CN208220113U - Construction waste recyclable device - Google Patents

Construction waste recyclable device Download PDF

Info

Publication number
CN208220113U
CN208220113U CN201820602470.9U CN201820602470U CN208220113U CN 208220113 U CN208220113 U CN 208220113U CN 201820602470 U CN201820602470 U CN 201820602470U CN 208220113 U CN208220113 U CN 208220113U
Authority
CN
China
Prior art keywords
charge
ring set
spring
fixed
pouring weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820602470.9U
Other languages
Chinese (zh)
Inventor
谭俊丰
张国华
卞新华
邹凤景
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGHENG CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHONGHENG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGHENG CONSTRUCTION GROUP Co Ltd filed Critical ZHONGHENG CONSTRUCTION GROUP Co Ltd
Priority to CN201820602470.9U priority Critical patent/CN208220113U/en
Application granted granted Critical
Publication of CN208220113U publication Critical patent/CN208220113U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model provides a kind of construction waste recyclable device, comprising: recovery tube, cast hopper, pouring weight and mounting assembly;It is placed with building every first floor using pouring weight made of lead material, dismountable cast hopper is equipped with by mounting assembly on each pouring weight, cast hopper is connected to recovery tube;Recovery tube includes: at least two and is in charge of, two it is adjacent be in charge of between be detachably connected by connection component.Construction waste recyclable device solve the problems, such as in the prior art because the installation of cast hopper and building need on building aperture due to cause cast hopper installation trouble.

Description

Construction waste recyclable device
Technical field
The utility model relates to build waste disposal in construction process, and in particular to a kind of construction waste recyclable device.
Background technique
Chinese patent discloses that a kind of application No. is the construction waste recyclable devices and building of CN201720560711.3 Waste recovery systems, the construction waste recovery system include pulverizer, recycling band and construction waste recyclable device, the construction waste Recyclable device includes recovery tube, more diversion pipes, multiple cast hoppers and layered component, and recovery tube is for being fixedly connected on building Wall face and be obliquely installed.One end of each diversion pipe is connected to recovery tube, and multiple cast hoppers are led with more correspondingly Flow tube connection.Layered component is fixedly connected in recovery tube and recovery channel is divided into first passage and second channel, layering group There are multiple sieve pores, so that construction waste is layered in recovery channel on part.Although the construction waste recyclable device is in recovery tube In realize preliminary layered shaping carried out to construction waste, but the shortcomings that the construction waste recyclable device still has are as follows:
Due to building be all it is square-folded, in order to realize cast hopper installation must the aperture on building, cause It is troublesome in poeration, and need drilling machine etc., need to expend a large amount of energy.
Utility model content
The utility model will provide a kind of construction waste recyclable device, solve in the prior art because of cast hopper and building Installation needs the aperture on building and cast hopper is caused to install troublesome problem.
To achieve the above object, the utility model uses the following technical solution:
A kind of construction waste recyclable device, comprising: recovery tube, cast hopper, pouring weight and mounting assembly;
It is placed with building every first floor using pouring weight made of lead material, passes through mounting assembly peace on each pouring weight Equipped with dismountable cast hopper, cast hopper is connected to recovery tube;
Recovery tube includes: at least two and is in charge of, two it is adjacent be in charge of between be detachably connected by connection component.
Compared with the prior art, the utility model has the following beneficial effects:
By the setting of pouring weight, and pouring weight is set and is made of lead material, is provided for very long lighter recovery tube more A installation point, so that the cast hopper of fixed connection opposite with recovery tube realizes the multiple spot to recovery tube after connecting with pouring weight Support, avoid the need on building aperture installation cast hopper and cause it is troublesome in poeration, since pouring weight is heavier, recovery tube because Need to pull pouring weight when gravity deflection, and lighter recovery tube does not pull pouring weight, brings convenience to operation, avoids the need for Aperture uses power source on building, reduces the use of the energy, is good for the environment.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
The structural schematic diagram of Fig. 1 construction waste recyclable device;
Fig. 2 is the A-A cross-sectional view of cast hopper and pouring weight junction in Fig. 1;
Fig. 3 is in charge of the B-B cross-sectional view for being in charge of junction with second in Fig. 1 first.
Appended drawing reference: recovery tube 1, cast hopper 2, pouring weight 3, convex block 41, clamping arm 42, driving mechanism 43, guide rod 431, Pedal 432, the first spring 433, drivening piece 434, voussoir 435, second spring 436, the first idler wheel 437, first are in charge of 11, second Be in charge of 12, thread bush 131, extruded sleeve 132, installation set 133, compressed part 134, third spring 51, mobile bar 52, compact heap 53, Sealing ring 135, conical sheet metal 136, cushion block 54, the first ring set 61, the second ring set 62, third ring set 63, the second idler wheel 55.
Specific embodiment
In order to make technological means of the utility model, creation characteristic, reach purpose and effect is more clear and is easy to Understand, the utility model be further elaborated with reference to the accompanying drawings and detailed description:
As shown in Figure 1, Figure 2 and shown in Fig. 3, the present embodiment proposes a kind of construction waste recyclable device, comprising: recovery tube 1, Cast hopper 2, pouring weight 3 and mounting assembly;
It is placed with building every first floor using pouring weight 3 made of lead material, passes through mounting assembly on each pouring weight 3 Dismountable cast hopper 2 is installed, cast hopper 2 is connected to recovery tube 1;
Recovery tube 1 includes: at least two and is in charge of, two it is adjacent be in charge of between be detachably connected by connection component.
In order to which design structure is simple and mounting assembly easy to use, mounting assembly include: convex block 41, clamping arm 42 and Driving mechanism 43 is protruding with convex block 41 in 2 bottom of cast hopper, and 3 top surface of pouring weight supports 2 bottom of cast hopper, 3 top surface concave shape of pouring weight At the jack being inserted into for convex block 41, the clamping arm 42 being caught on from horizontal direction in convex block 41 is installed by jack, Driving mechanism 43 of the installation for driving clamping arm 42 to move in the horizontal direction in pouring weight 3.
Cast hopper 2 and driving equipment using power consumption is avoided in order to facilitate the installation of, offers cavity in pouring weight 3;
Driving mechanism 43 includes: guide rod 431, pedal 432, the first spring 433, drivening piece 434, voussoir 435 and Two springs 436 are equipped in pouring weight 3 and are only capable of the guide rod 431 moved in the vertical direction, guide rod under the guiding of pouring weight 3 431 are fixed with the pedal 432 for stretching out pouring weight 3, and 431 bottom end of guide rod is fixed to 433 one end of the first spring, and the first spring 433 is another One end is fixed to cavity inner wall, and 431 side wall of guide rod is fixed to 434 one end of drivening piece, and 434 other end of drivening piece is fixed to voussoir 435, voussoir 435 is compressive plane close to the one side of jack, and compressive plane and vertical direction have angle, and compressive plane and clamping arm 42 are made With clamping arm 42, which passes through, second spring 436, and 436 one end of second spring is fixed with cavity inner wall, 436 other end of second spring Fixed with clamping arm 42,435 big end of voussoir is located at below 435 small end of voussoir, when not stepping on pedal 432, in the first spring 433 The extruding of 435 big end of voussoir is maintained under elastic force, and clamping arm 42 is inserted into convex block 41 down and second spring 436 is in by compression shape State;When stepping on pedal 432,435 small end of voussoir is acted on clamping arm 42 and clamping arm 42 cannot under 436 elastic force of second spring It is inserted into convex block 41.Certain driving mechanism 43 also directly can be cylinder.First spring, 433 elasticity rate second spring, 436 bullet Power is big.
In order to avoid the damage of clamping arm 42, clamping arm 42 is in contact by the first idler wheel 437 with compressive plane.
Preferably, two it is adjacent be in charge of, one is in charge of and is in charge of 11 for first, it is another be in charge of for second be in charge of 12;
Connection component includes: thread bush 131, extruded sleeve 132, installation set 133 and at least two compressed parts 134, first It is in charge of 11 external screw threads and is connected with thread bush 131, is in charge of the installation set 133 being fixed on 11 positioned at 131 side of thread bush first, Thread bush 131 is in charge of close to second is fixed with an extruded sleeve 132 being looped around outside installation set 133 on 12 end, in installation set At least two compressed parts 134 are installed on 133;Compressed part 134 includes: third spring 51, mobile bar 52 and compact heap 53, movement Bar 52 is mounted in installation set 133, and the opposite installation set 133 of 52 energy of mobile bar is in charge of 11 radially movement, mobile bar first 52 one end for being in charge of 11 axis close to first are fixed with compact heap 53, are used to be inserted into second between all compact heaps 53 and are in charge of 12 not The end of thread bush 131 is installed, 52 other end of mobile bar and 132 inner wall of extruded sleeve act on, and mobile bar 52, which passes through to have, is located at peace Third spring 51 in encapsulation 133,51 one end of third spring and compact heap 53 are fixed, 51 other end of third spring and installation set 133 is fixed;
When extruded sleeve 132 is in charge of 11 end and the effect of mobile bar 52 close to first, pushed in 51 elastic force of third spring Tight block 53 does not hinder second to be in charge of the 12 end insertions for being not installed with thread bush 131;When extruded sleeve 132 is in charge of 12 close to second When end and mobile bar 52 act on, third spring 51 is elongated, and compact heap 53 clamps second and is in charge of 12.In construction process, Its interior waste material can be cleared up by repairing one layer, it is only necessary to which the height that recovery tube 1 is connected into needs does not need to repair again One layer of speeling stairway of good later layer installs 1 each layer of recovery tube of collection hopper, saves labour, is each in charge of herein Corresponding each floor, that is, each it is in charge of the height after installation and each floor (height of each floor is constant) height phase It adapts to.When installation, firstly, thread bush 131 keeps the state after disassembly, that is, thread bush 131 that extruded sleeve 132 is driven to compare and lean on Nearly first is in charge of 11, and mobile bar 52 and extruded sleeve 132 are acted on far from the end of thread bush 131 at this time, and extruded sleeve 132 is to mobile bar 52 squeezing action is little, and under the elastic force of the first third spring 51, it is larger to be able to maintain the distance between all compact heaps 53, The end that 12 are not provided with thread bush 131 can be in charge of for second at this time to be inserted into, be inserted into compact heap 53 to facilitate second to be in charge of 12 Between;Then, it is in charge of 12 for second to be inserted between compact heap 53, and keeps second to be in charge of 12 and be pressed on first and be in charge of on 11 State;Finally, turn thread bush 131, so that extruded sleeve 132 is acted on close to the end of thread bush 131 and mobile bar 52, finally, Compact heap 53 is in charge of 12 compressions for second, and compact heap 53 avoids second from being in charge of 12 and first being in charge of 11 disengagings by friction.Due to The size being each in charge of is larger, therefore in order to enable easy for installation, only by rotation thread bush 131, thread bush 131 compared with In the case where big, two arm motion of people can easily rotate thread bush 131, avoid and need the multiple drives of turn under high-altitude The bolt of dynamic compact heap 53 and the generation for leading to safety accident.It also avoids simultaneously when not needing using very long recovery tube 1 And longer recovery tube 1 is used, the use waste of recovery tube 1 is avoided, the service life of recovery tube 1 is extended, reduces back The production of closed tube 1, has saved the energy, is good for the environment.
Due to only have compact heap 53 clamp second be in charge of 12 when be only frictionally, be in charge of 11 and second and be in charge of 12 when first It is in charge of 11 and second to first when interior waste material passes through to be in charge of 12 and have impact force, if impact force is in charge of on 11 axis directions first Strength it is excessive, it is most likely that so that first is in charge of 11 and second and is in charge of 12 and has the tendency that being separated from each other, then abutting compact heap 53 frictional force is very likely far from enough to be hindered first to be in charge of 11 and second to be in charge of 12 and have the tendency that being separated from each other, in order to convenience-for-people First, which is in charge of 11 and second, is in charge of the appearance of 12 the phenomenon that being separated from each other, therefore has done following design: connection component further include: sealing Circle 135 and conical sheet metal 136, the installation of conical sheet metal 136 second are in charge of on the outer wall that 12 are in charge of 12 close to second, conical sheet metal 136 be circular cone structure, and the big end of conical sheet metal 136 is equipped with sealing ring 135, and second, which is in charge of 12 end faces, passes through sealing ring 135 It to be in charge of 11 end faces with first to contact, 136 small end of conical sheet metal is located at 136 big end of conical sheet metal and is in charge of 11 sides away from first, Compact heap 53 is provided with the inclined-plane for being close to 136 side wall of conical sheet metal, and sealing ring 135 is made of elastic material, seals The setting of circle 135, so that second, which is in charge of 12, can squeeze the change of sealing ring 135 during compact heap 53 is in charge of 12 close to second Flat, then first is in charge of 11 and second and is in charge of 12 further towards finally, first, which is in charge of 11 and second, is in charge of 12 for sealing ring 135 compressive strains, sealing first are in charge of 11 and second and are in charge of gap between 12, with when compact heap 53 clamps second and is in charge of 12, Compact heap 53, which squeezes lower second, to be in charge of 12 sealing ring 135 is pressed on first and be in charge of on 11.It is in charge of when compact heap 53 compresses second After 12, compact heap 53 by conical sheet metal 136 have hinder first be in charge of 11 and second be in charge of 12 strength, in this way with compact heap 53 Compression double acting hinder first to be in charge of 11 and second to be in charge of 12 and be separated from each other, extend the service life of compact heap 53.
In order to enable compact heap 53 be pressed on second be in charge of on 12 after be not easily disconnected from, while guarantee compact heap 53 compress second Second will not be damaged and be in charge of 12 by being in charge of 12 intensity, and compact heap 53 is in charge of 12 compressions for second by a cushion block 54, and cushion block 54 is adopted It is made of elastic material.
In order to avoid turn thread bush 131 excessively causes extruded sleeve 132 and mobile bar 52 to be detached from, and then avoid extruded sleeve 132 with mobile bar 52 be detached from after under 51 elastic force of the first third spring mobile bar 52 be difficult to enter the phenomenon in extruded sleeve 132 Occur, extruded sleeve 132 includes: the first ring set 61, the second ring set 62 and third ring set 63, the first ring set 61 and third ring set 63 be circular ring shape, and 61 one end of the first ring set and thread bush 131 are fixed, and 61 other end of the first ring set and 62 one end of the second ring set are solid Fixed, 62 other end of the second ring set is fixed with 63 one end of third ring set, and the cyclic annular knot of centre bore is offered centered on the second ring set 62 Structure, and centre bore is the interior diameter of truncated cone, 61 interior diameter of the first ring set and the second ring set 62 close to 61 end of the first ring set Equal, interior diameter of 63 interior diameter of third ring set with the second ring set 62 close to 63 end of third ring set is equal, in the first ring set 61 Diameter is less than 63 interior diameter of third ring set.Especially when turn thread bush 131 is in charge of 12 far from second, hinder to move without obstacle The relative motion of lever 52 and extruded sleeve 132, if third ring set 63 does not have, very likely mobile bar 52 crosses over the second ring Set 62, under 51 elastic force of the first third spring, mobile bar 52 stretches out 62 central aperture edge of the second ring set, and mobile bar 52 is caused to reset It is difficult.
Since the relative movement orbit of mobile bar 52 and extruded sleeve 132 is spiral shape, so if mobile bar 52 directly with The contact of extruded sleeve 132 will lead to the damage of mobile bar 52, and in order to avoid this phenomenon: mobile bar 52 is on the end of extruded sleeve 132 The second idler wheel 55 being able to rotate, the second idler wheel 55 and the first ring set 61 or the second ring set 62 or 63 inner wall phase of third ring set are installed It cuts.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (9)

1. a kind of construction waste recyclable device characterized by comprising recovery tube, cast hopper, pouring weight and mounting assembly;
It is placed with building every first floor using pouring weight made of lead material, is equipped with by mounting assembly on each pouring weight Dismountable cast hopper, cast hopper are connected to recovery tube;
Recovery tube includes: at least two and is in charge of, two it is adjacent be in charge of between be detachably connected by connection component.
2. construction waste recyclable device according to claim 1, which is characterized in that mounting assembly includes: convex block, clamping arm And driving mechanism, it is protruding with convex block in cast hopper bottom, pouring weight top surface supports cast hopper bottom, and pouring weight top surface is recessed to form confession The jack of convex block insertion, the clamping arm being caught in convex block on from horizontal direction is equipped with by jack, is pacified in pouring weight Fill the driving mechanism for driving clamping arm to move in the horizontal direction.
3. construction waste recyclable device according to claim 2, which is characterized in that offer cavity in pouring weight;
Driving mechanism includes: guide rod, pedal, the first spring, drivening piece, voussoir and second spring, is equipped in pouring weight The guide rod moved in the vertical direction is only capable of under pouring weight guiding, guide rod is fixed with the pedal for stretching out pouring weight, guide rod bottom End is fixed to the first spring one end, and the first spring other end is fixed to cavity inner wall, and guide rod side wall is fixed to drivening piece one end, The drivening piece other end is fixed to voussoir, and voussoir is compressive plane close to the one side of jack, and compressive plane and vertical direction have angle, squeezes Face and clamping arm act on, and clamping arm, which passes through, second spring, and second spring one end is fixed with cavity inner wall, the second spring other end It is fixed with clamping arm, voussoir big end is located at below voussoir small end, when not stepping on pedal, is maintained at wedge under the first spring force Clamping arm is inserted into convex block under block big end squeezes and second spring is in confined state;When stepping on pedal, voussoir small end It is acted on clamping arm and clamping arm cannot be inserted into convex block under second spring elastic force.
4. construction waste recyclable device according to claim 3, which is characterized in that clamping arm is by the first idler wheel and squeezes Face is in contact.
5. construction waste recyclable device according to any one of claims 1 to 4, which is characterized in that two it is adjacent be in charge of, one Be in charge of and be in charge of for first, it is another be in charge of be in charge of for second;
Connection component includes: thread bush, extruded sleeve, installation set and at least two compressed parts, is in charge of external screw thread first and is connected with Thread bush is in charge of the installation set being fixed with by thread bush first, solid on the end that thread bush is in charge of close to second Surely there is an extruded sleeve being looped around outside installation set, at least two compressed parts are installed in installation set;Compressed part includes: third bullet Spring, mobile bar and compact heap, mobile bar are mounted in installation set, and the opposite installation set of mobile bar energy is in charge of radially first Movement, one end that mobile bar is in charge of axis close to first are fixed with compact heap, are in charge of between all compact heaps for being inserted into second It is not installed with the end of thread bush, the mobile bar other end and extruded sleeve inner wall act on, and mobile bar, which passes through, to be had in installation set Third spring, third spring one end are fixed with compact heap, and the third spring other end is fixed with installation set;
When the end and mobile bar that extruded sleeve is in charge of close to first act on, compact heap does not hinder second under third spring force It is in charge of the end insertion for being not installed with thread bush;When the end and mobile bar that extruded sleeve is in charge of close to second act on, third bullet Spring is elongated, and compact heap clamps second and is in charge of.
6. construction waste recyclable device according to claim 5, which is characterized in that connection component further include: sealing ring with And conical sheet metal, conical sheet metal installation second are in charge of on the second outer wall being in charge of, conical sheet metal is circular cone structure, circular cone The big end of platform part is equipped with sealing ring, and second, which is in charge of end face, is in charge of end face with first by sealing ring and contacts, conical sheet metal small end It is in charge of side away from first positioned at conical sheet metal big end, compact heap is provided with the inclined-plane for being close to conical sheet metal side wall, Sealing ring is made of elastic material, with when compact heap clamps second and is in charge of, second is in charge of and will seal under compact heap extruding Circle is pressed on first and is in charge of.
7. construction waste recyclable device according to claim 6, which is characterized in that compact heap is by a cushion block by second point Pipe compresses, and cushion block is made of elastic material.
8. construction waste recyclable device according to claim 7, which is characterized in that extruded sleeve includes: the first ring set, second Ring set and third ring set, the first ring set and third ring set are circular ring shape, and first ring set one end is fixed with thread bush, the first ring The set other end is fixed with second ring set one end, and the second ring set other end is fixed with third ring set one end, is opened centered on the second ring set Cyclic structure equipped with centre bore, and centre bore is truncated cone, the first ring set interior diameter and the second ring set are close to the first ring set The interior diameter of end is equal, and interior diameter of the third ring set interior diameter with the second ring set close to third ring set end is equal, the first ring It covers interior diameter and is less than third ring set interior diameter.
9. construction waste recyclable device according to claim 8, which is characterized in that mobile bar is on the end of extruded sleeve The second idler wheel being able to rotate is installed, the second idler wheel and the first ring set or the second ring set or third ring set inner wall are tangent.
CN201820602470.9U 2018-04-20 2018-04-20 Construction waste recyclable device Expired - Fee Related CN208220113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820602470.9U CN208220113U (en) 2018-04-20 2018-04-20 Construction waste recyclable device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820602470.9U CN208220113U (en) 2018-04-20 2018-04-20 Construction waste recyclable device

Publications (1)

Publication Number Publication Date
CN208220113U true CN208220113U (en) 2018-12-11

Family

ID=64512529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820602470.9U Expired - Fee Related CN208220113U (en) 2018-04-20 2018-04-20 Construction waste recyclable device

Country Status (1)

Country Link
CN (1) CN208220113U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175181A (en) * 2021-05-21 2021-07-27 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction
CN113501104A (en) * 2021-08-05 2021-10-15 上海外高桥造船有限公司 Mail steamer heavy object garbage throwing device and dock building system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175181A (en) * 2021-05-21 2021-07-27 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction
CN113175181B (en) * 2021-05-21 2023-02-03 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction
CN113501104A (en) * 2021-08-05 2021-10-15 上海外高桥造船有限公司 Mail steamer heavy object garbage throwing device and dock building system

Similar Documents

Publication Publication Date Title
CN208220113U (en) Construction waste recyclable device
CN212101751U (en) Pipeline embedding device for hydraulic engineering
CN107227756A (en) A kind of Safety well cover
CN208275934U (en) Recovery tube for construction waste reclaimer
CN210397779U (en) Novel single-welding-seam rotating disc liftable ball valve
CN212974388U (en) Improved high-speed filter for cyclone well
CN109175536A (en) A kind of floating type cutting mechanism of metal
CN200988322Y (en) Press head safety device of garbage compressing station
CN208168020U (en) Self-resetting mild steel damper
CN212984111U (en) Water supply and drainage pipeline convenient to dredge
CN205975525U (en) Device for improving sealing performance of extra-high water head gate water filling valve
CN205517909U (en) Material crushing device
CN206794560U (en) Hand-hydraulic reamer
CN211812998U (en) Clamp type pipeline vertical hoisting device
CN210334061U (en) Stamping flaring forming device
CN202140794U (en) Sealing device of feeding port of anchor agent gas tank
CN219858726U (en) Convenient manhole quick-opening door
CN206967405U (en) A kind of piston ring assembling apparatus
CN214036950U (en) Gate valve for granular ore pulp
CN209350385U (en) A kind of high pressure waterjet accumulator
CN117117755B (en) Suspension clamp of power supply line
CN209740209U (en) Fluidization nozzle for back pressure type sending tank
CN219384107U (en) Anti-splashing structure for mixing building discharging hopper
CN219221401U (en) Water pressure valve with new structure
CN215634130U (en) Hydraulic pressure station under water convenient to overhaul

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211

Termination date: 20190420

CF01 Termination of patent right due to non-payment of annual fee