CN108532945A - A kind of highway slope protection is marked time template - Google Patents

A kind of highway slope protection is marked time template Download PDF

Info

Publication number
CN108532945A
CN108532945A CN201810497071.5A CN201810497071A CN108532945A CN 108532945 A CN108532945 A CN 108532945A CN 201810497071 A CN201810497071 A CN 201810497071A CN 108532945 A CN108532945 A CN 108532945A
Authority
CN
China
Prior art keywords
template
interior
plate
front apron
slope protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810497071.5A
Other languages
Chinese (zh)
Other versions
CN108532945B (en
Inventor
谢建权
谢建奇
席晓东
谢凌通
谢晓旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Lifeng Agricultural Machinery Manufacturing Co Ltd
Original Assignee
Ningxia Lifeng Agricultural Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Lifeng Agricultural Machinery Manufacturing Co Ltd filed Critical Ningxia Lifeng Agricultural Machinery Manufacturing Co Ltd
Priority to CN201810497071.5A priority Critical patent/CN108532945B/en
Publication of CN108532945A publication Critical patent/CN108532945A/en
Application granted granted Critical
Publication of CN108532945B publication Critical patent/CN108532945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

It marks time template the invention discloses a kind of highway slope protection, including interior side form and outer side mold, wherein interior side form is made of several modular units of marking time, each modular unit of marking time includes at least two interior plates and several front aprons, two interior plates and a front apron assembling constitute level-one step, front apron is accordingly increased between two interior plates, forms multi-stage stairs;Outer side mold is the tablet mould on the outside of two interior plates, is attached along interior side form side wall.The slope surface of both sides of highway is dexterously utilized as bed die in the present invention, accordingly the groove that certain depth is set in the place digging in advance marked time is poured in needs, only need to be connected and installed in need to pour with outer side mold by interior side form when group mould can pour in the groove marked time after completion template assemblies, compared with prior art, with quick for installation, convenient advantage is removed, while reducing transportation cost, improves construction efficiency.

Description

A kind of highway slope protection is marked time template
Technical field:
The invention belongs to road engineering die plate equipment technical fields, more particularly to one kind being used for cast-type concrete highway Bank protection is marked time template.
Background technology:
Existing highway marks time a part as cast in situs, needs to splice various templates according to step dimension when pouring, pass Unite template construction after, there is a problem of form removable trouble, be easy truncation lack angle and installation and dismantling operation inconvenience;It is another Part is to shift to an earlier date prefabricated completion in concrete prefabricated factory, then transports construction site to again and is installed, and it is high that there are transportation cost, Also the shortcomings that cement products damage is be easy to cause in transportational process.
Invention content:
Of the existing technology in order to overcome the problems, such as, present invention offer is a kind of to install and removes convenient cast-type coagulation Native highway slope protection is marked time template.
In order to solve the above technical problems, the present invention takes following technical scheme:
A kind of highway slope protection is marked time template, including interior side form and outer side mold, wherein in side form by several template lists of marking time Member composition, modular unit of each marking time include at least two interior plates and several front aprons, two interior plates and a front Board group dress constitutes level-one step, and front apron is accordingly increased between two interior plates, forms multi-stage stairs;Outer side mold is peace Tablet mould on the outside of two interior plates is attached along interior side form side wall.
Above-mentioned two interior plate is made of left plate and right plate mirror symmetry, and left plate is distinguished with right plate both ends Equipped with unit connecting plate, unit connecting plate is used for the connection between two neighboring modular unit of marking time;Left plate and right plate Inside is respectively equipped with several front aprons connection channel steel, front apron connect channel steel for front apron and left plate and right plate it Between connection;The upper end of left plate and right plate is respectively welded support angle steel, both ends and left plate and the right side of support angle steel The unit connecting plate at plate both ends welds together, and support angle steel plays fixed cell connecting plate and ensures the work of side plate straightness With.
Above-mentioned front apron both ends are equipped with connecting flange, and connecting flange connect channel steel with front apron and is correspondingly connected with when organizing mould.
Further, above-mentioned front apron connection channel steel is cuboid channel steel, and the wide face of channel steel is equipped with leg mould mandril silk Hole that is, after the completion of mixed mud pours, only need to fasten leg mould mandril, can push up side form level for fastening leg mould mandril Go out, completes leg mould.
Further, above-mentioned highway slope protection marks time template using the slope surface of both sides of highway as bed die, in pre- by size in slope surface It first digs and sets the groove of certain depth, interior side form and outer side mold are installed in groove, that is, complete a set of highway slope protection and mark time template Assembling.The highway slope protections that cover can be connected when site operation according to the length of slope surface to mark time template more.
The beneficial effects of the present invention are:The slope of both sides of highway is dexterously utilized in highway slope protection of the present invention template of marking time Face pours the groove that certain depth is set in the place digging in advance marked time in needs accordingly as bed die, only need to be by inside when organizing mould Mould is connected and installed in need to pour with outer side mold and can be poured after completion template assemblies in the groove marked time, with existing skill Art is compared, have it is quick for installation, remove convenient advantage, while reducing transportation cost, improve construction efficiency.
Description of the drawings:
Fig. 1 is that highway slope protection of the present invention is marked time the structural schematic diagram of template;
Fig. 2 is that highway slope protection of the present invention is marked time the structural schematic diagram of left plate in template;
Fig. 3 is that highway slope protection of the present invention is marked time the structural schematic diagram of front apron in template;
In figure:Side form in 1-, 2- outer side molds, 3- front aprons, 4- left plates, 5- right plates, 6- unit connecting plates, before 7- Baffle connects channel steel, 8- support angle steels, 9- connecting flanges, 10- leg mould mandril wire holes, 11- leg mould mandrils.
Specific implementation mode:
Technical scheme of the present invention is described in detail below in conjunction with the accompanying drawings.
As shown in FIG. 1 to 3, a kind of highway slope protection is marked time template, including interior side form 1 and outer side mold 2, wherein in side form 1 It being made of several modular units of marking time, modular unit of each marking time includes at least two interior plates and several front aprons 3, Two interior plates and an assembling of front apron 3 constitute level-one step, and front apron 3, group are accordingly increased between two interior plates At multi-stage stairs;Outer side mold 2 is the tablet mould on the outside of two interior plates, is attached along interior side form side wall;Institute It states two interior plates to be made of left plate 4 and 5 mirror symmetry of right plate, and left plate 4 is respectively equipped with list with 5 both ends of right plate First connecting plate 6, unit connecting plate 6 are used for the connection between two neighboring modular unit of marking time;Left plate 4 is interior with right plate 5 Side is respectively equipped with several front aprons connection channel steel 7, and front apron connects channel steel 7 for front apron 3 and left plate 4 and right plate Connection between 5;Left plate 4 and the upper end of right plate 5 are respectively welded support angle steel 8, the both ends and left side of support angle steel 8 The unit connecting plate 6 at 5 both ends of plate 4 and right plate welds together, and support angle steel 8 plays fixed cell connecting plate 6 and ensures side The effect of plate straightness;3 both ends of the front apron are equipped with connecting flange 9, and connecting flange 9 connect channel steel 7 with front apron when organizing mould It is correspondingly connected with.
Further, the front apron connection channel steel 7 is cuboid channel steel, and the wide face of channel steel is equipped with leg mould mandril silk Hole 10 that is, after the completion of mixed mud pours, only need to fasten leg mould mandril 11 for fastening leg mould mandril 11, can be by side form water Flat-top goes out, and completes leg mould.
When site operation:It first marks time the place of template needing to pour the highway slope protection, is using the slope surface of both sides of highway Interior side form 1 and outer side mold 2 are installed in groove by bed die in digging the groove for setting certain depth in slope surface in advance by size; After the completion of mixed mud pours, side form level is ejected, completes leg mould, that is, complete a set of highway slope protection and step on by fastening leg mould mandril 11 Walk the assembling of template.The highway slope protections that cover can be connected when site operation according to the length of slope surface to mark time template more.

