CN208248807U - Pipe of cement transport protection clamp tool - Google Patents
Pipe of cement transport protection clamp tool Download PDFInfo
- Publication number
- CN208248807U CN208248807U CN201820656788.5U CN201820656788U CN208248807U CN 208248807 U CN208248807 U CN 208248807U CN 201820656788 U CN201820656788 U CN 201820656788U CN 208248807 U CN208248807 U CN 208248807U
- Authority
- CN
- China
- Prior art keywords
- pipe
- cement
- support plate
- spring
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
This application discloses pipe of cement transport protection clamp tools; including pedestal, support plate, spring, bolt assembly and several barrier assemblies; the support plate is installed in support plate by bolt assembly; the spring is nested on the screw rod of bolt assembly; and spring one end resists support plate; the spring other end resists pedestal, and the support plate is for placing pipe of cement;Slideway is offered in the support plate, the barrier assembly is removably installed in support plate, and the barrier assembly is set to the two sides of cement tube wall, and barrier assembly is mobile for limiting pipe of cement.The utility model has following usefulness: pipe of cement is greatly reduced and jolts what transportational process was subject to, reduces the bump injury in transportational process, improves economic benefit, and will not damage to ecological environment.
Description
Technical field
The utility model relates to pipe fields more particularly to a kind of pipe of cement transport protection clamp to have.
Background technique
Pipe of cement has important application in the pipe network construction in city, and the sewage network in city is laid with by pipe of cement
It is formed by connecting, the water supply network between city and reservoir is to be laid with to connect by prestressing force steel drum pipe of concrete (one kind of pipe of cement)
Made of connecing.
Since pipe of cement can generate biggish environmental pollution in process of production, so current pipe of cement factory all build in
Exurb or remote development zone, pipe of cement often after having produced pipe of cement, then by truck transport to building site into
Row is laid with.
The mode of present truck transport pipe of cement, pipe of cement is erected on truck and is transported, while in order to because of road
Road be it is uneven, necessarily will appear in transportational process and jolt, in order to avoid causing bump injury to pipe of cement because pipe network build
There are strict requirements to the quality of pipe of cement, the pipe of cement of bump injury is obsolete (especially prestressing force steel drum coagulation
Soil pipe, when pitch or epoxy ceramic are fallen, can only discard), many enterprises can between truck and pipe of cement pad one
A little planks jolt to slow down.But chock plate can consume a large amount of timber, destroy ecological environment.So being highly desirable to develop a
Special transport fixture protects the pipe of cement in transportational process.
Utility model content
The utility model is in view of the above-mentioned problems, propose a kind of pipe of cement transport protection clamp tool.
The technical solution that the utility model is taken is as follows:
A kind of pipe of cement transport protection clamp tool, including pedestal, support plate, spring, bolt assembly and several barrier assemblies, institute
It states support plate to be installed on pedestal by bolt assembly, the spring is nested on the screw rod of bolt assembly, and spring one end supports
Firmly support plate, the spring other end resist pedestal, and the support plate is for placing pipe of cement;Slideway is offered in the support plate,
The barrier assembly is removably installed in support plate, and the barrier assembly is set to the two sides of cement tube wall, is stopped
Component is mobile for limiting pipe of cement.
In the present apparatus, support plate is for placing pipe of cement, and pedestal is contacted with truck, and in actual design, pedestal can
To be a bulk of metal plate or a bulk of cement block plate, support plate can be one piece of metal plate, be also possible to one piece
Steel concrete plate, preferably metal plate, and steel plate as preferably in it is preferred.
The working principle of the present apparatus is as follows: pipe of cement being erect on the supporting plate, and several pairs of barrier assembly settings are existed
(slideway installs two barrier assemblies, and 4 cunnings are preferably arranged on the supporting plate in this programme inside and outside cement tube wall
Road), it can thus clamp pipe of cement, it is ensured that pipe of cement will not break away during transportation, simultaneously because branch
Spring (spring has multiple) is provided between fagging and pedestal, when truck pitches, since spring is with good
Buffer function, support plate basically will not produce pitch (or amplitude of jolting is very small), are arranged so that water on the supporting plate
Mud pipe, which would not generate, to pitch and (generates jolt in time, amplitude is also extremely small), effectively avoids to pipe of cement
Cause bump injury.Economic benefit greatly improved.
The present apparatus is greatly reduced pipe of cement and jolts what transportational process was subject to, reduces the bump injury in transportational process, mentions
High economic benefit, and ecological environment will not be damaged.
Optionally, the barrier assembly includes cylinder, screw rod and nut, and described screw rod one end and the cylinder are fixed on one
It rises, the screw rod passes through the slideway in support plate, and the nut is mounted on screw rod.
Specific mounting means is as follows, and two cylinders are placed on the two sides of cement tube wall, and (every slideway places two
Cylinder), nut then is being screwed on, thus cylinder has been secured firmly in support plate.
Optionally, the cylinder is rubber cylinder or silica gel cylinder, and the screw rod is metal screw, and the nut is metal
Nut;And the cylinder has eight.
Eight cylinders are adapted to 4 slideways, and in this case support plate circular support plate.
It optionally, further include side block bar, side boom and block, the side block bar is installed vertically on pedestal, and the side is stretched
Bar is removably mounted on side block bar, and the side boom, perpendicular to side block bar, the block is mounted on side block bar, the side
Bar is used to resist the tube wall of pipe of cement.
Because truck during turning, can generate certain eccentric phenomena, so design above structure;It stretches specific side
For bar above support plate, block firmly resists the outer tube wall of pipe of cement.When specific design, four sides are set on pedestal
Bar, and the mode that side block bar is connected through a screw thread is installed on pedestal.
Optionally, the side boom is mounted on side block bar by bolt assembly.
Optionally, an exhausting hole is provided on the side block bar, and side block bar is square pole, is provided on the side boom scarce
Mouthful, the notch two sides open and are respectively provided with row's through hole, and the notch of the side boom is buckled on the lever of side, the bolt assembly
Screw rod is located in through-hole and through hole.
Because different pipe of cements have unused height and diameter, design has an exhausting hole on side block bar, can adjust at any time
The mounting height of whole side boom, to adapt to the pipe of cement of different height;Two rows of through holes are designed on the boom of side, it can basis at any time
Need to adjust the distance between block and side block bar, to adapt to the pipe of cement of different tube diameters.In use, although side block bar
There are a gaps between the notch of side boom, and when block is not contacted with task object, side boom can occur certain downward
The phenomenon that rotation, but since block resists pipe of cement, have the tendency that a clip, it is ensured that side boom keeps horizontal.
Optionally, the block is the silica gel block of circular arc type, and the mode that block is connected through a screw thread is mounted on the boom of side.
When block corrupted, can replace at any time.
It jolts the beneficial effects of the utility model are: pipe of cement is greatly reduced what transportational process was subject to, reduces transport
Bump injury in the process improves economic benefit, and will not damage to ecological environment.
Detailed description of the invention:
Fig. 1 is pipe of cement transport protection clamp lamps structure simplified schematic diagram;
Fig. 2 is pedestal and support plate matching relationship schematic diagram;
Fig. 3 is side block bar and side boom matching relationship schematic diagram;
Fig. 4 is support plate and cylindrical fit relation schematic diagram;
Fig. 5 is supporting plate structure simplified schematic diagram.
Each appended drawing reference in figure are as follows: 1, pedestal, 2, spring, 3, support plate, 301, slideway, 4, side boom, 401, notch,
402, through hole, 5, block, 6, pipe of cement, 7, side block bar, 701, through-hole, 8, bolt assembly, 9, nut, 10, screw rod, 11, circle
Column.
Specific embodiment:
Below with reference to each attached drawing, the utility model is described in detail.
As shown in attached drawing 1,2,3,4 and 5, a kind of pipe of cement transport protection clamp tool, including pedestal 1, support plate 3, spring 2,
Bolt assembly 8 and several barrier assemblies, support plate 3 are installed on pedestal 1 by bolt assembly 8, and spring 2 is nested in bolt assembly
On 8 screw rod 10, and 2 one end of spring resists support plate 3, and 2 other end of spring resists pedestal 1, and support plate 3 is for placing pipe of cement
6;Slideway 301 is offered in support plate 3, barrier assembly is removably installed in support plate 3, and barrier assembly is set to cement
The two sides of 6 tube wall of pipe, barrier assembly are mobile for limiting pipe of cement 6.
In the present apparatus, for support plate 3 for placing pipe of cement 6, pedestal 1 is contacted with truck, in actual design, pedestal
1 can be a bulk of metal plate or a bulk of cement block plate, and support plate 3 can be one piece of metal plate, be also possible to
One piece of steel concrete plate, preferably metal plate, and steel plate as preferably in it is preferred.
The working principle of the present apparatus is as follows: pipe of cement 6 being erected in support plate 3, and several pairs of barrier assemblies are arranged
(slideway 301 installs two barrier assemblies, preferably sets in support plate 3 in this programme inside and outside 6 tube wall of pipe of cement
Set 4 slideways 301), it can thus clamp pipe of cement 6, it is ensured that side will not occur during transportation for pipe of cement 6
It is sliding, simultaneously because spring 2 (spring 2 has multiple) is provided between support plate 3 and pedestal 1, when truck pitches, by
There is good buffer function in spring 2, support plate 3 basically will not produce pitch (or amplitude of jolting is very small), this
Sample, which is placed on pipe of cement 6 in support plate 3 and would not generate and pitch, (to be generated jolt in time, amplitude is also extremely small
), it effectively avoids causing bump injury to pipe of cement 6.Economic benefit greatly improved.
The present apparatus is greatly reduced pipe of cement 6 and jolts what transportational process was subject to, reduces the bump injury in transportational process, mentions
High economic benefit, and ecological environment will not be damaged.
As shown in attached drawing 1,2,3,4 and 5, barrier assembly includes cylinder 11, screw rod 10 and nut 9,10 one end of screw rod and circle
Column 11 is fixed together, and screw rod 10 passes through the slideway 301 in support plate 3, and nut 9 is mounted on screw rod 10.
Specific mounting means is as follows, and two cylinders 11 are placed on the two sides of 6 tube wall of pipe of cement, and (every slideway 301 is put
Set two cylinders 11), nut 9 then is being screwed on, thus cylinder 11 has been secured firmly in support plate 3.
As shown in attached drawing 1,2,3,4 and 5, cylinder 11 is rubber cylinder or silica gel cylinder, and screw rod 10 is metal screw 10, spiral shell
Mother 9 is metal nuts 9;And cylinder 11 has eight.
Eight cylinders 11 are adapted to 4 slideways, and in this case 3 circular of support plate support plate 3.
It further include side block bar 7, side boom 4 and block 5 as shown in attached drawing 1,2,3,4 and 5, side block bar 7 is installed vertically on bottom
On seat 1, side boom 4 is removably mounted on side block bar 7, and side boom 4, perpendicular to side block bar 7, block 5 is mounted on side block bar
7, side block bar 7 is used to resist the tube wall of pipe of cement 6.
Because truck during turning, can generate certain eccentric phenomena, so design above structure;It stretches specific side
Bar 4 is to be located at 3 top of support plate, and block 5 firmly resists the outer tube wall of pipe of cement 6.When specific design, it is arranged on pedestal 1
Four side block bars 7, and the mode that side block bar 7 is connected through a screw thread is installed on pedestal 1.
As shown in attached drawing 1,2,3,4 and 5, side boom 4 is mounted on side block bar 7 by bolt assembly 8.
As shown in attached drawing 1,2,3,4 and 5, an exhausting hole 701 is provided on side block bar 7, and side block bar 7 is square pole, side is stretched
Notch 401 is provided on bar 4,401 two sides of notch open and are respectively provided with row's through hole 402, and the notch 401 of side boom 4 is buckled in side lever
On, the screw rod 10 of bolt assembly 8 is located in through-hole 701 and through hole 402.
Because different pipe of cements 6 have unused height and diameter, design has an exhausting hole 701, Ke Yisui on side block bar 7
When adjust side boom 4 mounting height, to adapt to the pipe of cement 6 of different height;Two rows of through holes 402 are designed on side boom 4, it can
To adjust the distance between block 5 and side block bar 7 as needed at any time, to adapt to the pipe of cement 6 of different tube diameters.In use process
In, although there are a gaps between side block bar 7 and the notch 401 of side boom 4, when block is not contacted with task object, side
Boom 4 can have the tendency that a clip there is a phenomenon where centainly rotating down, but since block 5 resists pipe of cement, can be with
Guarantee that side boom 4 keeps horizontal.
As shown in attached drawing 1,2,3,4 and 5, block 5 is the silica gel block of circular arc type, and the mode that block 5 is connected through a screw thread is pacified
On side boom 4.
When 5 corrupted of block, can replace at any time.
The above is only the preferred embodiment of the present invention, not thereby limits the patent protection of the utility model
Range, it is all with equivalent structure transformation made by the utility model specification and accompanying drawing content, directly or indirectly it is used in it
His relevant technical field similarly includes within the protection scope of the present utility model.
Claims (7)
1. a kind of pipe of cement transport protection clamp tool, which is characterized in that including pedestal, support plate, spring, bolt assembly and several resistances
Component is kept off, the support plate is installed on pedestal by bolt assembly, and the spring is nested on the screw rod of bolt assembly, and bullet
Spring one end resists support plate, and the spring other end resists pedestal, and the support plate is for placing pipe of cement;It is opened up in the support plate
There is slideway, the barrier assembly is removably installed in support plate, and the barrier assembly is set to the two of cement tube wall
Side, barrier assembly are mobile for limiting pipe of cement.
2. pipe of cement transport protection clamp tool as described in claim 1, which is characterized in that the barrier assembly includes cylinder, spiral shell
Bar and nut, described screw rod one end are fixed together with the cylinder, and the screw rod passes through the slideway in support plate, the nut
It is mounted on screw rod.
3. pipe of cement transport protection clamp tool as claimed in claim 2, which is characterized in that the cylinder is rubber cylinder or silica gel
Cylinder, the screw rod are metal screw, and the nut is metal nuts;And the cylinder has eight.
4. pipe of cement transport protection clamp tool as described in claim 1, which is characterized in that further include side block bar, side boom and gear
Block, the side block bar are installed vertically on pedestal, and the side boom is removably mounted on side block bar, and the side boom hangs down
Directly in side block bar, the block is mounted on side block bar, and the side block bar is used to resist the tube wall of pipe of cement.
5. pipe of cement transport protection clamp tool as claimed in claim 4, which is characterized in that the side boom is pacified by bolt assembly
On side block bar.
6. pipe of cement transport protection clamp tool as claimed in claim 5, which is characterized in that it is logical to be provided with a row on the side block bar
Hole, and side block bar is square pole, is provided with notch on the side boom, the notch two sides open and are respectively provided with row's through hole, described
The notch of side boom is buckled on the lever of side, and the screw rod of the bolt assembly is located in through-hole and through hole.
7. pipe of cement transport protection clamp tool as claimed in claim 4, which is characterized in that the block is the silica gel of circular arc type
Block, the mode that block is connected through a screw thread are mounted on the boom of side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820656788.5U CN208248807U (en) | 2018-05-04 | 2018-05-04 | Pipe of cement transport protection clamp tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820656788.5U CN208248807U (en) | 2018-05-04 | 2018-05-04 | Pipe of cement transport protection clamp tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208248807U true CN208248807U (en) | 2018-12-18 |
Family
ID=64634797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820656788.5U Active CN208248807U (en) | 2018-05-04 | 2018-05-04 | Pipe of cement transport protection clamp tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208248807U (en) |
-
2018
- 2018-05-04 CN CN201820656788.5U patent/CN208248807U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201739731U (en) | Portable adjustable bracket | |
CN208073095U (en) | Mobile falling-proof bracket | |
CN107282819A (en) | A kind of building bar apparatus for bending | |
CN101951191A (en) | Adjustable-height bracket base for photovoltaic array bracket | |
CN208248807U (en) | Pipe of cement transport protection clamp tool | |
CN205329703U (en) | A foundation structure and full aluminium building frame structure for making perfect aluminium building | |
CN209353779U (en) | A kind of novel civil engineering support device | |
CN204510804U (en) | A kind of Multifunctional building template bracing frame | |
CN214994011U (en) | Municipal construction is with supporting location bed-jig | |
CN203347247U (en) | Preinstallation floor type support for brick masonry inner wire box | |
CN201245986Y (en) | Packway special for adjustable cast-in-place board concrete pouring | |
CN203868611U (en) | Fixing device of high vibration apparatus | |
CN213509726U (en) | Construction template adjustable support for construction | |
CN204975859U (en) | Door frame jacking bed -jig | |
CN203067936U (en) | High-altitude pipeline installation safe lifting bracket | |
CN202391114U (en) | Pipe passing floorslab sleeve pail | |
CN203755635U (en) | Scaffold platform lifting structure | |
CN202055146U (en) | Connecting structure for screed board accessories | |
CN206438757U (en) | A kind of building curtain wall construction scaffolding | |
CN205118450U (en) | Concrete pump pipe fixing device | |
CN205934770U (en) | Novel built -in fitting | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN108167527A (en) | A kind of efficiently locking antidetonation branch device for hoisting of novel multitube | |
CN108067805A (en) | On-site Welding Technology equipment | |
CN204876588U (en) | Collapsible formula reinforcing bar bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |