CN208226526U - Railway passenger traffic line novel cable slot structure - Google Patents

Railway passenger traffic line novel cable slot structure Download PDF

Info

Publication number
CN208226526U
CN208226526U CN201820188598.5U CN201820188598U CN208226526U CN 208226526 U CN208226526 U CN 208226526U CN 201820188598 U CN201820188598 U CN 201820188598U CN 208226526 U CN208226526 U CN 208226526U
Authority
CN
China
Prior art keywords
layer
subgrade
section
groove
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820188598.5U
Other languages
Chinese (zh)
Inventor
张建文
姚裕春
赖紫辉
刘菀茹
张东卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201820188598.5U priority Critical patent/CN208226526U/en
Application granted granted Critical
Publication of CN208226526U publication Critical patent/CN208226526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Railway passenger traffic line novel cable slot structure improves construction efficiency, and ensure that transverse drainage is unobstructed effectively to simplify cable trough working procedure.Cable trough is made of groove body prefabricated components, cover board prefabricated components, is set to both lateral sides at the top of roadbed, roadbed includes surface layer of subgrade bed, bottom layer of subgrade.Further include: mounting groove and slab concrete prefabricated component, the section of mounting groove is L-shaped, is formed by surface layer of subgrade bed transverse end surface and bottom layer of subgrade top surface, and slab concrete prefabricated component is located under mounting groove outside bottom surface and sinks in bottom layer of subgrade;Water proof material pave-load layer, upper traversing section are formed with the surface layer of subgrade bed surface for closing on mounting groove and are bonded, and middle vertical section and installation groove sidewall are formed and bonded, and lower traversing section and bottom layer of subgrade surface and slab concrete preform surfaces, which are formed, to be bonded;The bottom surface of the cable trough is close to the lower lateral section surface of water proof material pave-load layer, and the inner sidewall of the bottom surface of cable trough is close to section surface vertical in water proof material pave-load layer.

