CN208201898U - One kind being used for highway excavation section subgrade drainage system - Google Patents
One kind being used for highway excavation section subgrade drainage system Download PDFInfo
- Publication number
- CN208201898U CN208201898U CN201820766157.9U CN201820766157U CN208201898U CN 208201898 U CN208201898 U CN 208201898U CN 201820766157 U CN201820766157 U CN 201820766157U CN 208201898 U CN208201898 U CN 208201898U
- Authority
- CN
- China
- Prior art keywords
- bed course
- excavation section
- drain hole
- permeable bed
- longitudinal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of for highway excavation section subgrade drainage system, including longitudinal drainage ditch, blotter, drain hole and permeable bed course, ground subsoil layer divides into blotter, it is connected by drain hole with longitudinal drainage ditch, the lower infiltration of discharge, separate underground water, longitudinal drainage ditch divides into permeable bed course, bed course bottom is equipped with longitudinal drainpipe with holes, for by side slope Interstitial Water, roadbed internal water and underground water discharge, it is connected by organically penetrating through dark heat-extraction system with bright heat-extraction system, form smooth drainage channel, for the drainage requirement of different regions and different rainfalls, by adjusting the aperture of drainpipe, drain hole aperture and spacing, the size of longitudinal drainage ditch, its drain function has more flexibility and specific aim.Safely, quickly, efficiently highway excavation section water can be discharged for the utility model, extend Road Service Life, reduce road maintenance cost.
Description
Technical field:
The utility model relates to subgrade drainage fields, more particularly to one kind to be used for highway excavation section section subgrade drainage system
System.
Background technique:
The intracorporal water-bearing layer in former slope has been truncated in highway cutting excavation, leads to water-bearing layer exposure, roadbed level of ground water one
As be in higher level, reduce bearing capacity.On the other hand, because excavation section supporting course intensity and foundation stability are generally higher,
Usually cut subgrade is relatively trusted, to the also fairly simple of subgrade drainage consideration, dank material generally used, is arranged simultaneously
French drain, sewer mode, to exclude that the water of roadbed may be penetrated into.Excavation section subgrade drainage is unsmooth, often will affect the intensity of roadbed
And stability, in turn result in the deformation failure of road surface and side slope.The draining of highway excavation section is always to restrict subgrade and pavement
Where the Adam's apple in service performance and service life.
The water of highway excavation section road structure mostlys come from two parts, and a part is that rainwater is directly drop to
Road surface, lower to seep to inside roadbed, another part is mainly crevice water, inside Groundwater infiltration to roadbed.Currently, excavation section road
Pumping equipment inside based structures, general dark using row, pumping equipment is enclosed in road structure layer state, is filling out the position for digging handover
It sets, dark row is interrupted, and water is caused not to be discharged timely.Therefore, for excavation section subgrade drainage problem, seek a kind of unimpeded company
Continuous, convenient construction, highly effective and safe excavation section drainage system is anticipated to improving the service performance on road surface, extending Road Service Life
Justice is great.
Utility model content:
For the shortcomings in the field, the purpose of this utility model is to provide one kind to be used for highway excavation section section
Subgrade drainage system.
Realize the technical solution of the utility model above-mentioned purpose are as follows:
One kind being used for highway excavation section subgrade drainage system, it is characterised in that: including blotter, longitudinal drainage
Ditch, drain hole and permeable bed course, ground subsoil layer is arranged in for the blotter hereinafter, the longitudinal drainage ditch is located at soil
On the outside of road shoulder, drain hole, the permeable bed course position is arranged in the bottom of the longitudinal drainage ditch and blotter connecting position
In longitudinal drainage ditch hereinafter, the permeable bed course bottom is equipped with longitudinal drainage pipe, concrete base is set under the permeable bed course
Plinth.
Anti-seepage geotextile is equipped between the concrete foundation and permeable bed course.
Anti-filter geotextiles are arranged in the permeable bed course two sides.
For the blotter with a thickness of 15~20cm, permeable bed course is blotter, and partial size is 1~5cm, longitudinal drainage
Ditch is cover board ditch, and width is 90~100cm, and depth is 90~100cm.
The drain hole is UPVC drainpipe, and at 2~3m setting one, drain hole should have 30~35% gradients,
Filling pipe end is wrapped up using anti-filter geotextiles, and aperture is 8~12cm.
The permeable bed course bottom and roadbed excavation section bottom of backbreaking flush, and dig binding site filling out and set with externally drained
Apply it is connected, permeable bed course bottom longitudinal drainage pipe be UPVC with holes pipe, caliber be 20~25cm.
The advantageous effects of the utility model are:
1, the utility model one kind is used for highway excavation section drainage system, and blotter, permeable pad is arranged in inside
The dark heat-extraction system of layer, outside setting longitudinal drainage ditch, by dark heat-extraction system with bright heat-extraction system is organic is connected, form the draining that one links up and lead to
Effectively highway excavation section subgrade drainage is discharged for road.
2, the utility model one kind is used for highway excavation section drainage system, connects in blotter with longitudinal drainage ditch
Position bottom is equipped with the drain hole of certain slope, and effectively blotter water can be discharged, the accumulation of blotter water is avoided to lead
Cause pavement destruction.
3, the utility model one kind is used for highway excavation section drainage system, and permeable pad is equipped on the outside of section in roadbed counter dig
Layer, the longitudinal drainpipe with holes of bed course bottom setting can separate cut slope Interstitial Water, and effectively discharge is instead dug under section roadbed
Infiltration and underground water guarantee subgrade strength and stability.
4, the utility model one kind is used for highway excavation section drainage system, aperture, sluicing by adjusting drainpipe
The size in hole aperture and spacing, longitudinal drainage ditch can satisfy the drainage requirement of different regions and different rainfalls, drain function
Flexibility and specific aim can be had more.
Detailed description of the invention
Fig. 1 is the utility model for highway excavation section subgrade drainage system schematic;
Wherein: 1, ground subsoil layer;2, blotter;3, counter to dig roadbed;4, anti-seepage geotextile;5, UPVC draining with holes
Pipe;6, drain hole;7, longitudinal drainage ditch;8, anti-filter geotextiles;9, permeable bed course 10, concrete foundation.
Specific embodiment
In order to be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, under
The utility model is further described in face with specific embodiments and the drawings, but following embodiments are only the excellent of the utility model
Embodiment is selected, and not all.Based on the implementation example in the implementation mode, those skilled in the art are not making creative work
Under the premise of obtained other embodiments, belong to the protection scope of the utility model.
Specific embodiment of the utility model is described with reference to the accompanying drawing.
Embodiment: the as shown in Figure 1 embodiment excavation section subgrade drainage system include ground subsoil layer 1, blotter 2,
It is anti-to dig roadbed 3, anti-seepage geotextile 4, UPVC drainpipe 5 with holes, drain hole 6, longitudinal drainage ditch 7, anti-filter geotextiles 8, permeable pad
Layer 9 and concrete foundation 10;
One kind being used for highway excavation section subgrade drainage system, including blotter 2, longitudinal drainage ditch 7, drain hole 6
With permeable bed course 9, blotter is arranged in ground subsoil layer 1 hereinafter, longitudinal drainage ditch is located on the outside of earth shoulder, the longitudinal direction
Drain hole is arranged in gutter and the bottom of blotter connecting position, and permeable bed course is located at longitudinal drainage ditch hereinafter, described is saturating
Water subfill bottom is equipped with UPVC drainpipe 5 with holes, and concrete foundation 10, concrete foundation and permeable bed course is arranged under permeable bed course
Between be equipped with anti-seepage geotextile 4, anti-filter geotextiles 8 are arranged in the filling pipe end of permeable bed course two sides and drain hole.
Ground subsoil layer 1 is low content cement stabilized gravel, and with a thickness of 20cm, underlayment 1 is lower to be arranged with a thickness of 18cm's
Blotter 2, blotter are graded broken stone, and partial size is 0~3.5cm, are anti-digging roadbed 3 under granular cushion, and anti-digging is deep
Degree is 30cm.
Longitudinal drainage ditch 7 is close to earth shoulder outside, and pattern is cover board ditch, and trench depth 95cm, ditch width is 95cm.
Drain hole 6 is arranged in blotter 2 and 7 connecting position bottom of longitudinal drainage ditch, and drain hole is UPVC drainpipe, caliber
For 8cm, the gradient 35%, drain hole 6 is at 2.5m setting one.
The lower permeable bed course 9 of setting of longitudinal drainage ditch 7, the two sides of permeable bed course and drain hole 6 connect position with blotter 2
Anti-filter geotextiles 8 are set, to prevent drainage system from blocking.
The UPVC with holes that the longitudinal aperture of permeable 9 bottom of bed course setting is 20cm is managed, and concrete base is arranged under blotter
Anti-seepage geotextile 4 is arranged in plinth 10 between permeable bed course 9 and concrete foundation 10.
In the position that roadbed excavation section is combined with embankment section, in due course is connected permeable bed course 9 with exterior drainage system, will
The discharge of excavation section water.
After infiltration and underground water enter blotter 2 under road surface, cross flow to 6 position of drain hole enters vertical through drain hole
To gutter 7, excluded by the guidance of longitudinal drainage ditch to outside roadbed.The Interstitial Water of side slope and the anti-water dug in roadbed, cross flow is extremely
Permeable bed course 9, permeable bed course divides into longitudinal drainage pipe with holes, for collecting the water in permeable bed course, by permeable bed course and longitudinal direction
Gutter is connected with the outer pumping equipment of excavation section, and finally water is expelled to outside excavation section.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Be only the utility model preference, be not intended to limit the utility model, do not departing from the spirit and scope of the utility model
Under the premise of, the utility model also has various changes and improvements, these changes and improvements both fall within claimed it is practical
In novel range.The protection scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
1. one kind be used for highway excavation section subgrade drainage system, it is characterised in that: including blotter, longitudinal drainage ditch,
Drain hole and permeable bed course, ground subsoil layer is arranged in for the blotter hereinafter, the longitudinal drainage ditch is located at dirt road
On the outside of shoulder, drain hole is arranged in the bottom of the longitudinal drainage ditch and blotter connecting position, and the permeable bed course is located at
Concrete foundation is arranged under the permeable bed course hereinafter, the permeable bed course bottom is equipped with longitudinal drainage pipe in longitudinal drainage ditch.
2. according to claim 1 a kind of for highway excavation section subgrade drainage system, it is characterised in that: described
Anti-seepage geotextile is equipped between concrete foundation and permeable bed course.
3. according to claim 1 a kind of for highway excavation section subgrade drainage system, it is characterised in that: described
Permeable bed course two sides be arranged anti-filter geotextiles.
4. according to claim 1 a kind of for highway excavation section subgrade drainage system, it is characterised in that: described
Longitudinal drainage ditch is cover board ditch.
5. according to claim 1 a kind of for highway excavation section subgrade drainage system, it is characterised in that: described
Drain hole be UPVC drainpipe, every 2~3m setting one at, drain hole have 30~35% gradients, filling pipe end use anti-filter
Geotextiles package.
6. according to claim 1 a kind of for highway excavation section subgrade drainage system, it is characterised in that: described
Permeable bed course bottom and roadbed excavation section bottom of backbreaking flush, dig binding site filling out and be connected with externally drained facility, it is permeable
Longitudinal drainage pipe in bed course bottom is UPVC with holes pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820766157.9U CN208201898U (en) | 2018-05-22 | 2018-05-22 | One kind being used for highway excavation section subgrade drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820766157.9U CN208201898U (en) | 2018-05-22 | 2018-05-22 | One kind being used for highway excavation section subgrade drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208201898U true CN208201898U (en) | 2018-12-07 |
Family
ID=64518272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820766157.9U Active CN208201898U (en) | 2018-05-22 | 2018-05-22 | One kind being used for highway excavation section subgrade drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208201898U (en) |
-
2018
- 2018-05-22 CN CN201820766157.9U patent/CN208201898U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202170502U (en) | Soil cut slope drainage system | |
CN105927272A (en) | Floor anchoring constraint tunnel lining structure | |
CN106087953B (en) | A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow | |
KR100491410B1 (en) | Drainage structure of an incline area | |
CN101914882B (en) | Low embankment structure in phreatic high slity soil region and construction method thereof | |
CN109930613A (en) | A kind of construction method and structure of the roadbed slope drainage system that seeps water | |
CN210857182U (en) | Roadbed drainage structure | |
CN110952574A (en) | Method for treating landslide deformation body | |
CN106759778A (en) | For the scattered collection mating type waterproof and water drainage system of highway median strip | |
CN102383408A (en) | Greening method for high water level impermeable saline and alkaline lands and greening system | |
CN211228269U (en) | High-grade highway central separation strip structure | |
CN112982459A (en) | Large-area drainage construction method for strongly weathered rock substrate rich in low-pressure-bearing fracture water | |
KR101201544B1 (en) | Underground Penetration Type Side Gutter Assembly | |
CN107794822A (en) | A kind of porous pavement based on sponge the idea of the city | |
CN210177294U (en) | Mountain area highway subgrade | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
CN208201898U (en) | One kind being used for highway excavation section subgrade drainage system | |
CN217997690U (en) | Highway prevents subsiding roadbed structure | |
CN206503213U (en) | Scattered collection mating type waterproof and water drainage system for highway median strip | |
CN214363925U (en) | Cut water seepage ditch system | |
KR101083032B1 (en) | Pavement | |
CN203360969U (en) | Express way reconstruction and extension engineering central median drainage system | |
KR20020000318A (en) | Method of horizontal drainage for pore water pumping of soft ground improvement | |
CN207297090U (en) | A kind of sewer structure for expansive stratum Tunnel Base draining | |
CN219490576U (en) | Drainage blind ditch structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |