CN208203097U - Cooperate steel column lifting construction steel ladder - Google Patents
Cooperate steel column lifting construction steel ladder Download PDFInfo
- Publication number
- CN208203097U CN208203097U CN201820366753.8U CN201820366753U CN208203097U CN 208203097 U CN208203097 U CN 208203097U CN 201820366753 U CN201820366753 U CN 201820366753U CN 208203097 U CN208203097 U CN 208203097U
- Authority
- CN
- China
- Prior art keywords
- ladder
- steel
- main branch
- steel column
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 85
- 239000010959 steel Substances 0.000 title claims abstract description 85
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 238000003466 welding Methods 0.000 claims description 6
- 239000011324 bead Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 2
- 230000009194 climbing Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
Abstract
The utility model discloses cooperation steel column lifting construction steel ladders, including the main branch of ladder, mark time, and gear support and hook, parallel interval of marking time are arranged between two main branch of ladder;Hook is welded and fixed with the main branch top rear face of ladder, and there are four the gear supports at least and is arranged at intervals on the main branch back side of ladder.The utility model structure is simple, and material is extensive, cheap, easy to make quick, it is no longer necessary to ladder is welded on steel column, directly sliced off with burning torch after being finished, will not be damaged to steel column component.Steel ladder stable structure, worker is safe and convenient to use, and can be used in turn, and reduces construction cost, not will cause the waste of resource.In order to cooperate steel column to lift, the construction channel of handy and safe is provided for construction personnel to the maximum extent, allows worker as far as possible close to construction location, provides good construction environment and space to worker.The precision and positioning for greatly improving Steel Structure Installation, ensure that construction quality.
Description
Technical field
The utility model relates to construction ancillary equipment fields, especially cooperation steel column lifting construction steel ladder.
Background technique
In large steel structure installation engineering, precision and its accurate positioning to Steel Structure Installation have higher requirements.It applies
Welding workload is big during work, and weld seam form is more, and worker is led to when carrying out many operations such as steel column installation or roof girder welding
It will often work in the space of relatively narrower, need that ladder is installed on steel column, carry out operation above pillar to climb to.
Present steel ladder is directly welded on steel column after being processed with round steel mostly, is directly sliced off with burning torch after being finished.It deposits
Main problem be: first, be easy steel column component is damaged;Second, it is not easy to the recycling of steel ladder, causes resource
Waste;Third cannot provide the construction channel of handy and safe for worker.
Utility model content
The purpose of the utility model is to provide cooperation steel column lifting construction steel ladders, to steel column structure when effectively avoiding constructing
Part damages and the wasting of resources, while providing the construction channel of handy and safe to construction personnel.
To achieve the above objectives, the present invention adopts the following technical solutions:
The utility model provides cooperation steel column lifting construction steel ladder, including the main branch of ladder, marks time, gear support and hook,
The parallel interval of marking time is arranged between two main branch of ladder;The hook is welded and fixed with the main branch top rear face of ladder, institute
It states there are four gear supports at least and is arranged at intervals on the main branch back side of ladder.
Further, the hook is L-shaped, and L-type hooking slits are downward, and L-type long side one end and the main branch top rear face of ladder are welded
Meet fixation, L-type short side and the main Zhi Pinghang of ladder.
Further, L-type long side top surface and the main branch either flush of ladder.
Further, gear support is triangular structure, and triangle a line is welded and fixed with the main branch of ladder.
Further, the main Zhi Caiyong 50mm*4mm angle steel of ladder or diameter 12MM round steel.
Further, the spacing of two main branch of ladder is 500mm.
Further, it marks time using diameter 12MM round steel.
Further, the adjacent spacing marked time is 30MM.
Further, it marks time and is fixed between the main branch of ladder using overlap welding, weld bead height 6mm.
Further, the main Zhi Gaodu of ladder is 600mm-900mm.
The beneficial effects of the utility model are embodied in:
1, the utility model cooperates steel column lifting construction steel ladder, and structure is simple, and rationally, material is extensive, price for design
It is cheap, it is easy to make quick, it is no longer necessary to ladder is welded on steel column, is directly sliced off with burning torch after being finished, it will not be to steel column
Component damages.The main branch back side of ladder is provided with the gap being used to support between ladder and steel column, and ladder is avoided to be close to steel column
Gear support, is climbed convenient for construction personnel.Practicability with higher.
2, the utility model cooperates steel column lifting construction steel ladder, and steel ladder stable structure, worker is safe and convenient to use,
And it can be used in turn, reduce construction cost, not will cause the waste of resource.
3, the utility model cooperates steel column lifting construction steel ladder, in order to cooperate steel column to lift, to the maximum extent to apply
Worker person provides the construction channel of handy and safe, provides worker close to construction location, well to worker as far as possible
Construction environment and space.The precision and positioning for greatly improving Steel Structure Installation, ensure that construction quality.
The utility model cooperation steel column lifting construction can be widely applied in steel structure column construction operation with steel ladder.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification
It becomes apparent, or is understood and implementing the utility model.The main purpose and further advantage of the utility model can lead to
Specifically noted scheme in specification, claims is crossed to be achieved and obtained.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the utility model main view.
Fig. 2 is the utility model side view.
Appended drawing reference: the main branch of 1- ladder, 2-mark time, 3-gear supports, 4-hooks.
Specific embodiment
In order to cooperate steel column to lift, the construction channel of handy and safe is provided for construction personnel to the maximum extent, this is practical new
Type provides cooperation steel column lifting construction steel ladder, and the main view of ladder marks time 2 as shown in Figure 1, specifically include the main branch 1 of ladder,
Gear support 3 and hook 4,2 parallel intervals of marking time are arranged between the main branch 1 of two ladders;On the hook 4 and the main branch 1 of ladder
The portion back side is welded and fixed.There are four the gear supports 3 at least and is arranged at intervals on main 1 back side of branch of ladder, and gear support 3 is triangle knot
Structure, triangle a line are welded and fixed with the main branch 1 of ladder, and gear support 3 is mainly used for supporting the gap between ladder and steel column, avoid climbing
Ladder is close to steel column, is not easy to construction personnel's climbing.
Wherein, the hook 4 is L-shaped, and Open Side Down for L-type hook 4, and L-type long side one end and main 1 top rear face of branch of ladder are welded
Fixation is connect, L-type short side is parallel with the main branch 1 of ladder.It L-type long side top surface can be with main 1 either flush of branch of ladder.
As shown in Fig. 2, the main branch 1 of ladder uses 50mm*4mm angle steel or diameter 12MM round steel.2 are marked time using diameter 12MM circle
Steel.The spacing of the main branch 1 of two ladders is 500mm;Main 1 height of branch of ladder is 600mm-900mm.Adjacent 2 spacing of marking time is
30MM。
Cooperate steel column lifting construction as follows with steel ladder Force Calculation:
It marks time and is fixed between 2 and the main branch 1 of ladder using overlap welding, weld bead height 6mm.If people's weight of standing is 100kg, i.e.,
By the pressure of 1KN, every side 500N.
Weld seam is as follows by shear force calculation:
Here βfTake 1.0
So σf=N/helw=500/0.7*6*2*50=1.19N/mm2< 160N/mm2Ladder meets construction requirement.
It is mentioned in use, often configuring the utility model at steel column position appropriate in main body steel construction steel column installation process
For cooperation steel column lifting construction steel ladder, ladder top and main structure overlap joint or spot welding are secured, while catching device are arranged.
It is easy to dismantle after use to be used in turn.
Ladder provided by the utility model can be such that worker close to construction location, provides as far as possible to worker good
Construction environment and space.The precision and positioning for greatly improving Steel Structure Installation, ensure that construction quality.
The foregoing is merely the preferable specific embodiment of the utility model, but the protection scope of the utility model not office
Be limited to this, variation that anyone skilled in the art is expected within the technical scope disclosed by the utility model or
Replacement, should be covered within the scope of the utility model.
Claims (10)
1. cooperating steel column lifting construction steel ladder, it is characterised in that: including the main branch of ladder (1), mark time (2), gear support (3) and extension
Hook (4), (2) parallel interval of marking time are arranged between two main branch of ladder (1);On the hook (4) and the main branch of ladder (1)
The portion back side is welded and fixed, gear support (3) at least there are four and be arranged at intervals on the main branch of ladder (1) back side.
2. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that the hook (4) is L-shaped, L
Type links up with (4), and Open Side Down, and L-type long side one end is welded and fixed with the main branch of ladder (1) top rear face, L-type short side and the main branch of ladder
(1) parallel.
3. cooperation steel column lifting construction steel ladder as claimed in claim 2, which is characterized in that L-type long side top surface and ladder
Main branch (1) either flush.
4. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that gear support (3) is triangle knot
Structure, triangle a line are welded and fixed with the main branch of ladder (1).
5. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that the main branch of ladder (1) uses
50mm*4mm angle steel or diameter 12MM round steel.
6. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that two main branch of ladder (1)
Spacing is 500mm.
7. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that mark time (2) using diameter
12MM round steel.
8. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that the adjacent spacing for marking time (2)
For 30MM.
9. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that mark time (2) and the main branch of ladder
(1) it is fixed between using overlap welding, weld bead height 6mm.
10. cooperation steel column lifting construction steel ladder as described in claim 1, which is characterized in that the main branch of ladder (1) is highly
600mm-900mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820366753.8U CN208203097U (en) | 2018-03-19 | 2018-03-19 | Cooperate steel column lifting construction steel ladder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820366753.8U CN208203097U (en) | 2018-03-19 | 2018-03-19 | Cooperate steel column lifting construction steel ladder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208203097U true CN208203097U (en) | 2018-12-07 |
Family
ID=64527109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820366753.8U Expired - Fee Related CN208203097U (en) | 2018-03-19 | 2018-03-19 | Cooperate steel column lifting construction steel ladder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208203097U (en) |
-
2018
- 2018-03-19 CN CN201820366753.8U patent/CN208203097U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101575892B (en) | Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof | |
CN204040439U (en) | A kind of reducing operation platform installed for steel rectangle column | |
CN205501837U (en) | Steel case roof beam becomes bridge welding simple platform | |
CN204487029U (en) | A kind of safety belt suspension clamp | |
CN208203097U (en) | Cooperate steel column lifting construction steel ladder | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN213234313U (en) | Concrete pumping hose auxiliary positioning device | |
CN204456908U (en) | A kind of heavy beam equipment | |
CN208604905U (en) | A kind of recyclable ease of Use platform for pier stud construction | |
CN203945038U (en) | A kind of Aluminum Alloy TIG Welding welding pressure frame frock | |
CN203821865U (en) | Adjusting device for installing gap of H-shaped steel beam | |
CN215671267U (en) | Telescopic edge protection device | |
CN207920043U (en) | Parapet Hanging Basket | |
CN207568210U (en) | ALC plate mounting auxiliaries | |
CN205716293U (en) | A kind of center pillar umbrella base | |
CN210918162U (en) | Adjustable overhanging outer scaffold upright rod fixing base | |
CN209261206U (en) | It is a kind of reply arc door it is hanging when upkeep operation operation ladder | |
CN207953006U (en) | A kind of flexible welding system of suspention | |
CN206858018U (en) | A kind of tool-type tower crane passageway | |
CN105113509A (en) | Tool type foundation pit suspended step ladder | |
CN215859014U (en) | Can have enough to meet need scaffold steel pipe fixing device that encorbelments | |
CN214006541U (en) | U holds in palm | |
CN215316612U (en) | Support device for welding beam | |
CN205134920U (en) | Simple and easy aerial working platform device of building engineering | |
CN205259636U (en) | Combined pavilion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181207 |