Description

Railway passenger traffic line novel cable slot structure
Technical field
The utility model relates to geotechnical engineering, in particular to a kind of railway passenger traffic line novel cable slot structure is fitted For having the tiny fragments of stone, coal, etc. and non-fragment orbit.
Background technique
Line for Passenger Transportation general subgrade location cable trough takes prefabricated component assembled at present, the high 37.5cm of groove body, top width 72cm, in Partition is arranged in portion, and communication and signal near line trackside close slot setting, and electric power slot is arranged far from route, by broken in surface layer of subgrade bed gradation Stone forms cable trough construction space, electricity at grooving to surface layer of subgrade bed bottom and side slope from top to bottom, from inside to outside after the completion of filling Permeable gravel and M10 cement mortar screeding layer is respectively set in slot bottom from bottom to top when cable slot is laid with, and groove body near line trackside excavates base C25 concrete backfill is taken in hole, and setting top surface is not less than the cast-in-place concrete shoulder protector of 10cm on the outside of groove body, it is desirable that at a certain distance In cable trench bottom, shoulder protector respective cable slot groove body bottom position and shoulder protector bottom, drain hole is set.This structure type is deposited Main problem have, work progress is extremely cumbersome, often fill layer of material all seams and handle, groove body bottom in practice of construction Material is lack of standardization, and table is be easy to cause to seep under water;Shoulder protector drain hole and cable trough drain hole is more difficult is located in same position, is laterally arranged Its easy blocking of water electrode.
Therefore, it is necessary to study a kind of novel railway roadbed cable slot structure, above-mentioned problem can effectively solve, simultaneously Need to have the characteristics that economical, environmentally friendly and easy for construction.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of railway passenger traffic line novel cable slot structure, Effectively to simplify cable trough working procedure, construction efficiency is improved, and ensure that transverse drainage is unobstructed.
It is as follows that the utility model solves technical solution used by its technical problem:
The railway passenger traffic line novel cable slot structure of the utility model, cable trough is by groove body prefabricated components, cover board Prefabricated components are constituted, and are set to both lateral sides at the top of roadbed, and roadbed includes surface layer of subgrade bed, bottom layer of subgrade, it is characterized in that further include: Mounting groove and slab concrete prefabricated component, the section of mounting groove is L-shaped, by surface layer of subgrade bed transverse end surface and bottom layer of subgrade top surface shape At slab concrete prefabricated component is located under mounting groove outside bottom surface and sinks in bottom layer of subgrade;Water proof material pave-load layer, it is horizontal thereon It is formed and is bonded with the surface layer of subgrade bed surface for closing on mounting groove to section, middle vertical section and installation groove sidewall are formed and bonded, lower traversing section It is formed and is bonded with bottom layer of subgrade surface and slab concrete preform surfaces;The bottom surface of the cable trough and water proof material pave-load layer Lower lateral section surface be close to, the inner sidewall of the bottom surface of cable trough is close to section surface vertical in water proof material pave-load layer.
The groove body prefabricated components have the interval that inner space is separated into communicaton and signal cable slot, Power Cable Groove Plate, communicaton and signal cable slot position is near line trackside;The bottom interior surface of the groove body prefabricated components has 4% gradient, middle partition Bottom opens up the interior drain hole of connection communicaton and signal cable slot, Power Cable Groove, the bottom edge of lateral wall along line direction interval Line direction interval opens up the outer drain hole passed to outside groove body prefabricated components, and interior drain hole and outer drain hole position are to corresponding.
Bottom drain tank is arranged in the bottom surface upper edge line direction interval of the groove body prefabricated components, erects in water proof material pave-load layer Through-hole is opened up to the bottom Duan Shangyu drain tank inner port relative position.
The utility model has the beneficial effects that efficiently solving the cumbersome of existing cable slot working procedure, cable trough and outer Side shoulder protector drain hole be easy blocking can not transverse drainage the problem of;Save shoulder protector bricklaying, former groove body bottom permeable gravel and The bricklaying of mortar levelling layer;For earth's surface every drainage measure construction is simple, procedure connection is uncomplicated, reduces the time of manual work, Improve the degree of mechanized construction;Have the characteristics that it is easy for construction, economical, environmentally friendly, have wide popularization and application foreground.
Detailed description of the invention
This specification includes following five width attached drawing:
Fig. 1 is the cross-section diagram (embankment) of the utility model railway passenger traffic line novel cable slot structure;
Fig. 2 is the enlarged drawing of the part A in Fig. 1;
Fig. 3 is the top view of groove body in the utility model railway passenger traffic line novel cable slot structure;
Fig. 4 is the cross-section diagram (cutting) of the utility model railway passenger traffic line novel cable slot structure.
Fig. 5 is a kind of cross-section diagram of structure type of the utility model railway passenger traffic line novel cable slot structure.
Component name and corresponding label: groove body prefabricated components 10, cover board prefabricated components 11, signal of communication are shown in figure Cable trough 13, Power Cable Groove 14, interior drain hole 15, outer drain hole 16, bottom drain tank 17, precast concrete 20, water proof material Expect pave-load layer 21, surface layer of subgrade bed 31, bottom layer of subgrade 32, embankment noumenon 33.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Referring to FIG. 1, FIG. 2 and FIG. 4, the utility model railway passenger traffic line novel cable slot structure, cable trough is by slot Body prefabricated components 10, cover board prefabricated components 11 are constituted, and are set to both lateral sides at the top of roadbed, roadbed includes surface layer of subgrade bed 31, base Bed bottom 32.Further include: mounting groove and slab concrete prefabricated component 20, the section of mounting groove is L-shaped, laterally by surface layer of subgrade bed 31 End face is formed with 32 top surface of bottom layer of subgrade, and slab concrete prefabricated component 20 is located under mounting groove outside bottom surface and sinks to bottom layer of subgrade In 32;Water proof material pave-load layer 21, upper traversing section are formed with 31 surface of surface layer of subgrade bed for closing on mounting groove and are bonded, middle vertical section It is formed and is bonded with installation groove sidewall, lower traversing section forms viscous with 32 surface of bottom layer of subgrade and 20 surface of slab concrete prefabricated component Knot;The bottom surface of the cable trough is close to the lower lateral section surface of water proof material pave-load layer 21, the inner sidewall of the bottom surface of cable trough It is close to section surface vertical in water proof material pave-load layer 21.
Referring to 2, it is effective that the bottom surface of cable groove sidewall passes through slab concrete prefabricated component 20, water proof material pave-load layer 21 in addition It blocks table to seep under water, is not required to setting shoulder protector.Save the trowel used for plastering of shoulder protector bricklaying, the permeable gravel of former groove body bottom and mortar levelling layer Work, construction is simple, procedure connection is uncomplicated, reduces the time of manual work, improves the degree of mechanized construction.Water proof material The laying such as waterproof geotextile material usually can be used in material pave-load layer 21.
Referring to Fig. 2, the height of the cable trough is equal with the thickness of surface layer of subgrade bed 31.The groove body prefabricated components 10 have Inner space is separated into the middle partition of communicaton and signal cable slot 13, Power Cable Groove 14, wherein communicaton and signal cable slot 13 In near line trackside, Power Cable Groove 14 is located remotely from line side.
Referring to 2, Fig. 3 and Fig. 5, to ensure that transverse drainage is unobstructed, the bottom interior surface of the groove body prefabricated components 10 has 4% gradient, interval board bottom portion open up the interior sluicing of connection communicaton and signal cable slot 13, Power Cable Groove 14 along line direction interval Hole 15, the bottom of lateral wall open up the outer drain hole 16 passed to outside groove body prefabricated components 10, interior drain hole along line direction interval 15 with outer 16 position of drain hole to corresponding.Bottom drain tank is arranged in the bottom surface upper edge line direction interval of the groove body prefabricated components 10 17, through-hole is opened up with 17 inner port relative position of bottom drain tank in vertical section in water proof material pave-load layer 21.
Referring to 2, when roadbed is embankment structure, 20 plate face of precast concrete is inclined outwardly, and outer panel faces upward It turns up, forms catchment tray by draining into the water in catchment tray in lateral sulcus along the spaced drainpipe of line direction and avoid electricity Cable slot transverse drainage directly washes away side slope of embankment by the water of discharge.Referring to Fig. 4, when roadbed is chasm structuref, concrete is pre- 20 plate face of product is straight, and with lateral sulcus top drop-over, cable trough transverse drainage is directly introduced lateral sulcus by the water of discharge.
Groove body prefabricated components 10 can be there are many section structure.Reference Fig. 2, the inner sidewall of the groove body prefabricated components 10, Lateral wall is erect to form rectangular cross section.Referring to Fig. 5,10 inner sidewall of groove body prefabricated components is erect, lateral wall introversion forms ladder Shape section, to improve cable trough self-stability and optimization top cable groove width.
The above is some of the utility model railway passenger traffic line novel cable slot structure that explain through diagrams Principle, be not intended to for the utility model to be confined to shown in and the specific structure and the scope of application in, therefore it is all it is all can The corresponding modification that can be utilized and equivalent, belong to the applied the scope of the patents of the utility model, especially for cable The placement location of slot and the modification or substitution made every adrainage material.

Claims (5)

1. railway passenger traffic line novel cable slot structure, cable trough is by groove body prefabricated components (10), cover board prefabricated components (11) it constitutes, is set to both lateral sides at the top of roadbed, roadbed includes surface layer of subgrade bed (31), bottom layer of subgrade (32), it is characterized in that also Include: mounting groove and slab concrete prefabricated component (20), the section of mounting groove is L-shaped, by surface layer of subgrade bed (31) transverse end surface with Bottom layer of subgrade (32) top surface is formed, and slab concrete prefabricated component (20) is located under mounting groove outside bottom surface and sinks to bottom layer of subgrade (32) in;Water proof material pave-load layer (21), upper traversing section are formed with surface layer of subgrade bed (31) surface for closing on mounting groove and are bonded, in Vertical section and installation groove sidewall are formed and are bonded, lower traversing section and bottom layer of subgrade (32) surface and slab concrete prefabricated component (20) table Face forms bonding;The bottom surface of the cable trough is close to the lower lateral section surface of water proof material pave-load layer (21), the bottom of cable trough The inner sidewall in face is close to section surface vertical in water proof material pave-load layer (21).
2. railway passenger traffic line novel cable slot structure as described in claim 1, it is characterized in that: the prefabricated structure of the groove body Part (10) has the middle partition that inner space is separated into communicaton and signal cable slot (13), Power Cable Groove (14), signal of communication Cable trough (13) is located near line trackside;The bottom interior surface of the groove body prefabricated components (10) has 4% gradient, interval board bottom portion The interior drain hole (15) of connection communicaton and signal cable slot (13), Power Cable Groove (14), lateral wall are opened up along line direction interval Bottom opened up along line direction interval and pass to the outer drain hole (16) of groove body prefabricated components (10) outside, interior drain hole (15) and outer Drain hole (16) position is to correspondence.
3. railway passenger traffic line novel cable slot structure as claimed in claim 2, it is characterized in that: the prefabricated structure of the groove body Bottom drain tank (17) are arranged in the bottom surface upper edge line direction interval of part (10), in water proof material pave-load layer (21) in vertical section with bottom Drain tank (17) inner port relative position opens up through-hole.
4. the railway passenger traffic line novel cable slot structure as described in any one top of claims 1 to 3, it is characterized in that: institute The height for stating cable trough is equal with the thickness of surface layer of subgrade bed (31).
5. railway passenger traffic line novel cable slot structure as described in claim 1, it is characterized in that: the prefabricated structure of the groove body Inner sidewall, the lateral wall of part (10) are erect to form rectangular cross section or inner sidewall setting, lateral wall introversion formation trapezoidal cross-section.
CN201820188598.5U 2018-02-02 2018-02-02 Railway passenger traffic line novel cable slot structure Expired - Fee Related CN208226526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820188598.5U CN208226526U (en) 2018-02-02 2018-02-02 Railway passenger traffic line novel cable slot structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820188598.5U CN208226526U (en) 2018-02-02 2018-02-02 Railway passenger traffic line novel cable slot structure

Publications (1)

Publication Number Publication Date
CN208226526U true CN208226526U (en) 2018-12-11

Family

ID=64529900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820188598.5U Expired - Fee Related CN208226526U (en) 2018-02-02 2018-02-02 Railway passenger traffic line novel cable slot structure

Country Status (1)

Country Link
CN (1) CN208226526U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108347025A (en) * 2018-02-02 2018-07-31 中铁二院工程集团有限责任公司 Railway passenger traffic line novel cable slot structure
CN110117920A (en) * 2019-04-22 2019-08-13 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of cast-type cable tank systems
CN110137894A (en) * 2019-04-22 2019-08-16 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of prefabricated cable tank systems

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108347025A (en) * 2018-02-02 2018-07-31 中铁二院工程集团有限责任公司 Railway passenger traffic line novel cable slot structure
CN110117920A (en) * 2019-04-22 2019-08-13 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of cast-type cable tank systems
CN110137894A (en) * 2019-04-22 2019-08-16 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of prefabricated cable tank systems

Similar Documents

Publication Publication Date Title
CN208226526U (en) Railway passenger traffic line novel cable slot structure
CN108347025A (en) Railway passenger traffic line novel cable slot structure
CN209227580U (en) The tower-crane foundation structure of raft foundation is placed under a kind of
CN205276099U (en) Drainage formula brick that permeates water
CN106981855A (en) A kind of high ferro roadbed cable tank systems
CN110747909A (en) Waterproof structure of open cut tunnel movement joint
CZ292829B6 (en) Basin construction for catchment of a traffic road
CN206834684U (en) A kind of high ferro roadbed cable tank systems
CN212479325U (en) Drainage system for construction joint of underground excavation tunnel
CN210596882U (en) Pedestrian road
CN110373982A (en) A kind of construction method administered for tunnel road surface infiltration
CN209039963U (en) A kind of platform back preventing car jump between high road bed and bridge
CN104358203B (en) The reinforced concrete floor formula gabion side's of abandoning lateral drainage groove structure
CN203821189U (en) Through cut sewer drainage antifreezing system based on existing railway operation condition
CN203321586U (en) Multifunctional prefabricated side type ditch in road tunnel for clean-up and separation of sewage and maintenance
CN214656089U (en) Be applied to assembled road surface structure in sinking area of underground coal mine
CN112302678B (en) Deformation control construction process for shallow tunnel of underpass building
CN111501959B (en) Combined cast-in-situ drainage ditch and construction method
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN204282157U (en) The reinforced concrete floor formula gabion side's of abandoning lateral drainage groove structure
CN203782665U (en) Modular ecologic drainage ditch building block and formed ecologic drainage ditch
CN105178134B (en) Green road reconstruction method
CN108221545B (en) Water permeable brick pavement structure and construction process thereof
CN107700301A (en) A kind of ruggedized construction on express highway roadbed
CN208717941U (en) A kind of no toe board buttress type road shoulder retaining wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211