CN208219447U - A kind of road and bridge crack reparation fixed structure - Google Patents

A kind of road and bridge crack reparation fixed structure Download PDF

Info

Publication number
CN208219447U
CN208219447U CN201820723003.1U CN201820723003U CN208219447U CN 208219447 U CN208219447 U CN 208219447U CN 201820723003 U CN201820723003 U CN 201820723003U CN 208219447 U CN208219447 U CN 208219447U
Authority
CN
China
Prior art keywords
fixedly installed
road
fixed
bridge
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820723003.1U
Other languages
Chinese (zh)
Inventor
辛永岗
李雷善
陈亚娟
赵赛赛
于洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dingxin Road And Bridge Test & Detection Co ltd
Shandong Expressway Changtongdao Bridge Engineering Co ltd
Original Assignee
Shandong Dingxin Road And Bridge Testing Co Ltd
Shandong Unblocked Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dingxin Road And Bridge Testing Co Ltd, Shandong Unblocked Group Ltd By Share Ltd filed Critical Shandong Dingxin Road And Bridge Testing Co Ltd
Priority to CN201820723003.1U priority Critical patent/CN208219447U/en
Application granted granted Critical
Publication of CN208219447U publication Critical patent/CN208219447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of road and bridge cracks to repair fixed structure, including road and bridge main body, the road and bridge main body inside middle, which is fixedly installed with, splits slot, described split is fixedly installed with filled layer among slot, the filling layer surface is fixedly installed with fixed link, Bonded Ring is fixedly installed with above the fixed rod outer surface, the fixed link internal activity is equipped with motion bar, fixation offers fixation hole below the fixed rod outer surface, stay hook is fixedly installed with below the motion bar, spiral centrum is fixedly installed with below the fixed link, fixation opens up fluted above the filled layer, the groove surrounding inner wall is fixedly installed with waterproof layer, the groove Corner Strapped is equipped with screw, fixed steel bars rack is fixedly installed among the groove, bituminous macadam is fixedly installed among the fixed steel bars rack.The utility model structure is simple, convenient and practical, stable structure, and the expansion for fundamentally avoiding road and bridge crack may be implemented in it.

Description

A kind of road and bridge crack reparation fixed structure
Technical field
The utility model relates to road and bridge field, fixed structure is repaired in specially a kind of road and bridge crack.
Background technique
Road and bridge is generally made of several parts such as road surface, roadbed, bridge, Tunnel Engineering and traffic engineering, wherein road surface It is easiest to impaired, since many reasons easily generate crack, and the generation in crack not only reduces the use of road and bridge Service life can also influence roadbed because of the infiltration of rainwater, and existing road surface recovery technique is by simple fill concrete come complete At the reparation in crack, the duration that this mode works is short, cannot fundamentally avoid the expansion in crack, and waterproof effect Very poor, the inefficiency of repairing is easy to appear bituminous concrete at crack and removes, thus secondary formation crack.Existing road Bridge Crack recovery technique cannot fundamentally avoid the expansion in crack.
Utility model content
The purpose of this utility model is to provide a kind of road and bridge cracks to repair fixed structure, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides the following technical solutions: a kind of road and bridge crack reparation fixed knot Structure, including road and bridge main body, the road and bridge main body inside middle, which is fixedly installed with, splits slot, described to split fixed peace among slot Equipped with filled layer, the filling layer surface is fixedly installed with fixed link, is fixedly installed with bonding above the fixed rod outer surface Ring, the fixed link internal activity are equipped with motion bar, and fixation offers fixation hole, the work below the fixed rod outer surface It is fixedly installed with stay hook below lever, spiral centrum is fixedly installed with below the fixed link, is fixed above the filled layer Open up fluted, the groove surrounding inner wall is fixedly installed with waterproof layer, and the groove Corner Strapped is equipped with screw, described recessed It is fixedly installed with fixed steel bars rack among slot, is fixedly installed with bituminous macadam among the fixed steel bars rack.
Preferably, linking-up road bridge main body is run through below the screw, top is through connection bituminous macadam.
Preferably, the stay hook quantity below the motion bar is two, and by through fixation hole and road and bridge master Body.
Preferably, the spiral conical surface is fixedly connected with screw thread.
Preferably, the fixed steel bars rack surrounding runs through waterproof layer and road and bridge main body.
Compared with prior art, the utility model has the beneficial effects that the utility model structure is simple, it is convenient and practical, from The expansion for fundamentally avoiding crack is inserted by setting fixed link, motion bar, stay hook and spiral centrum by spiral centrum Road and bridge main body, bang fixed link top motion bar outstanding, is inserted into stay hook in road and bridge main body, reaches fixed The purpose in the crack after repairing, by be arranged adhesive layer, achieve the purpose that it is fixed, pass through setting bituminous macadam, fixed steel bars Rack and waterproof layer achieve the purpose that mend a split and prevent, by the way that screw is arranged, to run through below screw and connect into water secondary damage Road and bridge main body is connect, top achievees the purpose that retained prosthesis makes crack through connection bituminous macadam.
Detailed description of the invention
Fig. 1 is the utility model agent structure schematic diagram;
Fig. 2 is the utility model motion bar schematic diagram of internal structure;
Fig. 3 is the utility model road and bridge body upper surface structural schematic diagram.
In figure: 1 road and bridge main body, 2 waterproof layers, 3 split slot, 4 fixed links, 5 screws, 6 grooves, 7 filled layers, 8 motion bars, 9 Bonded Rings, 10 stay hooks, 11 fixation holes, 12 spiral centrums, 13 bituminous macadams, 14 fixed steel bars racks.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that the instructions such as term "vertical", "upper", "lower", "horizontal" Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification Description, rather than the device or element of indication or suggestion meaning must have a particular orientation, constructed and grasped with specific orientation Make, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, Or it is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediary can also be passed through It is indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of road and bridge crack reparation fixed structure, Including road and bridge main body 1,1 inside middle of road and bridge main body, which is fixedly installed with, splits slot 3, and described split is fixed among slot 3 Filled layer 7 is installed, 7 surface of filled layer is fixedly installed with fixed link 4, for being fixedly connected with road and bridge main body 1 and filling out It fills layer 7, is fixedly installed with Bonded Ring 9 above 4 outer surface of fixed link, for being adhered filled layer 7, inside the fixed link 4 It is movably installed with motion bar 8,10 quantity of stay hook of 8 lower section of motion bar is two, and by running through fixation hole 11 and road Road and bridge beam body 1,4 outer surface of fixed link lower section fixation offer fixation hole 11, are fixedly installed with below the motion bar 8 Stay hook 10 is fixedly installed with spiral centrum 12 below the fixed link 4, and 12 surface of spiral centrum is fixedly connected with spiral shell Line, fixation opens up fluted 6 above the filled layer 7, and the 6 surrounding inner wall of groove is fixedly installed with waterproof layer 2, for preventing Water inlet, 6 Corner Strapped of groove is equipped with screw 5, for being fixedly connected with road and bridge main body 1 and bituminous macadam 13, institute It states below screw 5 through linking-up road bridge main body 1, top fixed peace among connection bituminous macadam 13, the groove 6 Equipped with fixed steel bars rack 14,14 surrounding of fixed steel bars rack runs through waterproof layer 2 and road and bridge main body 1, the fixation Bituminous macadam 13 is fixedly installed among bar frame 14.
Working principle: the first step opens up a groove 6 splitting above slot 3, by machine by fixed link 4 from splitting table in slot 3 Face is sideling squeezed into inside road and bridge main body 1, and screw 5 is vertically squeezed into inside road and bridge main body 1 from 6 surface of groove, Second step is entered in fixed link 4 by motion bar 8 with 4 upper surface of hammer fixed link motion bar 8 outstanding, is made stay hook 10 are pierced by fixation hole 11, and are fixedly connected inside road and bridge main body 1, third step, to 7 fill concrete of filled layer, to waterproof Layer 2 fills water-repellent substance, then, in 6 intermediate arrangement fixed steel bars rack 14 of groove, finally, filling out on fixed steel bars rack 14 Enter asphalt macadam, flushes it with road and bridge main body 1.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. fixed structure, including road and bridge main body (1) are repaired in a kind of road and bridge crack, it is characterised in that: the road bridge Beam body (1) inside middle, which is fixedly installed with, to be split slot (3), and described split is fixedly installed with filled layer (7) among slot (3), described to fill out It fills layer (7) surface to be fixedly installed with fixed link (4), is fixedly installed with Bonded Ring (9), institute above fixed link (4) outer surface It states fixed link (4) internal activity to be equipped with motion bar (8), fixation offers fixation hole below fixed link (4) outer surface (11), it is fixedly installed with stay hook (10) below the motion bar (8), is fixedly installed with spiral cone below the fixed link (4) Body (12), filled layer (7) top fixation open up fluted (6), and groove (6) the surrounding inner wall is fixedly installed with waterproof layer (2), groove (6) Corner Strapped is equipped with screw (5), is fixedly installed with fixed steel bars rack among the groove (6) (14), bituminous macadam (13) are fixedly installed among the fixed steel bars rack (14).
2. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the screw (5) Linking-up road bridge main body (1) is run through in lower section, and top is through connection bituminous macadam (13).
3. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the motion bar (8) stay hook (10) quantity below is two, and by through fixation hole (11) and road and bridge main body (1).
4. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the spiral centrum (12) surface is fixedly connected with screw thread.
5. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the fixed steel bars Rack (14) surrounding runs through waterproof layer (2) and road and bridge main body (1).
CN201820723003.1U 2018-05-15 2018-05-15 A kind of road and bridge crack reparation fixed structure Expired - Fee Related CN208219447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820723003.1U CN208219447U (en) 2018-05-15 2018-05-15 A kind of road and bridge crack reparation fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820723003.1U CN208219447U (en) 2018-05-15 2018-05-15 A kind of road and bridge crack reparation fixed structure

Publications (1)

Publication Number Publication Date
CN208219447U true CN208219447U (en) 2018-12-11

Family

ID=64507768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820723003.1U Expired - Fee Related CN208219447U (en) 2018-05-15 2018-05-15 A kind of road and bridge crack reparation fixed structure

Country Status (1)

Country Link
CN (1) CN208219447U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719399A (en) * 2020-07-08 2020-09-29 刘江桥 Highway pavement repairing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719399A (en) * 2020-07-08 2020-09-29 刘江桥 Highway pavement repairing method
CN111719399B (en) * 2020-07-08 2021-03-05 刘江桥 Highway pavement repairing method

Similar Documents

Publication Publication Date Title
CN204435564U (en) Prefabricated assembled frame construction New Types of Beam column Connections
CN108660950B (en) Fixing device is restoreed in road and bridge crack
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN106401207B (en) The overlapping connection structure and its construction method on pillar basis are added for existing building
CN106481090B (en) A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint
CN102995572B (en) The method of attachment of Thin-wall Hollow Pier and former pier stud and device thereof after bridge jacking
CN106223183B (en) Assembled concrete-filled rectangular steel tube combines truss bridge and construction method
CN209211296U (en) A kind of road and bridge crack reparation fixed structure
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN103590414A (en) Structure for connecting concrete tubular pile with bearing platform
CN109853802A (en) It is a kind of whole across precast prestressed flute profile floor, building cover structure and its assembly method
CN208219447U (en) A kind of road and bridge crack reparation fixed structure
CN202830755U (en) Prestress anchoring type bridge retractable device convenient to maintain
CN207079627U (en) A kind of assembled underground pipe gallery member connecting structure
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103726613B (en) A kind of novel fabricated concrete column
CN105970803A (en) Shearing resisting energy consumption device and construction method of prefabricated pier
CN205444968U (en) Bar planting anchor structure
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN106120542A (en) Can be applicable to assembled pier and the construction technology thereof of seismic fortification intensity upper zone
CN209039975U (en) One kind can temporarily turn permanent superstructure
CN205295969U (en) Fixing device is restoreed in road and bridge crack
CN208649917U (en) A kind of overhanging component bearing capacity stiffening device
CN208649865U (en) A kind of road and bridge crack ruggedized construction
CN205205647U (en) Prefabricated segment formula concrete bridge's bottom plate joint construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200731

Address after: 261506 Shandong city of Weifang province Gaomibei opposite the exit of Jinan Qingdao Expressway

Co-patentee after: SHANDONG DINGXIN ROAD AND BRIDGE TEST & DETECTION Co.,Ltd.

Patentee after: Shandong Expressway changtongdao Bridge Engineering Co.,Ltd.

Address before: 261506 Shandong Changtong Group Co., Ltd. No. 6 Pingri Road West, Jiangzhuang Town, Gaomi City, Weifang City, Shandong Province

Co-patentee before: SHANDONG DINGXIN ROAD AND BRIDGE TEST & DETECTION Co.,Ltd.

Patentee before: SHANDONG CHANGTONG GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211