CN208202093U - Terrazzo floor waste pulp are collected and regeneration application system - Google Patents

Terrazzo floor waste pulp are collected and regeneration application system Download PDF

Info

Publication number
CN208202093U
CN208202093U CN201820781451.7U CN201820781451U CN208202093U CN 208202093 U CN208202093 U CN 208202093U CN 201820781451 U CN201820781451 U CN 201820781451U CN 208202093 U CN208202093 U CN 208202093U
Authority
CN
China
Prior art keywords
water
intermediate pool
tank
primary sedimentation
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820781451.7U
Other languages
Chinese (zh)
Inventor
徐建华
程亮
余政兵
刘璐
杜玉荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING CONSTRUCTION ENGINEERING FOURTH CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING CONSTRUCTION ENGINEERING FOURTH CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION ENGINEERING FOURTH CONSTRUCTION Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING CONSTRUCTION ENGINEERING FOURTH CONSTRUCTION Co Ltd
Priority to CN201820781451.7U priority Critical patent/CN208202093U/en
Application granted granted Critical
Publication of CN208202093U publication Critical patent/CN208202093U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a kind of collection of terrazzo floor waste pulp and regeneration application systems, including water supplying pipe, drainpipe and storage pool, the storage pool includes the primary sedimentation tank, intermediate pool and reuse tank being sequentially connected, it is equipped with a first filter stand in primary sedimentation tank, is detachably provided with filter bag on first filter stand;High water level liquid-level switch and low water level liquid-level switch are additionally provided in reuse tank;The high water level liquid-level switch and low water level liquid-level switch are connected with water supply pump and water supply electromagnetic valve simultaneously.The utility model structure is simple, easy for construction, can change the size of storage pool at any time as needed, and rubbish separation is rapidly carried out, and fast implement pulp-water separation, to improve the separative efficiency of pulp-water, make the regeneration utilization rate of waste water faster, higher, while the exclusion for waste pulp of being more convenient for;To effectively improve environment protecting, engineering cost is reduced.

