CN204343281U - The horizontal pumped vacuum systems of soft foundation quick separating preloading - Google Patents

The horizontal pumped vacuum systems of soft foundation quick separating preloading Download PDF

Info

Publication number
CN204343281U
CN204343281U CN201420669908.7U CN201420669908U CN204343281U CN 204343281 U CN204343281 U CN 204343281U CN 201420669908 U CN201420669908 U CN 201420669908U CN 204343281 U CN204343281 U CN 204343281U
Authority
CN
China
Prior art keywords
pipe well
vacuum
pipe
horizontal
control end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420669908.7U
Other languages
Chinese (zh)
Inventor
叶吉
叶凝雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420669908.7U priority Critical patent/CN204343281U/en
Application granted granted Critical
Publication of CN204343281U publication Critical patent/CN204343281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading, it comprises the pipe well of network arrangement, one section of conical bottom is set bottom pipe well, then at pipe well mouth, control end (2) is installed, control end periphery middle part arranges multiple vacuum connection tube (2.9), the vacuum-pumping tube (2.4) of multiple pipe well jointly connects one and vacuumizes house steward, vacuumizes house steward and connects external vacuum pump; Lower floor's geotextiles (3), horizontal drainage pipeline (5), upper strata geotextiles (6) and diaphragm seal (7) successively on the soil body at tubes welding place, the vacuum connection tube (2.9) of each integrated pipe well is coupled together by horizontal drainage pipeline (5) and forms loop.The utility model can not only accelerate soil body consolidation in consolidation process process, and the soil property being applicable to coefficient of permeability K≤0.1m/d is as the soil layer of the hypotonicities such as very soft sill clay, for the soil property vacuum pre-press reinforcing of hypotonicity provides effective measures.

Description

The horizontal pumped vacuum systems of soft foundation quick separating preloading
Technical field
The utility model relates to a kind of soft foundation quick separating preloading, belongs to foundation treatment technology field.
Background technology
At present, vacuum preloading and preloading combined vacuum ground preloading processing method are all taked to normal consolidation, the saturated soil of owing consolidation and overconsolidation, wherein:
Vacuum method is by needing to insert vertical plastic draining board in soil mass consolidation, sand cushion is laid on top layer, plastic draining board connects horizontal drainage pipeline, lay a series of construction technologies such as diaphragm seal, by vacuum pump and the horizontal drainage pipeline be embedded in bed course, air under film between the soil body is extracted out, forms vacuum, make soil body draining and densification; The method utilizes the pressure reduction in vacuum between soil body bed course and plastic draining board, Free water generation seepage flow in the soil body, its essence is when total stress is substantially constant, pore water pressure is reduced, effective stress reduces, and soil strength realizes waiting in consolidation process.Because pore water pressure is spheric stress, therefore when vacuum prepressing reinforcement soft soil, the soil body is consolidation under isotropic consolidation pressure.
Preloading combined vacuum preloading method is then form in the methods combining piling prepressing method of above-mentioned vacuum preloading, and its method is after vacuum preloading under-membrance vacuum degree is stable, by the technological requirement of piling prepressing, and preloading on diaphragm seal.In work progress, for preventing diaphragm seal from damaging, effective safeguard procedures need be taked on diaphragm seal.Vacuum-surcharge preloading preloading its essence is at one time, and under the vacuum of the soil body under diaphragm seal and the preloading synergy on film, discharged by the moisture in the soil body, impel soil solidifying, intensity increases.When preloading, by ballast, the pressure in the soil body increases, and in the soil body, pressure reduction increases, and accelerate the discharge of water in the soil body, increase the consolidation rate of the soil body, the intensity of the soil body is improved further, and sedimentation is eliminated further.
But in engineering practice, because new hydraulically filled sludge belongs to three high and one low soil property, people, machine all cannot enter, therefore lay sand cushion just cannot realize, and cannot place mat sand cushion, to vacuum preloading technique, horizontal drainage passage just cannot realize, and ground preloading just cannot reach degree of consolidation and the degree of consolidation of designing requirement.Even if take the methods such as place mat chaste tree fragrant plant to make it place mat sand cushion, but cost is high, long in time limit.
For the geology of interlayer soil, particularly under the geological conditions such as skerry, shell, implement vacuum preloading, clay need be set at reinforcing area periphery and stir envelope wall, ensure the vacuum pressure needing reinforcing area to vacuumize period, because its under-membrance vacuum degree need be stabilized in more than 80KPa during vacuum preloading, vacuum is higher, and equivalent load is larger, and consolidation effect is better.Owing to requiring high to vacuum seal, therefore cost is high, long in time limit.
In sum; Vacuum preloading for soft foundations such as new hydraulically filled sludges, not only constructional difficulties, and cost is high, long in time limit, careless slightly, even unsuccessfully.Even if take the method for combined vacuum and surcharge preloading, because its vacuum preloading exists hidden danger, the also failure with the failure of vacuum preloading of its effect.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, there is provided a kind of and adopt water-gas separation integrated tube well substituted for plastic band drain precipitating, pre-pressing method, without the need to the horizontal sand cushion of place mat, every reinforcing technique index of design can be reached, be applicable to again the ground preloading of interlayer soil, and the horizontal pumped vacuum systems of soft foundation quick separating preloading without the need to adopting clay stirring envelope wall just can meet technique of soft soil foundation treatment index request.
The purpose of this utility model is achieved in that
The horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading, it comprises the pipe well of network arrangement, in pipe well, submersible pump is set, then at pipe well mouth, control end is installed, control end periphery middle part arranges multiple vacuum connection tube, lower floor's geotextiles successively on the soil body at tubes welding place, horizontal drainage pipeline, upper strata geotextiles and diaphragm seal, in the press mold ditch bottom of trench of diaphragm seal periphery press-in tubes welding periphery, the vacuum connection tube of each integrated pipe well is coupled together by horizontal drainage pipeline and forms loop, vacuum meter is buried underground under diaphragm seal, diaphragm seal arranges sedimentation mark, precompressed region periphery horizontal displacement observation instrument.
Preferred as one, control end comprises control end mounting pipe, the top of control end mounting pipe arranges cover plate, cover plate is arranged gutter, vacuum-pumping tube, cable submersible pump static line poling and aqueous vapor separation adjusting pipe that up/down perforation is arranged, aqueous vapor separation adjusting pipe is provided with control valve, and the top of aqueous vapor separation adjusting pipe is provided with vacuum meter.
Preferred as one, one section of conical bottom is set bottom pipe well.
Preferred as one, pipe well periphery arranges many reinforcing ribs, arranges filter screen outside reinforcing rib, pours into medium coarse sand between filter screen and pipe well.
Preferred as one, the vacuum-pumping tube of multiple pipe well jointly connects one and vacuumizes house steward, vacuumizes house steward and connects external vacuum pump.
Compared with prior art, the beneficial effects of the utility model are:
1, with pipe belt band, thoroughly settlement after construction and the uncontrollable difficulty of the rate of settling is solved
The vertical drainage passage of the plastic draining board foundation needed for traditional vacuum precompressed is substituted with pipe well, because pipe well diameter is much larger than plastic draining board, therefore its dewatering effect is better than plastic draining board, vacuumize the rear densification to soil body periphery and directly act on the soil body, its consolidation effect is greater than plastic draining board; After precompressed terminates, take to pipe well the method backfilling vibration compacting, noresidue drainage channel after consolidation process, efficiently solves because plastic draining board is retained in the settlement after construction and the uncontrollable problem of the rate of settling produced in the soil body.
2, with cloth for sand, reduce costs.
Traditional vacuum precompressed needs place mat 0.5m sand cushion to set up horizontal drainage passage and level vacuum pressure, and the utility model is by the integrated pipe well control end of beveled structure, periphery bonding in vacuum adopts ripple chimney filter to connect under several mouthfuls of integrated pipe well films, form vacuum pressure and horizontal drainage passage, unobstructed to vacuum of the level under film of ensure that, select to apply different vacuum pressures according to soil condition, the soil layer making it to meet the hypotonicity such as very soft sill clay, silty clay carries out consolidation process;
3, peripheral tube sealing substitutes and stirs envelope wall, reduces construction costs further.
The comparatively large and native consolidation process of interlayer to transmission coefficient, by arranging peripheral tube sealing, to ensure to need the groundwater table drop-out value in reinforcing area and vacuum, therefore without the need to arranging stirring envelope wall separately;
4, with well pile, a fado use, cost efficiency
When designing, can arrange tubes welding point according to construction requirements, after ground preloading completes, indwelling pipe well being made foundation pit dewatering, can be inserted the constructional materials such as sand, concrete when backfilling pipe well, to form pile body, can save a large amount of construction costs.
5, technological principle is different, and its consolidation effect is different
Traditional vacuum expection pressure adopts plastic draining board to connect vacuum pump by arm, supervisor, and under the condition forming pressure reduction, groundwater table generally declines at about 2m, and its underpart consolidation relies on hole change and reaches consolidation compaction; And the utility model adopts water-gas separation integrated tube well to utilize its waterpower to release restitution reason, groundwater table can be dropped to below 10m, by vacuumizing, set up vertical vacuum drainage passage, groundwater table can drawdown to 10 ~ 15m, and under this thickness soil body is in effective negative pressure of vacuum effect, the following soil body of this thickness, under the effect of overlying burden effect and pressure reduction, obtains further densification consolidation.
Therefore the horizontal pumped vacuum systems of this soft foundation quick separating preloading can not only accelerate soil body consolidation in consolidation process process, and the soil property being applicable to coefficient of permeability K≤0.1m/d is as the soil layer of the hypotonicities such as very soft sill clay, for the soil property vacuum pre-press reinforcing of hypotonicity provides effective measures.
Accompanying drawing explanation
Fig. 1 is the structural representation arranging conical bottom bottom pipe well of the present utility model.
Fig. 2 is the structural representation that pipe well of the present utility model periphery arranges reinforcing rib.
Fig. 3 is tubes welding structural representation of the present utility model (with double peripheral pipe well).
Fig. 4 is tubes welding structural representation of the present utility model (with single peripheral pipe well).
Fig. 5 is the structural representation that aqueous vapor of the present utility model is separated balance control end.
Fig. 6 of the present utility modelly sets up the structural representation that level vacuumizes network.
Wherein:
Pipe well 1, reinforcing rib 1.1, conical bottom 1.2, medium coarse sand 1.3, filter screen 1.4
Control end 2, control end mounting pipe 2.1, cover plate 2.2, gutter 2.3, vacuum-pumping tube 2.4, cable submersible pump static line poling 2.5, aqueous vapor separation adjusting pipe 2.6, control valve 2.7, vacuum meter 2.8, vacuum connection tube 2.9
Lower floor's geotextiles 3, press mold ditch 4, horizontal drainage pipeline 5, upper strata geotextiles 6, diaphragm seal 7.
Detailed description of the invention
The horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading that the utility model relates to, uses the method for this system to comprise following processing step:
Step one, water-gas separation integrated tube well are arranged
1.1, pipe well filter opening is set
Pipe well 1 can adopt PVC ripple chimney filter or other tubing, and the diameter of pipe well is 250mm or more than 250mm.Pipe well filter opening according to soil condition, can be arranged on the little soil layer of transmission coefficient by pipe well filter opening, to the good sandy soil of transmission coefficient, slity soil, shell soil property, does not arrange pipe well filter opening as far as possible.It is noted that owing to taking to arrange the method that aqueous vapor is separated control end in the aboveground portion of conventional tube, make traditional pipe well connect vacuum pump and form vacuum tube well, therefore pipe well filter opening maybe needs reinforcing thickness to determine according to soil condition simultaneously:
1.1.1, for shallow layer reinforcement (need reinforce thickness 4 ~ 6m scope, its pipe well filter opening is generally arranged on apart from the mouth of pipe 2 ~ below 3m):
1.1.2, for deep-layer reinforcing (need reinforce thickness 6 ~ 30m scope, then its pipe well filter opening is generally arranged on apart from below mouth of pipe 6m).
1.2, reinforcement pipe well is set
Transmission coefficient due to soft foundation is little and soil particle is small, therefore very easily pipe well film coating perfonnance is produced, then can tie up the materials such as the bamboo bar of 4 ~ 6 thick about 10cm or wooden stick at the periphery decile of pipe well as reinforcing rib 1.1 for such soil property, its effect increases pipe well to bury diameter; As the soil property larger to transmission coefficient, then can reinforcing rib be set.
1.3, pipe well embedded depth is determined and bottom setting
1.3.1, pipe well embedded depth: calculate pre-settling amount according to China's delaminating deposition, after the reinforcement depth of design and soil condition are determined, pipe well embedded depth=reinforcement depth-pre-settling amount.
As needed reinforcement depth to be 20m, calculate according to delaminating deposition and need reinforcing area total settlement to be 1.5m, then pipe well embedded depth is 18.5m.
As needed reinforcement depth to be 30m, calculate according to delaminating deposition and need reinforcing area total settlement to be 3.0m, then pipe well embedded depth is 27.0m.
1.3.2, arrange bottom pipe well: consider that this technique is during precompressed, water-gas separation integrated tube well, with needing the synchronous sedimentation of soil mass consolidation, is therefore provided with one section of conical bottom 1.2 bottom pipe well, to reduce the soil body resistance in pipe well infall process.
1.3.3, conical bottom 1.2 adopts PVC casting forming, and external diameter is greater than pipe well external diameter, connects conical bottom, then being sealed this junction, pipe well could be inserted the soil body, when constructing, noticing whether observe conical bottom comes off at the pipe well Shi Yuxian that buries bottom pipe well.As found to come off, reinstalling after pipe well must be extracted, burying after confirming sealing firmly.
1.4, deployment tube well pattern lattice
1.4.1, as new hydraulically filled sludge, only make shallow-layer (4 ~ 6m) consolidation process, then can adopt the artificial method injection pipe well inserted; In case of people, machine all cannot enter injection pipe well, then drilling equipment can be erected in special twin-hull pontoon, wellbore construction.
1.4.2, when designing tubes welding grid and pipe well embedded depth, can consider to build required foundation construction, pipe well needed for reserved excavation of foundation pit precipitation, after precompressed terminates, utilizes indwelling pipe well as foundation pit dewatering required during excavation of foundation pit; Because precompressed terminates the backfill of rear pipe well, therefore, during design, can consider that needed for infrastructure, pile foundation part pipe well is as Design of Foundation.
1.4.3, reinforcing area is being needed to be generally 5m × 10m or 5m × 5m according to geological conditions deployment tube well pattern lattice.Tubes welding comprises the layout of peripheral pipe well and the layout of internal layer pipe well.
1.4.3.1, peripheral pipe well: be arranged in and need reinforcing area periphery, peripheral pipe well well spacing 5m ~ 10m, its effect is as water proof sealing, to ensure to need not compress by the soil body that vacuumizes of peripheral water source and interlayer soil in reinforcing area.
1.4.3.2, internal layer pipe well: arrange according to geological conditions determination grid, can determine according to soil condition and groundwater table situation and vacuum during practice of construction.
1.4.3.3, the combination of peripheral pipe well and the integrated pipe well of internal layer, according to soil condition and reinforcing technique index should be needed, determine the parameter of arranging grid by test, and according to needing reinforcing area water level decreasing value and under-membrance vacuum degree to determine to arrange.
1.5, after pipe well inserts the soil body according to design, the unsettled submersible pump that is hung in each pipe well, submersible pump power adopts 0.75 ~ 2.2KW, submersible pump is hung in pipe well also fixing by rope, its constant depth is determined according to the drawdown of designing requirement, when drawdown needs 6m, then submersible pump hangs dark in about 6m; When drawdown needs 15m, then submersible pump hangs dark in about 15m.Connecting cable on submersible pump, cable is drawn control end by cable poling and is connected with outside power supply, and the outfall of submersible pump connects the lower end of gutter by flexible pipe, the upper end also connecting hose of gutter, this flexible pipe passes in periphery press mold ditch.The upper end of vacuum-pumping tube connects one and vacuumizes house steward, vacuumizes house steward and is vacuumized by external vacuum pump.
1.6, after pipe well 1 buries, namely pour into medium coarse sand 1.3 at periphery, to the integrated pipe well adopting reinforcement pipe well, then medium coarse sand poured between tube wall and filter screen 1.4, form sand filtration effect, ensure dewatering effect and the vacuumizing effect of pipe well.
1.7, after pipe well completes by determined network arrangement, control end 2(is installed hereinafter referred to as control end at pipe well mouth), control end adopts beveled structure, control end 2 comprises control end mounting pipe 2.1, the top of control end mounting pipe 2.1 arranges cover plate 2.2, cover plate 2.2 is arranged gutter 2.3, vacuum-pumping tube 2.4, cable submersible pump static line poling 2.5 and aqueous vapor separation adjusting pipe 2.6 that up/down perforation is arranged, aqueous vapor separation adjusting pipe 2.6 is provided with control valve 2.7, and the top of aqueous vapor separation adjusting pipe 2.6 is provided with vacuum meter 2.8.Control end periphery middle part can arrange several vacuum connection tube 2.9 as required, and the length of control end mounting pipe 2.1 is 500mm, and gutter 2.3 length stretched in control end mounting pipe 2.1 is 300mm, and the length of vacuum connection tube 2.9 is 300mm ~ 500mm.
1.8, control end mounting pipe 2.1 makes of iron pipe, its diameter is less than pipe well internal diameter, control end mounting pipe 2.1 inserts pipe well 1 from upper end, cover plate 2.2 is circular cover, and the diameter of cover plate 2.2 is greater than pipe well internal diameter, divides arrange vacuum connection tube at the middle part periphery etc. of this pipe well control end, be generally 4 ~ 6, control end mounting pipe 2.1 and pipe well are tightly connected, and the place of being tightly connected uses and is wound around film winding sealing, composition water-gas separation integrated tube well (hereinafter referred to as " integrated pipe well ").
1.9, the operating principle of integrated pipe well:
Vacuum pump vacuumizes, vacuum pressure is formed in integrated pipe well, in integrated pipe well, vacuum pressure is shown by vacuum meter 2.8, according to gas-vapor mix situation in integrated pipe well, vacuum pressure in integrated pipe well is regulated by control valve 2.7, make vacuumizing effect adjustable controlled, to reach the excess pore water pressure that the release soil body fast produces in dynamic reinforcement process, make the soil body shorten recovery time in dynamic reinforcement process.
1.10, integrated pipe well pattern network connects
After the installation of each integrated pipe well control end, the upper end of vacuum-pumping tube 2.4 connects one and vacuumizes house steward, vacuumize house steward to be vacuumized by external vacuum pump, a general vacuum pump connects main integrated pipe well by the pvc pipe of diameter 500mm, main integrated pipe well connects several diversity by the ripple chimney filter of diameter 500mm and becomes pipe well, and the power of vacuum pump is more than 15KW, and optimum is adopt reciprocating vacuum pump, because this equipment suction power is large, and be operated in pure state of bleeding.
1.11, vacuumize house steward when connecting vacuum pump and integrated pipe well, then by by vacuumizing house steward to location, integrated pipe aboveground portion, the port at integrated pipe well can be tied up with iron wire, vertical to guarantee integrated pipe well.
1.12, after integrated pipe well pattern network has connected, then vacuum pump can be started, check interface tube and junction sealing intact after carry out pumping test, when practice of construction, according to vacuum meter display and submersible pump drainage situation, debug in time, require that vacuum reaches 0.6 ~ 0.8MPa, the normal water outlet of submersible pump, to guarantee the normal operation of integrated pipe well.
1.13, for shallow layer foundation, thickness 4 ~ 6m scope need be reinforced, after trying normal water outlet out, within about 1 ~ 2 day, groundwater table can be down to below earth's surface 5 ~ 7m, now in the soil body, Free water sharply declines, and after vacuum pump gap vacuumizes, inside soil body divides Bound moisture to be sucked out the soil body to form Free water and be discharged, the soil body chaps through vacuum tube well top layer of drawing water, and the soil body is cellular status;
For deep foundation, thickness 6 ~ 30m need be reinforced, after trying normal water outlet out, within about 2 ~ 5 days, groundwater table can be down to below earth's surface 10 ~ 15m, now in the soil body, Free water sharply declines, and after vacuum pump gap vacuumizes, inside soil body divides Bound moisture to be sucked out the soil body to form Free water and be discharged, the soil body chaps through vacuum tube well top layer of drawing water, and the soil body is cellular status.
Step 2, the level of foundation vacuumize network and arrange monitoring instrument
2.1, be separated the precipitation soil body and chap to top layer carrying out water and soil, the soil body is in cellular status process, then by place mat geotextiles, Horizontal filter pipe and diaphragm seal, vacuumize connection by integrated pipe well, sets up horizontal drainage passage and vacuumizes network (figure six).
2.1.1, place mat lower floor geotextiles 3, in soft foundation Shang Fudian lower floor, geotextiles 3 is two-layer, and its effect one is prevent soft foundation from having hard object, destroys diaphragm seal and affect vacuum during vacuumizing precompressed.Two is prevent Horizontal filter pipe from affecting horizontal drainage effect vacuumizing in the period press-in mud soil body.Three is after place mat this layer of geotextiles, serves certain carrying effect, make personnel enter construction area, carry out the construction of next step on weak soil top layer.As can be seen here, the thickness of this lower floor's geotextiles 3 is most important, and more thick better, General Requirements tensile strength is the geotextiles of more than 40KN/m.
2.1.2, excavate press mold ditch 4, set up precompressed community separately, divide, generally with 30000m according to conventional vacuum precompressed construction area 2be a construction community, division of cells excavation press mold ditch accordingly, press mold ditch 4 is arranged in needs reinforcing area surrounding, and the general width of press mold ditch 4 is 0.6m ~ 0.8m, and the degree of depth should be arranged in the little Soft Soil Layer of gas permeability.
2.1.3, connect horizontal drainage pipeline 5, horizontal drainage pipeline adopts the PVC ripple chimney filter of Φ 50, is coupled together by the vacuum connection tube 2.9 needing the integrated aqueous vapor in reinforcing area to be separated pipe well, form loop, require to be connected firmly by this horizontal drainage pipeline 5.
2.1.4, place mat upper strata geotextiles 6, each horizontal drainage pipeline 5 is separated after pipe well connected with aqueous vapor, repave pad upper strata geotextiles 6 one deck or two-layer thereon.
2.1.5, place mat diaphragm seal 7, diaphragm seal adopts ageing resistace good, good toughness, the gas impermeable material that puncture resistant ability is strong, general employing polyvinyl chloride film, usual thickness is 0.8 ~ 1.0mm, during practice of construction, can place mat diaphragm seal 7 be two-layer to three layers as requested, in diaphragm seal 7 periphery press-in press mold ditch bottom of trench.
2.1.6, the flat overlap joint of the heat bonding of the appropriate to the occasion use of diaphragm seal heat bonding two pieces of films seam, lap width should be greater than 15mm.
2.1.7, in plastic film mulch process should carry out press mold with paving with sand pocket, prevent from blowing and film swept away or tears.Also can carry out aqueous vapor separation to vacuumize while plastic film mulch, hold soil body top layer to make film.
2.2, vacuum pump connects integrated pipe well and vacuumizes, underground water in pipe well is discharged outside the soil body by gutter by the built-in submersible pump of pipe well, in this technical process of enforcement, people, machine, native direct dialogue is realized by digital management, by monitorings such as monitoring vacuum, under-membrance vacuum degree, pore pressure gauge, sedimentations to judge that the soil body is being separated the change of the consolidation during precompressed, and adjust vacuum in time according to reacted digital information, load time and winding interval, guarantee the success being separated precompressed.
2.3, the burying underground of monitoring instrument:
2.3.1, the burying underground of vacuum meter under film: be the transmission effect understanding under-membrance vacuum degree, bury 4 ~ 8 pieces of vacuum meters for 7 times underground at precompressed zone diaphragm seal,
2.3.2, by being arranged vertically pore water pressure dissipation situation in the soil body, can understand vacuum in transmittance process to the soil body load time, excess pore water pressure situation of change in the soil body.
2.3.3, sedimentation mark is set on diaphragm seal, is separated the rate of settling and the effect of settling of the soil body in pre-compaction process by observation and analysis, and adjusts the load or unload time at any time.
2.3.4, periphery horizontal displacement observation instrument, to understand precompressed zone periphery level to deformation.
Step 3, the precompressed of aqueous vapor separate vacuum and control criterion
3.1, after above-mentioned steps completes, vacuum pump can be opened and carry out aqueous vapor separation precompressed, according to precompressed principle, on film, atmospheric pressure pa acts on film, vacuum pressure po is produced owing to bleeding under film, film downforce is made to be down to pv(pv=pa-pv), there is pressure differential pa-pv inside and outside film, make diaphragm seal be close to geotextiles.Because geotextiles bed course to be separated the pressure reduction between pipe well with aqueous vapor, Free water generation seepage flow in the soil body, aqueous vapor separator tube well water power is released heavily, converge soil body pore water, and being separated the control end discharge soil body by the built-in submersible pump of well by aqueous vapor, pore water pressure is reduced, and effective stress increases, soil solidifying, gain in strength.
3.2, in pre-compaction process, pipe well sedimentation value need be observed, as found to produce pipe well sedimentation asynchronous with soil body sedimentation, then the geotextiles and diaphragm seal that cover pipe well control end can be adjusted to and pipe well peripheral sealing, with rubber ring diaphragm seal is fixed on the method on pipe well wall, to ensure soil body sealing performance.
3.3, control criterion: when meeting following condition for the moment, then can stop vacuumizing, carry out loading and unloading:
3.3.1, continuous five days Tested settlement Su Shuai≤2mm/d time.
When 3.3.2, meeting design requirement to sedimentation, bearing capacity, effective pressure intensity.
3.3.3 when, the degree of consolidation reaches more than 80%.
Step 4, indwelling need utilize pipe well, backfill other pipe wells
4.1, when designing the utility model, can according to the construction requirements needing reinforcing area, the required basis of pre-designed superstructure; After utilizing pipe well precompressed to terminate, indwelling pipe well is as foundation pit dewatering or utilize pipe well to backfill different constructional materialss to form pile body.
4.2, after separation precompressed vacuumizes end, then control end can be pulled out, take out the built-in submersible pump of integrated pipe well, the weak soil of integrated pipe well periphery is utilized to insert in integrated pipe well, should be noted while the integrated pipe well of backfill in this link, adopt the backfill limit jolt ramming of board-plugging device limit, put down until be backfilling into place.If pipe well embedded depth is when more than 6.0m, then can adopt the backfill limit jolt ramming of vibrating spear limit, put down until be backfilling into place.

Claims (5)

1. the horizontal pumped vacuum systems of soft foundation quick separating preloading, it is characterized in that it comprises the pipe well of network arrangement, in pipe well, submersible pump is set, then at pipe well mouth, control end (2) is installed, control end periphery middle part arranges multiple vacuum connection tube (2.9), lower floor's geotextiles (3) successively on the soil body at tubes welding place, horizontal drainage pipeline (5), upper strata geotextiles (6) and diaphragm seal (7), in press mold ditch (4) bottom of trench of diaphragm seal (7) periphery press-in tubes welding periphery, the vacuum connection tube (2.9) of each integrated pipe well is coupled together by horizontal drainage pipeline (5) and forms loop, diaphragm seal buries vacuum meter underground under (7), diaphragm seal arranges sedimentation mark, precompressed region periphery horizontal displacement observation instrument.
2. the horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading according to claim 1, it is characterized in that control end (2) comprises control end mounting pipe (2.1), the top of control end mounting pipe (2.1) arranges cover plate (2.2), cover plate (2.2) is arranged the gutter (2.3) that up/down perforation is arranged, vacuum-pumping tube (2.4), cable submersible pump static line poling (2.5) and aqueous vapor separation adjusting pipe (2.6), aqueous vapor separation adjusting pipe (2.6) is provided with control valve (2.7), the top of aqueous vapor separation adjusting pipe (2.6) is provided with vacuum meter (2.8).
3. the horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading according to claim 1 and 2, is characterized in that arranging one section of conical bottom bottom pipe well.
4. the horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading according to claim 1 and 2, is characterized in that pipe well periphery arranges many reinforcing ribs, arranges filter screen, pour into medium coarse sand between filter screen and pipe well outside reinforcing rib.
5. the horizontal pumped vacuum systems of a kind of soft foundation quick separating preloading according to claim 1 and 2, is characterized in that the vacuum-pumping tube (2.4) of multiple pipe well jointly connects one and vacuumizes house steward, vacuumizes house steward and connect external vacuum pump.
CN201420669908.7U 2014-11-12 2014-11-12 The horizontal pumped vacuum systems of soft foundation quick separating preloading Expired - Fee Related CN204343281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420669908.7U CN204343281U (en) 2014-11-12 2014-11-12 The horizontal pumped vacuum systems of soft foundation quick separating preloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420669908.7U CN204343281U (en) 2014-11-12 2014-11-12 The horizontal pumped vacuum systems of soft foundation quick separating preloading

Publications (1)

Publication Number Publication Date
CN204343281U true CN204343281U (en) 2015-05-20

Family

ID=53226559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420669908.7U Expired - Fee Related CN204343281U (en) 2014-11-12 2014-11-12 The horizontal pumped vacuum systems of soft foundation quick separating preloading

Country Status (1)

Country Link
CN (1) CN204343281U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457784A (en) * 2022-03-18 2022-05-10 汕尾市广投建设工程有限公司 Prepressing structure of coastal sludge geological soft soil foundation and construction process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457784A (en) * 2022-03-18 2022-05-10 汕尾市广投建设工程有限公司 Prepressing structure of coastal sludge geological soft soil foundation and construction process thereof

Similar Documents

Publication Publication Date Title
CN103628468B (en) A kind of water penetration pile combined vacuum prepressing ground foundation treatment method
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN100549303C (en) Reinforcement method of deep layer soft soil foundation
CN102817354B (en) Method for dredging soft foundation by dredger fill and reinforcement
CN102587352A (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN101130952A (en) Packingless fast vacuum prepressing dynamic consolidation method
CN104120711B (en) A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure and method
CN104047280B (en) Soft foundation sharp separation compacting method
CN111395299A (en) Multifunctional combined type vacuum preloading treatment method for sludge with high water content and high organic matter content
CN104452734B (en) Rapid soft foundation separation preloading method
CN108797759B (en) Underwater riprap grouting reinforcement method for suspended soft foundation below immersed tube
CN205839779U (en) A kind of sandy soil stratum base pit dewatering water level following catch pit structure
CN204343281U (en) The horizontal pumped vacuum systems of soft foundation quick separating preloading
CN105862716B (en) Integral type well point plastic strip pipe
CN205917685U (en) Integral type well dotted arranges vacuum system
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN116145638A (en) Soft soil foundation reinforcing and draining process
CN105970910B (en) Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN105862714B (en) Soft soil foundation covers water type integral type well point plastic strip vacuum system
CN105926577B (en) Vacuum preloading seepage consolidation method
CN212001021U (en) Soft soil foundation reinforcing structure in dredger fill area
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN203939019U (en) A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure
CN205917684U (en) Integral type well dotted calandria
CN105862719A (en) Reinforced foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant