CN205839779U - A kind of sandy soil stratum base pit dewatering water level following catch pit structure - Google Patents
A kind of sandy soil stratum base pit dewatering water level following catch pit structure Download PDFInfo
- Publication number
- CN205839779U CN205839779U CN201620752249.2U CN201620752249U CN205839779U CN 205839779 U CN205839779 U CN 205839779U CN 201620752249 U CN201620752249 U CN 201620752249U CN 205839779 U CN205839779 U CN 205839779U
- Authority
- CN
- China
- Prior art keywords
- well
- dewatering
- pit
- dewatering well
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
(一)技术领域(1) Technical field
本实用新型涉及建筑施工技术领域,特别涉及一种砂土地层基坑降水水位以下集水坑结构。The utility model relates to the technical field of building construction, in particular to a sump structure below the precipitation water level of a foundation pit in a sandy soil layer.
(二)背景技术(2) Background technology
砂土地层基坑降水水位以下集水坑施工,如果不采取措施直接开挖,由于侧壁水的渗流和底部水的上涌,基坑侧壁坍塌严重,无法开挖;现有技术一般是采取二级井点降水方法将水位降至所需标高,然后开挖→做垫层→做防水→防水封井(或者不封井直接后期用底板混凝土浇死)→绑钢筋→浇筑混凝土。在浇筑混凝土前封井或直接用混凝土浇筑填井,若封井防水层将会产生上浮破坏,给地下室底板防水留下严重隐患;如若不封井,留下的防水隐患将会更大。If no measures are taken to excavate the sump pit below the dewatering water level of the foundation pit in sandy soil stratum, the side wall of the foundation pit will collapse seriously due to the seepage of side wall water and the upwelling of bottom water, making it impossible to excavate; the existing technology is generally Take the second-level well point dewatering method to lower the water level to the required elevation, then excavate → make a cushion layer → do waterproofing → waterproof and seal the well (or directly pour the bottom plate concrete to death without sealing the well) → tie steel bars → pour concrete. Seal the well before pouring concrete or fill the well directly with concrete pouring. If the well is closed, the waterproof layer will be damaged by floating, leaving serious hidden dangers to the waterproofing of the basement floor; if the well is not sealed, the hidden danger of waterproofing will be even greater.
(三)发明内容(3) Contents of the invention
本实用新型为了弥补现有技术的不足,提供了一种砂土地层基坑降水水位以下集水坑结构,现场施工无需考虑后期封井的问题,保证了底板防水的整体性,避免了因防水层不完整或被破坏产生的基础底板漏水隐患,很好的解决了因不能封井和不能在合适的时间封井的问题,解决了现有技术中存在的问题。In order to make up for the deficiencies of the prior art, the utility model provides a sump structure below the precipitation water level of the foundation pit in sandy soil stratum. On-site construction does not need to consider the problem of closing the well in the later stage, which ensures the integrity of the waterproofing of the bottom plate and avoids The hidden danger of water leakage of the foundation floor caused by incomplete or damaged layers has well solved the problems of not being able to seal the well and not being able to seal the well at a suitable time, and solved the problems existing in the prior art.
本实用新型是通过如下技术方案实现的:The utility model is achieved through the following technical solutions:
一种砂土地层基坑降水水位以下集水坑结构,包括降水井,在降水井内部的底部设有一水泵,在水泵的进水口外部包设外包滤网,在降水井内设有一底端与水泵的抽水口相连的硬质塑料水管,硬质塑料水管的顶部穿出降水井顶部外侧并埋设于地面以下设置,在硬质塑料水管下方的降水井顶部设有一底端与降水井相连通设置的硬质塑料透气管,在硬质塑料水管和硬质塑料透气管外部的降水井内填充碎石;在降水井外部的地面以下设有坑槽,在坑槽内侧壁上铺设基础垫层,基础垫层的顶端伸出地面以上并覆设于降水井井口上方,在基础垫层上方设有防水层,在防水层上方设有基础底板,所述基础底板在坑槽上方浇铸形成集水坑。A sump structure below the dewatering water level of a foundation pit on sandy ground, including a dewatering well, a water pump is provided at the bottom inside the dewatering well, an outsourcing filter is provided outside the water inlet of the water pump, and a bottom end and The hard plastic water pipe connected to the suction port of the water pump. The top of the hard plastic water pipe passes through the outside of the top of the dewatering well and is buried below the ground. A bottom end is provided on the top of the dewatering well below the hard plastic water pipe to communicate with the dewatering well. The rigid plastic air pipe is filled with gravel in the hard plastic water pipe and the precipitation well outside the hard plastic air pipe; a pit is arranged below the ground outside the precipitation well, and a foundation cushion is laid on the inner wall of the pit. The top of the cushion layer protrudes above the ground and is covered above the wellhead of the dewatering well. A waterproof layer is provided above the base cushion layer, and a base plate is provided above the waterproof layer. The base plate is cast above the pit to form a sump.
所述基础垫层为混凝土基础垫层,所述基础底板为混凝土基础底板。The foundation cushion is a concrete foundation cushion, and the foundation bottom plate is a concrete foundation bottom plate.
所述降水井的数量大于等于1个,各降水井分别设于基础垫层下方的地面以下。The number of the dewatering wells is greater than or equal to one, and each dewatering well is respectively arranged below the ground below the foundation cushion.
本实用新型的有益效果是:该砂土地层基坑降水水位以下集水坑结构具有如下优点:1、防水层施工前全部成活,减少多道工序的多次穿插施工;排除了现有方案的漏水隐患。2、原理简单,方便操作,无质量隐患,原材易取,费用低廉。3、治水效果好。该砂土地层基坑降水水位以下集水坑结构因将基础垫层设于降水井口上方并通过混凝土浇铸,很好的解决了因不能封井和不能在合适的时间封井的问题,让现场施工无需考虑后期封井的问题,保证了底板防水的整体性,避免了因防水层不完整或被破坏产生的基础底板漏水隐患。通过在水泵的进水口外部包设外包滤网,避免了水泵进水口在抽水过程中的堵塞。The beneficial effects of the utility model are: the sump structure below the foundation pit precipitation water level of the sandy soil stratum has the following advantages: 1. All survive before the construction of the waterproof layer, reducing the multiple interspersed construction of multiple processes; Water leakage hazard. 2. The principle is simple, the operation is convenient, there is no quality risk, the raw materials are easy to obtain, and the cost is low. 3. Good water control effect. The sump structure below the dewatering water level of the foundation pit in the sandy soil stratum, because the foundation cushion is set above the dewatering wellhead and cast with concrete, it solves the problem that the well cannot be closed and the well cannot be closed at a suitable time, so that the site The construction does not need to consider the problem of closing the well in the later stage, which ensures the integrity of the waterproofing of the bottom plate and avoids the hidden danger of water leakage of the foundation bottom plate caused by incomplete or damaged waterproof layer. The water inlet of the water pump is prevented from being blocked during water pumping by wrapping an outsourcing filter screen outside the water inlet of the water pump.
(四)附图说明(4) Description of drawings
下面结合附图对本实用新型作进一步的说明。Below in conjunction with accompanying drawing, the utility model is further described.
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图中,1降水井,2水泵,3硬质塑料水管,4硬质塑料透气管,5碎石,6基础垫层,7防水层,8基础底板,9集水坑,10电缆。In the figure, 1 is a dewatering well, 2 is a water pump, 3 is a hard plastic water pipe, 4 is a hard plastic ventilation pipe, 5 is gravel, 6 is a foundation cushion, 7 is a waterproof layer, 8 is a foundation floor, 9 is a sump, and 10 is a cable.
(五)具体实施方式(5) Specific implementation methods
为能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本实用新型进行详细阐述。In order to clearly illustrate the technical features of this solution, the utility model will be described in detail below through specific implementation methods and in conjunction with the accompanying drawings.
如附图1所示,该砂土地层基坑降水水位以下集水坑结构包括降水井1,在降水井1内部的底部设有一水泵2,在水泵2的进水口外部包设外包滤网,在降水井1内设有一底端与水泵2的抽水口相连的硬质塑料水管3,硬质塑料水管3的顶部穿出降水井1顶部外侧并埋设于地面以下设置,在硬质塑料水管3下方的降水井1顶部设有一底端与降水井1相连通设置的硬质塑料透气管4,在硬质塑料水管3和硬质塑料透气管外4部的降水井1内填充碎石5;在降水井1外部的地面以下设有坑槽,在坑槽内侧壁上铺设基础垫层6,基础垫层6的顶端伸出地面以上并覆设于降水井1井口上方,在基础垫层6上方设有防水层7,在防水层7上方设有基础底板8,所述基础底板8在坑槽上方浇铸形成集水坑9。As shown in accompanying drawing 1, the sump structure below the dewatering water level of the foundation pit of the sandy soil layer comprises a dewatering well 1, and a water pump 2 is provided at the bottom of the dewatering well 1 inside, and an outsourcing filter is wrapped outside the water inlet of the water pump 2, In the dewatering well 1, a hard plastic water pipe 3 whose bottom end is connected to the suction port of the water pump 2 is provided. The top of the precipitation well 1 below is provided with a hard plastic ventilation pipe 4 whose bottom end communicates with the precipitation well 1, and gravel 5 is filled in the precipitation well 1 outside the hard plastic water pipe 3 and the outer 4 parts of the hard plastic ventilation pipe; Below the ground outside the dewatering well 1, a pit is provided, and a base cushion 6 is laid on the inside wall of the pit. A waterproof layer 7 is arranged above, and a foundation base plate 8 is arranged above the waterproof layer 7, and the base base plate 8 is casted above the pit to form a sump 9.
所述基础垫层6为混凝土基础垫层,所述基础底板8为混凝土基础底板。The foundation cushion 6 is a concrete foundation cushion, and the foundation bottom plate 8 is a concrete foundation bottom plate.
所述降水井1的数量大于等于1个,各降水井1分别设于基础垫层6下方的地面以下。The number of the dewatering wells 1 is greater than or equal to one, and each dewatering well 1 is respectively arranged below the ground below the foundation cushion 6 .
具体施工过程:Specific construction process:
在积水坑开挖前,先在集水坑四面打降水井1(深度根据集水坑的深度和平面尺寸计算所得),降水井1内放置水泵2(潜水泵)抽取地下水,随着降水井1降水漏斗的形成,成功截住了外侧地下水的流入并同时对内侧地下水进行疏干;水位达到疏干标高后进行坑槽(砂土基坑)的开挖,开挖完成即可进行后续的各分项施工,基础底板8混凝土浇筑完成并呈现强度后在基础底板8外边缘处掐断硬质塑料水管3、水泵2的电缆10和硬质塑料透气管4。Before the excavation of the sump pit, the dewatering well 1 is built on the four sides of the sump (the depth is calculated according to the depth and plane size of the sump), and the water pump 2 (submersible pump) is placed in the dewatering well 1 to extract groundwater. The formation of the well 1 dewatering funnel successfully intercepted the inflow of groundwater on the outside and drained the groundwater on the inside at the same time; after the water level reached the draining level, the pit (sand foundation pit) was excavated, and the follow-up could be carried out after the excavation was completed. Each sub-construction of the foundation base plate 8 concrete pouring is finished and presents strength after the foundation base plate 8 outer edges cut off the hard plastic water pipe 3, the cable 10 of the water pump 2 and the hard plastic vent pipe 4.
该砂土地层基坑降水水位以下集水坑结构的降水井1根据地层情况可打多个。The dewatering well 1 of the sump structure below the foundation pit dewatering water level of this sandy soil stratum can hit a plurality of according to stratum situation.
为增强封井效果,降水井1井口处的基础垫层用混凝土可采用微膨胀混凝土。In order to enhance the well sealing effect, the concrete for the foundation cushion at the wellhead of the dewatering well 1 can adopt micro-expansion concrete.
为防止水泵2进水口堵塞,需要保证外包滤网的孔径尽可能密集,实现良好的阻挡功能。In order to prevent the water inlet of the water pump 2 from being blocked, it is necessary to ensure that the pore size of the outsourcing filter screen is as dense as possible to achieve a good blocking function.
该砂土地层基坑降水水位以下集水坑结构的施工关键点在于防水施工前进行填井、埋管和封井:1、填井:(1)在水泵2下放前,在水泵2进水口部位用铁丝网包扎严实(过滤作用);(2)在防水施工前(防止回填过早,如若水泵出现问题无法修复与更换)用碎石回填降水井(碎石既有填充承载性又有透水过滤性)。2、将硬质塑料水管3、电缆10和硬质塑料透气管4暗埋于基础垫层6下土层内。3、用基础垫层6高一标号的微膨胀混凝土将降水井1井口封住。4、防水层施工。The key points of the construction of the sump structure below the water level of the foundation pit in the sandy soil layer are to fill the well, bury the pipe and seal the well before the waterproof construction: 1. Fill the well: (1) before the water pump 2 is lowered, the water pump 2 water inlet The site is tightly wrapped with barbed wire (filtering effect); (2) Before waterproofing construction (to prevent premature backfilling, if the water pump fails to repair and replace) backfill the dewatering well with gravel (crushed stone has both filling capacity and permeable filtration sex). 2. The hard plastic water pipe 3, the cable 10 and the hard plastic air pipe 4 are buried in the soil layer under the foundation cushion 6. 3. Seal the wellhead of the dewatering well 1 with the micro-expansion concrete of one mark higher than the base cushion 6. 4. Waterproof layer construction.
本实用新型未详述之处,均为本技术领域技术人员的公知技术。最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围当中。The parts of the utility model that are not described in detail are the known techniques of those skilled in the art. Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the utility model can be Modifications or equivalent replacements of the technical solutions without departing from the purpose and scope of the technical solutions of the utility model shall be covered by the claims of the utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620752249.2U CN205839779U (en) | 2016-07-15 | 2016-07-15 | A kind of sandy soil stratum base pit dewatering water level following catch pit structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620752249.2U CN205839779U (en) | 2016-07-15 | 2016-07-15 | A kind of sandy soil stratum base pit dewatering water level following catch pit structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205839779U true CN205839779U (en) | 2016-12-28 |
Family
ID=57619990
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620752249.2U Expired - Fee Related CN205839779U (en) | 2016-07-15 | 2016-07-15 | A kind of sandy soil stratum base pit dewatering water level following catch pit structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205839779U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112709247A (en) * | 2021-01-20 | 2021-04-27 | 北京城建道桥建设集团有限公司 | Subway construction dewatering system and method for complex ground |
| CN115094930A (en) * | 2022-07-19 | 2022-09-23 | 中铁十一局集团有限公司 | Auxiliary precipitation device and method for basement sump or elevator foundation pit |
| CN115324090A (en) * | 2022-10-13 | 2022-11-11 | 山东金城建设有限公司 | Underground engineering pit-in-pit dewatering and well sealing construction method |
| CN115977126A (en) * | 2023-02-03 | 2023-04-18 | 中建八局天津建设工程有限公司 | The plugging structure and construction method of the dewatering well in the sump pit of the foundation floor |
| CN116163324A (en) * | 2023-02-13 | 2023-05-26 | 中国新兴建设开发有限责任公司 | A method for dewatering the bottom of foundation pit |
| CN116411584A (en) * | 2023-03-27 | 2023-07-11 | 天津武清建总建设工程集团有限公司 | A Construction Method for Diversion and Sealing of Dewatering Wells in Foundation Pit |
| CN116591205A (en) * | 2023-05-22 | 2023-08-15 | 中电建铁路建设投资集团有限公司 | Method for quick construction of sump pit in foundation pit of subway entrance and exit in water-rich sand layer |
-
2016
- 2016-07-15 CN CN201620752249.2U patent/CN205839779U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112709247A (en) * | 2021-01-20 | 2021-04-27 | 北京城建道桥建设集团有限公司 | Subway construction dewatering system and method for complex ground |
| CN115094930A (en) * | 2022-07-19 | 2022-09-23 | 中铁十一局集团有限公司 | Auxiliary precipitation device and method for basement sump or elevator foundation pit |
| CN115324090A (en) * | 2022-10-13 | 2022-11-11 | 山东金城建设有限公司 | Underground engineering pit-in-pit dewatering and well sealing construction method |
| CN115977126A (en) * | 2023-02-03 | 2023-04-18 | 中建八局天津建设工程有限公司 | The plugging structure and construction method of the dewatering well in the sump pit of the foundation floor |
| CN116163324A (en) * | 2023-02-13 | 2023-05-26 | 中国新兴建设开发有限责任公司 | A method for dewatering the bottom of foundation pit |
| CN116411584A (en) * | 2023-03-27 | 2023-07-11 | 天津武清建总建设工程集团有限公司 | A Construction Method for Diversion and Sealing of Dewatering Wells in Foundation Pit |
| CN116591205A (en) * | 2023-05-22 | 2023-08-15 | 中电建铁路建设投资集团有限公司 | Method for quick construction of sump pit in foundation pit of subway entrance and exit in water-rich sand layer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205839779U (en) | A kind of sandy soil stratum base pit dewatering water level following catch pit structure | |
| CN102797266B (en) | Well sealing waterproof construction method for dewatering well | |
| CN110670613B (en) | Foundation pit elevator shaft water seepage prevention structure and construction method thereof | |
| CN104846836B (en) | Water supply and drainage device for deep foundation pit and construction method based on the water supply and drainage device | |
| CN110318410A (en) | A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method | |
| CN202730786U (en) | Well-sealing waterproof construction structure of dewatering well | |
| CN113818402A (en) | Reinforcement and reinforcement structure of clay core rockfill dam and its construction method | |
| CN103437379B (en) | Post-cast strip construction and drainage method for base plate of basement | |
| CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
| CN107059523A (en) | A kind of construction method that road is built on reclaimed ground and the subgrade strengthening structure of construction method formation | |
| CN103898915B (en) | Building small-area deep foundation pit anti-floating water stop construction method | |
| CN106677158B (en) | A method and structure for fast and uniform treatment of superficial layer of newly blown and filled silt | |
| CN105133619A (en) | Construction method for deep foundation pit of elevator shaft | |
| CN205205844U (en) | Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit | |
| CN216275518U (en) | Reinforcing and reinforcing structure of clay core rockfill dam | |
| CN203768925U (en) | Seal device for dewatering well in foundation pit | |
| CN206385557U (en) | The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate | |
| CN108824113A (en) | A kind of soft-soil foundation treatment method | |
| CN205907658U (en) | Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body | |
| CN107268364A (en) | The construction method that mud bag builds road is filled on reclaimed ground | |
| CN105201009B (en) | Tower foundation negative-pressure construction method for river channel | |
| CN219261074U (en) | Pump dewatering structure is buried at foundation ditch tank bottom | |
| CN211312564U (en) | Groundwater control structure of deep foundation pit in highly permeable stratum based on pressure reduction and seepage reduction | |
| CN218148458U (en) | Deep water deep foundation pit drainage system of fissure development rock stratum | |
| CN105821892A (en) | Horizontal screen pipe dewatering system and treatment method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161228 |