CN208275934U - Recovery tube for construction waste reclaimer - Google Patents

Recovery tube for construction waste reclaimer Download PDF

Info

Publication number
CN208275934U
CN208275934U CN201820574464.7U CN201820574464U CN208275934U CN 208275934 U CN208275934 U CN 208275934U CN 201820574464 U CN201820574464 U CN 201820574464U CN 208275934 U CN208275934 U CN 208275934U
Authority
CN
China
Prior art keywords
charge
ring set
mobile bar
compact heap
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820574464.7U
Other languages
Chinese (zh)
Inventor
胡云帆
刘久华
刘方园
林前在
徐军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Guo Yu Construction Co Ltd
Original Assignee
Sichuan Guo Yu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Guo Yu Construction Co Ltd filed Critical Sichuan Guo Yu Construction Co Ltd
Priority to CN201820574464.7U priority Critical patent/CN208275934U/en
Application granted granted Critical
Publication of CN208275934U publication Critical patent/CN208275934U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model provides a kind of recovery tube for construction waste reclaimer, comprising: at least two are in charge of, two it is adjacent be in charge of between be detachably connected by connection component;Connection component includes: thread bush, extruded sleeve, installation set and at least two compressed parts, it is in charge of external screw thread first and is connected with thread bush, it is in charge of the installation set being fixed with by thread bush first, an extruded sleeve being looped around outside installation set is fixed on the end that thread bush is in charge of close to second;Compressed part includes: spring, mobile bar and compact heap, mobile bar is mounted in installation set, one end that mobile bar is in charge of axis close to first is fixed with compact heap, it is in charge of the end for being not installed with thread bush for being inserted into second between all compact heaps, the mobile bar other end and extruded sleeve inner wall act on, and mobile bar, which passes through, the spring in installation set.Recovery tube for construction waste reclaimer solves the problems, such as to lead to using trouble because the length of recovery tube cannot adjust as needed in the prior art.

Description

Recovery tube for construction waste reclaimer
Technical field
The utility model relates to build waste disposal in construction process, and in particular to one kind is used for construction waste reclaimer Recovery tube.
Background technique
Chinese patent discloses a kind of returning for construction waste reclaimer application No. is CN201720560711.3 Closed tube and construction waste recovery system, the construction waste recovery system include pulverizer, recycling band and return for construction waste The recovery tube of receiving unit, the recovery tube for being used for construction waste reclaimer include recovery tube, more diversion pipes, multiple cast hoppers And layered component, recovery tube are used to be fixedly connected on the wall face of building and are obliquely installed.One end of each diversion pipe with return Closed tube connection, multiple cast hoppers are connect with more diversion pipes correspondingly.Layered component is fixedly connected in recovery tube and will Recovery channel is divided into first passage and second channel, has multiple sieve pores in layered component, so that construction waste is in recovery channel Middle layering.Construction waste is tentatively divided although the recovery tube for being used for construction waste reclaimer realizes in recovery tube The shortcomings that layer is handled, but the recovery tube for being used for construction waste reclaimer still has are as follows:
Since in the buildings construction process such as high building, the quantity of floor is gradually increased, complete to build work layer by layer Make, construction waste can be drained into recovery tube after the completion of one layer, but the length of recovery tube cannot be according to building Height adjustment, cause using when too long or too short phenomenon occur, it is too long or it is too short bother in use, it is especially too short It will appear the phenomenon that top layer waste material can not be collected appearance.
Utility model content
The utility model will provide a kind of recovery tube for construction waste reclaimer, solve in the prior art because of recycling The problem of length of pipe cannot adjust as needed and lead to using trouble.
To achieve the above object, the utility model uses the following technical solution:
A kind of recovery tube for construction waste reclaimer, comprising: at least two are in charge of, two it is adjacent be in charge of between pass through Connection component is detachably connected;
Two it is adjacent be in charge of, one is in charge of and is in charge of for first, it is another be in charge of be in charge of for second;
Connection component includes: thread bush, extruded sleeve, installation set and at least two compressed parts, is in charge of external screw thread first and connects It is connected to thread bush, is in charge of the installation set being fixed with by thread bush first, in the end that thread bush is in charge of close to second On be fixed with an extruded sleeve being looped around outside installation set, at least two compressed parts are installed in installation set;Compressed part includes: bullet Spring, mobile bar and compact heap, mobile bar are mounted in installation set, and the opposite installation set of mobile bar energy is in charge of radially first Movement, one end that mobile bar is in charge of axis close to first are fixed with compact heap, are in charge of between all compact heaps for being inserted into second It is not installed with the end of thread bush, the mobile bar other end and extruded sleeve inner wall act on, and mobile bar, which passes through, to be had in installation set Spring, spring one end are fixed with compact heap, and the spring other end is fixed with installation set;
When the end and mobile bar that extruded sleeve is in charge of close to first act on, compact heap does not hinder second under spring force It is in charge of the end insertion for being not installed with thread bush;When the end and mobile bar that extruded sleeve is in charge of close to second act on, spring quilt It elongates, and compact heap clamps second and is in charge of.
Compared with the prior art, the utility model has the following beneficial effects:
In construction process, its interior waste material can be cleared up by repairing one layer, it is only necessary to which recovery tube is connected into needs Height is not needed to repair one layer of speeling stairway of later layer again and be installed to each layer of recovery tube of collection hopper, is saved Labour is each in charge of corresponding each floor herein, that is, is each in charge of height and each floor (each building after installation The height of layer is constant) highly it is adapted.When installation, firstly, thread bush keeps the state after disassembly, that is, thread bush to drive Extruded sleeve is in charge of relatively close to first, and mobile bar and extruded sleeve are acted on far from the end of thread bush at this time, and extruded sleeve is to mobile bar Squeezing action it is little, under the elastic force of spring, it is larger to be able to maintain the distance between all compact heaps, at this time can be for second It is in charge of the end insertion for being not provided with thread bush, is inserted between compact heap with facilitating second to be in charge of;Then, it is in charge of insertion for second To between compact heap, and keeps second to be in charge of and be pressed on the first state being in charge of;Finally, turn thread bush, so that extruded sleeve It is acted on close to the end of thread bush and mobile bar, finally, compact heap is in charge of compression for second, and compact heap avoids second by friction It is in charge of and is in charge of disengaging with first.Since each size being in charge of is larger, in order to enable it is easy for installation, only pass through rotation spiral shell Line covers, and in the biggish situation of thread bush, thread bush can be rotated easily, be avoided under high-altitude by two arm motion of people It needs the bolts of the multiple driving compact heaps of turn and leads to the generation of safety accident.It also avoids working as simultaneously and not need using very long Recovery tube when and use longer recovery tube, avoid recovery tube use waste, extend the service life of recovery tube, subtract The production for having lacked recovery tube, has saved the energy, is good for the environment.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of construction waste reclaimer;
Fig. 2 is the two adjacent B-B cross-sectional views for being in charge of junction in Fig. 1.
Appended drawing reference: recovery tube 1, first are in charge of 11, second and are in charge of 12, thread bush 3, extruded sleeve 4, installation set 5, compressed part 6, sealing ring 7, conical sheet metal 8, spring 61, mobile bar 62, compact heap 63, cushion block 60, the first ring set 41, the second ring set 42, Three ring sets 43, idler wheel 64.
Specific embodiment
In order to make technological means of the utility model, creation characteristic, reach purpose and effect is more clear and is easy to Understand, the utility model be further elaborated with reference to the accompanying drawings and detailed description:
As shown in Figure 1 and Figure 2, the present embodiment proposes a kind of recovery tube 1 for construction waste reclaimer, comprising: At least two are in charge of, two it is adjacent be in charge of between be detachably connected by connection component;
Two it is adjacent be in charge of, one is in charge of and is in charge of 11 for first, it is another be in charge of for second be in charge of 12;
Connection component includes: thread bush 3, extruded sleeve 4, installation set 5 and at least two compressed parts 6, is in charge of outside 11 first It is threaded with thread bush 3, is in charge of the installation set 5 being fixed on 11 positioned at the side of thread bush 3 first, in thread bush 3 close to the Two are in charge of and are fixed with an extruded sleeve 4 being looped around outside installation set 5 on 12 end, and at least two compressions are equipped in installation set 5 Portion 6;Compressed part 6 includes: spring 61, mobile bar 62. and compact heap 63, and mobile bar 62. is mounted in installation set 5, mobile bar 62. the opposite installation set 5 of energy is in charge of 11 radially movement first, one end that mobile bar 62. is in charge of 11 axis close to first is consolidated Surely there is compact heap 63, be used to be inserted into second between all compact heaps 63 and be in charge of 12 ends for being not installed with thread bush 3, mobile bar 62. the other end and 4 inner wall of extruded sleeve act on, mobile bar 62., which passes through, the spring 61 in installation set 5,61 one end of spring with Compact heap 63 is fixed, and 61 other end of spring and installation set 5 are fixed;
When extruded sleeve 4 is in charge of 11 end and the effect of mobile bar 62. close to first, the compact heap 63 under 61 elastic force of spring Second is not hindered to be in charge of the 12 end insertions for being not installed with thread bush 3;When extruded sleeve 4 close to second be in charge of 12 end and movement When bar 62. acts on, spring 61 is elongated, and compact heap 63 clamps second and is in charge of 12.
Due to only have compact heap 63 clamp second be in charge of 12 when be only frictionally, be in charge of 11 and second and be in charge of 12 when first It is in charge of 11 and second to first when interior waste material passes through to be in charge of 12 and have impact force, if impact force is in charge of on 11 axis directions first Strength it is excessive, it is most likely that so that first is in charge of 11 and second and is in charge of 12 and has the tendency that being separated from each other, then abutting compact heap 63 frictional force is very likely far from enough to be hindered first to be in charge of 11 and second to be in charge of 12 and have the tendency that being separated from each other, in order to convenience-for-people First, which is in charge of 11 and second, is in charge of the appearance of 12 the phenomenon that being separated from each other, therefore has done following design: connection component further include: sealing Circle 7 and conical sheet metal 8, the installation of conical sheet metal 8 second are in charge of on the outer wall that 12 are in charge of 12 close to second, and conical sheet metal 8 is circle Frustum structure, the big end of conical sheet metal 8 are equipped with sealing ring 7, and second, which is in charge of 12 end faces, is in charge of 11 ends by sealing ring 7 and first Face contact, 8 small end of conical sheet metal are located at 8 big end of conical sheet metal and are in charge of 11 sides away from first, be provided with and be used in compact heap 63 The inclined-plane being close to 8 side wall of conical sheet metal, sealing ring 7 are made of elastic material, the setting of sealing ring 7, so that in compact heap 63 close to second be in charge of 12 during, second, which is in charge of 12, can squeeze sealing ring 7 and become flat, and then first is in charge of 11 and second point Pipe 12 is further towards finally, first, which is in charge of 11 and second, is in charge of 12 for 7 compressive strain of sealing ring, and sealing first is in charge of 11 and the Two are in charge of gap between 12, with when compact heap 63 clamp second be in charge of 12 when, compact heap 63 extruding under second be in charge of 12 will be close Seal 7 is pressed on first and is in charge of on 11.After compact heap 63, which compresses second, is in charge of 12, compact heap 63 has resistance by conical sheet metal 8 Hinder first be in charge of 11 and second be in charge of 12 strength, hinder first to be in charge of 11 and second in this way with the compression double acting of compact heap 63 It is in charge of 12 to be separated from each other, extends the service life of compact heap 63.
In order to enable compact heap 63 be pressed on second be in charge of on 12 after be not easily disconnected from, while guarantee compact heap 63 compress second Second will not be damaged and be in charge of 12 by being in charge of 12 intensity, and compact heap 63 is in charge of 12 compressions for second by a cushion block 60, and cushion block 60 is adopted It is made of elastic material.
In order to avoid turn thread bush 3 excessively causes extruded sleeve 4 and mobile bar 62. to be detached from, so avoid extruded sleeve 4 with Mobile bar 62. is difficult to enter the generation of the phenomenon in extruded sleeve 4, extruded sleeve 4 under 61 elastic force of spring after the disengaging of mobile bar 62. It include: the first ring set 41, the second ring set 42 and third ring set 43, the first ring set 41 and third ring set 43 are circular ring shape, the One ring set, 41 one end and thread bush 3 are fixed, and 41 other end of the first ring set is fixed with 42 one end of the second ring set, and the second ring set 42 is another End is fixed with 43 one end of third ring set, the cyclic structure of centre bore is offered centered on the second ring set 42, and centre bore is circular cone Platform shape, interior diameter of 41 interior diameter of the first ring set with the second ring set 42 close to 41 end of the first ring set is equal, in third ring set 43 Interior diameter of the diameter with the second ring set 42 close to 43 end of third ring set is equal, and 41 interior diameter of the first ring set is less than third ring set 43 interior diameters.Especially when turn thread bush 3 is in charge of 12 far from second, mobile bar 62. and extruded sleeve 4 are hindered without obstacle Relative motion, if third ring set 43 does not have, very likely mobile bar 62. crosses over the second ring set 42, in 61 elastic force of spring Under, mobile bar 62. stretches out 42 central aperture edge of the second ring set, and mobile bar 62. is caused to reset difficulty.
Since the relative movement orbit of mobile bar 62. and extruded sleeve 4 is spiral shape, so if mobile bar 62. directly with The contact of extruded sleeve 4 will lead to the damage of mobile bar 62., and in order to avoid this phenomenon: mobile bar 62. is pacified on the end of extruded sleeve 4 Equipped with the idler wheel 64 being able to rotate, idler wheel 64 and the first ring set 41 or the second ring set 42 or 43 inner wall of third ring set are tangent.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (5)

1. a kind of recovery tube for construction waste reclaimer characterized by comprising at least two are in charge of, and two adjacent points It is detachably connected between pipe by connection component;
Two it is adjacent be in charge of, one is in charge of and is in charge of for first, it is another be in charge of be in charge of for second;
Connection component includes: thread bush, extruded sleeve, installation set and at least two compressed parts, is in charge of external screw thread first and is connected with Thread bush is in charge of the installation set being fixed with by thread bush first, solid on the end that thread bush is in charge of close to second Surely there is an extruded sleeve being looped around outside installation set, at least two compressed parts are installed in installation set;Compressed part includes: spring, moves Lever and compact heap, mobile bar are mounted in installation set, the radially movement that the opposite installation set of mobile bar energy is in charge of first, One end that mobile bar is in charge of axis close to first is fixed with compact heap, is in charge of between all compact heaps for insertion second and does not install There is the end of thread bush, the mobile bar other end and extruded sleeve inner wall act on, and mobile bar, which passes through, the spring in installation set, bullet Spring one end is fixed with compact heap, and the spring other end is fixed with installation set;
When the end and mobile bar that extruded sleeve is in charge of close to first act on, compact heap does not hinder second to be in charge of under spring force It is not installed with the end insertion of thread bush;When the end and mobile bar that extruded sleeve is in charge of close to second act on, spring is elongated, And compact heap clamps second and is in charge of.
2. the recovery tube according to claim 1 for construction waste reclaimer, which is characterized in that connection component also wraps Include: sealing ring and conical sheet metal, conical sheet metal installation second are in charge of on the second outer wall being in charge of, and conical sheet metal is circular cone Platform structure, the big end of conical sheet metal are equipped with sealing ring, and second, which is in charge of end face, is in charge of end face with first by sealing ring and contacts, and justify Frustum part small end is located at conical sheet metal big end and is in charge of side away from first, is provided in compact heap for tight with conical sheet metal side wall The inclined-plane of patch, sealing ring are made of elastic material, with when compact heap clamp second be in charge of when, compact heap extruding under second point Sealing ring is pressed on first and is in charge of by pipe.
3. the recovery tube according to claim 1 or 2 for construction waste reclaimer, which is characterized in that compact heap is logical It crosses a cushion block and is in charge of compression for second, cushion block is made of elastic material.
4. the recovery tube according to claim 3 for construction waste reclaimer, which is characterized in that extruded sleeve includes: First ring set, the second ring set and third ring set, the first ring set and third ring set are circular ring shape, first ring set one end and screw thread Set is fixed, and the first ring set other end is fixed with second ring set one end, and the second ring set other end is fixed with third ring set one end, and second The cyclic structure of centre bore is offered centered on ring set, and centre bore is truncated cone, the first ring set interior diameter and the second ring set Interior diameter close to the first ring set end is equal, the interior diameter of third ring set interior diameter and the second ring set close to third ring set end Equal, the first ring set interior diameter is less than third ring set interior diameter.
5. the recovery tube according to claim 4 for construction waste reclaimer, which is characterized in that mobile bar is close to crowded The idler wheel being able to rotate is installed, idler wheel and the first ring set or the second ring set or third ring set inner wall are tangent on the end of pressing sleeve.
CN201820574464.7U 2018-04-20 2018-04-20 Recovery tube for construction waste reclaimer Expired - Fee Related CN208275934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820574464.7U CN208275934U (en) 2018-04-20 2018-04-20 Recovery tube for construction waste reclaimer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820574464.7U CN208275934U (en) 2018-04-20 2018-04-20 Recovery tube for construction waste reclaimer

Publications (1)

Publication Number Publication Date
CN208275934U true CN208275934U (en) 2018-12-25

Family

ID=64751783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820574464.7U Expired - Fee Related CN208275934U (en) 2018-04-20 2018-04-20 Recovery tube for construction waste reclaimer

Country Status (1)

Country Link
CN (1) CN208275934U (en)

Similar Documents

Publication Publication Date Title
CN210566409U (en) Pneumatic rotary ball valve
CN208220113U (en) Construction waste recyclable device
CN209703765U (en) One kind can reset venting of dust explosion wall
CN208275934U (en) Recovery tube for construction waste reclaimer
CN215816595U (en) Waterproof type rifle that charges for new energy automobile
CN115949792B (en) Connecting valve
CN205745802U (en) A kind of rustless steel tee pipe coupling
CN214197651U (en) Natural gas pipeline convenient to connect and seal
CN212984111U (en) Water supply and drainage pipeline convenient to dredge
CN215528447U (en) Threading construction device for building electrical engineering
CN209666367U (en) Dewatering device on Domestic garbage treatment equipment
CN208815516U (en) A kind of hydraulic engineering anchor pole
CN212959956U (en) Safety ball valve with pressure discharge function
CN208982013U (en) Grouting port plugging device
CN208528638U (en) A kind of anti-foreign matter device
CN221400654U (en) Drainage slag current collector for coal mine
CN206794560U (en) Hand-hydraulic reamer
CN219389004U (en) Plugging tool for perforating welding branch pipe of oil and gas gathering and transportation pipeline
CN221595009U (en) Grouting fullness detection device suitable for stretching of negative bending moment of T beam
CN216242690U (en) Hydraulic and hydroelectric engineering construction supporting frame convenient to disassemble
CN204572018U (en) Mining constant-resistance is stepped down energy absorption device
CN202834483U (en) Resisting drawing seal pipe fitting interface
CN210866499U (en) Reusable self-locking type line pressing cap for weak current engineering
CN216241434U (en) Colliery ventilation blower wind pressure detection device
CN217842731U (en) Water saving device for siphon water saving tap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

CF01 Termination of patent right due to non-payment of annual fee