- CN208202796U CN208202796U CN201820646237.0U CN201820646237U CN208202796U CN 208202796 U CN208202796 U CN 208202796U CN 201820646237 U CN201820646237 U CN 201820646237U CN 208202796 U CN208202796 U CN 208202796U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- connection frame
- fixedly connected
- foundation pit
- easily installed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of construction foundation pit stress guardrails for being easily installed disassembly, including guardrail board, connection frame and mounting ring, the mounting ring is fixedly connected on connection frame two sidewalls, the connection frame is fixedly connected on guardrail board side by mounting ring, one side surface of guardrail board is fixedly welded with stainless steel cloth, the stainless steel wire net surface and connection frame one side wall fixed bonding have reflection plaster, another side surface of guardrail board is fixedly welded with cross reinforcing rib, the cross reinforcing rib middle part surface is fixedly connected with thread plate, the screw thread plate surface is fixedly connected with oblique frame by connecting plate, the connection frame bottom is fixedly welded with supporting plate.The utility model is designed reasonably is novel, it is easily installed and dismantles, the mounting stability of foundation pit stress guardrail is higher simultaneously, it is larger power can be absorbed impact, and totality total amount is lighter, easy to carry and maintenance, while guardrail is with dust-proof and warning purpose, practicability with higher is suitble to be widely popularized and use.
Description
Technical field
The utility model relates to a kind of construction guardrail, in particular to a kind of construction foundation pit for being easily installed disassembly
Stress guardrail.
Background technique
The foundation pit guardrail of civil construction includes ontology and support leg, and ontology is substantially plate-like, and support leg is fixed with ontology
Connection and support leg are located at the lower section of ontology.The support leg is for keeping foundation pit guardrail vertical on the ground, in use, by multiple bases
Guardrail is cheated along in one line.
In place of currently used guardrail Shortcomings, guardrail upper end formation intensity is lower, does not resist the energy of horizontal loading
Power, guardrail are easy to fall down to the ground in the case where blowing hard and break, and practicability is not high, are not easy to multiple guardrails and are attached installation admittedly
When fixed and disassembly, and stability is poor, the hand steered guardrail upper end of construction personnel and guardrail upper end occur mobile, foundation pit is easily fallen into
It is interior.For this purpose, it is proposed that a kind of construction foundation pit stress guardrail for being easily installed disassembly.
Utility model content
The main purpose of the utility model is to provide a kind of construction foundation pit stress guardrails for being easily installed disassembly, can
Effectively to solve the problems in background technique.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of construction foundation pit stress guardrail being easily installed disassembly, including guardrail board, connection frame and mounting ring, it is described
Mounting ring is fixedly connected on connection frame two sidewalls, and the connection frame is fixedly connected on guardrail board side, the shield by mounting ring
One side surface of breast board is fixedly welded with stainless steel cloth, and the stainless steel wire net surface and connection frame one side wall fixed bonding have
Reflection plaster, another side surface of guardrail board are fixedly welded with cross reinforcing rib, and the cross reinforcing rib middle part surface is fixed to be connected
It is connected to thread plate, the screw thread plate surface is fixedly connected with oblique frame by connecting plate, and the connection frame bottom is fixedly welded with support
Plate.
Further, the oblique frame bottom and supporting plate bottom end are fixedly connected with fixed disk, and the fixed disk surface activity connects
It is connected to threaded drillpipe.
Further, the cross reinforcing rib is fixedly connected with dust-proof gauze close to thread plate side.
Further, the oblique frame is specially the oblique frame of stainless steel.
Further, the guardrail board and connection frame are the aluminium alloy production for spraying oxidation-resistant material.
Compared with prior art, the utility model has the following beneficial effects:
1. this kind is easily installed the construction foundation pit stress guardrail of disassembly, two pieces of adjacent guardrail boards pass through connection frame
And mounting ring is fixed, and guardrail board bottom is supported by supporting plate, recycles fixed disk combination threaded drillpipe that will connect
Frame is fixed on ground, the quick fixed and disassembly of threaded drillpipe may be implemented using electric drill, fixed effect is ideal, in turn
Realization is rapidly assembled and disassembled foundation pit stress guardrail.
2. can prevent extraneous personnel from climbing guardrail board using the stainless steel cloth of guardrail plate surface, realize the mesh of isolation
, while timely reminding passerby or vehicular traffic to avoid bumping against guardrail board using reflection plaster, by the intersection of the guardrail board other side
Reinforcing rib can effectively improve the stability and non-deformability of guardrail board, and the later period is avoided to carry and caused to become by object impact
Shape, influencing the later period normally uses.
3. dust-proof gauze is fixed on cross reinforcing rib side simultaneously, installation and fixation are relatively simple, facilitate the later period more
It changes and cleans, effectively the sand and dust during foundation pit construction can be isolated, avoid the environment for influencing the guardrail board external world, compared with
It is practical.
4. being fixed on the oblique frame on cross reinforcing rib surface by thread plate and connecting plate, install more convenient while sharp
With the principle of gusseted, effectively guardrail board can be supported, guardrail board is avoided to be fallen by external impacts, more in fact
With, and tiltedly frame is specially the oblique frame of stainless steel, and guardrail board and connection frame are the aluminium alloy production for spraying oxidation-resistant material,
Its service life is longer, and weight is lighter relative to brandreth, convenient for the carrying and maintenance in later period.
Detailed description of the invention
Fig. 1 is the overall structure diagram for the construction foundation pit stress guardrail that the utility model is easily installed disassembly.
Fig. 2 is the guardrail board structural schematic diagram for the construction foundation pit stress guardrail that the utility model is easily installed disassembly.
Fig. 3 is the connecting frame structure schematic diagram for the construction foundation pit stress guardrail that the utility model is easily installed disassembly.
In figure: 1, guardrail board;2, connection frame;3, mounting ring;4, stainless steel cloth;5, reflection plaster;6, cross reinforcing rib;7,
Dust-proof gauze;8, thread plate;9, connecting plate;10, oblique frame;11, supporting plate;12, fixed disk;13, threaded drillpipe.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment, the utility model is further described.
As shown in Figure 1-3, a kind of construction foundation pit stress guardrail for being easily installed disassembly, including guardrail board 1, connection frame
2 and mounting ring 3, the mounting ring 3 is fixedly connected on 2 two sidewalls of connection frame, and the connection frame 2 is fixedly connected by mounting ring 3
In 1 side of guardrail board, 1 one side surface of guardrail board is fixedly welded with stainless steel cloth 4,4 surface of stainless steel cloth with
And 2 one side wall fixed bonding of connection frame has reflection plaster 5, another side surface of the guardrail board 1 is fixedly welded with cross reinforcing rib 6,
6 middle part surface of cross reinforcing rib is fixedly connected with thread plate 8, and 8 surface of thread plate is fixedly connected with by connecting plate 9
Oblique frame 10,2 bottom of connection frame is fixedly welded with supporting plate 11.
Wherein, 10 bottom of oblique frame and 11 bottom end of supporting plate are fixedly connected with fixed disk 12, and 12 surface of fixed disk is living
It is dynamic to be connected with threaded drillpipe 13.
Wherein, the cross reinforcing rib 6 is fixedly connected with dust-proof gauze 7 close to 8 side of thread plate.
Wherein, the oblique frame 10 is specially the oblique frame of stainless steel.
Wherein, the guardrail board 1 and connection frame 2 are the aluminium alloy production for spraying oxidation-resistant material.
It should be noted that the utility model is a kind of construction foundation pit stress guardrail for being easily installed disassembly, work
When, two pieces of adjacent guardrail boards 1 are fixed by connection frame 2 and mounting ring 3, and 1 bottom of guardrail board by supporting plate 11 into
Row support, recycles fixed disk 12 to combine threaded drillpipe 13 that connection frame 2 is fixed on ground, threaded bore may be implemented using electric drill
The quick fixed and disassembly of bar 13, fixed effect is ideal, and then realizes the Fast Installation to foundation pit stress guardrail and tear open
It unloads, using the stainless steel cloth 4 on 1 surface of guardrail board, can prevent extraneous personnel from climbing guardrail board 1, realize the purpose of isolation, together
Shi Liyong reflection plaster 5 timely reminds passerby or vehicular traffic to avoid bumping against guardrail board 1, is added by the intersection of 1 other side of guardrail board
Strengthening tendons 6 can effectively improve the stability and non-deformability of guardrail board 1, and the later period is avoided to carry and caused to become by object impact
Shape, influencing the later period normally uses, while dust-proof gauze 7 is fixed on 6 side of cross reinforcing rib, installation and fixed more simple
It is single, facilitate the replacement and cleaning in later period, effectively the sand and dust during foundation pit construction can be isolated, avoids influencing guardrail
The extraneous environment of plate 1, it is more practical, it is fixed on the oblique frame 10 on 6 surface of cross reinforcing rib by thread plate 8 and connecting plate 9, pacifies
Principle that is more convenient, while utilizing gusseted is filled, effectively guardrail board 1 can be supported, avoid guardrail board 1 by outer
Power impact falls, more practical, and tiltedly frame 10 is specially the oblique frame of stainless steel, guardrail board 1 and connection frame 2 be sprayed it is anti-
The aluminium alloy of oxidation material makes, and service life is longer, and weight is lighter relative to brandreth, convenient for the carrying and dimension in later period
Shield.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also
It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model
Claimed range is defined by the appending claims and its equivalent thereof.
Claims (5)
1. a kind of construction foundation pit stress guardrail for being easily installed disassembly, including guardrail board (1), connection frame (2) and mounting ring
(3), the mounting ring (3) is fixedly connected on connection frame (2) two sidewalls, and the connection frame (2) is fixedly connected by mounting ring (3)
In guardrail board (1) side, it is characterised in that: (1) one side surface of guardrail board is fixedly welded with stainless steel cloth (4), described
Stainless steel cloth (4) surface and connection frame (2) one side wall fixed bonding have reflection plaster (5), guardrail board (1) other side table
Face is fixedly welded with cross reinforcing rib (6), and cross reinforcing rib (6) middle part surface is fixedly connected with thread plate (8), the spiral shell
Card (8) surface is fixedly connected with oblique frame (10) by connecting plate (9), and connection frame (2) bottom is fixedly welded with supporting plate
(11)。
2. a kind of construction foundation pit stress guardrail for being easily installed disassembly according to claim 1, it is characterised in that: institute
It states oblique frame (10) bottom and supporting plate (11) bottom end to be fixedly connected with fixed disk (12), fixed disk (12) surface activity is connected with
Threaded drillpipe (13).
3. a kind of construction foundation pit stress guardrail for being easily installed disassembly according to claim 1, it is characterised in that: institute
It states cross reinforcing rib (6) and is fixedly connected with dust-proof gauze (7) close to thread plate (8) side.
4. a kind of construction foundation pit stress guardrail for being easily installed disassembly according to claim 1, it is characterised in that: institute
State the oblique frame that oblique frame (10) is specially stainless steel.
5. a kind of construction foundation pit stress guardrail for being easily installed disassembly according to claim 1, it is characterised in that: institute
It states guardrail board (1) and connection frame (2) is the aluminium alloy production for spraying oxidation-resistant material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820646237.0U CN208202796U (en) | 2018-05-03 | 2018-05-03 | A kind of construction foundation pit stress guardrail being easily installed disassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820646237.0U CN208202796U (en) | 2018-05-03 | 2018-05-03 | A kind of construction foundation pit stress guardrail being easily installed disassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208202796U true CN208202796U (en) | 2018-12-07 |
Family
ID=64522795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820646237.0U Expired - Fee Related CN208202796U (en) | 2018-05-03 | 2018-05-03 | A kind of construction foundation pit stress guardrail being easily installed disassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208202796U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456532A (en) * | 2020-04-29 | 2020-07-28 | 中冶建工集团有限公司 | Construction method of water retaining ridge with barrier rods around foundation pit |
CN114320008A (en) * | 2022-02-11 | 2022-04-12 | 中国建筑第八工程局有限公司 | Novel enclosure structure |
-
2018
- 2018-05-03 CN CN201820646237.0U patent/CN208202796U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456532A (en) * | 2020-04-29 | 2020-07-28 | 中冶建工集团有限公司 | Construction method of water retaining ridge with barrier rods around foundation pit |
CN114320008A (en) * | 2022-02-11 | 2022-04-12 | 中国建筑第八工程局有限公司 | Novel enclosure structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208202796U (en) | A kind of construction foundation pit stress guardrail being easily installed disassembly | |
CN206595948U (en) | A kind of photovoltaic component system support for resisting high wind impact | |
CN207805947U (en) | A kind of self-cleaning bar screen plate | |
CN207499592U (en) | A kind of construction place bounding wall guardrail structure | |
CN209212031U (en) | A kind of novel steel pipe pole equipped with telescoping mechanism | |
CN104295146B (en) | 110kV line project improvement corner tower composition structure | |
CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
CN208415118U (en) | A kind of Hanging Basket assembled protection structure | |
CN207510682U (en) | A kind of removable and alterable height tower for boarding ship | |
CN207405503U (en) | A kind of road and bridge crack bracing means | |
CN209353864U (en) | A kind of 220kV high-tension apparatus area pinpoints safe fence bar | |
CN106495061A (en) | Stable lifting device for steel structure machining | |
CN208329667U (en) | A kind of horizontal hard protection system of integrated form floor edge | |
CN207485026U (en) | A kind of protection shed for construction engineering | |
CN206801135U (en) | A kind of transverse and longitudinal beam attachment structure securely | |
CN207419764U (en) | A kind of lateral force resisting steel plate wall structure | |
CN206397253U (en) | A kind of builder's temporary shed for building of lightweight steel construction | |
CN209208688U (en) | A kind of new concrete vehicle protection device | |
CN204662383U (en) | A kind of draft tube of hydropower station inspection platform | |
CN209457158U (en) | A kind of beam for building rod structure | |
CN203809042U (en) | Draw shaft grid sieve | |
CN204040491U (en) | Concrete vibrator | |
CN204000603U (en) | The special hitch of a kind of bridge overhauling nacelle | |
CN220126349U (en) | Construction waste treatment device | |
CN203961239U (en) | High-altitude overhanging awning construction operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |