CN208604905U - A kind of recyclable ease of Use platform for pier stud construction - Google Patents

A kind of recyclable ease of Use platform for pier stud construction Download PDF

Info

Publication number
CN208604905U
CN208604905U CN201821051208.6U CN201821051208U CN208604905U CN 208604905 U CN208604905 U CN 208604905U CN 201821051208 U CN201821051208 U CN 201821051208U CN 208604905 U CN208604905 U CN 208604905U
Authority
CN
China
Prior art keywords
pier stud
base shaft
base station
ease
recyclable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821051208.6U
Other languages
Chinese (zh)
Inventor
马贵红
杨云弘
吴仕林
许延安
李亚晨
冯建浩
潘永涛
卜浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201821051208.6U priority Critical patent/CN208604905U/en
Application granted granted Critical
Publication of CN208604905U publication Critical patent/CN208604905U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a kind of recyclable ease of Use platforms for pier stud construction, belong to architectural engineering construction technique field, the recyclable ease of Use platform for pier stud construction, by base station pedestal, connect base shaft, guardrail, fence composition, the base station pedestal includes multiple is arranged concentrically, but the circular support ring of different-diameter, it is at L-shaped to connect base shaft, connecting base shaft includes horizontal part and vertical component effect, the horizontal part of connection base shaft is mutually welded with base station base bottom, base station base bottom uniform welding has connection base shaft, connect the horizontal guardrail being welded with positioned at different height on the inside of the vertical component effect of base shaft, top is welded with fence.The utility model can substantially reduce material utilization amount in the case where guaranteeing overall stability, mitigate base station gross weight, it can satisfy construction site requirement, it is convenient and efficient, it is reusable, utilization rate is high, efficiency solves the problems such as pier stud construction operation space is narrow, effectively improves the safety of construction site pier stud construction.

Description

A kind of recyclable ease of Use platform for pier stud construction
Technical field
The utility model relates to a kind of recyclable ease of Use platforms for pier stud construction, belong to building engineering construction skill Art field.
Background technique
In current pier stud work progress, often there is at the top of pier stud that operating space is narrow, staff is difficult to narrow Space in effectively carry out operation, and set up operating platform expend project amount it is larger the problems such as, in the premise for meeting construction requirement Under, to facilitate construction, improve the target of construction site working efficiency.By comparing and groping, in line with practical propagable principle, Need to propose a kind of recyclable ease of Use platform for pier stud construction, the safety of the construction site Lai Tigao pier stud construction.
Utility model content
In order to solve the problems, such as background technique, the utility model pier is made and welding each component, cost Bottom, simple process, small, light-weight, circular design overall stability is preferable, can satisfy construction site requirement, convenient fast Victory, reusable, utilization rate is high, efficiency solves the problems such as pier stud construction operation space is narrow, effectively improves construction site pier The safety of column construction, and may extend in the construction of other types pier stud.
In order to solve the problems, such as background technique, to solve the above problems, the utility model passes through following technical side Case is realized:
The recyclable ease of Use platform for pier stud construction includes base station pedestal, connects base shaft, guardrail, fence, The base station pedestal include it is multiple be arranged concentrically but the circular support ring of different-diameter, connection base shaft is at L-shaped, connects base shaft packet Horizontal part and vertical component effect are included, the horizontal part and base station base bottom for connecting base shaft mutually weld, and base station base bottom uniform welding has Base shaft is connected, connects the horizontal guardrail being welded with positioned at different height on the inside of the vertical component effect of base shaft, top is welded with fence.
Preferably, the guardrail, fence, support ring are curved arc into circular Ribbed Bar.
Preferably, circular inlet and outlet are formed among the support ring of the minimum diameter.
Preferably, the horizontal part of the connection base shaft and the center of circle of support ring are perpendicular.
Preferably, the connection base shaft, support ring, guardrail, fence are painted with anticorrosive paint.
The utility model has the following beneficial effects:
The recyclable ease of Use base station of the utility model pier stud construction is made and welding each component, cost bottom, It is simple process, small, bill of materials one, light-weight, it is used uniformly circular structure good integrity, can guarantee overall stability In the case of substantially reduce material utilization amount, mitigate base station gross weight;It can satisfy construction site requirement, it is convenient and efficient, reusable, Utilization rate is high, and efficiency solves the problems such as pier stud construction operation space is narrow, effectively improves the safety of construction site pier stud construction, And it may extend in the construction of other types pier stud.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model main view;
Fig. 3 is the utility model top view;
Fig. 4 is the utility model base station base vertical view;
Fig. 5 is that the utility model connects base shaft schematic diagram.
Figure label are as follows: 1- base station pedestal, 2- connection base shaft, 3- guardrail, 4- fence, 5- support ring, 6- horizontal part, 7- hang down Straight portion, 8- inlet and outlet, 9- pier stud, 10- cable wind rope.
Specific embodiment
In order to keep the purpose of this utility model, technical scheme and beneficial effects clearer, below in conjunction with attached drawing, to this The preferred embodiment of utility model is described in detail, to facilitate the technical staff to understand.
As shown in Figs. 1-5, the recyclable ease of Use platform for pier stud construction includes base station pedestal 1, linker Bar 2, guardrail 3, fence 4, the base station pedestal 1 include it is multiple be arranged concentrically but the circular support ring 5 of different-diameter, it is described most Circular inlet and outlet 8 are formed among the support ring 5 of minor diameter, connection base shaft 2 is at L-shaped, and connection base shaft 2 includes horizontal part 6 and hangs down The horizontal part 6 in straight portion 7, connection base shaft 2 is mutually welded with 1 bottom of base station pedestal, and 1 bottom uniform welding of base station pedestal has connection base shaft 2, connect the horizontal guardrail 3 being welded with positioned at different height in the inside of vertical component effect 7 of base shaft 2, top is welded with fence 4, and guardrail 3 20 curved arc of Ф is at circular Ribbed Bar, and connecting base shaft 2 is that Ф 25 is bent into L-shaped Ribbed Bar, and support ring 5 is 22 curved arc of Ф At circular Ribbed Bar, fence 4 is 25 curved arc of Ф into circular Ribbed Bar, connects the horizontal part 6 and support ring 5 of base shaft 2 The center of circle it is perpendicular so that the position that is welded in support ring 5 of connection base shaft 2 is uniformly distributed, in stress, pressure Uniformly distributed, to extend the service life of device entirety, connection base shaft 2, support ring 5, guardrail 3, fence 4 are painted with antirust oil Paint, so that extending service life in rainy weather in use, prevent the oxidation and rusting of Ribbed Bar.
The course of work of the utility model: the crane lifting ease of Use platform is used after 9 template of pier stud is installed To die head, rubber mat plate (or other flexible materials) should be arranged to protect template in die head and operating platform contact site Not damaged, mesa base is fixed with die head and links, and from least three directions, setting cable wind rope 10 ensures to operate flat Platform is firm, and setting channel is connected to ladder at inlet and outlet 8, facilitates passage;It is removed after the completion of construction and links fixed device, then will The operating platform is hung to next construction site.
The recyclable ease of Use base station of the utility model pier stud construction is made and welding each component, cost bottom, It is simple process, small, bill of materials one, light-weight, it is used uniformly circular structure good integrity, can guarantee overall stability In the case of substantially reduce material utilization amount, mitigate base station gross weight;It can satisfy construction site requirement, it is convenient and efficient, reusable, Utilization rate is high, and efficiency solves the problems such as pier stud construction operation space is narrow, effectively improves the safety of construction site pier stud construction, And it may extend in the construction of other types pier stud.
Finally, it is stated that preferred embodiment above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, to the greatest extent Pipe has been described in detail the utility model by above preferred embodiment, but those skilled in the art should manage Solution, can make various changes, without departing from the utility model claims book institute to it in the form and details The range of restriction.

Claims (5)

1. a kind of recyclable ease of Use platform for pier stud construction, it is characterised in that: the following for pier stud construction Ring ease of Use platform includes base station pedestal (1), connection base shaft (2), guardrail (3), fence (4), and the base station pedestal (1) includes Multiple to be arranged concentrically but the circular support ring (5) of different-diameter, connection base shaft (2) is at L-shaped, and connection base shaft (2) includes horizontal part (6) it is mutually welded with vertical component effect (7), the horizontal part (6) of connection base shaft (2) with base station pedestal (1) bottom, base station pedestal (1) bottom Uniform welding has connection base shaft (2), connects the horizontal guardrail being welded with positioned at different height on the inside of the vertical component effect (7) of base shaft (2) (3), top is welded with fence (4).
2. the recyclable ease of Use platform according to claim 1 for pier stud construction, it is characterised in that: the guardrail (3), fence (4), support ring (5) are curved arc into circular Ribbed Bar.
3. the recyclable ease of Use platform according to claim 1 for pier stud construction, it is characterised in that: the minimum Circular inlet and outlet (8) are formed among the support ring (5) of diameter.
4. the recyclable ease of Use platform according to claim 1 for pier stud construction, it is characterised in that: the connection The horizontal part (6) of base shaft (2) and the center of circle of support ring (5) are perpendicular.
5. the recyclable ease of Use platform according to claim 1 for pier stud construction, it is characterised in that: the connection Base shaft (2), support ring (5), guardrail (3), fence (4) are painted with anticorrosive paint.
CN201821051208.6U 2018-07-04 2018-07-04 A kind of recyclable ease of Use platform for pier stud construction Active CN208604905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821051208.6U CN208604905U (en) 2018-07-04 2018-07-04 A kind of recyclable ease of Use platform for pier stud construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821051208.6U CN208604905U (en) 2018-07-04 2018-07-04 A kind of recyclable ease of Use platform for pier stud construction

Publications (1)

Publication Number Publication Date
CN208604905U true CN208604905U (en) 2019-03-15

Family

ID=65667765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821051208.6U Active CN208604905U (en) 2018-07-04 2018-07-04 A kind of recyclable ease of Use platform for pier stud construction

Country Status (1)

Country Link
CN (1) CN208604905U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424951A (en) * 2020-04-16 2020-07-17 中国建筑第四工程局有限公司 Steel structure high-altitude welding enclosure cage type closed environment operation platform and use method thereof
CN111535197A (en) * 2020-05-21 2020-08-14 中冶建工集团有限公司 Pier column construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424951A (en) * 2020-04-16 2020-07-17 中国建筑第四工程局有限公司 Steel structure high-altitude welding enclosure cage type closed environment operation platform and use method thereof
CN111535197A (en) * 2020-05-21 2020-08-14 中冶建工集团有限公司 Pier column construction method
CN111535197B (en) * 2020-05-21 2021-12-14 中冶建工集团有限公司 Pier column construction method

Similar Documents

Publication Publication Date Title
CN208604905U (en) A kind of recyclable ease of Use platform for pier stud construction
CN108043630B (en) Automatic cleaning and spraying device for outer wall of storage tank
CN109881590A (en) Bridge steel box girder high altitude operation operating platform and building method
CN209494204U (en) Suspension type steel ladder
CN206336964U (en) A kind of support top formula lifting pipeline apparatus and system
CN208650506U (en) A kind of slip-framed reverse mould constructing device
CN106761361A (en) A kind of climbing instrument for overhauling power transmission tower pike pole Beam
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN206753087U (en) A kind of lighting roof operating platform structure
CN205955303U (en) Transformer substation's framework suitable for 110KV and 220KV
CN202731270U (en) Movable platform for aerial installation operation of space steel structure
CN211370277U (en) Movable track type inclined ladder
CN203514287U (en) Special operating platform suitable for independent pile offshore construction
CN110847687B (en) Quick installation method of conical direct-discharge chimney
CN206368682U (en) A kind of climbing instrument for overhauling power transmission tower pike pole Beam
CN112357743A (en) Manufacturing method of simple hoisting tool for purlines of factory building roof
CN220487064U (en) Arc elevation high-altitude electric lifting operation platform
CN213806520U (en) Building engineering is with outer equipment of demolising of climbing frame
CN214570354U (en) Large storage tank flip-chip manufacturing and mounting tool
CN220739881U (en) Platform for welding and installing inclined shaft pressure steel pipes of pumped storage power station
CN219060835U (en) Self-elevating lighting well operation platform device
CN216185929U (en) Combined type movable lifting platform
CN218290242U (en) Lifting equipment for building construction
CN215402670U (en) Assembled tower crane temporary pedestrian passageway
CN210915006U (en) Crane support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant