CN208251629U - A kind of highway slope protection is marked time template - Google Patents
A kind of highway slope protection is marked time template Download PDFInfo
- Publication number
- CN208251629U CN208251629U CN201820766525.XU CN201820766525U CN208251629U CN 208251629 U CN208251629 U CN 208251629U CN 201820766525 U CN201820766525 U CN 201820766525U CN 208251629 U CN208251629 U CN 208251629U
- Authority
- CN
- China
- Prior art keywords
- interior
- plate
- template
- slope protection
- front apron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
It marks time template the utility model discloses a kind of highway slope protection, including interior side form and outer side mold, wherein interior side form is made of several modular units of marking time, modular unit of each marking time includes at least two interior plates and several front aprons, two interior plates and a front apron assembling constitute level-one step, front apron is accordingly increased between two interior plates, forms multi-stage stairs;Outer side mold is the plate mould being mounted on the outside of two interior plates, is attached along interior side form side wall.The slope surface of both sides of highway is dexterously utilized as bed die in the utility model, the groove that certain depth is set in the place digging in advance marked time is poured in needs accordingly, only need to be connected and installed in interior side form with outer side mold to need to pour when group mould can pour after completion template assemblies in the groove marked time, compared with prior art, with quick for installation, convenient advantage is removed, while reducing transportation cost, improves construction efficiency.
Description
Technical field:
The utility model belongs to road engineering die plate equipment technical field, more particularly to a kind of public for cast-type concrete
Road slope protection is marked time template.
Background technique:
Existing highway marks time a part as cast in situs, needs to splice various templates according to step dimension when pouring, pass
Unite template construction after, there is a problem of form removable trouble, be easy truncation lack angle and installation and dismantling operation inconvenience;Another portion
It is divided into and shifts to an earlier date prefabricated completion in concrete prefabricated factory, then transport construction site to again and installed, there are transportation cost height, are transporting
The shortcomings that also cement products being be easy to cause to damage in the process.
Summary of the invention:
Of the existing technology in order to overcome the problems, such as, the utility model provides a kind of installation and to remove convenient cast-type mixed
Solidifying soil highway slope protection is marked time template.
In order to solve the above technical problems, the utility model takes following technical scheme:
A kind of highway slope protection is marked time template, including interior side form and outer side mold, wherein in side form by several template lists of marking time
Member composition, modular unit of each marking time include at least two interior plates and several front aprons, two interior plates and a front
Board group dress constitutes level-one step, and front apron is accordingly increased between two interior plates, forms multi-stage stairs;Outer side mold is installation
Plate mould on the outside of two interior plates is attached along interior side form side wall.
Above-mentioned two interior plate is made of left plate and right side plate mirror symmetry, and left plate is set respectively with right side board ends
There is unit connecting plate, unit connecting plate is for the connection between two neighboring modular unit of marking time;Left plate and right side plate it is interior
Side is respectively equipped with several front aprons connection channel steel, and front apron connects channel steel and is used between front apron and left plate and right side plate
Connection;The upper end of left plate and right side plate is respectively welded support angle steel, the both ends of support angle steel and left plate and right side plate two
The unit connecting plate at end welds together, and support angle steel plays the role of fixed cell connecting plate and guarantees side plate straightness.
Above-mentioned front board ends are equipped with connecting flange, and connecting flange connect channel steel with front apron and is correspondingly connected with when organizing mould.
Further, above-mentioned front apron connection channel steel is cuboid channel steel, and the wide face of channel steel is equipped with leg mould mandril wire hole,
For fastening leg mould mandril, i.e., after the completion of mixed mud pours, leg mould mandril only need to be fastened, side form level can be ejected, it is complete
At leg mould.
Further, above-mentioned highway slope protection marks time template using the slope surface of both sides of highway as bed die, in pre- by size in slope surface
It first digs and sets the groove of certain depth, interior side form and outer side mold are installed in groove, that is, complete a set of highway slope protection and mark time template
Assembling.Length when site operation according to slope surface can connect the highway slope protections that cover more and mark time template.
The utility model has the beneficial effects that: the utility model highway slope protection is marked time, highway two is dexterously utilized in template
The slope surface of side pours the groove that certain depth is set in the place digging in advance marked time in needs accordingly, only needs when organizing mould as bed die
By interior side form and outer side mold be connected and installed in needs pour complete template assemblies in the groove marked time after can pour, and it is existing
There is technology to compare, have it is quick for installation, remove convenient advantage, while reducing transportation cost, improve construction efficiency.
Detailed description of the invention:
Fig. 1 is that the utility model highway slope protection is marked time the structural schematic diagram of template;
Fig. 2 is that the utility model highway slope protection is marked time the structural schematic diagram of left plate in template;
Fig. 3 is that the utility model highway slope protection is marked time the structural schematic diagram of front apron in template;
In figure: side form in 1-, 2- outer side mold, 3- front apron, 4- left plate, 5- right side plate, 6- unit connecting plate, 7- front
Plate connects channel steel, 8- support angle steel, 9- connecting flange, 10- leg mould mandril wire hole, 11- leg mould mandril.
Specific embodiment:
The technical solution of the utility model is described in detail with reference to the accompanying drawing.
As shown in FIG. 1 to 3, a kind of highway slope protection is marked time template, including interior side form 1 and outer side mold 2, wherein in side form 1
It being made of several modular units of marking time, modular unit of each marking time includes at least two interior plates and several front aprons 3, and two
A interior plate and an assembling of front apron 3 constitute level-one step, and front apron 3 is accordingly increased between two interior plates, is formed
Multi-stage stairs;Outer side mold 2 is the plate mould being mounted on the outside of two interior plates, is attached along interior side form side wall;It is described
Two interior plates are made of left plate 4 and 5 mirror symmetry of right side plate, and left plate 4 and 5 both ends of right side plate are respectively equipped with unit company
Fishplate bar 6, unit connecting plate 6 is for the connection between two neighboring modular unit of marking time;The inside of left plate 4 and right side plate 5 point
Not She You several front aprons connect channel steel 7, front apron connect channel steel 7 be used between front apron 3 and left plate 4 and right side plate 5
Connection;The upper end of left plate 4 and right side plate 5 is respectively welded support angle steel 8, the both ends and left plate 4 and the right side of support angle steel 8
The unit connecting plate 6 at 5 both ends of side plate welds together, and support angle steel 8 plays fixed cell connecting plate 6 and guarantees side plate straightness
Effect;3 both ends of front apron are equipped with connecting flange 9, and connecting flange 9 connect channel steel 7 with front apron and is correspondingly connected with when organizing mould.
Further, the front apron connection channel steel 7 is cuboid channel steel, and the wide face of channel steel is equipped with leg mould mandril wire hole
10, for fastening leg mould mandril 11, i.e., after the completion of mixed mud pours, leg mould mandril 11 only need to be fastened, it can be by side form level
Leg mould is completed in ejection.
When site operation: first marking time the place of template needing to pour the highway slope protection, be using the slope surface of both sides of highway
Interior side form 1 is installed in groove by bed die in digging the groove for setting certain depth in slope surface in advance by size with outer side mold 2;?
After the completion of mixed mud pours, leg mould mandril 11 is fastened, side form level is ejected, completed leg mould, that is, complete a set of highway slope protection and step on
Walk the assembling of template.Length when site operation according to slope surface can connect the highway slope protections that cover more and mark time template.
Claims (5)
- The template 1. a kind of highway slope protection is marked time, it is characterised in that: including interior side form (1) and outer side mold (2), wherein interior side form (1) It being made of several modular units of marking time, modular unit of each marking time includes at least two interior plates and several front aprons (3), Two interior plates and front apron (3) assembling constitute level-one step, accordingly increase front apron between two interior plates (3), multi-stage stairs are formed;Outer side mold (2) is the plate mould being mounted on the outside of two interior plates, is carried out along interior side form side wall Connection.
- The template 2. highway slope protection according to claim 1 is marked time, it is characterised in that: described two interior plates are by left plate (4) it is constituted with right side plate (5) mirror symmetry, and left plate (4) and right side plate (5) both ends are respectively equipped with unit connecting plate (6), it is single First connecting plate (6) is for the connection between two neighboring modular unit of marking time;Distinguish the inside of left plate (4) and right side plate (5) Channel steel (7) are connected equipped with several front aprons, front apron connects channel steel (7) for front apron (3) and left plate (4) and right side plate (5) connection between;The upper end of left plate (4) and right side plate (5) is respectively welded support angle steel (8), and the two of support angle steel (8) It holds and welds together with the unit connecting plate (6) of left plate (4) and right side plate (5) both ends, support angle steel (8) plays fixed cell Connecting plate (6) and the effect for guaranteeing side plate straightness.
- The template 3. highway slope protection according to claim 2 is marked time, it is characterised in that: front apron (3) both ends, which are equipped with, to be connected Acting flange (9), connecting flange (9) connect channel steel (7) with front apron and is correspondingly connected with when organizing mould.
- The template 4. highway slope protection according to claim 2 or 3 is marked time, it is characterised in that: the front apron connects channel steel (7) Wide face for cuboid channel steel, channel steel is equipped with leg mould mandril wire hole (10), for fastening leg mould mandril (11).
- The template 5. highway slope protection according to claim 1 is marked time, it is characterised in that: the highway slope protection marks time template with public affairs The slope surface of road two sides is bed die, and in digging the groove for setting certain depth in slope surface in advance by size, interior side form and outer side mold are installed In groove, that is, completes a set of highway slope protection and mark time the assembling of template.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820766525.XU CN208251629U (en) | 2018-05-22 | 2018-05-22 | A kind of highway slope protection is marked time template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820766525.XU CN208251629U (en) | 2018-05-22 | 2018-05-22 | A kind of highway slope protection is marked time template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208251629U true CN208251629U (en) | 2018-12-18 |
Family
ID=66481018
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820766525.XU Active CN208251629U (en) | 2018-05-22 | 2018-05-22 | A kind of highway slope protection is marked time template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208251629U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532945A (en) * | 2018-05-22 | 2018-09-14 | 宁夏力丰农机制造有限公司 | A kind of highway slope protection is marked time template |
-
2018
- 2018-05-22 CN CN201820766525.XU patent/CN208251629U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532945A (en) * | 2018-05-22 | 2018-09-14 | 宁夏力丰农机制造有限公司 | A kind of highway slope protection is marked time template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561681B (en) | Casting molding template and casting molding process for constructional columns of infilled walls | |
CN108149706A (en) | A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing | |
CN203977309U (en) | A kind of shuttle type culvert linear steel form carrier | |
CN104878924A (en) | Stair step concrete pouring-molded template and stair cast-in-situ construction method | |
CN106351180B (en) | The all-hydraulic unlatching self-propelled template system of aqueduct | |
CN109208632A (en) | A kind of precast hollow module block type concrete retaining wall | |
CN208251629U (en) | A kind of highway slope protection is marked time template | |
CN206844275U (en) | Mutual buckle type precast concrete cover ditch and its suspender | |
CN205688792U (en) | Beam slab post-cast strip cleanout formula template construction structure | |
CN214144682U (en) | Early structure of tearing open of floor template and building frame template structure | |
CN211948946U (en) | Novel post-cast strip construction structure | |
CN210597794U (en) | Connecting device of prefabricated plate | |
CN108532945A (en) | A kind of highway slope protection is marked time template | |
CN110080299A (en) | A kind of shallow embedding mountain tunnel open-cut engineering method | |
CN109057331A (en) | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint | |
CN211038666U (en) | Sleeve lining pouring construction structure based on assembled scaffold | |
CN209040844U (en) | Pin-connected panel shield dregs pond | |
CN210768793U (en) | Two-lining construction system at intersection of main tunnel and double-layer construction transverse channel | |
CN211547140U (en) | Concrete precast slab made of recycled materials | |
CN208396295U (en) | A kind of open-cut station construction stair formwork erecting structure | |
CN204781953U (en) | Stair concrete placement shaping template of marking time | |
CN214219758U (en) | Ground monitoring point concreting protection block die carrier | |
CN106321116A (en) | Construction method for parallel working of tunnel excavation and concrete lining | |
CN210141137U (en) | U-shaped mold for subway central ditch and special combined mold for central ditch | |
CN206053128U (en) | A kind of special-shaped speed connects formula steel column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |