CN208201901U - Caisset for soft soil foundation sea wall - Google Patents

Caisset for soft soil foundation sea wall Download PDF

Info

Publication number
CN208201901U
CN208201901U CN201820652723.3U CN201820652723U CN208201901U CN 208201901 U CN208201901 U CN 208201901U CN 201820652723 U CN201820652723 U CN 201820652723U CN 208201901 U CN208201901 U CN 208201901U
Authority
CN
China
Prior art keywords
caisson
caisset
wall
water pipe
soft soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820652723.3U
Other languages
Chinese (zh)
Inventor
郝春玲
程传国
连娉婷
方欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Institute of Oceanography SOA
Original Assignee
Second Institute of Oceanography SOA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Institute of Oceanography SOA filed Critical Second Institute of Oceanography SOA
Priority to CN201820652723.3U priority Critical patent/CN208201901U/en
Application granted granted Critical
Publication of CN208201901U publication Critical patent/CN208201901U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Caisset for soft soil foundation sea wall, including caisson one, caisson two and retaining wall, form a structural units, caisson two is mounted on caisson one, wherein: caisson one and two one-piece casting of caisson, retaining wall is laid in the right side of caisson two, it is characterized in that, the top left side of the caisson two is equipped with water pump, the side of the water pump is connected with water pipe one and leads to through the country, the other side is connected with water pipe two and leads in caisson two, the water pipe two extends to the left bottom of caisson two, the bottom of the caisson two is equipped with ramp structure, cross bar is mounted on the top of ramp structure;The utility model has the beneficial effects that the utility model is designed using reasonable structure, using thin-wall caisson structure, make caisset unit and foundation soil similar density, to without basement process, directly build sea wall, reduce the cost of basement process, reduce sea wall differential settlement, is suitble to promote the use of.

Description

Caisset for soft soil foundation sea wall
Technical field
The present invention relates to a kind of caissets for soft soil foundation sea wall, belong to field of ocean engineering.
Background technique
Weak soil refers to that strand, lakes and marhshes, valley floor, the natural moisture content of river shoal deposition is high, void ratio is big, compressibility is high, shearing resistance The low fine grained soil of intensity.With natural moisture content is high, natural void ratio is big, compressibility is high, shearing strength is low, the coefficient of consolidation is small, Consolidation time length, high sensitivity, perturbation be big, bad hydraulic permeability, soil layer layered distribution are complicated, physico-mechanical properties phase between each layer The features such as difference is larger.
Sea wall is built on soft soil foundation, basement process generally occupies great amount of cost, takes considerable time.
Summary of the invention
The present invention overcomes problems of the existing technology, propose a kind of caisset for soft soil foundation sea wall, The present invention is designed using reasonable structure, and using thin-wall caisson structure, water-filling makes caisson by caisson adjusting water level in caisson The bulk density and foundation soil similar density of structural units, to directly build sea wall without basement process.
The specific technical solution of the present invention is as follows:
For the caisset of soft soil foundation sea wall, including cabinet and retaining wall, the cabinet is divided into caisson one, caisson Two, caisson two is located on caisson one, and retaining wall is laid in the right side of caisson two, which is characterized in that the top left of the caisson two Side is equipped with water pump, and the side of the water pump is connected with water pipe one and leads to through the country, and the other side is connected with water pipe two and leads to caisson two Interior, the water pipe two extends to the left bottom of caisson two, and the bottom of the caisson two is equipped with ramp structure, and cross bar is mounted on tiltedly The top of slope structure, the cross bar are equipped with the gas blow pipe of multiple inclinations to the left, and main air inlet pipe penetrates in caisson two simultaneously from outside It is connect with gas blow pipe;The water body of the caisson two of adjacent sea wall structure unit is connected, and every 5~10 structural units are by a water pump Control water level.
The top of the caisson two is also equipped with cover board, and anchor cable is mounted on the side of retaining wall, and the anchor cable is equipped with lock Chain is connect with cabinet, is additionally provided with hidden discount on the cover board.
Preferentially, the cabinet integrally uses armored concrete to pour into the caisson one as bottom surface unenclosed construction, The right hand top of two seal closure structure of caisson, caisson one is equipped with drainage hole.The water pipe two and water pipe one are heavy by being mounted on The limit sleeve of two wall surface of case is fixed.
Preferentially, the right side of the caisson two is additionally provided with maintenance ladder, and water pressure sensor is mounted under maintenance ladder Side.
Beneficial effects of the present invention: the present invention is designed using reasonable structure, using thin-wall caisson structure, makes caisset Unit and foundation soil similar density, to directly build sea wall without basement process, reduce the cost of basement process, subtract Shaohai dike differential settlement is suitble to promote the use of.
Detailed description of the invention
Fig. 1 is schematic diagram of the present invention for the caisset of soft soil foundation sea wall.
Specific embodiment
Embodiment 1
For the caisset of soft soil foundation sea wall, including cabinet and retaining wall 10, the cabinet be divided into caisson 1, Caisson 29, caisson 29 are located on caisson 1, and retaining wall 10 is laid in the right side of caisson 29, the effect of retaining wall 10 be by Soil blocks, and prevents the soil on right side from squeezing caisset;Caisson 29 and the arrangement of caisson 1 lay and form sea by the sea Dike, the bottom of caisson 29 are interconnected and have communicating pipe 21, and cabinet integrally uses armored concrete to pour, in which: caisson one 20 be bottom surface unenclosed construction, and such caisson 1 is just located on weak soil, inside be weak soil, 29 seal closure knot of caisson The right hand top of structure, caisson 1 is equipped with drainage hole 22, when caisson 29 is mounted on above caisson 1, in weak soil Water is extruded by pressure, is just discharged along drainage hole 22.
The top left side of caisson 29 is equipped with water pump 18, and the side of the water pump 18 is connected with water pipe 1 and leads to through the country, The other side is connected with water pipe 22 and leads in caisson 29, and the water pipe 22 extends to the left bottom of caisson 29, the water pipe 22 and water pipe 1 it is fixed by the limit sleeve 4 for being mounted on 29 wall surface of caisson, water pump 18 both can be from drawing water in the sea into caisson Two, and the water of caisson two can be drawn back in the sea, when being actuated for drawing water, water pipe is shaken in order to prevent, therefore using limit Set 4 is fixed, in use, only needing that seawater is pumped into caisson 29 using water pump 18, such 29 weight of caisson increases, Sea wall use can be done.
There is sludge inside caisson 29 in order to prevent, therefore the present invention is additionally provided with the structure cleaned to caisson inside, Specific as follows: the bottom of the caisson 29 is equipped with ramp structure 7, and cross bar 5 is mounted on the top of ramp structure 7, the cross bar 5 It is equipped with the gas blow pipe 6 of multiple inclinations to the left, main air inlet pipe 17 is penetrated in caisson 29 from outside and connect with gas blow pipe 6;When heavy It when case 29 needs to clean, is blown by main air inlet pipe 17 to gas blow pipe 6, the mud accumulated so just forms mud with water body Muddy water extraction is sent back in the sea by starting water pump 18, avoids silt from largely gathering in caisson 29, make caisson weight by slurry mixing Amount is excessively increased.
In addition, the top of the caisson 29 is also equipped with cover board 16, anchor cable 12 is mounted on the side of retaining wall 10, described Anchor cable 12 is equipped with chain 13 and connect with cabinet, is additionally provided with hidden discount 15 on the cover board 16.The effect of anchor cable 12 is to draw cabinet It is indefinite firmly to fix, it is prevented to be subjected to displacement, and the right side of caisson 29 is additionally provided with maintenance ladder 19.Water pressure sensor 8 is mounted on inspection The lower section for repairing ladder 19 determines the water level in caisson 29 for detecting water pressure, makes in caisson two water level in the range of design Interior, caisson meets soft base requirement for bearing capacity when high water level, and caisson density is not less than the density of foundation soil when low water level.It is using When, for the ease of the maintenance in caisson 29, by manually pulling hidden discount to pull open cover board 16, such staff can pass through The inside that maintenance ladder 19 enters caisson 29 is overhauled, and is climbed out of after the completion of maintenance, by manually pushing hidden discount 15 again will lid Plate 16 pushes closure to seal caisson 29.

Claims (4)

1. be used for the caisset of soft soil foundation sea wall, including cabinet and retaining wall (10), the cabinet be divided into caisson one (20), Caisson two (9), caisson two (9) are located on caisson one (20), and retaining wall (10) is laid in the right side of caisson two (9), and feature exists In the top left side of the caisson two (9) is equipped with water pump (18), and it is logical that the side of the water pump (18) is connected with water pipe one (1) To through the country, the other side is connected with water pipe two (2) and leads in caisson two (9), and the water pipe two (2) extends to a left side for caisson two (9) The bottom of side bottom, the caisson two (9) is equipped with ramp structure (7), and cross bar (5) is mounted on the top of ramp structure (7), described Cross bar (5) is equipped with multiple inclination gas blow pipes (6) to the left, main air inlet pipe (17) penetrated in caisson two (9) from outside and with blow Tracheae (6) connection;
It is also equipped at the top of the caisson two (9) cover board (16), anchor cable (12) is mounted on the side of retaining wall (10), the anchor Rope (12) is equipped with chain (13) and connect with cabinet, is additionally provided with hidden discount (15) on the cover board (16).
2. being used for the caisset of soft soil foundation sea wall as described in claim 1, which is characterized in that the cabinet integrally uses Armored concrete pours, in which: caisson one (20) is bottom surface unenclosed construction, caisson two (9) seal closure structure, caisson The right hand top of one (20) is equipped with drainage hole (22).
3. as described in claim 1 be used for soft soil foundation sea wall caisset, which is characterized in that the water pipe two (2) and Water pipe one (1) is fixed by the limit sleeve (4) for being mounted on caisson two (9) wall surface.
4. being used for the caisset of soft soil foundation sea wall as described in claim 1, which is characterized in that the caisson two (9) Right side is additionally provided with maintenance ladder (19), and water pressure sensor (8) is mounted on the lower section of maintenance ladder (19).
CN201820652723.3U 2018-05-03 2018-05-03 Caisset for soft soil foundation sea wall Expired - Fee Related CN208201901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820652723.3U CN208201901U (en) 2018-05-03 2018-05-03 Caisset for soft soil foundation sea wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820652723.3U CN208201901U (en) 2018-05-03 2018-05-03 Caisset for soft soil foundation sea wall

Publications (1)

Publication Number Publication Date
CN208201901U true CN208201901U (en) 2018-12-07

Family

ID=64521820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820652723.3U Expired - Fee Related CN208201901U (en) 2018-05-03 2018-05-03 Caisset for soft soil foundation sea wall

Country Status (1)

Country Link
CN (1) CN208201901U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396757A (en) * 2018-05-03 2018-08-14 国家海洋局第二海洋研究所 Caisset for soft soil foundation sea wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396757A (en) * 2018-05-03 2018-08-14 国家海洋局第二海洋研究所 Caisset for soft soil foundation sea wall

Similar Documents

Publication Publication Date Title
CN102817354A (en) Method for dredging soft foundation by dredger fill and reinforcement
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN104395530B (en) Suction type spud leg, marine caisson and bottom-sitting type offshore platform
CN109763479A (en) A kind of supercharged vacuum flexibility pipe well Yield rainfall relation system and its construction method
CN208201901U (en) Caisset for soft soil foundation sea wall
CN107794954A (en) A kind of anti-floating sluicing pressure relief
CN213086883U (en) Buoyancy control structure of underground building
CN108396757A (en) Caisset for soft soil foundation sea wall
CN104452734B (en) Rapid soft foundation separation preloading method
CN111501950A (en) Drainage system for logistics transportation of underground pipe gallery
CN2799674Y (en) Channel deposits cleaning apparatus
CN207452925U (en) Base pit dewatering device and base pit dewatering system
CN100336985C (en) River channel silt cleaning method and equipment thereof
CN216765832U (en) In-situ consolidation treatment device for large-diameter vacuum pipe well of municipal domestic sludge
CN105498351B (en) Cast-in-situ bored pile mud sediment filter and its construction method
CN1584220A (en) Composite foundation comprehensive treatment with self anchored vacuum compact rigid piles
CN212001021U (en) Soft soil foundation reinforcing structure in dredger fill area
CN208395840U (en) A kind of preventative water draw-off of basement sump
CN102400451B (en) Gravity geotextile pipe mud grouting device
CN214245858U (en) Anti-floating drainage structure for underground structure
CN1080796C (en) Construction method for building dyke by utilizing sand bag
CN210194700U (en) Basement drainage anti-floating structure
CN205917684U (en) Integral type well dotted calandria
CN204343281U (en) The horizontal pumped vacuum systems of soft foundation quick separating preloading
CN219298275U (en) Multi-functional infiltration line observation well of heavy-calibre deep hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

Termination date: 20200503