assembled pipe gallery
CN207177329U (en) A kind of prefabricated hollow floor bracing means
CN207314655U (en) Fill concrete wallboard in a kind of prefabricated thermal insulation
CN106759485B (en) A kind of prefabricated piping lane of two-piece unit formula and installation method
CN208266929U (en) Prefabricated assembled concrete aproll component system
CN109779033B (en) Assembled house and construction method thereof
CN104005474B (en) A kind of method and die house of being constructed house by inflating die
CN107237448B (en) The prefabricated interior fill concrete wallboard of one kind and its manufacturing method
CN207063189U (en) A kind of prefabricated panel, prefabricated panel and its bottom waterproof construction
CN206928323U (en) A kind of ring muscle fastens assembled pipe gallery
CN201459985U (en) Waterproof structure of flat-roofed house
CN204627052U (en) Steel work machine room under a kind of Integral tower
CN208578067U (en) Half prefabricated assembled pipe gallery
CN203977451U (en) Electric power overhaul well
CN108884675A (en) Convenient for the external insulation integrated thermal-insulation block system and its construction method of dry method decoration
CN215630170U (en) Advanced sealing structure of basement outer wall post-cast strip
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN104196178B (en) Hollow double structure layer water-proof roofing and construction method thereof
CN209637142U (en) Steel concrete combines the light-duty assembled stair of flat underside
CN209243751U (en) A kind of low-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221