CN208201925U - prefabricated rainwater inspection well - Google Patents

prefabricated rainwater inspection well Download PDF

Info

Publication number
CN208201925U
CN208201925U CN201820341702.XU CN201820341702U CN208201925U CN 208201925 U CN208201925 U CN 208201925U CN 201820341702 U CN201820341702 U CN 201820341702U CN 208201925 U CN208201925 U CN 208201925U
Authority
CN
China
Prior art keywords
well
well body
prefabricated
rainwater inspection
square hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820341702.XU
Other languages
Chinese (zh)
Inventor
黄轶
黄菊华
张婷婷
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd filed Critical WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201820341702.XU priority Critical patent/CN208201925U/en
Application granted granted Critical
Publication of CN208201925U publication Critical patent/CN208201925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to town roads to drain field, and in particular to a kind of prefabricated rainwater inspection well is it is characterized by: it includes the prefabricated lower part well body of armored concrete, top well body and assembled plate;The lower part well body is upper opening lower part square tubular with the end, and lower well body sidewall lower part offers inlet and outlet;The assembly plate covers in the well body of lower part, and connection square hole is offered on assembled plate;The top well body is the square tubular that top and the bottom are open, and well head size and the connection square hole of the top well body match, and is placed on right above connection square hole.Armored concrete is prefabricated, and batch production batch is prefabricated, and sound construction is reliable, can be protected from weather influences and the limitation of civil construction and site condition.

Description

Prefabricated rainwater inspection well
Technical field
The utility model relates to town roads to drain field, and in particular to a kind of prefabricated rainwater inspection well.
Background technique
With the progress and development of domestic highway construction theory, to the shadow of surrounding enviroment during road construction and after being completed The considerations of being gradually included in owner and designer range is rung, environmental requirement is just being increasingly subject to people's attention.
Rainwater inspection well is located at drainage pipeline intersection, turning, caliber or gradient change, at drop etc., in order to Convenient for inspecting periodically, cleaning and dredge or the well shape structures of down-hole operation inspection, generally plastics integrated injection molding form or Person is brick to be formed.
In recent years, road inspection well design in China's was all using cement calcine-free brick masonry, and cement umburned brick is generally internal It is loose, compression strength is low, service life is short, after the several years, borehole wall masonry will be destroyed, so as to cause well periphery road surface Cracking sinks, and seriously affects pavement usage.In addition, not only process is various but also easy to leak for cement calcine-free brick masonry inspection shaft, no But the time-consuming protection being also unfavorable for simultaneously to groundwater resources of work consuming.
Utility model content
In view of the above technical problems, the purpose of this utility model is to provide a kind of prefabricated rainwater inspection well, reinforced concretes Soil is prefabricated, and batch production batch is prefabricated, and sound construction is reliable, can be protected from weather influences and the limit of civil construction and site condition System.
To achieve the above object, technical solution adopted in the utility model is:
A kind of prefabricated rainwater inspection well, it is characterised in that: it includes the prefabricated lower part well body of armored concrete, top well body With assembled plate;The lower part well body is upper opening lower part square tubular with the end, and lower well body sidewall lower part offers water inlet And water outlet;The assembly plate covers in the well body of lower part, and connection square hole is offered on assembled plate;The top well body is top and the bottom The square tubular being open, well head size and the connection square hole of the top well body match, and be placed on connection square hole just on Side.
It is tightly connected by viscose between the assembly plate and lower part well body and top well body.
The lower part well body is divided into well bore and well seat two parts up and down;Bottom, top are arranged at the well seat upper opening lower part Opening is equipped with groove;The well bore is open up and down, and its underpart is fallen in the groove on well seat top;The water inlet and water outlet Mouth is all located on well seat.
It is tightly connected by viscose between the well bore and well seat.
The inlet and outlet are designed with HDPE pipeline.
Steel ladder is equipped with inside the prefabricated rainwater inspection well.
The beneficial effects of the utility model are: the utility model is armored concrete precast construction, batch production batch is prefabricated, Sound construction is reliable, can be protected from weather influences and the limitation of civil construction and site condition.The utility model, which uses, to be divided Section is prefabricated and the structure that assembles, the bad primary prefabricated problem of very good solution superelevation inspection shaft, it is particularly suitable be more than The superelevation inspection shaft of 2.8M;And be tightly connected between segmentation by viscose, solve the seal leakage problem of interface.
Detailed description of the invention
Fig. 1 is the sectional schematic diagram of the utility model.
Detailed description of the invention: the lower part 1- well body;The top 2- well body;3- assembly plate;4- water inlet;5- water outlet;6-HDPE pipeline; 7- well seat;8- well bore;9- connection square hole.
Specific embodiment
The utility model in order to better understand does the technical solution of the utility model below with reference to embodiment and attached drawing Further instruction (as shown in Figure 1).
A kind of prefabricated rainwater inspection well, it includes the prefabricated lower part well body 1 of armored concrete, top well body 2 and assembled plate 3;The lower part well body 1 is upper opening lower part square tubular with the end, and well body 1 lower sidewall in lower part offers water inlet 4 and goes out The mouth of a river 5;The assembly plate 3 covers in lower part well body 1, offers connection square hole 9 on assembled plate 3;The top well body 2 is upper and lower The square tubular that portion is open, well head size and the connection square hole 9 of the top well body 2 match, and are placed on connection square hole 9 Surface.
It is tightly connected by viscose between the assembly plate 3 and lower part well body 1 and top well body 2.
The lower part well body 1 is divided to for about 7 two parts of well bore 8 and well seat;Bottom is arranged at the 7 upper opening lower part of well seat, (circumferential) groove is equipped at upper opening;About 8 well bore is open, and its underpart is fallen in the groove on 7 top of well seat;Institute It states water inlet 4 and water outlet 5 is all located on well seat 7.
It is tightly connected by viscose between the well bore 8 and well seat 7.
The water inlet 4 and water outlet 5 are designed with HDPE pipeline 6.
Steel ladder is equipped with inside the prefabricated rainwater inspection well.
Production requires: lower part well body 1, top well body 2 and assembled plate 3 it is prefabricated before, choose one piece of suitable prefabricated place, pour Concrete terrace is built as operation platform, completes Steel Reinforcing Bar Material, binding according to construction design drawing when reinforcement yard is prefabricated, reinforcing bar Processing binding is carried out by related reinforced concrete construction technical regulation.For the globality of stiffener, entire steel mesh is primary Property binding finish, the steel bar stress of shaft bottom and the borehole wall is as whole steel bar meter.
The installation of prefabricated rainwater inspection well: to shaft bottom cleaning, leveling before installation, it is poured 15cm thickness C15 concrete bed course;When installation Integral hoisting is in place.According to its material and design requirement, the height of the disposable prefabricated well body of producer is no more than 2.8M, therefore right It is more than 2.8M in well room height, it is prefabricated is all made of segmentation;Segmentation is then needed to be lifted when construction and installation.Then pipeline is carried out to apply Work, and encapsulation process is carried out to well casing linkage section.All inspection shafts are unified to install steel ladder before IMM algorithm, convenient for inspection Look into the maintenance of well.
It is described above be only the utility model Application Example, certainly cannot with this come limit the utility model it Interest field, therefore equivalence changes made according to the patent scope of the utility model, still belong to the protection scope of the utility model.

Claims (6)

1. a kind of prefabricated rainwater inspection well, it is characterised in that: it includes the prefabricated lower part well body (1) of armored concrete, top well Body (2) and assembled plate (3);The lower part well body (1) is upper opening lower part square tubular with the end, under lower part well body (1) side wall Portion offers water inlet (4) and water outlet (5);The assembly plate (3) is covered on lower part well body (1), is offered on assembled plate (3) Connection square hole (9);The top well body (2) is the square tubular that is open of top and the bottom, the well head size of the top well body (2) with Connection square hole (9) matches, and is placed on right above connection square hole (9).
2. prefabricated rainwater inspection well according to claim 1, it is characterised in that: the assembly plate (3) and lower part well body (1) It is tightly connected by viscose between top well body (2).
3. prefabricated rainwater inspection well according to claim 1 or 2, it is characterised in that: the lower part well body (1) is divided into well bore (8) and well seat (7) two parts up and down;Bottom is arranged at well seat (7) the upper opening lower part, is equipped with groove at upper opening;It is described Well bore (8) is open up and down, and its underpart is fallen in the groove on well seat (7) top;The water inlet (4) and water outlet (5) are all set On well seat (7).
4. prefabricated rainwater inspection well according to claim 3, it is characterised in that: between the well bore (8) and well seat (7) It is tightly connected by viscose.
5. prefabricated rainwater inspection well according to claim 1, it is characterised in that: the water inlet (4) and water outlet (5) are all Equipped with HDPE pipeline (6).
6. prefabricated rainwater inspection well according to claim 1, it is characterised in that: be equipped with inside the prefabricated rainwater inspection well Steel ladder.
CN201820341702.XU 2018-03-13 2018-03-13 prefabricated rainwater inspection well Expired - Fee Related CN208201925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820341702.XU CN208201925U (en) 2018-03-13 2018-03-13 prefabricated rainwater inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820341702.XU CN208201925U (en) 2018-03-13 2018-03-13 prefabricated rainwater inspection well

Publications (1)

Publication Number Publication Date
CN208201925U true CN208201925U (en) 2018-12-07

Family

ID=64527931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820341702.XU Expired - Fee Related CN208201925U (en) 2018-03-13 2018-03-13 prefabricated rainwater inspection well

Country Status (1)

Country Link
CN (1) CN208201925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706970A (en) * 2018-12-12 2019-05-03 金华电力设计院有限公司 A kind of prefabricated square cable active well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706970A (en) * 2018-12-12 2019-05-03 金华电力设计院有限公司 A kind of prefabricated square cable active well

Similar Documents

Publication Publication Date Title
CN101148884A (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN207268004U (en) Toilet leakage protective system
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN208201925U (en) prefabricated rainwater inspection well
CN102285003A (en) Production process of reinforced concrete pipeline with anti-corrosion inner lining
CN206956783U (en) A kind of assembling type device for detecting manhole
CN103343534A (en) Closed precipitation method for foundation pit construction
CN106400838B (en) A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method
CN203256886U (en) Inspection well for preventing sundries from overflowing
CN211395755U (en) Prefabricated square inspection shaft
CN108149775A (en) A kind of prefabricated Boosting pumping station of PE and its mounting process
CN108625404B (en) Basement waterproof leaking stoppage method based on grouting and internal and external dredging combination
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN203701145U (en) Underground pipe network inspection well concrete assembly
CN207998913U (en) Prefabricated sewage inspection well
CN206859091U (en) A kind of coarse-grained soil high-fill roadbed discharge structure
CN108842904A (en) A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction
CN104911999A (en) Construction method for deeply burying anchor
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN2509250Y (en) Integral one-time forming reinforced concrete manhole with climbing ladder
CN205576973U (en) Circular inspection shaft of prefabricated formula
CN203729323U (en) Precast concrete pipeline foundation
CN206545284U (en) A kind of subsided rest room
CN219364714U (en) Novel rainwater-proof well cover plate assembly for inspection and repair
CN219909020U (en) Prefabricated assembly type protection well for road occupation dewatering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

Termination date: 20190313