CN208203270U - A kind of Jing Kuang driving cuts a simultaneous drifting structure - Google Patents
A kind of Jing Kuang driving cuts a simultaneous drifting structure Download PDFInfo
- Publication number
- CN208203270U CN208203270U CN201820638769.XU CN201820638769U CN208203270U CN 208203270 U CN208203270 U CN 208203270U CN 201820638769 U CN201820638769 U CN 201820638769U CN 208203270 U CN208203270 U CN 208203270U
- Authority
- CN
- China
- Prior art keywords
- facet
- tunnel
- big face
- cuts
- anchor cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of Jing Kuang drivings to cut a simultaneous drifting structure, including cuts a tunnel, big face, facet, development machine, belt, the dilatory tail of movable type, hydraulic prop, and two operatings carry belt, anchor cable;It is characterized in that a tunnel of cutting is divided into big face and facet, big face is entirely cut a tunnel 2/3rds wide, facet be entirely cut a tunnel one third it is wide;The big facet alternate cycles operation simultaneous drifting perforation;The length that the development machine first tunnels big face is 10-12 meters;The length that facet is tunneled after the development machine is flushed with big face;The belt is mounted on the side where big face;Described cut is equipped with hydraulic prop in a tunnel;Described cut is equipped with anchor cable in a tunnel;The structure reduces operational procedure, mitigates the labor intensity of worker, avoids the waste of material, and high-yield and high-efficiency realizes speedy drivage.
Description
Technical field
The utility model relates to coal mine fields, and in particular to a kind of Jing Kuang driving cuts a simultaneous drifting structure.
Background technique
In today of the rapid development of modern science and technology, endlessly novel device comes into coal mine, and mechanization degree is more next
Higher, some traditional construction methods and technique can not be suitable for novel sci-tech product, and only novel technique is plus novel
Equipment can just increase productivity, reduce labor intensity, save the investment of fund, accomplish high-yield and high-efficiency, safety in production is future
The direction of development.
The process that present mining construction cuts eye needs secondary driving at lane, big face of first constructing, by relevant device after perforation
It recalls, then facet of constructing, is tunneled in two times, the shortcomings that such construction method is that the construction period is long, wastes material, and fund is thrown
Enter big, not can guarantee safely, such as: construct big face when, facet sky side time long easy-weathering wall caving is hurted sb.'s feelings, and is also needed when helping out with money broken
Beat side portion's support anchor rod, when secondary brushing extended surface is sliced off again, causes that process is tedious, waste of material.
Utility model content
The purpose of this utility model is to provide a kind of Jing Kuang drivings to cut a simultaneous drifting structure, which can obviously contract
The short construction time reduces operational procedure, mitigates the labor intensity of worker, avoids the waste of material, and high-yield and high-efficiency realizes quickly pick
Into.
A kind of Jing Kuang driving cuts a simultaneous drifting structure, including cuts a tunnel, big face, facet, development machine, and belt is mobile
Formula draws tail, hydraulic prop, and two operatings carry belt, anchor cable;It is characterized in that a tunnel of cutting is divided into big face and facet,
Big face is entirely cut a tunnel 2/3rds wide, facet be entirely cut a tunnel one third it is wide;Big face facet is alternately followed
The perforation of ring operation simultaneous drifting;The length that the development machine first tunnels big face is 10-12 meters;Facet is tunneled after the development machine
Length is flushed with big face;The belt is mounted on the side where big face;Described cut is equipped with hydraulic prop in a tunnel;Institute
It states to cut and is equipped with anchor cable in a tunnel.
Preferably, the section for cutting a tunnel are as follows: the rectangle of wide × height=7.3 × 3.3m cuts a drift section.
Preferably, driving facet expand side when must not exceed meeting head on for big face working face, with specific reference to local regulatory requirements into
Row expands side, it is ensured that entire work progress carries out safely.
Preferably, anchor cable strengthening construction to the working face in the big face is met head on, and big face anchor cable is not finished, and must not be constructed small
Side is expanded in face, in order to avoid causing large area sky top, causes roof fall accident.
Preferably, facet anchor cable lag facet meets head on to be no more than 15 meters, Specific construction according to the geologic structures of each department and
Depending on regulation.
Preferably, the hydraulic prop must not lag facet and meet head on 25 meters, and 25 meters carry for development machine and two operatings
Belt activity space.
Preferably, the anchor cable arrangement is 4-4-4, and array pitch is 1800 × 2700mm between anchor cable, Specific construction according to
Depending on the geologic structure and regulation of each department, it is ensured that work progress is safe and reliable.
Preferably, there are the empty top zones 300~500mm before last row's anchor pole prevents top plate not so as to subsequent cycle coal cutting
It is flat.
The beneficial effects of the utility model are that the construction time can be obviously shortened, reduce operational procedure, mitigate worker's
Labor intensity, avoids the waste of material, high-yield and high-efficiency, by big face and facet replace driving in the way of, realize speedy drivage.
Detailed description of the invention
Fig. 1 is teams and groups' work cycle chart of the utility model.