Claims (5)

  1. The template 1. a kind of highway slope protection is marked time, it is characterised in that:Including interior side form (1) and outer side mold (2), wherein interior side form (1) It being made of several modular units of marking time, modular unit of each marking time includes at least two interior plates and several front aprons (3), Two interior plates and front apron (3) assembling constitute level-one step, and front apron is accordingly increased between two interior plates (3), multi-stage stairs are formed;Outer side mold (2) is the tablet mould on the outside of two interior plates, is carried out along interior side form side wall Connection.
  2. The template 2. highway slope protection according to claim 1 is marked time, it is characterised in that:Described two interior plates are by left plate (4) it is constituted with right plate (5) mirror symmetry, and left plate (4) is respectively equipped with unit connecting plate (6) with right plate (5) both ends, it is single First connecting plate (6) is used for the connection between two neighboring modular unit of marking time;Left plate (4) and the inside of right plate (5) are distinguished Equipped with several front aprons connection channel steel (7), front apron connects channel steel (7) for front apron (3) and left plate (4) and right plate (5) connection between;The upper end of left plate (4) and right plate (5) is respectively welded support angle steel (8), and the two of support angle steel (8) The unit connecting plate (6) with left plate (4) and right plate (5) both ends is held to weld together, support angle steel (8) plays fixed cell Connecting plate (6) and the effect for ensureing side plate straightness.
  3. The template 3. highway slope protection according to claim 2 is marked time, it is characterised in that:Front apron (3) both ends, which are equipped with, to be connected Acting flange (9), connecting flange (9) connect channel steel (7) with front apron and is correspondingly connected with when organizing mould.
  4. The template 4. highway slope protection according to claim 2 or 3 is marked time, it is characterised in that:The front apron connection channel steel (7) Wide face for cuboid channel steel, channel steel is equipped with leg mould mandril wire hole (10), for fastening leg mould mandril (11).
  5. The template 5. highway slope protection according to claim 1 is marked time, it is characterised in that:The highway slope protection marks time template with public affairs The slope surface of road both sides is bed die, and in digging the groove for setting certain depth in slope surface in advance by size, interior side form and outer side mold are installed In groove, that is, completes a set of highway slope protection and mark time the assembling of template.
CN201810497071.5A 2018-05-22 2018-05-22 Highway bank protection template of marking time Active CN108532945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810497071.5A CN108532945B (en) 2018-05-22 2018-05-22 Highway bank protection template of marking time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810497071.5A CN108532945B (en) 2018-05-22 2018-05-22 Highway bank protection template of marking time

Publications (2)

Publication Number Publication Date
CN108532945A true CN108532945A (en) 2018-09-14
CN108532945B CN108532945B (en) 2024-08-23

Family

ID=63471701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810497071.5A Active CN108532945B (en) 2018-05-22 2018-05-22 Highway bank protection template of marking time

Country Status (1)

Country Link
CN (1) CN108532945B (en)

Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB836244A (en) * 1957-05-23 1960-06-01 John Shaw A combined profile indicator and shuttering appliance for use in the construction of concrete stairs and steps
JPH10180734A (en) * 1996-12-24 1998-07-07 Tokyu Koken Co Ltd Method for manufacturing precast concrete stairs, unit stepboard made of precast concrete, and stepboard support device
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
KR200169431Y1 (en) * 1999-08-24 2000-02-15 강남건설주식회사 Stairs mold structure
KR200196692Y1 (en) * 2000-03-21 2000-09-15 양태권 A stairway mould
KR100864211B1 (en) * 2007-10-10 2008-10-17 정민선 Precast concrete stair unit structure with inverted triangular cross section and stairs using the same
KR20090013479A (en) * 2007-08-02 2009-02-05 이노건설주식회사 Adjustable Stair Wall Formwork
US20090250097A1 (en) * 2008-04-07 2009-10-08 Eric Ting-Shan Pan Solar-To-Electricity Conversion System
CN202627487U (en) * 2012-06-11 2012-12-26 涿州市三博桥梁模板制造有限公司 Novel tunnel mould
CN202745371U (en) * 2012-07-24 2013-02-20 江苏圣乐机械有限公司 T-shaped beam anchor pocket template
JP3184856U (en) * 2013-05-09 2013-07-18 株式会社西宮産業 Prefab stairs
CN203334663U (en) * 2013-06-08 2013-12-11 广东台澳特种铝材有限公司 Aluminum formwork for stairway structure
CN103866972A (en) * 2014-03-18 2014-06-18 中天建设集团有限公司 Multi-story shaped stair construction method
CN203856202U (en) * 2014-05-27 2014-10-01 江苏南通二建集团有限公司 Simple pullable sizing device of reserved holes
CN104295095A (en) * 2014-10-08 2015-01-21 中国化学工程第十三建设有限公司 Steel and wood composite stair template
CN204112725U (en) * 2014-07-22 2015-01-21 福建安厦新型建筑模板制造有限公司 A kind of stair template assembly
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN204800819U (en) * 2015-06-24 2015-11-25 中民筑友有限公司 Stair mold's mark time subassembly and stair mold
CN204920212U (en) * 2015-07-15 2015-12-30 王春雷 Pour stair template
CN204960327U (en) * 2015-09-17 2016-01-13 山东瑞鸿重工机械有限公司 Demould structure of steel form
CN204968353U (en) * 2015-06-09 2016-01-20 宁夏力丰农机制造有限公司 Land shaper
CN105735328A (en) * 2016-04-25 2016-07-06 杭州江润科技有限公司 Construction method of stepped mortar-rubble-paved slope of ventilation embankment
CN206128636U (en) * 2016-10-24 2017-04-26 中冶建工集团有限公司 Detachable stair formwork of flier
CN106836672A (en) * 2017-03-28 2017-06-13 扬州大学 A kind of assembled ecotype RPC combined staircase
CN108029248A (en) * 2017-12-27 2018-05-15 宁夏力丰农机制造有限公司 Collapsible laser puts down rake all-in-one machine
CN208251629U (en) * 2018-05-22 2018-12-18 宁夏力丰农机制造有限公司 A kind of highway slope protection is marked time template

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB836244A (en) * 1957-05-23 1960-06-01 John Shaw A combined profile indicator and shuttering appliance for use in the construction of concrete stairs and steps
JPH10180734A (en) * 1996-12-24 1998-07-07 Tokyu Koken Co Ltd Method for manufacturing precast concrete stairs, unit stepboard made of precast concrete, and stepboard support device
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
KR200169431Y1 (en) * 1999-08-24 2000-02-15 강남건설주식회사 Stairs mold structure
KR200196692Y1 (en) * 2000-03-21 2000-09-15 양태권 A stairway mould
KR20090013479A (en) * 2007-08-02 2009-02-05 이노건설주식회사 Adjustable Stair Wall Formwork
KR100864211B1 (en) * 2007-10-10 2008-10-17 정민선 Precast concrete stair unit structure with inverted triangular cross section and stairs using the same
US20090250097A1 (en) * 2008-04-07 2009-10-08 Eric Ting-Shan Pan Solar-To-Electricity Conversion System
CN202627487U (en) * 2012-06-11 2012-12-26 涿州市三博桥梁模板制造有限公司 Novel tunnel mould
CN202745371U (en) * 2012-07-24 2013-02-20 江苏圣乐机械有限公司 T-shaped beam anchor pocket template
JP3184856U (en) * 2013-05-09 2013-07-18 株式会社西宮産業 Prefab stairs
CN203334663U (en) * 2013-06-08 2013-12-11 广东台澳特种铝材有限公司 Aluminum formwork for stairway structure
CN103866972A (en) * 2014-03-18 2014-06-18 中天建设集团有限公司 Multi-story shaped stair construction method
CN203856202U (en) * 2014-05-27 2014-10-01 江苏南通二建集团有限公司 Simple pullable sizing device of reserved holes
CN204112725U (en) * 2014-07-22 2015-01-21 福建安厦新型建筑模板制造有限公司 A kind of stair template assembly
CN104295095A (en) * 2014-10-08 2015-01-21 中国化学工程第十三建设有限公司 Steel and wood composite stair template
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN204968353U (en) * 2015-06-09 2016-01-20 宁夏力丰农机制造有限公司 Land shaper
CN204800819U (en) * 2015-06-24 2015-11-25 中民筑友有限公司 Stair mold's mark time subassembly and stair mold
CN204920212U (en) * 2015-07-15 2015-12-30 王春雷 Pour stair template
CN204960327U (en) * 2015-09-17 2016-01-13 山东瑞鸿重工机械有限公司 Demould structure of steel form
CN105735328A (en) * 2016-04-25 2016-07-06 杭州江润科技有限公司 Construction method of stepped mortar-rubble-paved slope of ventilation embankment
CN206128636U (en) * 2016-10-24 2017-04-26 中冶建工集团有限公司 Detachable stair formwork of flier
CN106836672A (en) * 2017-03-28 2017-06-13 扬州大学 A kind of assembled ecotype RPC combined staircase
CN108029248A (en) * 2017-12-27 2018-05-15 宁夏力丰农机制造有限公司 Collapsible laser puts down rake all-in-one machine
CN208251629U (en) * 2018-05-22 2018-12-18 宁夏力丰农机制造有限公司 A kind of highway slope protection is marked time template

Also Published As

Publication number Publication date
CN108532945B (en) 2024-08-23

Similar Documents

Publication Publication Date Title
WO2021189746A1 (en) Rapid construction structure and method for secondary lining of multiple variable-cross-section bored tunnels
CN106351180B (en) The all-hydraulic unlatching self-propelled template system of aqueduct
CN105134253A (en) Tunnel inverted arch combined integrated template and method for concreting construction
CN108149706A (en) Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof
CN104878924A (en) Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN110966017A (en) Construction method for water-rich stratum shield interval outer wrapping type tunnel portal ring beam
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN109057331A (en) A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
CN206748695U (en) The prefabricated edges of boards mould of zigzag
CN206538737U (en) Aqueduct is all-hydraulic to open self-propelled template system
CN208816125U (en) Shield inspection-pit maintenance backfill support construction
CN114294015A (en) Intelligent positioning template hydraulic trolley for loess tunnel VI-level surrounding rock double-layer lining construction
CN208251629U (en) A kind of highway slope protection is marked time template
CN109235419A (en) Ke Xunhuanliyong steel diaphram wall unit and its construction method
CN108590316A (en) A kind of assembly concrete tower piece construction method
CN106321116A (en) Construction method for parallel working of tunnel excavation and concrete lining
CN108343052A (en) A kind of steel Guan Liang and its installation method for SMW engineering methods
CN210597794U (en) Connecting device of prefabricated plate
CN207919537U (en) A kind of steel Guan Liang for SMW engineering methods
CN206678146U (en) Multiple box culvert makes mould
CN215289775U (en) Early-dismantling formwork system for cast-in-place culvert
CN213709846U (en) Prefabricated steel structure self-insulation building
CN205711755U (en) A kind of template scaffold integral system
CN110685710B (en) Construction method and system for two liners at intersection of normal tunnel and double-layer construction transverse channel
CN213296364U (en) Connecting piece and supporting beam steel bar assembly for cast-in-place reinforced concrete foundation pit inner support sectional construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant