CN208234180U - Clinker automatic loading system - Google Patents

Clinker automatic loading system Download PDF

Info

Publication number
CN208234180U
CN208234180U CN201820407361.1U CN201820407361U CN208234180U CN 208234180 U CN208234180 U CN 208234180U CN 201820407361 U CN201820407361 U CN 201820407361U CN 208234180 U CN208234180 U CN 208234180U
Authority
CN
China
Prior art keywords
weighbridge
clinker
feed bin
automatic loading
loading system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820407361.1U
Other languages
Chinese (zh)
Inventor
韩韶辉
魏卫东
刘冀强
侯永峰
张佳
康俊鹏
只艳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jinyu Dingxin Cement Co Ltd
Original Assignee
Hebei Jinyu Dingxin Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jinyu Dingxin Cement Co Ltd filed Critical Hebei Jinyu Dingxin Cement Co Ltd
Priority to CN201820407361.1U priority Critical patent/CN208234180U/en
Application granted granted Critical
Publication of CN208234180U publication Critical patent/CN208234180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Abstract

The utility model provides a kind of clinker automatic loading system comprising the weighbridge being movably arranged in melt pit, the weighbridge driving device that the weighbridge can be driven to move along its length, and can real-time detection weighbridge present position position detection unit.It further include the bracket being fixed on above weighbridge, the feed bin being fixed on bracket, it is fixed on the cement bulk head of the discharge end of feed bin, is located at the Material control valve that feed bin and cement bulk head fall or stop controlling clinker, and the elevating mechanism that control cement bulk head moves up and down.Further include simultaneously and weighbridge driving device, position detection unit, Material control valve and the connected control unit of elevating mechanism control.After vehicle is parked in designated position, it can be automatically performed entrucking work by the clinker automatic loading system, reduce the labor intensity of worker, reduce flash caused by worker operation is made mistakes, reduce the pollution to environment.

Description

Clinker automatic loading system
Technical field
The utility model relates to clinker truck-loading facilities technical field more particularly to a kind of clinker automatic loading systems System.
Background technique
Existing cement bulk equipment is generally existing to be simply equipped, and dust from flying is big, and the degree of automation is relatively low, it is also necessary to big Measure manual operation.Labor intensity of workers is larger, and since operating environment is poor, causes greatly to the health of worker Harm.Meanwhile needing frequently to move the position of vehicle during entrucking, if the communication with driver is bad, it is also possible to cause The problem of existing spreading, flash.
Utility model content
In view of this, the utility model is directed to a kind of clinker automatic loading system, can more automate Completion clinker entrucking work.
In order to achieve the above objectives, the technical solution of the utility model is achieved in that
A kind of clinker automatic loading system comprising:
Weighbridge is movably arranged in melt pit;
Weighbridge driving device is located in the melt pit and is sequentially connected in the weighbridge, to drive the weighbridge mobile;
Position detection unit, relative to the melt pit fixed and arranged, to constitute the detection to the weighbridge position;
Feed bin is fixed on the top of the melt pit through bracket, and the feed bin has downwardly open discharge end;
Cement bulk head is fixed on the discharge end;
Material control valve is set between the feed bin and the cement bulk head, to control clinker from the feed bin Outflow;
Elevating mechanism is located on the bracket and is sequentially connected with the cement bulk head, the cement can be driven to dissipate Dress head moves up and down;
Control unit, with the weighbridge, the weighbridge driving device, the position detection unit, the Material control valve And the elevating mechanism control is connected.
Further, the weighbridge driving device includes guide rail, and the weighbridge can be (mobile along the guide rail.It further include turning The dynamic traction wheel set on the melt pit both ends, the traction rope for being connected and being wound on traction wheel with weighbridge, and described in driving The power device of traction wheel rotation.
Further, the position detection unit is the photoelectric position sensor for being fixed on weighbridge side.
Further, it is equipped with clinker dust-precipitator in the top of the feed bin, the clinker dust-precipitator, which has, to be prolonged Extend to the suction pipe of the bin bottom.
Further, the elevating mechanism includes the fixed elevator for being wound with hoist engine traction rope on the bracket Machine, and rotation be set to the bracket on, so that the hoist engine traction rope pile warp and determine with what the cement bulk head was connect Pulley.
Compared with the prior art, clinker automatic loading system described in the utility model has the advantage that;
(1) the clinker automatic loading system of the utility model, after vehicle is parked in the designated position on weighbridge, by controlling Unit control weighbridge processed is mobile, drives vehicle mobile, and is provided with the position of position detection unit detection weighbridge and vehicle, also sets The outflow for having set Material control valve control clinker, by above-mentioned setting, after the completion of vehicle is parked in and specifies on weighbridge, It can be automatically performed entrucking work by the cement automatic loading system, reduce the labor intensity of worker.Meanwhile compared to by taking charge of The problems such as machine frequently controls vehicle movement, reduces flash caused by operation error.
(2) installation of clinker dust-precipitator can absorb the clinker raised, protect environment.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.? In attached drawing:
Fig. 1 is clinker automatic loading system overall structure diagram described in the utility model embodiment;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the front view of Fig. 1;
Fig. 4 is the enlarged drawing in Fig. 3 at B.
Description of symbols:
1- melt pit, 2- weighbridge, 3- weighbridge driving device, 4- bracket, 5- feed bin, 6- cement bulk head, 7- Material control valve, 8- elevating mechanism, 9- dust-precipitator, 21- rubber tire, 31- traction wheel, 32- traction rope, 33- power device, 34- are led, 81- hoist engine, 82- fixed pulley, 83- hoist engine traction rope.
Specific embodiment
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
The present embodiment is related to a kind of clinker automatic loading system, and as shown in Figures 1 and 3, which fills automatically Vehicle system includes the removable weighbridge 2 in melt pit 1, the weighbridge driving dress that the weighbridge 2 can be driven to move along its length Set 3, and can 2 present position of real-time detection weighbridge position detection unit.It further include the bracket 4 for being fixed on 2 top of weighbridge, Gu The feed bin 5 being scheduled on bracket 4 is fixed on the cement bulk head 6 of the discharge end of feed bin 5, be located at feed bin 5 and cement bulk head 6 with The Material control valve 7 that control clinker falls or stops, and the elevating mechanism 8 that control cement bulk head 6 moves up and down.Together When further include with weighbridge 2, weighbridge driving device 3, position detection unit, Material control valve 7 and elevating mechanism 8 control be connected Control unit.
Since the vehicle shipped for cement is usually longer, for multiple entrucking points would generally be arranged on vehicle convenient for entrucking. After the completion of an entrucking point, need move vehicle to next entrucking point.For this purpose, in the present embodiment, as shown in Figures 1 and 2, It is fixed with castor 21 in the bottom of weighbridge 2, to move under the drive of weighbridge driving device 3.Weighbridge driving device 3 specifically includes Rotation is set to the traction wheel 31 at 1 both ends of melt pit, the traction rope 32 of traction wheel 31 is connected and can be wound in weighbridge 2, and corresponding Traction wheel 31, the power device 33 that melt pit both ends are set and traction wheel 31 is driven to rotate, further include be fixed in melt pit 1 with The guide rail 34 that castor 21 is equipped with.Power device 33 is motor in the present embodiment.Traction rope 32 uses high strength wire rope.Control Unit processed controls the rotation of traction wheel 31 by controlling the opening and closing of motor, and then controls the movement of weighbridge 2, drives ground with this Lorry on pound 2 is mobile.It is not necessary that by the frequent move vehicle of driver, can reduce the personnel to operate caused bulk cargo of making mistakes, and flash etc. is asked Topic.
In order to detect whether weighbridge 2 namely vehicle reach the entrucking point of setting, which is additionally provided in figure Unshowned position detection unit.In the present embodiment, position detection unit is specially to be located at the photoelectric type position biography of 2 side of weighbridge Whether test point is arranged by 2 side of weighbridge again in sensor, to be arrived using photoelectric position sensor detection weighbridge 2 namely vehicle Position.When vehicle is after the completion of an entrucking point, control unit controls electric motor starting, drives weighbridge 2 mobile.Work as position detection unit After detecting that weighbridge 2 drives vehicle to reach next entrucking point, position detection unit meeting feedback signal is to control unit, control Unit controls motor and closes, and can start the entrucking work of the entrucking point.Obvious, which can also open for limit The position sensor of pass or other forms.
The feed bin 5 to store the clinker to entrucking is additionally provided in the present embodiment.The feed bin 5 is fixed by bracket 4 In the top of weighbridge 2, and the feed bin 5 has opening down discharge end.Clinker can be fallen into vehicle from discharge end.For convenient for The outflow of clinker in feed bin 5 is controlled, is additionally provided with cement bulk head 6 in discharge end in the present embodiment, and discharging Material control valve 7 is equipped between end and cement bulk head 6.It can be when needed by the unlatching of control unit control Material control valve 7 Or it closes.It can inevitably kick up a dust since clinker falls process, environment be polluted, for this purpose, expecting in the present embodiment The top in storehouse 5 is additionally provided with the dust-precipitator that suction pipe extends to 5 bottom of feed bin.
Very big dust can be raised since clinker is fallen from above.For this purpose, the clinker automatic loading system is set The elevating mechanism 8 for thering is control cement bulk head 6 to go up and down, so that cement bulk head 6 is carried out from low to high by the bottom of vehicle cargo hold Entrucking operation.In the present embodiment, which specifically includes the hoist engine 81 being fixed on bracket 4, and rotation is located at bracket 4 On fixed pulley 82, drawing-in fixed pulley 82 and in cement bulk head 6 be connected hoist engine traction rope 83.Obvious, the lifting knot Structure can also be other structures, for example can be the hydraulic lifting mechanism or lead screw being fixed between bracket 4 and cement bulk head 6 Lifting mechanism.To be detached from cement bulk head 6 with Material control valve 7 in the process of moving up and down, in cement bulk head 6 and object Expect to be equipped with one section of bellows between control valve 7.
Cement bulk head 6 can be by presetting its rate of climb, but since clinker is flowed out from cement bulk head 6 Rate may be different, may cause the clinker of outflow not enough or cause flash beyond predetermined value, thus the automatic loading System is additionally provided with Level measurement instrument not shown in the figure, and the Level measurement instrument with control unit by connecting, by the material at this Height Real-time Feedback prevents material thanks to or flash to control unit, then by the promotion speed of control unit control hoist engine 81.This reality It applies in example, which is to be servo-actuated in the radar levelmeter of cement bulk head 6.
The clinker automatic loading system of the present embodiment is in use, steps are as follows:
A, vehicle reaches weighbridge 2, and is parked in designated position, is weighed from weighbridge 2 and fed back to control unit the tare weight of vehicle Value, by manual confirmation it is errorless after, start entrucking program;
B, control unit control weighbridge driving device 3 and work, and drive vehicle to move forward, detect vehicle by position detection unit First entrucking point whether is reached, until vehicle reaches first entrucking point;
C, control unit control elevating mechanism 8 drive cement bulk head 6 move down, cement bulk head 6 in place after, control Unit controls Material control valve 7 and opens;
D, by the height of the Level measurement instrument real-time detection position clinker, and Real-time Feedback is controlled to control unit Unit is according to the height value of clinker, and control elevating mechanism 8 drives cement bulk head 6 gradually to rise, until cement bulk head 6 Reach setting height, and clinker height meets setting value.
E is worked by control unit control weighbridge driving device 3, drives vehicle to move forward, detected by position detection unit Whether vehicle reaches next entrucking point, until vehicle reaches next entrucking point;
F repeats step c, and d, e are until arrival compartment tail portion or gross vehicle load reach setting value, and thus entrucking is completed.
G, automatic loading system reset, and wait next entrucking.
In addition to above structure, control unit can also be connect with access control system and Doduments printing system, and driver can swipe the card And after vehicle is parked in designated position, complete to charge by the clinker automatic loading system, weighing, the processes such as printing document.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (5)

1. a kind of clinker automatic loading system, characterized by comprising:
Weighbridge (2) is movably arranged in melt pit (1);
Weighbridge driving device (3) is located in the melt pit and is sequentially connected in the weighbridge (2), to drive the weighbridge (2) It is mobile;
Position detection unit, relative to the melt pit (1) fixed and arranged, to constitute the detection to the weighbridge (2) position;
Feed bin (5) is fixed on the top of the melt pit (1) through bracket (4), and the feed bin (5) has downwardly open discharging End;
Cement bulk head (6), is fixed on the discharge end;
Material control valve (7) is set between the feed bin (5) and the cement bulk head (6), to control clinker from described The outflow of feed bin (5);
Elevating mechanism (8) is located on the bracket and is sequentially connected with the cement bulk head (6), can drive the cement Loading spout (6) moves up and down;
Control unit, with the weighbridge (2), the weighbridge driving device (3), the position detection unit, the Material control Valve (7) and the elevating mechanism (8) control are connected.
2. clinker automatic loading system according to claim 1, it is characterised in that: the weighbridge driving device (3) Including guide rail (34), the weighbridge can be mobile along the guide rail (34), further includes the traction that rotation is set to the melt pit (1) both ends It takes turns (31), the traction rope (32) for being connected and being wound on traction wheel (31) with weighbridge (2), and the driving traction wheel (31) The power device (33) of rotation.
3. clinker automatic loading system according to claim 1, it is characterised in that: the position detection unit is solid It is scheduled on the photoelectric position sensor of weighbridge (2) side.
4. clinker automatic loading system according to claim 1, it is characterised in that: in the top of the feed bin (5) Equipped with clinker dust-precipitator (9), the clinker dust-precipitator (9) has the suction pipe for extending to the bin bottom.
5. clinker automatic loading system according to claim 1, it is characterised in that: the elevating mechanism (8) includes The hoist engine (81) for being wound with hoist engine traction rope (83) being fixed on the bracket (4), and rotation are set to the bracket (4) on, so that the hoist engine traction rope pile warp and the fixed pulley (82) that is connect with the cement bulk head.
CN201820407361.1U 2018-03-23 2018-03-23 Clinker automatic loading system Expired - Fee Related CN208234180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820407361.1U CN208234180U (en) 2018-03-23 2018-03-23 Clinker automatic loading system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820407361.1U CN208234180U (en) 2018-03-23 2018-03-23 Clinker automatic loading system

Publications (1)

Publication Number Publication Date
CN208234180U true CN208234180U (en) 2018-12-14

Family

ID=64585181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820407361.1U Expired - Fee Related CN208234180U (en) 2018-03-23 2018-03-23 Clinker automatic loading system

Country Status (1)

Country Link
CN (1) CN208234180U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109896308A (en) * 2019-03-05 2019-06-18 洛阳矿山机械工程设计研究院有限责任公司 It is a kind of for aggregate and the control method for fully automatic of sandstone quantifying and loading
CN113968488A (en) * 2021-10-29 2022-01-25 中国电建集团华东勘测设计研究院有限公司 Intelligent and environment-friendly building aggregate rapid loading method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109896308A (en) * 2019-03-05 2019-06-18 洛阳矿山机械工程设计研究院有限责任公司 It is a kind of for aggregate and the control method for fully automatic of sandstone quantifying and loading
CN109896308B (en) * 2019-03-05 2021-06-25 洛阳矿山机械工程设计研究院有限责任公司 Full-automatic control method for quantitative loading of aggregate and sand and stone
CN113968488A (en) * 2021-10-29 2022-01-25 中国电建集团华东勘测设计研究院有限公司 Intelligent and environment-friendly building aggregate rapid loading method and system
CN113968488B (en) * 2021-10-29 2023-08-15 中国电建集团华东勘测设计研究院有限公司 Intelligent and environment-friendly quick loading method and system for building aggregate

Similar Documents

Publication Publication Date Title
CN108792662A (en) A kind of full-automatic continuous and quantitative loading system of railway freight train and method
CN2848787Y (en) Bulk loading head of dust proof for automobile
CN208234180U (en) Clinker automatic loading system
CN111891775A (en) Intelligent loading hopper and material transferring method
KR20110112950A (en) Ladder auto move control system
CN109693923A (en) A kind of warehouse logistics cargo automatic splinter screening device for screening
CN106429995A (en) Fork lowering device and fork descent method of electric forklift
CN112478675A (en) Automatic chain part feeding system
CN109956326B (en) Bulk grain transport vehicle unloading system
CN112193862A (en) Full-automatic control dust-free loading system
CN208544846U (en) A kind of glass automatic push machine on assembly line
CN208361820U (en) The AGV stacker of rising height can be determined automatically
CN110077804A (en) A kind of bulk cargo loading system
CN111676785B (en) Material conveying control method of milling machine, material conveying control system of milling machine and milling machine
CN210682561U (en) Prevent raise dust powder control system that loads
CN209492994U (en) A kind of AGV vehicle system for automatic transporting heavy type aluminum profile material
CN209567469U (en) A kind of warehouse logistics cargo automatic splinter screening device for screening
CN112093506A (en) Automatic loading device for multiple sliding barrels of train
CN111115302A (en) Automatic bulk material distribution control system
CN206720650U (en) One kind automation lowering or hoisting gear
CN216548650U (en) Aggregate automatic loading system of multiple spot unloading
CN109737879A (en) A kind of warehouse logistics cargo size measuring device
CN108996267A (en) A kind of packed feed jettison system
CN105366317B (en) A kind of logistics automatical feeding system
CN205060997U (en) Kiln casket -like bowl charging system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214

CF01 Termination of patent right due to non-payment of annual fee