CN208415118U - A kind of Hanging Basket assembled protection structure - Google Patents

A kind of Hanging Basket assembled protection structure Download PDF

Info

Publication number
CN208415118U
CN208415118U CN201820961185.6U CN201820961185U CN208415118U CN 208415118 U CN208415118 U CN 208415118U CN 201820961185 U CN201820961185 U CN 201820961185U CN 208415118 U CN208415118 U CN 208415118U
Authority
CN
China
Prior art keywords
cover board
protective net
hanging basket
pallet
main couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820961185.6U
Other languages
Chinese (zh)
Inventor
李广权
周国云
李侠
欧军
马伟侠
帅垚
马念
龙锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Road and Bridge Group Co Ltd
Original Assignee
Guizhou Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Road and Bridge Group Co Ltd filed Critical Guizhou Road and Bridge Group Co Ltd
Priority to CN201820961185.6U priority Critical patent/CN208415118U/en
Application granted granted Critical
Publication of CN208415118U publication Critical patent/CN208415118U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

The utility model discloses a kind of Hanging Basket assembled protection structures, including main couple, fulcrum, upper protective net and lower protective net, first cover board is installed above the main couple, second cover board is installed on the right side of the main couple, and second the left end of cover board be connected with each other by the right end of bolt and main couple, crossbeam is installed below the fulcrum, bed die is installed below the crossbeam, and foot guard pallet is provided with below bed die, the interior lower end of the foot guard pallet is equipped with geotextiles, the upper end of the upper protective net is mounted on the lower end outside of the second cover board.The Hanging Basket assembled protection structure, using foot guard pallet, it effectively prevents from mincing from high aerial Crater face, the slurry fallen down can be caught, slurry is absorbed simultaneously, it using two zinc-plated protective nets and cover board, effectively shelters to mince and be launched away from surrounding and top, entirety is easy to disassemble, improves safety of the Hanging Basket in high altitude operation simultaneously.

Description

A kind of Hanging Basket assembled protection structure
Technical field
The utility model relates to Hanging Basket equipment technical field, specially a kind of Hanging Basket assembled protection structure.
Background technique
Hanging Basket is the capital equipment in cantilever construction, and Hanging Basket is that design principle is simple structure, more stable and stronger, convenient for tearing open Dress has the characteristics that deform after stronger reusable property and stress that space below small and Hanging Basket is sufficient, is capable of providing Biggish operation side carries out constructing operation using steel bar template.
There are still huge risks during cradle construction.Cradle construction belongs to high altitude operation, especially in cantilever casting construction Lower section is high there are requiring when residential block or river the safeguard of security protection and civilized construction, and the protection of Hanging Basket is not achieved It is required that being easy to that falling object from high altitude is caused to cause safety accident.Therefore, setting safeguard structure is usually required when current cradle construction. In view of the above-mentioned problems, carrying out innovative design on the basis of original Hanging Basket assembled protection structure.
Utility model content
The purpose of this utility model is to provide a kind of Hanging Basket assembled protection structures, to solve to mention in above-mentioned background technique Not the problem of protection does not reach requirement, easily causes falling object from high altitude out.
To achieve the above object, the utility model provides the following technical solutions: a kind of Hanging Basket assembled protection structure, including Main couple, fulcrum, upper protective net and lower protective net are equipped with the first cover board above the main couple, and under the first cover board End is provided with sleeve, and the sleeve is internally connected with support column, the second cover board, and second are equipped on the right side of the main couple The left end of cover board is connected with each other by the right end of bolt and main couple, and sunpender cover board is provided on the right side of the second cover board, institute Fixed pivot is stated in the lower section of main couple, and crossbeam is installed below fulcrum, bed die, and bottom are installed below the crossbeam Foot guard pallet is provided with below mould, the crossbeam is connected with each other by screw rod and foot guard pallet, and the bottom is anti- The interior lower end of shield pallet is equipped with geotextiles, and the upper end of the upper protective net is mounted on the lower end outside of the second cover board, and on The lower end of protective net is connected on the outside of the upper end of crossbeam, and caution slogan is provided on the right side of upper protective net, the lower protection The upper end of net is connected to the lower end of crossbeam.
Preferably, the steel plate with a thickness of 3mm of first cover board, the second cover board and sunpender cover board.
Preferably, first cover board and the second cover board cover all main couple, and the first cover board and the second cover board are Detachable structure.
Preferably, the Sleeve Inner Diameter is identical with the diameter of support column.
Preferably, the lower end area of the foot guard pallet is greater than the lower end area of bed die, and foot guard pallet Interior lower end area is identical with the area of geotextiles.
Preferably, the upper protective net and lower protective net use zinc-plated protective net, and the net of upper protective net and lower protective net Bore dia is 7mm.
Compared with prior art, the utility model has the beneficial effects that the Hanging Basket assembled protection structure, anti-using bottom Pallet is protected, when Hanging Basket carries out high altitude operation, effectively prevents spanner, screw, steel bar end, welding slag, mixed mud etc. from mincing from height Aerial Crater face, while when carrying out longitudinal mud jacking, the slurry fallen down can be caught, while inhaling to slurry It receives, using two zinc-plated protective nets and cover board, effectively shelters to mince and be launched away from surrounding and top, overall structure is steady It is fixed, easy to disassemble, improve safety of the Hanging Basket in high altitude operation simultaneously.
Detailed description of the invention
Fig. 1 is the utility model side structure schematic view;
Fig. 2 is the utility model fractionation structural representation;
Fig. 3 is the utility model positive structure diagram;
Fig. 4 is the first cover board of the utility model overlooking structure diagram.
In figure: 1, main couple;2, the first cover board;3, sleeve;4, support column;5, the second cover board;6, bolt;7, sunpender lid Plate;8, fulcrum;9, crossbeam;10, bed die;11, screw rod;12, foot guard pallet;13, geotextiles;14, upper protective net;15, under Protective net;16, caution slogan.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of Hanging Basket assembled protection structure, including master Truss 1, the first cover board 2, sleeve 3, support column 4, the second cover board 5, bolt 6, sunpender cover board 7, fulcrum 8, crossbeam 9, bed die 10, spiral shell Bar 11, foot guard pallet 12, geotextiles 13, upper protective net 14, lower protective net 15 and caution slogan 16, the top of main couple 1 First cover board 2 being installed, and the lower end of the first cover board 2 is provided with sleeve 3,3 interior diameter of sleeve is identical with the diameter of support column 4, Column 4 easy to support is inserted into inside sleeve 3, is mutually coincide and is not generated shaking, sleeve 3 is internally connected with support column 4, main couple 1 right side is equipped with the second cover board 5, and the first cover board 2 and the second cover board 5 cover all main couple 1, and the first cover board 2 and Two cover boards 5 are detachable structure, convenient for being disassembled and installed to the first cover board 2 and the second cover board 5, and a left side for the second cover board 5 End is connected with each other by the right end of bolt 6 and main couple 1, and the right side of the second cover board 5 is provided with sunpender cover board 7, the first lid The steel plate with a thickness of 3mm of plate 2, the second cover board 5 and sunpender cover board 7 is effectively prevented from easily falling object and be covered from the first cover board 2, second It being launched away above plate 5 and sunpender cover board 7, fulcrum 8 is fixed on the lower section of main couple 1, and the lower section of fulcrum 8 is equipped with crossbeam 9, The lower section of crossbeam 9 is equipped with bed die 10, and the lower section of bed die 10 is provided with foot guard pallet 12, under foot guard pallet 12 End area is greater than the lower end area of bed die 10, effectively catches the article that falls of 10 top of bed die, and crossbeam 9 passes through screw rod 11 and bottom Portion's protection tray 12 is connected with each other, and the interior lower end of foot guard pallet 12 is equipped with geotextiles 13, foot guard pallet 12 Interior lower end area is identical with the area of geotextiles 13, and geotextiles 13 effectively absorb the slurry and water droplet of mixed mud, upper protection The upper end of net 14 is mounted on the lower end outside of the second cover board 5, and the lower end of upper protective net 14 is connected on the outside of the upper end of crossbeam 9, And the right side of upper protective net 14 is provided with caution slogan 16, and the upper end of lower protective net 15 is connected to the lower end of crossbeam 9, upper protection Net 14 and lower protective net 15 use zinc-plated protective net, and the mesh diameter of upper protective net 14 and lower protective net 15 is 7mm, effectively Prevent from easily falling article from surrounding's projectile fall of Hanging Basket to lower section.
Working principle: the first cover board 2 first, the second cover board 5 and sunpender cover board 7 shelter from the upper space of Hanging Basket completely, Prevent some mince from launching away from the top of Hanging Basket, the first cover board 2, the second cover board 5 and sunpender cover board 7 are detachable knot Structure, convenient for being mounted and dismounted to it, lower position of the foot guard pallet 12 in bed die 10, crossbeam 9 drive bed die 10, bottom Portion's protection tray 12 and lower protective net 15 move together, and when carrying out longitudinal mud jacking, extra slurry falls to foot guard support Inside disk 12, geotextiles 13 absorb slurry in water, keep foot guard pallet 12 inside drying, upper protective net 14 and it is lower prevent Protective net 15 is sheltered to mince from what Hanging Basket surrounding was launched outward, by rotary screw 11 to foot guard pallet 12 carry out disassembly and Installation, caution slogan 16 are hung on higher position, convenient for reminding the people passed by near Hanging Basket to pay attention to falling object from high altitude.
Finally it should be noted that the above content is only to illustrate the technical solution of the utility model, rather than it is practical to this The limitation of novel protected range, those skilled in the art to the technical solution of the utility model carry out it is simple modification or Person's equivalent replacement, all without departing from the spirit and scope of technical solutions of the utility model.

Claims (6)

1. a kind of Hanging Basket assembled protection structure, including main couple (1), fulcrum (8), upper protective net (14) and lower protective net (15), it is characterised in that: be equipped with the first cover board (2) above the main couple (1), and the lower end setting of the first cover board (2) Have sleeve (3), the sleeve (3) is internally connected with support column (4), is equipped with the second cover board on the right side of the main couple (1) (5), and the left end of the second cover board (5) is connected with each other by the right end of bolt (6) and main couple (1), and the second cover board (5) Right side is provided with sunpender cover board (7), and the fulcrum (8) is fixed on the lower section of main couple (1), and is equipped with below fulcrum (8) Crossbeam (9) is equipped with bed die (10) below the crossbeam (9), and is provided with foot guard pallet below bed die (10) (12), the crossbeam (9) is connected with each other by screw rod (11) and foot guard pallet (12), the foot guard pallet (12) Interior lower end is equipped with geotextiles (13), and the upper end of the upper protective net (14) is mounted on the lower end outside of the second cover board (5), and The lower end of upper protective net (14) is connected on the outside of the upper end of crossbeam (9), and is provided with warning-sign on the right side of upper protective net (14) The upper end of language (16), the lower protective net (15) is connected to the lower end of crossbeam (9).
2. a kind of Hanging Basket assembled protection structure according to claim 1, it is characterised in that: first cover board (2), Two cover boards (5) and sunpender cover board (7) with a thickness of 3mm.
3. a kind of Hanging Basket assembled protection structure according to claim 1, it is characterised in that: first cover board (2) and Second cover board (5) covers all main couple (1), and the first cover board (2) and the second cover board (5) are detachable structure.
4. a kind of Hanging Basket assembled protection structure according to claim 1, it is characterised in that: sleeve (3) interior diameter It is identical with the diameter of support column (4).
5. a kind of Hanging Basket assembled protection structure according to claim 1, it is characterised in that: the foot guard pallet (12) lower end area is greater than the lower end area of bed die (10), and the interior lower end area and geotextiles of foot guard pallet (12) (13) area is identical.
6. a kind of Hanging Basket assembled protection structure according to claim 1, it is characterised in that: the upper protective net (14) and Lower protective net (15) uses zinc-plated protective net, and the mesh diameter of upper protective net (14) and lower protective net (15) is 7mm.
CN201820961185.6U 2018-06-21 2018-06-21 A kind of Hanging Basket assembled protection structure Expired - Fee Related CN208415118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820961185.6U CN208415118U (en) 2018-06-21 2018-06-21 A kind of Hanging Basket assembled protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820961185.6U CN208415118U (en) 2018-06-21 2018-06-21 A kind of Hanging Basket assembled protection structure

Publications (1)

Publication Number Publication Date
CN208415118U true CN208415118U (en) 2019-01-22

Family

ID=65109633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820961185.6U Expired - Fee Related CN208415118U (en) 2018-06-21 2018-06-21 A kind of Hanging Basket assembled protection structure

Country Status (1)

Country Link
CN (1) CN208415118U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114277669A (en) * 2021-10-08 2022-04-05 广东冠粤路桥有限公司 Anti-collision and anti-corrosion device for bridge pier column and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114277669A (en) * 2021-10-08 2022-04-05 广东冠粤路桥有限公司 Anti-collision and anti-corrosion device for bridge pier column and construction method thereof
CN114277669B (en) * 2021-10-08 2023-11-24 广东冠粤路桥有限公司 Anti-collision and anti-corrosion device for bridge pier column and construction method thereof

Similar Documents

Publication Publication Date Title
CN208415118U (en) A kind of Hanging Basket assembled protection structure
CN201184058Y (en) Protection shed for construction work site
CN209637286U (en) A kind of detachable recovery type distribution box cabinet protection canopy
CN106077518A (en) For wind power hub high-strength combination energy saver
CN208202796U (en) A kind of construction foundation pit stress guardrail being easily installed disassembly
CN206082786U (en) Leaf processor is used in gardens
CN208456278U (en) A kind of garden layout protective fence
CN208310302U (en) A kind of new reinforcing steel bar processing protection canopy
CN207452685U (en) A kind of bridge with embedded climbing structures
CN206359210U (en) A kind of processing of steel construction is with stablizing lowering or hoisting gear
CN206346332U (en) A kind of replaceable armored concrete mixing shear wall in damaged position
CN212526594U (en) Umbrella-shaped fire receiving plate
CN204960273U (en) Protection handling frame instrument formula steel platform in elevartor shaft
CN204038917U (en) Detachable external hanging type operating platform
CN106495061A (en) Stable lifting device for steel structure machining
CN205967303U (en) Be used for wind power hub high strength combination economizer
CN208329867U (en) A kind of protective net for site operation power supply box
CN208931930U (en) A kind of high-strength fire-retardant fire-retarded corrugated paper case
CN206397253U (en) A kind of builder's temporary shed for building of lightweight steel construction
CN202970717U (en) Auxiliary hanging scaffold for sheath wall
CN207176888U (en) One kind is used for the anticlogging drainage manhole cover in sponge city
CN207829591U (en) A kind of electric fence
CN203238975U (en) Steel structure building protection net
CN208009924U (en) A kind of construction protective device
CN207552996U (en) Detachable movable guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122