CN208201880U - A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit - Google Patents
A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit Download PDFInfo
- Publication number
- CN208201880U CN208201880U CN201820055483.9U CN201820055483U CN208201880U CN 208201880 U CN208201880 U CN 208201880U CN 201820055483 U CN201820055483 U CN 201820055483U CN 208201880 U CN208201880 U CN 208201880U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- support
- fitting
- built
- diagonal brace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses the steel pipe underpinning devices for replacing traditional support replacement mode in a kind of deep basal pit, it mainly include support pile, crown beam, steel pipe is to support, steel pipe diagonal brace, built-in fitting, postposition anchor, basement floor, support pile top is installed by crown beam, built-in fitting is installed in crown beam, support pile top is installed by postposition anchor, built-in fitting and postposition anchor are separately connected steel pipe diagonal brace and steel pipe to support, steel pipe diagonal brace and steel pipe are connected to basement floor by built-in fitting to the support other end, it is initially formed steel pipe underpinning device, the dismounting of reinforced concrete brace in foundation pit is carried out again, load transfering strip is formed in foundation pit, prevent foundation pit collapse.The utility model design replaces traditional support replacement arrangement and method for construction with steel pipe underpinning technique, success support replacement tears support open, it overcomes common support replacement mode and removes the drawbacks such as long construction period caused by reinforced concrete inner support and personnel's work holdup, application advantage of the support pile+reinforced concrete inner support in Deep Foundation Pit Supporting Project, significant effect are expanded.
Description
Technical field
The utility model relates to the fields of construction installation in civil engineering, and in particular to a kind of deep basal pit is interior to replace tradition to change
The steel pipe underpinning device of support mode.
Background technique
In numerous deep foundation pit support types, support pile+reinforced concrete inner support has calculating simplicity, stress clear,
The advantages that rigidity is big, deformation is small, technology maturation.Especially anchor drawing etc. is restricted the deep foundation pit support region used, can more highlight
Its strong point.However, common removes reinforcing bar in the way of the support replacement of casting concrete strip between support pile and structure floor
Concrete inner support has long construction period, required operating space big, and support is not removed preceding blocking subsequent structural and continuously applied
Work and cause the drawbacks such as shut-down, worker's long-time work holdup, restrict its extensive use.Optimize former support replacement with steel pipe underpinning technique to set
Meter scheme, can safely, it is economical, be rapidly carried out support replacement, tear support open, elimination construction delay early period realizes constructing aims in advance.
Utility model content
The purpose of the utility model is to overcome the shortcomings of the prior art, and provide a kind of interior substitution tradition of deep basal pit
The steel pipe underpinning device of support replacement mode.
The purpose of this utility model is completed by following technical solution: replacing traditional support replacement side in this deep basal pit
The steel pipe underpinning device of formula mainly includes support pile, crown beam, steel pipe to support, steel pipe diagonal brace, built-in fitting, postposition anchor, basement
Crown beam is installed on floor, support pile top, and built-in fitting is equipped in crown beam, and postposition anchor is installed on support pile top, and built-in fitting is with after
It sets anchor and is separately connected steel pipe diagonal brace and steel pipe and by built-in fitting underground is connected to the support other end to support, steel pipe diagonal brace and steel pipe
Room floor is initially formed steel pipe underpinning device, then carries out the dismounting of reinforced concrete brace in foundation pit, and power transmission is formed in foundation pit
Band prevents foundation pit collapse.
The support pile is reinforced concrete bored pile.
The steel pipe is not less than Φ 300mm to support, its diameter of steel pipe diagonal brace, and wall thickness is not less than 10mm, and spacing is by≤4m cloth
It sets, and steel pipe is to support and steel pipe diagonal brace interlaced arrangement.
The built-in fitting is formed by steel plate and four reinforced steel bar perforation plug weldings, and steel plate 500mm × 500mm × 10mm, reinforcing bar is adopted
WithLength >=250mm, built-in fitting by design spacing it is embedded on basement floor construction corresponding position and crown beam.
Four reinforcing bars are first placed in support pile using bar planting mode by the postposition anchor production, and then steel plate and bar planting are welded
It connects.
The steel pipe uses the connection of support, steel pipe diagonal brace and built-in fitting, postposition anchor and is fully welded, and weld seam is not less than 8mm.
The construction process of the utility model are as follows: foundation slab structure construction;The installation of postposition anchor;It is Underground Construction, pre-
Embedded part is pre-buried;Steel pipe installs support, diagonal brace;Concrete support is removed;Basement construction finishes backfilling of earthwork;Steel pipe recycling.
The utility model has the following beneficial effects:
1, the utility model replaces traditional support replacement arrangement and method for construction with steel pipe underpinning technique, and success support replacement tears support open, overcomes often
See that support replacement mode removes the drawbacks such as long construction period caused by reinforced concrete inner support and personnel's work holdup, has expanded support pile
Application advantage of+the reinforced concrete inner support in Deep Foundation Pit Supporting Project, significant effect.
Detailed description of the invention
Fig. 1 is that the utility model one embodiment applies sectional view in foundation pit construction.
Fig. 2 is the partial elevational structural schematic diagram of the utility model.
Fig. 3 is the positive structure diagram of the utility model postposition anchor, built-in fitting.
Fig. 4 is the side structure schematic view of the utility model postposition anchor, built-in fitting.
Description of symbols: support pile 1, crown beam 2, steel pipe are to support 3, steel pipe diagonal brace 4, built-in fitting 5, postposition anchor 6, underground
Room floor 7.
Specific embodiment
Detailed introduction is done to the utility model below in conjunction with attached drawing:
As shown in the picture, the steel pipe underpinning device that traditional support replacement mode is replaced in this deep basal pit mainly includes support pile
1, to support 3, steel pipe diagonal brace 4, built-in fitting 5, postposition anchor 6, basement floor 7, crown beam is installed on 1 top of support pile for crown beam 2, steel pipe
2, built-in fitting 5 is installed, postposition anchor 6 is installed on 1 top of support pile, and built-in fitting 5 and postposition anchor 6 are separately connected steel in crown beam 2
Pipe diagonal brace 4 and steel pipe are connected to basement floor 7 by built-in fitting 5 to 3 other ends of support to support 3, steel pipe diagonal brace 4 and steel pipe, first
Steel pipe underpinning device is formed, then carries out the dismounting of reinforced concrete brace in foundation pit, load transfering strip is formed in foundation pit, prevents out
Existing foundation pit collapse.
The support pile 1 is reinforced concrete bored pile.
The steel pipe is not less than Φ 300mm to support 3, its diameter of steel pipe diagonal brace 4, and wall thickness is not less than 10mm, and spacing is by≤4m
Arrangement, and steel pipe is to support 3 and 4 interlaced arrangement of steel pipe diagonal brace.
The built-in fitting 5 is formed by steel plate and four reinforced steel bar perforation plug weldings, and steel plate 500mm × 500mm × 10mm, reinforcing bar is adopted
WithLength >=250mm, built-in fitting 5 by design spacing it is embedded on 7 structure corresponding position of basement floor and crown beam 2.
Four reinforcing bars are first placed in support pile using bar planting mode by the production of postposition anchor 6, and then steel plate and bar planting are welded
It connects.
The steel pipe uses the connection of support 3, steel pipe diagonal brace 4 and built-in fitting 5, postposition anchor 6 and is fully welded, and weld seam is not less than
8mm。
The construction process of the utility model are as follows: foundation slab structure construction;The installation of postposition anchor;It is Underground Construction, pre-
Embedded part is pre-buried;Steel pipe installs support, diagonal brace;Concrete support is removed;Basement construction finishes backfilling of earthwork;Steel pipe recycling.
It is understood that it will be understood by those skilled in the art that the technical solution of the utility model and utility model structure
Think of is subject to equivalent substitution or change all and should belong to the protection scope of the utility model the attached claims.
Claims (6)
1. replacing the steel pipe underpinning device of traditional support replacement mode in a kind of deep basal pit, it is characterised in that: mainly include support pile
(1), crown beam (2), steel pipe are to support (3), steel pipe diagonal brace (4), built-in fitting (5), postposition anchor (6), basement floor (7), supporting
Crown beam (2) are installed on stake (1) top, are equipped with built-in fitting (5) in crown beam (2), and postposition anchor (6) are installed on support pile (1) top, in advance
Embedded part (5) and postposition anchor (6) are separately connected steel pipe diagonal brace (4) and steel pipe to support (3), and steel pipe diagonal brace (4) and steel pipe are to support (3)
The other end is connected to basement floor (7) by built-in fitting (5), forms steel pipe underpinning device.
2. replacing the steel pipe underpinning device of traditional support replacement mode in deep basal pit according to claim 1, it is characterised in that: institute
Stating support pile (1) is reinforced concrete bored pile.
3. replacing the steel pipe underpinning device of traditional support replacement mode in deep basal pit according to claim 1, it is characterised in that: institute
Steel pipe is stated to support (3), steel pipe diagonal brace (4) its diameter not less than Φ 300mm, wall thickness is not less than 10mm, and spacing presses≤4m arrangement, and
Steel pipe is to support (3) and steel pipe diagonal brace (4) interlaced arrangement.
4. replacing the steel pipe underpinning device of traditional support replacement mode in deep basal pit according to claim 1, it is characterised in that: institute
It states built-in fitting (5) to be formed by steel plate and four reinforced steel bar perforation plug weldings, steel plate 500mm × 500mm × 10mm, reinforcing bar usesIt is long
Degree >=250mm, built-in fitting (5) by design spacing it is embedded on basement floor (7) structure corresponding position and crown beam (2).
5. replacing the steel pipe underpinning device of traditional support replacement mode in deep basal pit according to claim 1, it is characterised in that: institute
It states postposition anchor (6) production and four reinforcing bars is first placed in support pile using bar planting mode, then steel plate and bar planting are welded.
6. replacing the steel pipe underpinning device of traditional support replacement mode in deep basal pit according to claim 1, it is characterised in that: institute
Steel pipe is stated to be fully welded the connection use of support (3), steel pipe diagonal brace (4) and built-in fitting (5), postposition anchor (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820055483.9U CN208201880U (en) | 2018-01-12 | 2018-01-12 | A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820055483.9U CN208201880U (en) | 2018-01-12 | 2018-01-12 | A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208201880U true CN208201880U (en) | 2018-12-07 |
Family
ID=64491148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820055483.9U Expired - Fee Related CN208201880U (en) | 2018-01-12 | 2018-01-12 | A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208201880U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485432A (en) * | 2019-07-30 | 2019-11-22 | 中建三局第一建设工程有限责任公司 | A kind of foundation pit tears support body system optimization method and its system open |
CN112431208A (en) * | 2020-11-18 | 2021-03-02 | 上海二十冶建设有限公司 | Construction method for deep foundation pit supporting by adopting component type force transmission belt |
CN113404056A (en) * | 2021-07-13 | 2021-09-17 | 上海茂裕建设工程有限公司 | Steel pipe underpinning device for replacing support in deep foundation pit |
CN114232639A (en) * | 2021-12-10 | 2022-03-25 | 中国一冶集团有限公司 | Construction method for dismantling deep foundation pit support |
-
2018
- 2018-01-12 CN CN201820055483.9U patent/CN208201880U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485432A (en) * | 2019-07-30 | 2019-11-22 | 中建三局第一建设工程有限责任公司 | A kind of foundation pit tears support body system optimization method and its system open |
CN110485432B (en) * | 2019-07-30 | 2022-03-15 | 中建三局第一建设工程有限责任公司 | Foundation pit support removing system optimization method and system |
CN112431208A (en) * | 2020-11-18 | 2021-03-02 | 上海二十冶建设有限公司 | Construction method for deep foundation pit supporting by adopting component type force transmission belt |
CN113404056A (en) * | 2021-07-13 | 2021-09-17 | 上海茂裕建设工程有限公司 | Steel pipe underpinning device for replacing support in deep foundation pit |
CN114232639A (en) * | 2021-12-10 | 2022-03-25 | 中国一冶集团有限公司 | Construction method for dismantling deep foundation pit support |
CN114232639B (en) * | 2021-12-10 | 2023-08-25 | 中国一冶集团有限公司 | Construction method for post-dismantling of deep foundation pit support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208201880U (en) | A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit | |
CN108086343B (en) | Cantilever type single-side wall body mixed reinforcement and replacement structure and construction method thereof | |
CN104389419B (en) | Encorbelment and prop up mould structure for mounting platform and a constructional method | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
CN107740420A (en) | Foundation ditch tears support and support replacement system and method open | |
CN102518300B (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN103290851B (en) | Prestressed steel support used for controlling internal and external differential displacement of foundation pit enclosure wall and construction method | |
CN205676882U (en) | A kind of novel supporting construction | |
JP2007162266A (en) | Two-step earth retaining wall and its construction method | |
CN207160018U (en) | A kind of dismountable bracing members Guan Liang Z-shaped support hanging plate | |
CN106065710A (en) | A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold | |
CN211848785U (en) | Cast-in-place concrete road terrace template quick supporting and dismounting device | |
CN206477326U (en) | A kind of combined type shaped steel building enclosure | |
CN205036077U (en) | Shear force wall formwork support suitable for narrow and small space usage | |
CN207228125U (en) | A kind of steel pipe support structure for exempting to tear support open | |
CN206289632U (en) | Tiltedly throw support support replacement beam support system | |
CN208309750U (en) | A kind of fashioned iron adds the rectangle vertical shaft reacting wall of steel plate structure | |
CN204080820U (en) | A kind of concrete structure foundation ditch support replacement device | |
CN107460879A (en) | A kind of fixed structure of flare template | |
CN210975825U (en) | Lattice column joint combined type inclined-throwing steel support supporting structure | |
CN204080821U (en) | A kind of steel work foundation ditch support replacement device | |
CN209323527U (en) | A kind of frame-type double-row pile foundation pit enclosure structure | |
CN203113526U (en) | Temporary fixing structure of rubber waterstop | |
CN108487259A (en) | Small across footpath Larsen steel sheep pile support system and its method for supporting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181207 Termination date: 20200112 |