Fig. 2 is the big surface construction structural schematic diagram of the utility model.
Fig. 3 is the facet constructing structure schematic diagram of the utility model.
Fig. 4 cuts a tunnel anchor cable/rod arrangement schematic diagram for the utility model.
In figure, a tunnel 1 is cut, big face 2, facet 3, development machine 4, belt 5, mobile tractor is 5-1, belt conveyer head 6,
Belt gate road 7, hydraulic prop 8, two operatings carry belt 9, anchor cable 10.
Specific embodiment
It elaborates below with reference to example embodiment to technical solutions of the utility model;However, example embodiment
It can implement in a variety of forms, and be not understood as limited to embodiment set forth herein;On the contrary, providing these embodiments
So that the utility model is more comprehensively and completely, and the design of example embodiment is comprehensively communicated to those skilled in the art
Member.
A kind of Jing Kuang driving cuts a simultaneous drifting structure, including cuts a tunnel 1, big face 2, facet 3, development machine 4, belt 5,
The dilatory tail 5-1 of movable type, hydraulic prop 8, two operatings carry belt 9, anchor cable 10;It is characterized in that a tunnel 1 of cutting is divided
For big face 2 and facet 3, big face 2 is entirely cut a tunnel 1 2/3rds wide, facet 3 be entirely cut a tunnel 1 three/
One is wide;The big face 2, the perforation of 3 alternate cycles operation simultaneous drifting of facet;The length that the development machine 4 first tunnels big face 2 is
10-12 meters;Stop digging when the length of driving facet 3 is flushed with big face 2 after the development machine 4;The belt 5 is mounted on big 2 institute of face
Side;Described cut is equipped with hydraulic prop 8 in a tunnel 1;Described cut is equipped with anchor cable 10 in a tunnel 1.
Embodiment 1
Driving preparation is carried out first: construction personnel is divided into three teams and groups, respectively night shift, mornig shift, the middle class in a kindergarten, three teams and groups
It recycles and constructs in strict accordance with division of labor, a tunnel 1 will be cut divide and tunneled for big face 2 and facet 3, the width in big face 2 is entire
Cut a tunnel 1 it is wide 2/3rds, 3 width of facet be entirely cut the wide one third in a tunnel 1;Working face open-off cut eye, such as: driving is wide
The rectangle of × height=7.3 × 3.3m cuts 1 section of a tunnel, and sets installation 5 side of belt as big face 2, sets following parameter.
Step 1: sending night operator to carry out big face 2 and tunnel, big 2 excavated section of face are as follows: wide × high=4.8 ×
3.3m stops digging when driving is to 10-12m;
Step 2: sending morning machine repair personnel to carry out plant maintenance and maintenance, at the same producers to the big face 2 of driving,
Facet 3 carries out the reinforcing of anchor cable 10 and side portion's supporting, and the covering of anchor cable 10 is met head on to development end;
Step 3: sending the middle class in a kindergarten to carry out facet 3 and tunnel, and development machine 4 is back to big 2 initial position of face progress facet 3 and is dug
Into 3 excavated section of facet is that width × height=2.5 × 3.3m is being cut in a tunnel 1 while facet 3 is tunneled with beating monomer hydraulic
Pillar 8, the lag facet 3 of hydraulic prop 8 meet head on to be no more than 25m, and 3 anchor cable 10 of facet lag meets head on to be no more than 15m, if will
When the driving of facet 3 is flushed with big face 2 driving, it is then returned to step 1 and carries out the big driving of face 2 again, according to described Step 1: step
Rapid two, the sequence circulation of step 3 carries out construction and cuts eye.
When cutting big face 2, the alternating construction of facet 3 in tunnel 1, big cross section, light-gauge maximum unsupported back span are not more than 4.8m,
Specific construction is depending on the geologic structure of each department and regulation, if top side is broken, should take the side of " one row of pick, one row of branch "
Case is constructed, and fully ensures that whole process carries out safely.
When big face 2, facet 3 are alternately constructed, 2 boring head of primary big face must not meet head on 12 meters of advanced secondary facet 3.
Cutting, the opening space-time top surface of tunnel 1 is larger, to add in the place for not influencing driving and beat interim hydraulic single prop,
In order to avoid causing roof fall casualty accident.
If can suitably be stayed when roof cracking and set 200-300mm top coal, it is ensured that cut 1 height of a tunnel not less than 3.1m, cut eye
Height of the height in tunnel 1 not less than design installation requirement.
After the completion of each circulation, last row anchor pole before must there are the empty top zones 300~500mm, so that subsequent cycle is cut
Coal prevents top plate uneven.
The spacing of the hydraulic prop 8 are as follows: be 2700mm when top plate is complete, top plate is when more broken
1800mm, hydraulic prop 8 will wear bolumn cap, prick post shoes, and bolumn cap is bundled on column cap with iron wire or chainlet, hydraulic prop
8 will fasten anti-down rope, and anti-down rope uses 8# iron wire by monomer column column cap bolt jail on top plate steel band or mesh sheet, with anti-down column wound
People.
Brushing, extended surface must not be carried out under 10 state of spare anchor rope, in order to avoid cause safety accident.
10 arrangement of anchor cable is 4-4-4, and array pitch is 1800 × 2700mm between anchor cable 10, and Specific construction is according to each
Depending on the geologic structure and regulation in area, it is ensured that work progress is safe and reliable.
Claims (8)
1. a kind of Jing Kuang driving cuts a simultaneous drifting structure, including cuts a tunnel, big face, facet, development machine, belt is mobile
Dilatory tail, hydraulic prop, two operatings carry belt, anchor cable;It is characterized in that a tunnel of cutting is divided into big face and facet, greatly
Face is entirely cut a tunnel 2/3rds wide, facet be entirely cut a tunnel one third it is wide;A tunnel of cutting is big
Face, facet alternate cycles operation perforation;The length that the development machine first tunnels big face is 10-12 meters;It is tunneled after the development machine
The length of facet is flushed with big face;The belt is mounted on the side where big face;Described cut is equipped with monomer hydraulic in a tunnel
Pillar;Described cut is equipped with anchor cable in a tunnel.
2. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: described to cut a tunnel
Section are as follows: the rectangle of wide × height=7.3 × 3.3m cuts a drift section.
3. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: driving facet expands side
No more than meeting head on for big face working face.
4. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: the anchor in the big face
Rope strengthening construction to working face is met head on, and big face anchor cable is not finished, and the facet that must not construct expands side.
5. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: facet anchor cable lag
Facet meets head on to be no more than 15 meters.
6. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: the monomer hydraulic
Pillar must not lag facet and meet head on 25 meters.
7. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: the anchor cable arrangement
Mode is 4-4-4, and array pitch is 1800 × 2700mm between anchor cable.
8. a kind of Jing Kuang driving according to claim 1 cuts a simultaneous drifting structure, it is characterised in that: last row's anchor pole
It is preceding that there are the empty top zones 300~500mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820638769.XU CN208203270U (en) | 2018-05-02 | 2018-05-02 | A kind of Jing Kuang driving cuts a simultaneous drifting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820638769.XU CN208203270U (en) | 2018-05-02 | 2018-05-02 | A kind of Jing Kuang driving cuts a simultaneous drifting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208203270U true CN208203270U (en) | 2018-12-07 |
Family
ID=64521709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820638769.XU Expired - Fee Related CN208203270U (en) | 2018-05-02 | 2018-05-02 | A kind of Jing Kuang driving cuts a simultaneous drifting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208203270U (en) |
-
2018
- 2018-05-02 CN CN201820638769.XU patent/CN208203270U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410515B (en) | It is a kind of that three-soft seam is reciprocating combines mining method without coal column | |
CN101349159B (en) | Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face | |
CN103195457A (en) | Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader | |
CN101761338A (en) | Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed | |
CN110924952B (en) | Construction method for three-step seven-step normal medium rock pillar method conversion of super-large section tunnel | |
CN105003288B (en) | A kind of method and support system of medium-thickness seam gob side entry retaining | |
CN102268998A (en) | Dual-micro-arch span-reducing support method of large-span open-off cut | |
CN105134266A (en) | Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel | |
AU2014292699A1 (en) | Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same | |
CN103061771A (en) | Remining mine fully-mechanized coal mining face open-off cut tunneling process and supporting method | |
CN202391424U (en) | Supporting type comprehensive bolter miner | |
CN104405392B (en) | Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method | |
CN208203270U (en) | A kind of Jing Kuang driving cuts a simultaneous drifting structure | |
CN108222945B (en) | Construction method for excavating underground excavation station of subway with super-large section by using main and auxiliary layered tunnels | |
CN110118085A (en) | A kind of compound advanced secondary tunneling method in two lane of top working face of large mining depth high working face | |
CN107605510B (en) | Dragline type steel grid arch frame and construction method thereof | |
CN108590670A (en) | A kind of Jing Kuang driving cuts a simultaneous drifting construction technology | |
CN110159327A (en) | Dig the continuous temporary support device for drivage in tunnel and method of anchor separation | |
CN113700489A (en) | Coal mine bottom suction roadway rapid tunneling construction process | |
CN206111215U (en) | Be used for big section weak surrounding rock tunnel construction supporting construction | |
CN106400696B (en) | Mobile type combination Bailey bracket platform, packaged type combination Bailey bracket set up platform and the erection method of steel platform | |
CN108756902A (en) | It is a kind of to be used for the auxiliary device and shield machine steering method that shield machine transition is missed the stop | |
CN202125305U (en) | Hydraulic bracket for roadway support | |
CN203769795U (en) | Tracked hydraulic combined bracket temporary support and permanent support parallel operation tunneling equipment | |
CN110130928A (en) | Integrated mole and technique under fully mechanized coal face coal top |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181207 Termination date: 20210502 |
|
CF01 | Termination of patent right due to non-payment of annual fee |