CN208201667U - Pier stud high-altitude operation platform and high-altitude construction system - Google Patents

Pier stud high-altitude operation platform and high-altitude construction system Download PDF

Info

Publication number
CN208201667U
CN208201667U CN201721226873.XU CN201721226873U CN208201667U CN 208201667 U CN208201667 U CN 208201667U CN 201721226873 U CN201721226873 U CN 201721226873U CN 208201667 U CN208201667 U CN 208201667U
Authority
CN
China
Prior art keywords
pier stud
workbench
column
fence
altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721226873.XU
Other languages
Chinese (zh)
Inventor
祁文源
柳志宏
柳涓
钟旭新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Bridge Luqiao Steel Template Technology Co Ltd
Original Assignee
Ningxia Bridge Luqiao Steel Template Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Bridge Luqiao Steel Template Technology Co Ltd filed Critical Ningxia Bridge Luqiao Steel Template Technology Co Ltd
Priority to CN201721226873.XU priority Critical patent/CN208201667U/en
Application granted granted Critical
Publication of CN208201667U publication Critical patent/CN208201667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Pier stud high-altitude provided by the utility model operation platform and high-altitude construction system are related to high-altitude construction safety technical field, which includes: workbench, high fence and low fence;The workbench is sheathed on outside pier stud, and the high fence is set to the outside of the workbench, and the low fence is set to the inside of the workbench;Correspond to the low fence on the workbench and be provided with column, the workbench is fixed on the pier stud by column.Workbench is set on pier stud by column in the operation platform of pier stud high-altitude provided by the utility model, it is easy to use, the high fence can guarantee the safety of personnel, entire platform can guarantee safety, save the cost for repeating to build, can reuse, with high security with it is at low cost the advantages that.

Description

Pier stud high-altitude operation platform and high-altitude construction system
Technical field
The utility model relates to high-altitude construction safety technical fields, more particularly, to a kind of pier stud high-altitude operation platform and height Empty construction system.
Background technique
For a long time, in the construction of high-speed rail, expressway, always all without good safety protection facility, especially Outstanding to be, in the construction of high-level bridge pier column, greatly all in reliable safety devices are lacked, having part is also with simple and crude It is nonstandard, or by construction team with reinforcing bar weld all around column shelves once, the shelves that enclose construct, i.e., it is dangerous reliable, and expense of taking a lot of work When, and be once finished and cut off, next time welds again, wastes a lot of manpower and material resources, and simultaneously unsightly, be not durable, security risk More, Lessons are more.
The general state of the art is: after the template standing of pier stud comes, just welding several angle steel supports on the top of template Once, several blocks of plates are then taken.It is once just gathered together with reinforcing bar weld all around on periphery.Safe altitude is inadequate, and the welding is not firm, security risk Very much, the accident of falling at high altitude often occurs.
In construction site throughout the country, since these are lack of standardization, actually and unsafe simply the reason of building, Caused by all kinds of falling from high altitude death by accident of hurting sb.'s feelings it is commonplace.
Status makes people worried: since the background technique of this respect is very poor, the technical of science is not sayed, serious non-compliance National security specification, is substantially scrub, disposably, seriously lacks safety reliability and science, generally deposits In accident potential, therefore status is badly in need of solving, and technology is suddenly to be modified.
It is of the existing technology the disadvantage is that: 1, by technical specification design, production, installation and use.2, it to weigh every time It builds, cannot repeatedly utilize again.Material and artificial all in waste repeatedly.3, build process is dangerous, and construction efficiency is very low.4, Structural instability, it is unreliable to weld, and is unable to undergo the dependence and collision of construction personnel, easily collapses and fall apart, and junk is caused to hurt sb.'s feelings or high Empty landing accident.
In conclusion existing constructing device needs to repeat to build, cannot reuse and the problem of structural instability.
Utility model content
One of the utility model is designed to provide a kind of pier stud high-altitude operation platform, to solve existing constructing device It needs to repeat to build, cannot reuse and the technical issues of structural instability.
Another of the utility model is designed to provide a kind of high-altitude construction system, the pier stud high-altitude including above-mentioned offer Operation platform.
In order to solve the above technical problems, the utility model uses following technical scheme;The utility model first aspect mentions The pier stud high-altitude operation platform of confession, wherein include: workbench, high fence and low fence;
The workbench is sheathed on outside pier stud, and the high fence is set to the outside of the workbench, described low to enclose Column is set to the inside of the workbench;
Correspond to the low fence on the workbench and be provided with column, the workbench is fixed on institute by column It states on pier stud.
Workbench is set on pier stud by column in the operation platform of pier stud high-altitude provided by the utility model, user Just, the high fence can guarantee the safety of personnel, entire platform can guarantee safety, save the cost for repeating to build, can Reuse, with high security with it is at low cost the advantages that.
In any of the above-described technical solution, further, it is provided with suspender on the column top, the column passes through Suspender is set to outside the pier stud.
In any of the above-described technical solution, further, on the suspender corresponds to the pier stud and is provided with adjustable plate, Adjusting bolt is provided on the adjustable plate, described one end for adjusting bolt is arranged in the inside of the adjustable plate Yu the pier stud Connection.
In order to protect the steel form of pier stud, prevent adjusting bolt from causing to scratch to its inner surface, in any of the above-described technical side In case, further, cushion block is provided between the adjusting bolt and the pier stud.
In any of the above-described technical solution, further, it is provided on the column for fixing the column bottom Lead screw on the pier stud, one end of the lead screw are arranged in the column and connect with the outside of the pier stud.
In order to protect the steel form of pier stud, prevent adjusting bolt from causing to scratch to its outer surface, in any of the above-described technical side In case, further, cushion block is provided between the lead screw and the pier stud.
It further include the exit passageway being connect with the high fence further in any of the above-described technical solution.
In any of the above-described technical solution, further, the exit passageway includes by platform and guardrail, the guardrail It is rotatablely arranged on the platform.
In any of the above-described technical solution, further, manhole is offered on the high fence or workbench, is also wrapped Include the rotation door for corresponding to the upper manhole setting.
The utility model additionally provides a kind of high-altitude construction system, wherein flat including pier stud high-altitude as described above construction Platform.
By adopting the above technical scheme, the utility model has the following beneficial effects:
High fence described in the operation platform of pier stud high-altitude provided by the utility model and low fence are rotatably arranged in respectively On the workbench, open fence construct, do not need using when fold pack up.It can guarantee safety, save repetition The cost built can be reused, with high security with it is at low cost the advantages that.
Further, it is provided with suspender on the column top, the column is set to the pier stud by suspender Outside.
Further, the pier stud is corresponded on the suspender and is provided with adjustable plate, tune is provided on the adjustable plate Bolt is saved, described one end for adjusting bolt is arranged in the adjustable plate and connect with the inside of the pier stud.
Further, the lead screw for being fixed on the column bottom on the pier stud, institute are provided on the column The one end for stating lead screw is arranged in the column and connect with the outside of the pier stud.
The additional aspect and advantage of the utility model will become obviously in following description section, or practical new by this The practice of type is recognized.
Detailed description of the invention
It below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the top view for the pier stud high-altitude operation platform that the utility model embodiment one provides;
Fig. 2 is the top view that the pier stud high-altitude operation platform that the utility model embodiment one provides removes pedal;
Fig. 3 is the structural schematic diagram of pier stud high-altitude operation platform and pier stud that the utility model embodiment one provides;
Fig. 4 is the structural schematic diagram for the pier stud high-altitude operation platform that the utility model embodiment one provides;Fig. 5 is that this is practical The structural schematic diagram of exit passageway in the pier stud high-altitude operation platform that new embodiment one provides.
Appended drawing reference:
1: pier stud;2: pedal;3: high fence;
4: low fence;5: steel form;6: dodge gate;
7: column;8: suspender;9: adjustable plate;
10: lead screw;11: cushion block;12: adjusting bolt;
13: exit passageway;14: workbench.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.It should be noted that in the absence of conflict, the feature in embodiments herein and embodiment can To be combined with each other.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Explanation is further explained to the utility model below with reference to specific embodiment.
As shown in Figures 1 to 5, the pier stud high-altitude operation platform that the embodiment of the utility model first aspect provides, comprising: Workbench 14, high fence 3 and low fence 4;
The workbench 14 is sheathed on outside pier stud 1, and the high fence 3 is set to the outside of the workbench 14, institute State the inside that low fence 4 is set to the workbench 14;
Correspond to the low fence 4 on the workbench 14 and be provided with column 7, the workbench 14 passes through column 7 It is fixed on the pier stud 1.
Workbench 14 is set on pier stud 1 by column 7 in 1 high-altitude operation platform of pier stud provided by the utility model, Easy to use, the high fence 3 can guarantee the safety of personnel, entire platform can guarantee safety, save repeat to build at This, can reuse, with high security with it is at low cost the advantages that.
Workbench 14 can be round or rectangular, rectangle etc., and concrete shape size is depending on the section of pier stud 1.Periphery The safe altitude that column is 1.2 meters, inside fence is 200 millimeters of skirting board height for convenience of constructing operation.Pier stud 1 is applied in centre Work, surrounding are surrounded with 80 centimetres of width of workbench 14, are high fences 3 on the outside of platform, fall to prevent personnel, platform it is interior Side is low fence 4, is made a misstep to prevent personnel.Pedal 2 is equipped on workbench 14, workbench 14 is steel material, is set on pedal 2 Decorative pattern is equipped with anti-skidding.Construction personnel's activity is steady and sure, spacious, firm, safe on security platform.
Column 7 is close to the low fence 4 of inside, column 7 be it is multiple, multiple columns 7 are uniformly distributed along the circumferential direction of workbench 14, hang Pendant 8 is arranged on symmetrical 4 columns 7 in inside, (each respectively setting one of column 7).Its primary structure is hanging down in column 7 Histogram makes its cross-arm in the top Flange Plane of 7 upper steel template 5 of column, makes whole workbench to one component of each weldering 14 are firmly suspended on the top of pier stud 1.
Whole device can be easily installed with dimidiation or muti-piece, can be attached between each other with fastener.
In any of the above-described technical solution, further, suspender 8, the column 7 are provided on 7 top of column It is set to outside the pier stud 1 by suspender 8.
In any of the above-described technical solution, further, on the suspender 8 corresponds to the pier stud 1 and be provided with adjusting Plate 9 is provided on the adjustable plate 9 and adjusts bolt 12, described one end for adjusting bolt 12 be arranged in the adjustable plate 9 with it is described The inside of pier stud 1 connects.
By adjusting bolt 12 is adjusted for will be fixed on outside the pier stud 1 at the top of the column 7, it may be set to be As long as his structure, which is able to achieve, to be fixed on the scheme outside the pier stud 1 at the top of column 7, as adjustable plate 9 can be along suspender 8 It is mobile, column 7 is fixed on the steel form 5 of pier stud 1.To adjust the opposite position of 5 inner wall of steel form Yu overall work platform 14 It sets, and reduces the opposite shaking of the platform, increase stability.
Suspender 8 is vertically installed in the top of pier stud 1, and the axis of adjustable plate 9 is parallel with the axis of column 7.
In order to protect the steel form 5 of pier stud 1, prevent adjusting bolt 12 from causing to scratch to its inner surface, in any of the above-described skill In art scheme, further, cushion block 11 is provided between the adjusting bolt 12 and the pier stud 1.The material of cushion block 11 is wood Material or other materials can prevent from causing to damage to 5 inner surface of steel form.
In order to enable the entire fixation of workbench 14 is more stable, in any of the above-described technical solution, further, institute State the lead screw 10 being provided on column 7 for being fixed on 7 bottom of column on the pier stud 1, one end of the lead screw 10 The column 7 is arranged in connect with the outside of the pier stud 1.Column 7 can also can be consolidated using bolt 12 or other is adjusted It is scheduled on the structure in 1 outside of pier stud.
In order to protect the steel form 5 of pier stud 1, prevent adjusting bolt 12 from causing to scratch to its outer surface, in any of the above-described skill In art scheme, further, cushion block 11 is provided between the lead screw 10 and the pier stud 1.The material of cushion block 11 is wooden.
At the middle part or bottom of low 4 symmetrically arranged 4 columns 7 of fence, it is respectively provided with and holds out against lead screw 10, it is whole to make Body platform and 1 steel form 5 of pier stud further hold out against and (to add wooden unit to fill gap at lead screw 10), make safe construction platform more It is reliable and stable, and the table top that can adjust the workbench 14 is in horizontality, in order to which personnel construct and walk.
It further include the exit passageway 13 being connect with the high fence 3 further in any of the above-described technical solution.When When workbench 14 has multiple, each workbench 14 is sheathed on respectively on pier stud 1, is symmetrical arranged on adjacent workbench 14 There is dodge gate 6, is connected with exit passageway 13 between adjacent dodge gate 6.
In the outside, certain antimere of high fence 3 opens up two dodge gates 6, to facilitate bigeminy, three, multi-joint pier stud 1, when more pier studs 1 under same bent cap are constructed simultaneously, a few pier bridging connection with the personnel for facilitating while constructing walk about in the air with The exchange of goods and materials equipment.
In any of the above-described technical solution, further, the exit passageway 13 includes by platform and guardrail, the shield Column is rotatablely arranged on the platform.
In the bigeminy, three, the construction of multi-joint pier stud 1, each pier stud 1 is fitted with the safe fence, two The exit passageway 13 of mutual connection is provided between connection, three.The platform two sides of the exit passageway 13 are equipped with guardrail, exit passageway 13 both ends are connected with 1 fence of pier stud, and guardrails of both sides is movable or folds, and are rotatablely arranged at the platform by shaft On.The fixed block for nonfloating rail can be set between guardrail and platform.
The both ends adjustable in length of exit passageway 13, guardrail and platform are settable multiple, and the platform of elongated portion can be rolled over It is folded to be set to primary platform bottom, or the same elongated channel is provided on the inside of exit passageway 13, the guardrail of elongated channel and Platform can be moved along the guardrail in outside, by modes such as guide rails, to increase the length of guardrail.To adapt to different engineering designs Size needs.
The exit passageway 13 ensures construction safety, it is ensured that the mutual circulation between aerial construction personnel, technology, object Money, the exchange of work equipment greatly facilitate construction, further improve work efficiency.
In any of the above-described technical solution, further, manhole is offered on the high fence 3 or workbench 14, It further include the rotation door corresponding to the upper manhole setting.High 3 a part of fence in the outside is provided with rotation door or sets It sets and opens up upper manhole on the floor of workbench, and set rotation door, two schemes are depending on the circumstances, to facilitate construction personnel Disengaging.
The utility model additionally provides a kind of high-altitude construction system, wherein flat including pier stud high-altitude as described above construction Platform.
A kind of high-altitude construction method, wherein apply 1 high-altitude operation platform of pier stud as described above, specific steps are as follows:
S1, workbench 14 is set on pier stud 1 by column 7, low fence 4 is arranged close to pier stud 1, and high fence 3 is remote It is arranged from pier stud 1;
S2, the top of column 7 is fixed on pier stud 1 using adjustable plate 9, and is consolidated the bottom of column 7 using lead screw 10 It is scheduled on pier stud 1, fixes entire column 7;
Exit passageway 13 can be set between S3, multiple workbenches 14.
Column 7 provided by the utility model is set to the top of pier stud 1 by top suspender 8, and suspender 8 passes through adjusting Position of the bolt 12 for 7 top and pier stud 1 of vertical columns, the position of vertical columns 7 bottom and pier stud 1 is used for by lead screw 10 It sets, walks about on workbench 14 convenient for personnel.It is connected between multiple workbenches 14 with exit passageway 13.The utility model It is for 1 class of pier stud, 1 high-altitude operation platform purpose of pier stud provided by the utility model are as follows: to solve the personnel in site operation Safety problem;Make the civilized construction in building site, safe construction rises to a new level;In addition to guaranteeing safe construction, also for Construction cost has been saved in building site, is avoided the waste of manpower, financial resources caused by repetition is built, material resources, is in addition also ad save the time, It is advanced by the duration, embodies and carries out production strictly in line with rules and regulations for building site, is kept the safety in production.
1 high-altitude operation platform of pier stud provided by the utility model solves the various difficult safety in the presence of site construction Technical problem, and can be repeated several times use, waste of manpower, material resources is not repeated, has substantially saved construction cost, it is ensured that applies Work is safe and efficient, quick.
In conclusion high fence described in the operation platform of pier stud high-altitude provided by the utility model and low fence rotate respectively Ground is set on the workbench, open fence construct, do not need using when fold pack up.Can guarantee safety, Save repeat build cost, can reuse, with high security with it is at low cost the advantages that.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.In addition, it will be appreciated by those of skill in the art that although some implementations described herein Example includes certain features included in other embodiments rather than other feature, but the group of the feature of different embodiments is desirable Taste within the scope of the utility model and form different embodiments.For example, in claims above, institute Claimed embodiment it is one of any can in any combination mode come using.

Claims (9)

1. a kind of pier stud high-altitude operation platform characterized by comprising workbench, high fence and low fence;
The workbench is sheathed on outside pier stud, and the high fence is set to the outside of the workbench, and the low fence is set It is placed in the inside of the workbench;
Correspond to the low fence on the workbench and be provided with column, the workbench is fixed on the pier by column On column;It is provided with suspender at the top of the column, the column is set to outside the pier stud by suspender.
2. pier stud high-altitude according to claim 1 operation platform, which is characterized in that correspond to the pier on the suspender Column is provided with adjustable plate, and adjusting bolt is provided on the adjustable plate, and described one end for adjusting bolt is arranged in the adjustable plate It is connect with the inside of the pier stud.
3. pier stud high-altitude according to claim 2 operation platform, which is characterized in that the adjusting bolt and the pier stud it Between be provided with cushion block.
4. pier stud high-altitude according to claim 2 operation platform, which is characterized in that be provided on the column for by institute The lead screw that column bottom is fixed on the pier stud is stated, one end of the lead screw is arranged in the outside of the column Yu the pier stud Connection.
5. pier stud high-altitude according to claim 4 operation platform, which is characterized in that set between the lead screw and the pier stud It is equipped with cushion block.
6. pier stud high-altitude according to claim 1 operation platform, which is characterized in that further include being connect with the high fence Exit passageway.
7. pier stud high-altitude according to claim 6 operation platform, which is characterized in that the exit passageway includes passing through platform And guardrail, the guardrail are rotatablely arranged on the platform.
8. pier stud high-altitude according to claim 1 operation platform, which is characterized in that opened on the high fence or workbench It further include the rotation door corresponding to the upper manhole setting equipped with upper manhole.
9. a kind of high-altitude construction system, which is characterized in that including the pier stud high-altitude construction as described in claim 1-8 any one Platform.
CN201721226873.XU 2017-09-22 2017-09-22 Pier stud high-altitude operation platform and high-altitude construction system Expired - Fee Related CN208201667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721226873.XU CN208201667U (en) 2017-09-22 2017-09-22 Pier stud high-altitude operation platform and high-altitude construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721226873.XU CN208201667U (en) 2017-09-22 2017-09-22 Pier stud high-altitude operation platform and high-altitude construction system

Publications (1)

Publication Number Publication Date
CN208201667U true CN208201667U (en) 2018-12-07

Family

ID=64490017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721226873.XU Expired - Fee Related CN208201667U (en) 2017-09-22 2017-09-22 Pier stud high-altitude operation platform and high-altitude construction system

Country Status (1)

Country Link
CN (1) CN208201667U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method

Similar Documents

Publication Publication Date Title
CN205025072U (en) A construction platform device for high altitude construction
CN202054588U (en) Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links
CN104577876B (en) Plug-in hanging basket for live working of helicopter
CN208201667U (en) Pier stud high-altitude operation platform and high-altitude construction system
CN205206282U (en) Concertina type work platform
CN205822747U (en) Architectural engineering scaffold
US9243425B2 (en) Safety barrier system
CN204752026U (en) Tower crane escape way
CN207277192U (en) Portable overhanging lifting platform for crash barrier template construction
CN206048160U (en) A kind of height-adjustable split heads
CN107642048A (en) Pier stud high-altitude construction platform and high-altitude construction method
CN205369866U (en) Assembled steel ladder
CN205474792U (en) Movable type cable ditch escape way bridge
CN208055875U (en) Foldable high-altitude operation platform and high-altitude construction system
CN208650506U (en) A kind of slip-framed reverse mould constructing device
CN207131172U (en) Windproof fence rack
CN202913679U (en) Double-function construction operation protection derrick in elevator shaft way
CN208517819U (en) Pier stud high-altitude operation platform and high-altitude construction system
CN212052563U (en) Scaffold for water conservancy construction
CN107587708A (en) Foldable high-altitude construction platform and high-altitude construction method
CN206928697U (en) A kind of safe ladder cage of new bananas type for building trade
CN208668277U (en) Foldable high-altitude operation platform and high-altitude construction system
CN207863501U (en) Heavy icing area reinforcement type shaft tower climbs cross-arm securing plate falling proof device
CN105836683A (en) Aerial pile extension lifting basket of steel pipe piles
CN207686256U (en) A kind of scaffold of the safety and stability municipal administration with lifting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207