Description

Terrazzo floor waste pulp are collected and regeneration application system
Technical field
It collects the utility model relates to technical field of building construction more particularly to a kind of terrazzo floor waste pulp and makes profits again Use system.
Background technique
In building construction process, to reduce engineering cost, disposal of pollutants is reduced, improves environment protecting, it all can be to construction The waste pulp etc. generated in the process are recycled, are stored, are handled and carry out regeneration as far as possible.Current waste pulp recycling is main It is collected by diversion pipe, then the waste pulp being collected into is unifiedly stored in a large-scale storage pool, stood to waste pulp After layering, the water on upper layer is reused, and the slurry of downside is excluded.But such structure, cannot to compared with Big rubbish (such as stone, stone) is screened out, to be easy to cause larger rubbish to be deposited in the bottom of pond of storage pool, and not It easily excludes, be easy to cause the rubbish in storage more and more after long-time service, causing the volume of storage pool to reduce influences waste pulp It excludes;Meanwhile pulp-water is separated by the way of standing, the time is longer, and efficiency is slower, cannot fast and effeciently carry out pulp-water point From effectively wastewater reuse cannot be got up.Also, existing storage pool needs are made very big, not only construct in this way It is very troublesome, and construction cost is also higher.
Utility model content
In view of the above shortcomings of the prior art, the purpose of this utility model is to provide a kind of terrazzo floor waste pulp Collection and regeneration application system, structure is simple, easy for construction, can change the size of storage pool at any time as needed, and quickly Ground carries out rubbish separation, and fast implements pulp-water separation, to improve the separative efficiency of pulp-water, makes the regeneration utilization rate of waste water more Fastly, higher, while the exclusion for waste pulp of being more convenient for;To effectively improve environment protecting, engineering cost is reduced.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is such that a kind of terrazzo floor Waste pulp are collected and regeneration application system, including water supplying pipe, drainpipe and storage pool, the water supplying pipe and several water supply branch pipes It is connected, drainpipe is connected with several waste water aqueducts;It is characterized by: the storage pool include the primary sedimentation tank being sequentially connected, in Between pond and reuse tank, wherein the intermediate pool be at least one;The primary sedimentation tank is close to the side of intermediate pool, intermediate pool Opposite sides and reuse tank offer gap, primary sedimentation tank, intermediate pool close to the top of the corresponding position of the side of intermediate pool And reuse tank be sequentially connected by gap it is logical;
A first filter stand is equipped in primary sedimentation tank, the just filter stand is located at below the discharge ends of drainpipe, can on first filter stand Disassembly is provided with filter bag, and the waste water of drainpipe discharge can flow into the filter bag;Opening position between primary sedimentation tank and intermediate pool, The opening position between opening position and intermediate pool and reuse tank between intermediate pool and intermediate pool is equipped with filter baffle;
A dredge pump is respectively equipped in the bottom of primary sedimentation tank, intermediate pool and reuse tank;It is equipped with and gives at the middle part of reuse tank Water pump, the feed pump are connected with the water inlet end of water supplying pipe, and the water inlet end of the water supplying pipe is also connected with running water pipe, in running water pipe It is equipped with water supply electromagnetic valve;High water level liquid-level switch and low water level liquid-level switch, and the low water level are additionally provided in reuse tank Liquid-level switch is located at the top of feed pump;The high water level liquid-level switch and low water level liquid-level switch simultaneously with water supply pump and confession Water solenoid valve is connected.
Further, the just filter stand includes upper locating rack, bottom bracket and four supporting legs, the upper locating rack and branch The upper end of support leg is connected, and bottom bracket is connected with support midleg;Filter bag location structure is equipped on upper locating rack.
Further, between the primary sedimentation tank and intermediate pool, between intermediate pool and intermediate pool and intermediate pool and reuse tank Between be bolted to connection, the filter baffle is pressed between primary sedimentation tank and intermediate pool respectively, intermediate pool and intermediate pool Between and intermediate pool and reuse tank between;It is respectively arranged with gasket in the two sides of filter baffle, the gasket will filter baffle Opposite sides and downside and primary sedimentation tank, intermediate pool and reuse tank between gap closing.
Further, it is equipped with backing plate below storage pool, is respectively equipped with branch baffle, and the supporting and retaining system in the surrounding of storage pool Plate is fixed together with backing plate;It is equipped on the outside of the branch baffle on the outside of intermediate pool side and its adjacent two sides in primary sedimentation tank Draining grid, is equipped with Water tank below draining grid, which is connected by backflash with primary sedimentation tank.
Further, the primary sedimentation tank, intermediate pool and reuse tank are glass steel material.
Compared with prior art, the utility model has the advantages that
1. structure is simple, storage pool is connected by primary sedimentation tank, intermediate pool and reuse tank to be constituted, and primary sedimentation tank, intermediate pool with And reuse tank is bolted, to keep the construction of storage pool more convenient;Also, it is selected as needed by multiple intermediate pools It is connected, can satisfy the storage demand of different waste pulp, to make the more adaptable of entire storage pool.
2, just filter stand is set in primary sedimentation tank, and filter bag is set on first filter stand, can by biggish rubbish (such as stone, Stone) etc. filtered out, so that biggish rubbish be avoided to occupy the space of primary sedimentation tank, and influence the exclusion of waste pulp.
3, slurries are flowed by the way of overflow in primary sedimentation tank, intermediate pool and reuse tank, so as to carry out step by step Except slurry, top more clear water releases dynamic backward for sedimentation;And under the action of filtering baffle, the flow velocity of slurries had both been reduced, Again can component the slurry in slurries is filtered out, to realize the dynamic filtration of waste pulp, substantially reduce the separation of pulp-water Time improves the separative efficiency of pulp-water, is capable of the use of effectively save tap water, reduces Construction Cost.
4, by the cooperation of high water level liquid-level switch and low water level liquid-level switch realize water supply pump and water supply electromagnetic valve from Dynamic switch-mode regulation, it is more intelligent so as to make entirely to supply water, also, effectively improve waste water reclamation utilization efficiency.
Detailed description of the invention
Fig. 1 is the top view of storage pool in the utility model.
Fig. 2 is the side view of Fig. 1.
In figure: 1-drainpipe, 21-primary sedimentation tanks, 22-intermediate pools, 23-reuse tanks, 3-first filter stands, 4-filter bags, 5- Filter baffle, 6-high water level liquid-level switches, 7-low water level liquid-level switches, 8-backing plates, 9-branch baffles, 10-draining grids, 11-Water tanks, 12-backflashes.
Specific embodiment
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail.
Embodiment: referring to Fig. 1, Fig. 2, a kind of terrazzo floor waste pulp are collected and regeneration application system, including water supplying pipe, row Water pipe 1 and storage pool, the water supplying pipe are connected with several water supply branch pipes, and drainpipe 1 is connected with several waste water aqueducts;Peace When dress, plasma discharge hole is opened up in floor plates, then waste water aqueduct is inserted into the plasma discharge hole, to realize the collection of waste pulp. The storage pool includes the primary sedimentation tank 21, intermediate pool 22 and reuse tank 23 being sequentially connected, wherein the intermediate pool 22 is at least One.The primary sedimentation tank 21 is close to the side of intermediate pool 22, the opposite sides of intermediate pool 22 and reuse tank 23 close to intermediate pool The top of the corresponding position of 22 side offers gap, primary sedimentation tank 21, intermediate pool 22 and reuse tank 23 by gap according to It is secondary to be connected.When it is implemented, the primary sedimentation tank 21, intermediate pool 22 and reuse tank 23 are glass steel material;To significantly Reduce the weight of storage pool, the dismounting for storage pool of being more convenient in this way;Meanwhile using glass steel material, it is more advantageous to through storage In pond the case where waste pulp, in order to carry out the operations such as plasma discharge in time.Wherein, storage pool by primary sedimentation tank 21, intermediate pool 22 and returns It is connected with pond 23 and is constituted, and primary sedimentation tank 21, intermediate pool 22 and reuse tank 23 are bolted, to makes the construction of storage pool It is more convenient;Also, multiple intermediate pools 22 are connected by selection as needed, can satisfy the storage demand of different waste pulp, thus Make the more adaptable of entire storage pool.
A first filter stand 3 is equipped in primary sedimentation tank 21, the just filter stand 3 is located at below the discharge ends of drainpipe 1, in first filter stand Filter bag 4 is detachably provided on 3, the waste water that drainpipe 1 is discharged can flow into the filter bag 4, wherein the filter bag 4 is using extremely It is less the filter bag 4 of 40 mesh, so as to preferably filter out larger rubbish.During actual processing, the just filter stand 3 includes upper fixed Position frame, bottom bracket and four supporting legs, the upper locating rack are connected with the upper end of supporting leg, bottom bracket and support midleg It is connected;4 location structure of filter bag (such as trunnion, hook) is equipped on upper locating rack;In such manner, it is possible to easily by biggish rubbish It is filtered out, it, can be by replacing filter bag 4, to continue to filter out larger rubbish when larger garbage collection is more;It avoids biggish Rubbish occupies the space of primary sedimentation tank 21, and influences the exclusion of waste pulp.
When intermediate pool 22 is multiple, opening position, intermediate pool 22 and intermediate pool between primary sedimentation tank 21 and intermediate pool 22 The opening position between opening position and intermediate pool 22 and reuse tank 23 between 22 is equipped with filter baffle 5.Wherein, described just heavy Pass through bolt between pond 21 and intermediate pool 22, between intermediate pool 22 and intermediate pool 22 and between intermediate pool 22 and reuse tank 23 Be fixedly connected, the filter baffle 5 is pressed on respectively between primary sedimentation tank 21 and intermediate pool 22, between intermediate pool 22 and intermediate pool 22 with And between intermediate pool 22 and reuse tank 23.When it is implemented, the mesh number of filter baffle 5 gradually increases from primary sedimentation tank 21 to reuse tank 23 Add, such as: filtering baffle 5 using 100 mesh between primary sedimentation tank 21 and intermediate pool 22, successively used between intermediate pool 22 and intermediate pool 22 200 mesh filter baffle 5,300 mesh filter baffle 5, using 400 mesh filter baffle 5 etc. between intermediate pool 22 and reuse tank 23;To preferably It carries out slurry to filter out, it is ensured that the waste water clarity in reuse tank 23 reaches recycling and requires.It is respectively set in the two sides of filter baffle 5 Have a gasket, the gasket by filter baffle 5 opposite sides and downside and primary sedimentation tank 21, intermediate pool 22 and reuse tank 23 it Between gap closing.In such manner, it is possible to prevent from causing slurries leakage etc., and convenient for the replacement of filter baffle 5.
A dredge pump is respectively equipped in the bottom of primary sedimentation tank 21, intermediate pool 22 and reuse tank 23.In reuse tank 23 Portion is equipped with feed pump, which is connected with the water inlet end of water supplying pipe, and the water inlet end of the water supplying pipe is also connected with running water pipe, Running water pipe is equipped with water supply electromagnetic valve.High water level liquid-level switch 6 and low water level liquid-level switch 7 are additionally provided in reuse tank 23, And the low water level liquid-level switch 7 is located at the top of feed pump;The high water level liquid-level switch 6 and low water level liquid-level switch 7 are equal It is connected simultaneously with water supply pump and water supply electromagnetic valve.It is realized and is supplied by the cooperation of high water level liquid-level switch 6 and low water level liquid-level switch 7 The automatic switch of water pump and water supply electromagnetic valve is adjusted, it may be assumed that when water level reaches the high water level of setting in (waste water) reuse tank 23, only Stone mill is wanted to work, high water level liquid-level switch 6 issues signal, automatic to start feed pump and close tap water supply solenoid valve;When When water level reaches the lowest water level of setting, low water level liquid-level switch 7 issues signal, and water pump is automatically closed and opens tap water supply Solenoid valve;It is more intelligent to make entirely to supply water, also, effectively improve waste water reclamation utilization efficiency.
It is equipped with backing plate 8 below storage pool, is respectively equipped with branch baffle 9, and the branch baffle 9 and pad in the surrounding of storage pool Plate 8 is fixed together;To effectively fix the position of storage pool, the stability for separating slurries is more preferable.It sinks just Pond 21 is equipped with draining grid 10 on the outside of the branch baffle 9 on the outside of 22 side of intermediate pool and its adjacent two sides, in draining grid 10 Lower section is equipped with Water tank 11, which is connected by backflash 12 with primary sedimentation tank 21;When drainpipe 1 exclude waste pulp compared with It is more, using it is endless when, the slurries in primary sedimentation tank 21 can be extracted out, and be packed into have filtering function slurry bag in, then will Material strip is placed on draining grid 10, by the way that material strip to be slowly filtered;The waste water filtered out is through Water tank 11 and backflash 12 Into in primary sedimentation tank 21, to preferably carry out the recycling of waste pulp, cost is further saved.
In the utility model, slurries are flowed by the way of overflow in primary sedimentation tank 21, intermediate pool 22 and reuse tank 23, So as to carry out sedimentation step by step except slurry, top more clear water releases dynamic backward;And under the action of filtering baffle 5, both Reduce the flow velocity of slurries, but can component the slurry in slurries is filtered out, to realize the dynamic filtration of waste pulp, significantly The disengaging time for shortening pulp-water improves the separative efficiency of pulp-water, is capable of the use of effectively save tap water, reduces engineering and applies Work cost.
Finally, it should be noted that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application technology Scheme, those skilled in the art should understand that, those are modified to the technical solution of the utility model or are equal Replacement, without departing from the objective and range of the technical program, should all cover in the scope of the claims of the utility model.

Claims (5)

1. a kind of terrazzo floor waste pulp are collected and regeneration application system, including water supplying pipe, drainpipe and storage pool, described Water supplying pipe is connected with several water supply branch pipes, and drainpipe is connected with several waste water aqueducts;It is characterized by: the storage pool includes Primary sedimentation tank, intermediate pool and the reuse tank being sequentially connected, wherein the intermediate pool is at least one;The primary sedimentation tank is in Between the side in pond, the opposite sides of intermediate pool and reuse tank opened up close to the top of the corresponding position of the side of intermediate pool There is gap, primary sedimentation tank, intermediate pool and reuse tank are sequentially connected logical by gap;
A first filter stand is equipped in primary sedimentation tank, the just filter stand is located at below the discharge ends of drainpipe, detachable on first filter stand It is provided with filter bag, the waste water of drainpipe discharge can flow into the filter bag;Opening position, centre between primary sedimentation tank and intermediate pool The opening position between opening position and intermediate pool and reuse tank between pond and intermediate pool is equipped with filter baffle;
A dredge pump is respectively equipped in the bottom of primary sedimentation tank, intermediate pool and reuse tank;It is equipped with feed pump at the middle part of reuse tank, The feed pump is connected with the water inlet end of water supplying pipe, and the water inlet end of the water supplying pipe is also connected with running water pipe, sets on running water pipe There is water supply electromagnetic valve;High water level liquid-level switch and low water level liquid-level switch, and the low water level liquid level are additionally provided in reuse tank Switch is located at the top of feed pump;The high water level liquid-level switch and low water level liquid-level switch are simultaneously with water supply pump and for water power Magnet valve is connected.
2. terrazzo floor waste pulp according to claim 1 are collected and regeneration application system, it is characterised in that: the initial filter Frame includes upper locating rack, bottom bracket and four supporting legs, and the upper locating rack is connected with the upper end of supporting leg, bottom bracket and branch Midleg is supportted to be connected;Filter bag location structure is equipped on upper locating rack.
3. terrazzo floor waste pulp according to claim 1 are collected and regeneration application system, it is characterised in that: described just heavy It is bolted to connection between pond and intermediate pool, between intermediate pool and intermediate pool and between intermediate pool and reuse tank, institute State filter baffle be pressed between primary sedimentation tank and intermediate pool respectively, between intermediate pool and intermediate pool and intermediate pool and reuse tank it Between;Be respectively arranged with gasket in the two sides of filter baffle, the gasket by filter baffle opposite sides and downside and primary sedimentation tank, Gap closing between intermediate pool and reuse tank.
4. terrazzo floor waste pulp according to claim 1 are collected and regeneration application system, it is characterised in that: in storage pool Lower section is equipped with backing plate, is respectively equipped with branch baffle in the surrounding of storage pool, and the branch baffle is fixed together with backing plate;? Primary sedimentation tank is equipped with draining grid on the outside of the branch baffle on the outside of intermediate pool side and its adjacent two sides, sets below draining grid There is Water tank, which is connected by backflash with primary sedimentation tank.
5. terrazzo floor waste pulp according to claim 1 are collected and regeneration application system, it is characterised in that: described just heavy Pond, intermediate pool and reuse tank are glass steel material.
CN201820781451.7U 2018-05-24 2018-05-24 Terrazzo floor waste pulp are collected and regeneration application system Expired - Fee Related CN208202093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820781451.7U CN208202093U (en) 2018-05-24 2018-05-24 Terrazzo floor waste pulp are collected and regeneration application system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820781451.7U CN208202093U (en) 2018-05-24 2018-05-24 Terrazzo floor waste pulp are collected and regeneration application system

Publications (1)

Publication Number Publication Date
CN208202093U true CN208202093U (en) 2018-12-07

Family

ID=64516259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820781451.7U Expired - Fee Related CN208202093U (en) 2018-05-24 2018-05-24 Terrazzo floor waste pulp are collected and regeneration application system

Country Status (1)

Country Link
CN (1) CN208202093U (en)

Similar Documents

Publication Publication Date Title
CN102505728A (en) Complete technology for resource utilization of rainwater
CN205222960U (en) Residence community rainwater processing system
CN102247728A (en) First rain treatment system
CN101708387B (en) Method for dynamically backwashing dirt separator by using continuous flow
CN2897388Y (en) Cross-current vortex solid-liquid separator
CN203904082U (en) Efficient and environment-friendly sewage treatment system
CN208202093U (en) Terrazzo floor waste pulp are collected and regeneration application system
CN111535516A (en) Roof rainwater purification treatment system and method
CN204196865U (en) A kind of building ground environmental protection and energy saving build-up type automatic car washing equipment
CN110585796A (en) Pretreatment device for recycling release agent wastewater
CN206278983U (en) A kind of controllable biotechnology effluent treatment plant
CN213204372U (en) Ecological device that utilizes of little ecological filter bed rainwater
CN103771668B (en) A kind of urban drainage pipe network sewage separation treatment system
CN209362031U (en) A kind of textile sewage treatment system
CN204973191U (en) Continuous szyrt filter equipment of many bins of multistage water distribution
CN217679392U (en) Micropower machine-room-free rainwater recycling system
CN204973298U (en) Washing chamber's wastewater recovery processing system
CN111359283A (en) Anti-blocking intercepting type sewage treatment device and working method
CN110038338A (en) A kind of the river Multistage filtering device and method of Intelligent pollution discharge
CN211799248U (en) Be applied to renewable energy's effluent treatment plant
CN204671959U (en) Sewage disposal distribution reservoir is from flushing type filtration
CN203700106U (en) Sewage treatment tank
CN212200572U (en) Municipal afforestation plumbing water saving fixtures
CN217053713U (en) Broken grid-type sewage lifting device
CN219773143U (en) Inspection shaft of domestic sewage collection pipe network

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207