CN208266920U - Groove wall manufactures mold and groove wall manufacturing equipment - Google Patents

Groove wall manufactures mold and groove wall manufacturing equipment Download PDF

Info

Publication number
CN208266920U
CN208266920U CN201820829906.8U CN201820829906U CN208266920U CN 208266920 U CN208266920 U CN 208266920U CN 201820829906 U CN201820829906 U CN 201820829906U CN 208266920 U CN208266920 U CN 208266920U
Authority
CN
China
Prior art keywords
collapsible form
sliding rail
groove wall
groove
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820829906.8U
Other languages
Chinese (zh)
Inventor
黄常清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820829906.8U priority Critical patent/CN208266920U/en
Application granted granted Critical
Publication of CN208266920U publication Critical patent/CN208266920U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model relates to the manufacturing technology field of cable trench more particularly to groove wall manufacture mold and groove wall manufacturing equipments.It includes sliding rail, sliding rail fixing groove and the collapsible form being arranged in pairs and the receiving hopper for connecing concrete that groove wall, which manufactures mold, collapsible form is enough to be installed on the slide rail, the collapsible form that simultaneously shape is arranged in pairs when collapsible form is installed on the slide rail, it opposite can be adjusted with sliding rail by sliding rail fixing groove between template, the when of falling concrete, fixes sliding rail, template adjustment, sliding rail, template and ditch wall unclamp when sliding, and being configured to the sliding rail when collapsible form is installed on the slide rail being capable of sliding opposite with sliding rail fixing groove.This programme work progress be it is die-filling, pour, loosen, sliding formwork, fixation, pouring, repeat.The utility model can solution change conventional construction method: lay bricks, be die-filling, pouring, demoulding, floating, there is no the processes of die-filling demoulding.The utility model technology is able to solve template consumption and manually measures big problem.

Description

Groove wall manufactures mold and groove wall manufacturing equipment
Technical field
It manufactures mold the utility model relates to the manufacturing technology field of cable trench more particularly to groove wall and has and be somebody's turn to do The groove wall manufacturing equipment of groove wall manufacture mold.
Background technique
In the prior art, the general production method of cable duct wall is: building brick on carrying out concrete foundation bed course Wall pours the beams of concrete that 300mm is thick, strength grade is C20 again on brick wall.General process flow is, first in concrete It lays bricks on blinding layer, then customizes the template of beams of concrete, template is mounted on brick wall, the casting concrete into template, Template is removed from brick wall, then smears cement mortar in the inner wall surface of brick wall.
It using above-mentioned construction method, needs largely manually to build brick wall, high labor cost, the construction period is long.And One section concrete beam of every production, it is necessary to which a template, the consumption of template are huge.
Utility model content
The purpose of this utility model is to provide groove walls to manufacture mold, is disappeared with solving template existing in the prior art The big technical problem of consumption.
Groove wall manufactures mold, can including sliding rail, sliding rail fixing groove and the collapsible form being arranged in pairs, collapsible form Installation on the slide rail, and when collapsible form installation on the slide rail when be arranged in pairs collapsible form at least partly can be relatively remote From sliding rail is configured to the sliding rail when collapsible form is installed on the slide rail being capable of sliding opposite with sliding rail fixing groove.
The groove wall manufactures mold, the collapsible form that can be at least partly relatively distant from is arranged, and can be solid along sliding rail Determine slot sliding and can with fixing groove fixation sliding rail, can when sliding rail is located at some position of sliding rail fixing groove movable mold Plate is relatively close to, the casting concrete into collapsible form, to which collapsible form to be relatively distant from, that is, when opening collapsible form, is utilized The sliding of sliding rail, collapsible form is pulled out, so that collapsible form is at new position, continues to pour fixed form.So only It need to pull template that can continue to manufacture extended wall, in this way, can use same set of groove wall manufacture mould Tool, the continuous cable trench wall for manufacturing long length, so number of molds needed for saving manufacture wall.Moreover, the party Case can also significantly reduce the time required for dismounting template, significantly reduce the amount of labour of worker, shorten construction Period.
Preferred technical solution, supplementary features are, further include template device for positioning space, template device for positioning space Can be separately connected at the top of the collapsible form that is arranged in pairs.
By the way that template device for positioning space is arranged, the collapsible form being arranged in pairs can be determined before casting concrete Spacing, the thickness to guarantee concrete is accurate.It, can be by template device for positioning space, by two after casting concrete Piece collapsible form is opened, so that two panels collapsible form is detached from by the concrete of pouring molding, to be moved.
Further preferred technical solution, supplementary features are that template device for positioning space includes studs, double end Stud has a threaded portion in every one end, can be threaded at least two nuts on each threaded portion, on each threaded portion Nut can be adjacent from the two sides of collapsible form and collapsible form.
Cooperate by the way that studs is arranged, and in every one end of studs and nut, it can be in the spiral shell on the outside of utilization Mother limits the trend that collapsible form outwardly opens, thus guarantee the specific size of casting space, it is more accurate to form size Concrete wall.When needing to open two panels collapsible form, collapsible form outboard nut is first unscrewed into a distance, then revolve The nut on the inside of moving template is turned a work, can use thrust caused by nut screw, collapsible form is pushed open outward, to make Collapsible form can be concrete be detached from the case where, moved, and be moved to new pouring location.
Preferred technical solution, supplementary features are, further include front template and rear pattern plate, front template and rear pattern plate and work Moving template removably connects, and front template, rear pattern plate and the collapsible form being arranged in pairs form casting space, movable mold Plate includes collapsible form ontology and collapsible form shaft, and collapsible form shaft is fixedly connected on the bottom of collapsible form ontology, sliding Shaft mounting groove is provided at the top of rail, collapsible form shaft can be embedded in shaft mounting groove, and collapsible form can be with Shaft mounting groove relatively rotates.
By the way that collapsible form shaft is arranged in the bottom of collapsible form, and collapsible form shaft is embedded in shaft installation In slot, being rotatably assorted to realize bottom of the collapsible form when opening for shaft mounting groove and collapsible form shaft can use Support.Two pieces of collapsible forms are strutted by certain distance by template device for positioning space above, most mould can be realized The opening of plate, so that the major part of template can be detached from the concrete poured.Moreover, by the way of rotation, by Contact portion in only shaft Yu the bottom of shaft mounting groove can generate friction, even if there is frictional force generation, since its is several There is no the arm of force, so what torque will not be generated, thus significantly reduce by the major part of collapsible form with poured Concrete required active force when being detached from.
Further preferred technical solution, supplementary features are that the top of collapsible form ontology is also with dismountable side Formula is connected with cover board string mouth, the length direction setting of cover board string opening's edge collapsible form ontology.
By the way that cover board string mouth is arranged, it can make the top of the groove wall poured out that there is a shape and cover board string mouth The slot matched, the slot can be used for placing the cover board of cable duct, in order to maintenance personal's down-hole operation.
Preferred technical solution, supplementary features are, further include fixed link, and it is fixed that first is provided on collapsible form Hole, the first fixation hole is vertical with the length direction of collapsible form shaft, fixed link can pass through fixation hole and with sliding rail fixing groove It is fixedly connected.
By the way that fixed link is arranged, collapsible form and sliding rail fixing groove can be fixed, place collapsible form in wall Length direction on move, avoid cement from being damaged in process of setting.When needing to open collapsible form, can incite somebody to action Fixed link is extracted, so that collapsible form be opened and move collapsible form and sliding rail in sliding rail fixing groove together.
Preferred technical solution, supplementary features are, further include feed device, feed device include hopper guide groove and The feeding hopper being movably arranged in hopper guide groove, hopper guide groove are mounted on the top of collapsible form, and feeding hopper has Inlet port and outlet port, the collapsible form that the width of discharge port is less than or equal to be arranged in pairs in casting concrete between away from From.
Setting can use the reciprocating motion of feed device in the movable feed device in collapsible form top will mix Solidifying soil is uniformly cast in casting space.And by the width of discharge port be arranged be less than collapsible form in casting concrete it Between distance, can be trickled down on the outside of collapsible form in casting process to avoid concrete, avoid and be stained on the outside of collapsible form Concrete and the movement for limiting collapsible form.
Preferred technical solution, supplementary features are, further include coupling hitch, and coupling hitch includes traction Bar and traction link block, for connecting with the end of sliding rail, the end of draw bar is connect traction link block with traction link block.
By the way that coupling hitch is arranged, can be connect with external pulling equipment, in favor of by drawing sliding rail band Dynamic collapsible form is mobile.Wherein draw bar is responsible for being pulled by external equipment, and traction link block can move together with sliding rail.
Preferred technical solution, supplementary features are, further include isolation film, and isolation film, which is used to be laid on, to be arranged in pairs The opposite side of collapsible form.
By the way that isolation film is arranged, collapsible form can be separated with the concrete poured, when needing to play collapsible form When opening, the opposite side of the collapsible form being arranged in pairs will not adhesion concrete and cause falling off for concrete.Meanwhile in laying Active force in opening procedure between collapsible form and concrete surface can also be reduced by stating isolation film, to reduce opening activity Strength required for template.
Another of the utility model is designed to provide a kind of groove wall manufacturing equipment, including dragger and above-mentioned One groove wall manufactures mold, and dragger is connect with groove wall manufacture mold.
The groove wall manufacturing equipment has all technical effects of above-mentioned groove wall manufacture mold.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram after the groove wall manufacture mold assembling of embodiment one;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the A-A cross-sectional view of Fig. 1;
Fig. 4 is the top view of the coupling hitch in embodiment one;
Fig. 5 is the B-B cross-sectional view of Fig. 4;
Fig. 6 is the structural schematic diagram of the sliding rail fixing groove in embodiment one;
Fig. 7 is the top view of Fig. 6;
Fig. 8 is the structural schematic diagram of the template device for positioning space in embodiment one;
Fig. 9 is the structural schematic diagram of the feed device in embodiment one;
Figure 10 is the structural schematic diagram of the slotting loose bar in embodiment one.
Icon: 10- sliding rail fixing groove;11-positioning columns;12-pilot pins;13-insert loose bar;14- fixed link;141- is heavy Hole;20-sliding rails;21-connection sub-blocks;31- collapsible form ontology;32- collapsible form shaft;33- fixed plate;34- front template; 35- rear pattern plate;36- angle cleat;37- connecting rib;38- stiffener plate;39- cover board string mouth;41- studs;42- spiral shell It is female;51- hopper guide groove;52- feeding hopper;53- fixing axle;54- bearing;55- baffle;61- draw bar;62- traction connection Bolt;The longitudinally connected bar of 63-;64- transverse connecting rod.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
Embodiment one
As shown in Fig. 1-Figure 10, groove wall manufactures mold, including sliding rail 20, sliding rail 20 fixing groove 10 and is arranged in pairs Collapsible form, the work that collapsible form can be mounted on sliding rail 20, and be arranged in pairs when collapsible form is mounted on sliding rail 20 Moving template can be at least partly relatively distant from, and sliding rail 20 is configured to 20 energy of sliding rail when collapsible form is mounted on sliding rail 20 The enough and opposite sliding of 20 fixing groove of sliding rail 10.
The groove wall manufactures mold, the collapsible form that can be at least partly relatively distant from is arranged, and can be along sliding rail 20 The sliding of fixing groove 10 and it can be located at some position of 20 fixing groove 10 of sliding rail in sliding rail 20 with the sliding rail 20 of fixing groove fixation Collapsible form is relatively close to when setting, the casting concrete into collapsible form, to which collapsible form is relatively distant from, i.e. opening activity When template, using the sliding of sliding rail 20, collapsible form is pulled out, so that collapsible form is at new position, continues to pour solid Solid plate.So only need to pull template that can continue to manufacture extended wall, in this way, can use same set of Groove wall manufactures mold, the continuous cable trench wall for manufacturing long length, so mold needed for saving manufacture wall Quantity.Moreover, the program can also significantly reduce the time required for dismounting template, the labour of worker is significantly reduced Amount, shortens the construction period.
It particularly, further include template device for positioning space, template device for positioning space can be with the activity that is arranged in pairs It is separately connected at the top of template.
By the way that template device for positioning space is arranged, the collapsible form being arranged in pairs can be determined before casting concrete Spacing, the thickness to guarantee concrete is accurate.It, can be by template device for positioning space, by two after casting concrete Piece collapsible form is opened, so that two panels collapsible form is detached from by the concrete of pouring molding, to be moved.
Further particularly, template device for positioning space includes studs 41, and studs 41 has in every one end One threaded portion can be threaded at least two nuts 42 on each threaded portion, and the nut 42 on each threaded portion can be from The two sides of collapsible form and collapsible form are adjacent.
Cooperate by the way that studs 41 is arranged, and in every one end of studs 41 and nut 42, can use outside The nut 42 of side limits the trend that collapsible form outwardly opens, to guarantee the specific size of casting space, to form size More accurately concrete wall.When needing to open two panels collapsible form, collapsible form outboard nut 42 is first unscrewed one Section distance, then rotary moveable template on the inside of nut 42, can use thrust caused by 42 spiral of nut, by collapsible form to Outside is pushed open, in the case where enabling collapsible form to be that concrete is detached from, is moved, and be moved to new pour Place.
It particularly, further include front template 34 and rear pattern plate 35, front template 34 and rear pattern plate 35 and collapsible form are with removable The mode unloaded connects, and front template 34, rear pattern plate 35 and the collapsible form being arranged in pairs form casting space.Collapsible form includes living Moving template ontology 31 and collapsible form shaft 32, collapsible form shaft 32 are fixedly connected on the bottom of collapsible form ontology 31, sliding The top of rail 20 is provided with shaft mounting groove, and collapsible form shaft 32 can be embedded in shaft mounting groove, and collapsible form energy Enough and shaft mounting groove relatively rotates.
Specifically, collapsible form shaft 32 can be a steel pipe (being also possible to solid bar), collapsible form ontology 31 Bottom be connected with angle cleat 36, the end of a horizontal edge of angle cleat 36 and the top edge of steel pipe are welded, angle cleat 36 stile is laid on the lateral surface of collapsible form ontology 31, and the lower end of the stile of angle cleat 36 is horizontal by one piece Connecting rib 37 and the side of steel pipe are attached.In this way, rotation center can be made to be located at collapsible form ontology 31 After medial surface, the surface of the bottom and shaft mounting groove that can not only make collapsible form ontology 31 collectively forms one and puts down Face, to form a smooth wall, and when collapsible form starts rotation collapsible form ontology 31 bottom end, can be with Directly to the movement outside on the surface far from the concrete poured, bottom will not be interfered with concrete surface.
Certainly, in order to increase the rigidity of collapsible form, angle steel can be set in the lateral surface of collapsible form ontology 31 or hangs down Directly in the band iron of collapsible form ontology 31 as stiffener plate 38.
By the way that collapsible form shaft 32 is arranged in the bottom of collapsible form, and collapsible form shaft 32 is embedded in shaft In mounting groove, being rotatably assorted to realize collapsible form when opening for shaft mounting groove and collapsible form shaft 32 can use The support of bottom.Two pieces of collapsible forms are strutted by certain distance by template device for positioning space above, big portion can be realized The opening for the template divided, so that the major part of template can be detached from the concrete poured.Moreover, using the side of rotation Formula, due to being only that shaft and the contact portion of the bottom of shaft mounting groove can generate friction, even if there is frictional force generation, due to It is almost without the arm of force, so what torque will not be generated, to significantly reduce the major part and quilt of collapsible form The concrete poured required active force when being detached from.
Further particularly, the top of collapsible form ontology 31 is also removably connected with cover board string mouth 39, Cover board string mouth 39 is arranged along the length direction of collapsible form ontology 31.Specifically, cover board string mouth 39 can be the case of a rectangle Body structure, the body structure are mounted on the top of collapsible form ontology 31 by 39 fixing bolt of cover board string mouth.
By the way that cover board string mouth 39 is arranged, it can make the top of the groove wall poured out that there is a shape and cover board string mouth 39 matched slots, the slot can be used for placing the cover board of cable duct, in order to maintenance personal's down-hole operation.
Particularly, groove wall manufacture mold further includes fixed link 14, and the first fixation hole is provided on collapsible form, the One fixation hole is vertical with the length direction of collapsible form shaft 32, fixed link 14 can pass through fixation hole and with 20 fixing groove of sliding rail 10 are fixedly connected.Specifically, the middle part of the lateral surface of collapsible form ontology 31, is arranged a fixed plate 33, the first fixation hole (figure In due to projecting direction the problem of, be not shown) setting fixed plate 33 on.The bottom of fixed link 14, can be one it is up big and down small Taper, a counterbore 141 is set on the end face of taper, and the axis of counterbore 141 is overlapped with the axis of fixed link 14, in sliding rail 20 Pilot pin 12 is set in fixing groove 10, and the form of specific pilot pin 12 can be using at least one of following two: a, consolidating Surely the vertical cylinder of 20 fixing groove of sliding rail, 10 upper surface is connected to as pilot pin 12, b, is arranged in 20 fixing groove 10 of sliding rail Downward cylinder in cylinder, can plug a cylinder pilot pin 12.In Figure of description, it has been shown that same sliding rail The pilot pin 12 of both forms is set simultaneously in 20 fixing grooves 10, it is not intended that both shapes must be arranged simultaneously The pilot pin 12 of formula, in fact, those skilled in the art can according to need the pilot pin 12 that any form is arranged in selection.
In addition, positioning column 11 can also be arranged in the upper surface of 20 fixing groove 10 of sliding rail, to determine a pair of of sliding rail 20 most Closely.In addition, in order to enable the surface disengaging on the opposite surface of a pair of of sliding rail 20 and the concrete poured, can also adopt With the slotting loose bar 13 of sliding rail 20 as shown in Figure 10, one end which inserts loose bar 13 has one and tiltedly splits structure, splits knot using oblique Structure is inserted between the bottom of concrete and sliding rail 20, so that the two be separated.
By the way that fixed link 14 is arranged, collapsible form and 20 fixing groove 10 of sliding rail can be fixed, place collapsible form It is moved on the length direction of wall, cement is avoided to be damaged in process of setting.When needing to open collapsible form, Fixed link 14 can be extracted, so that collapsible form be opened and make collapsible form and sliding rail 20 fixed in sliding rail 20 together It is moved in slot 10.
Particularly, groove wall manufacture mold further includes feed device, and feed device includes hopper guide groove 51 and lives The dynamic feeding hopper 52 being arranged in hopper guide groove 51, hopper guide groove 51 are mounted on the top of collapsible form, feeding hopper 52 have an inlet port and outlet port, the collapsible form that the width of discharge port is less than or equal to be arranged in pairs in casting concrete between Distance.Specifically, the bottom of feeding hopper 52 is equipped with fixing axle 53, the both ends of fixing axle 53 are coated with bearing 54, bearing 54 outside is limited by baffle 55, and bearing 54 can be used as idler wheel, roll in hopper guide groove 51.
Setting can use the reciprocating motion of feed device in the movable feed device in collapsible form top will mix Solidifying soil is uniformly cast in casting space.And by the width of discharge port be arranged be less than collapsible form in casting concrete it Between distance, can be trickled down on the outside of collapsible form in casting process to avoid concrete, avoid and be stained on the outside of collapsible form Concrete and the movement for limiting collapsible form.
Particularly, groove wall manufacture mold further includes coupling hitch, and coupling hitch includes draw bar 61 With traction link block, for connecting with the end of sliding rail 20, the end of draw bar 61 is connect traction link block with traction link block. Specifically, the end of sliding rail 20 is equipped with connection sub-block 21, connection sub-block 21 has leads to perpendicular to the second of 20 length direction of sliding rail Hole, traction link block have sleeve part, and connection sub-block 21 is inserted into sleeve part, and sleeve part has perpendicular to 20 length side of sliding rail To third through-hole, coupling hitch further include traction coupling bar 62, traction connection brush is inserted in the second through-hole and third through-hole In, sub-block 21 will be connected and sleeve part is relatively fixed.In addition, guiding piece may include two longitudinally connected bars 63, Zong Xianglian Extension bar 63 is connected with sleeve part, and sleeve part can be exactly a part of longitudinally connected bar 63 in other words, and sleeve part can be longitudinal A part of connecting rod 63, each sleeve part are respectively used to one one slide rail 20 of connection, and longitudinally connected bar 63 can pass through two cross It is supported to connecting rod 64, transverse connecting rod 64 can select the profiles such as channel steel or angle steel, and draw bar 61 can be at U-shaped or half Circle, the both ends of draw bar 61 are inserted in place the transverse connecting rod 64 in front and are attached thereto.
By the way that coupling hitch is arranged, can be connect with external pulling equipment, in favor of by drawing sliding rail 20 Drive collapsible form mobile.Wherein draw bar 61 is responsible for being pulled by external equipment, and traction link block can be with sliding rail 20 together Movement.
Particularly, groove wall manufacture mold further includes isolation film (not shown), and isolation film is for being laid on into To the opposite side of the collapsible form of setting.Specifically, isolation film is plastic film paper.
By the way that isolation film is arranged, collapsible form can be separated with the concrete poured, when needing to play collapsible form When opening, the opposite side of the collapsible form being arranged in pairs will not adhesion concrete and cause falling off for concrete.Meanwhile in laying Active force in opening procedure between collapsible form and concrete surface can also be reduced by stating isolation film, to reduce opening activity Strength required for template.
Embodiment two
As shown in figure 4, the present embodiment provides a kind of groove wall manufacturing equipments, including dragger and any of the above-described groove Wall manufactures mold, and dragger is connect with groove wall manufacture mold.Specifically, dragger can be winch.
The groove wall manufacturing equipment has all technical effects of above-mentioned groove wall manufacture mold.
The operating principle of the present embodiment are as follows:
1, cable duct is excavated, it is levelling;
2. unwrapping wire, the position where positioning slide 20;
3. installing 20 fixing groove 10 of sliding rail, plate face is higher than base surface 2mm;
4. cast-in-place structural intensity is that 20 fixing groove 10 of sliding rail is cast in mixed by the concrete of C15 grade with a thickness of 100mm In solidifying soil;
5. after concrete setting, the installation template sliding rail 20 in 20 fixing groove 10 of sliding rail, wherein 20 fixing groove 10 of sliding rail The positioning column 11 of upper surface positions sliding rail 20;
6. the collapsible form shaft 32 of collapsible form is inserted into the fixing groove of template sliding rail 20;
7. the spacing between the collapsible form being arranged in pairs is adjusted in place with template device for positioning space, and tightening nut 42 are fixed;Front template 34 and rear pattern plate 35 are connect with collapsible form respectively simultaneously;
8. fixed link 14 is inserted in sliding rail 20 to lead on the pilot pin 12 of fixing groove, by collapsible form, sliding rail 20 and sliding rail 20 Fixing groove 10 is relatively fixed;
9. being laid with plastic film paper on the opposite surface for the collapsible form being arranged in pairs;
10. after pair each template passed examination, carrying out concrete and casting.
11. installing feed device on the top of collapsible form, will fill interior intensity rank by feed device is the mixed of C20 In solidifying soil access casting space;
12. place cover board string mouth 3913 when concrete casts 900mm high, when being further continued for casting to 1000mm high, smooth out Concrete surface;
13. after concrete setting, extract fixed link 14 out sliding rail 20 fixing groove 10,
14. unclamping template device for positioning space, first the nut 42 on the outside of collapsible form is unclamped, then utilizes collapsible form The nut 42 of inside ejects collapsible form, by the outside tiltedly 10mm or more of collapsible form 11, recycles collapsible form two afterwards in place The nut 42 of side is fixed, and then with inserting between the loose insertion sliding rail 20 of bar 13 and concrete base, sliding rail 20 is loosened;
15. confirmation sliding rail 20, collapsible form have been separated with concrete;
16. pulling draw bar 61 with winch, groove wall manufacture mold is moved to new position.
17. being adjusted collapsible form using template device for positioning space after movement in place, recovery is fixed afterwards in place.
18. the insertion sliding rail 20 of fixed link 14 is led fixing groove, fixed rack 20 and collapsible form, then film is sticked in plate Plastic paper carries out second of cable duct wall pouring.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second ", " third " are used for description purposes only, it is not understood to indicate or imply phase To importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced, such as:
(1) in embodiment one, two collapsible forms are the forms that pivot joint is similar to using bottom, are outwardly opened, actually It such as by the way of translation, but by the way of translation, then can also be needed on the slide rail using other motion modes The guide rail vertical with the length direction of sliding rail, the structure of such as T-slot are set, or increase the guide rod of multiple levels, is added Work cost is big, is unfavorable for using under this occasion of concreting.Nevertheless, the mode of translation is only not optimal Mode, but nor absolutely not may be used.
It (2) is that the mode of at least two nuts is arranged on every one end using studs, with realization pair in embodiment one The fixation or opening for the collapsible form being arranged in pairs, actually can also be in such a way that others position collapsible form, extremely , it might even be possible to collapsible form is connected using steel wire, when opening, is tapped on collapsible form ontology by the way of edge using hammer, Collapsible form is opened.
And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. groove wall manufactures mold, which is characterized in that including sliding rail, sliding rail fixing groove and the collapsible form being arranged in pairs, institute Stating collapsible form can be mounted on the sliding rail, and the institute being arranged in pairs when the collapsible form is mounted on the sliding rail Capable of being at least partly relatively distant from for collapsible form is stated, the sliding rail is configured to be mounted on the sliding rail when the collapsible form The sliding rail being capable of sliding opposite with the sliding rail fixing groove when upper.
2. groove wall according to claim 1 manufactures mold, which is characterized in that it further include template device for positioning space, The template device for positioning space can be separately connected at the top of the collapsible form that is arranged in pairs.
3. groove wall according to claim 2 manufactures mold, which is characterized in that the template device for positioning space includes Studs, the studs have a threaded portion in every one end, can be threaded at least two on each threaded portion Nut, the nut on each threaded portion can be adjacent from the two sides of the collapsible form and the collapsible form.
4. groove wall according to claim 2 manufactures mold, which is characterized in that further include front template and rear pattern plate, institute State front template and the rear pattern plate removably connect with the collapsible form, the front template, the rear pattern plate and The collapsible form being arranged in pairs forms casting space, and the collapsible form includes that collapsible form ontology and collapsible form turn Axis, the collapsible form shaft are fixedly connected on the bottom of the collapsible form ontology, are provided with shaft at the top of the sliding rail Mounting groove, the collapsible form shaft can be embedded in the shaft mounting groove, and the collapsible form can be with described turn Axis mounting groove relatively rotates.
5. groove wall according to claim 4 manufactures mold, which is characterized in that the top of the collapsible form ontology is also Removably it is connected with cover board string mouth, the length direction setting of collapsible form ontology described in the cover board string opening's edge.
6. groove wall according to claim 4 manufactures mold, which is characterized in that it further include fixed link, the movable mold The first fixation hole is provided on plate, first fixation hole is vertical with the length direction of the collapsible form shaft, the fixation Bar can pass through the fixation hole and be fixedly connected with the sliding rail fixing groove.
7. groove wall according to claim 1 manufactures mold, which is characterized in that it further include feed device, the feeding Device includes hopper guide groove and the feeding hopper that is movably arranged in hopper guide groove, and the hopper guide groove is mounted on described The top of collapsible form, the feeding hopper have inlet port and outlet port, and the width of the discharge port is less than or equal to set in pairs Distance of the collapsible form set in casting concrete.
8. groove wall according to claim 1 manufactures mold, which is characterized in that it further include coupling hitch, it is described Coupling hitch includes draw bar and traction link block, and the traction link block with the end of the sliding rail for connecting, institute The end for stating draw bar is connect with traction link block.
9. groove wall according to claim 1 to 8 manufactures mold, which is characterized in that it further include isolation film, The isolation film is used to be laid on the opposite side for the collapsible form being arranged in pairs.
10. groove wall manufacturing equipment, which is characterized in that the groove wall including any one of dragger and claim 1-9 Mold is manufactured, the dragger is connect with groove wall manufacture mold.
CN201820829906.8U 2018-05-30 2018-05-30 Groove wall manufactures mold and groove wall manufacturing equipment Expired - Fee Related CN208266920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820829906.8U CN208266920U (en) 2018-05-30 2018-05-30 Groove wall manufactures mold and groove wall manufacturing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820829906.8U CN208266920U (en) 2018-05-30 2018-05-30 Groove wall manufactures mold and groove wall manufacturing equipment

Publications (1)

Publication Number Publication Date
CN208266920U true CN208266920U (en) 2018-12-21

Family

ID=64688031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820829906.8U Expired - Fee Related CN208266920U (en) 2018-05-30 2018-05-30 Groove wall manufactures mold and groove wall manufacturing equipment

Country Status (1)

Country Link
CN (1) CN208266920U (en)

Similar Documents

Publication Publication Date Title
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN106426525A (en) Prefabricated pipe rack mold
CN102966121A (en) Integrally movable mould frame for pipe rack cast-in-site construction
CN106223980B (en) A kind of construction method of tunnel ditch cable trough construction trolley
CN111186000B (en) Heat-insulating concrete block and manufacturing mold thereof
CN209686859U (en) It is a kind of for pouring the formwork erecting structure of superimposed sheet
CN206170286U (en) Prefabricated piping lane mould
CN108468348B (en) The porous piping lane construction technology of box quick assembly and disassembly mould
CN208266920U (en) Groove wall manufactures mold and groove wall manufacturing equipment
CN102528896B (en) Block making machine
CN106089256B (en) Ditch cable trench construction trolley and its construction method, tunnel cable die set device
CN209669811U (en) Dam body seepage wall trolley and its walling mechanism
CN111810193A (en) Small-section tunnel secondary lining construction method
CN206277490U (en) A kind of comprehensive pipe gallery die
CN207954212U (en) PC wallboard moulds with window opening module
CN109763458A (en) Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method
CN108729456A (en) It is a kind of one concrete revetment pour mold and its pouring construction method
CN201778822U (en) Hydraulic formwork trolley
CN209011845U (en) A kind of tunnel grouting structure
CN205934611U (en) Pouring of ballastless track base overhung portion is with supporting template and template installation device
CN206815867U (en) A kind of device contained cast-in-situ concrete hollow slab internal model and floated
CN203449433U (en) Wall block making machine of honeycomb structure
CN206035502U (en) Cable die carrier device and ditch cable duct construction trolley car for tunnel
CN214089961U (en) Mortar mound preparation is with dismantling iron-box mould
CN220378293U (en) Tunnel template structure with longitudinal slope and bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee