CN208186297U - A kind of maleic anhydride waste gas burning boiler system - Google Patents
A kind of maleic anhydride waste gas burning boiler system Download PDFInfo
- Publication number
- CN208186297U CN208186297U CN201820541271.1U CN201820541271U CN208186297U CN 208186297 U CN208186297 U CN 208186297U CN 201820541271 U CN201820541271 U CN 201820541271U CN 208186297 U CN208186297 U CN 208186297U
- Authority
- CN
- China
- Prior art keywords
- temperature
- maleic anhydride
- waste gas
- burner
- anhydride waste
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 239000002912 waste gas Substances 0.000 title claims abstract description 44
- FPYJFEHAWHCUMM-UHFFFAOYSA-N maleic anhydride Chemical compound O=C1OC(=O)C=C1 FPYJFEHAWHCUMM-UHFFFAOYSA-N 0.000 title claims abstract description 43
- 239000007789 gas Substances 0.000 claims abstract description 22
- 238000002485 combustion reaction Methods 0.000 claims abstract description 20
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 12
- 239000003345 natural gas Substances 0.000 claims abstract description 8
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 claims abstract description 4
- 239000003546 flue gas Substances 0.000 claims abstract description 4
- 238000010438 heat treatment Methods 0.000 claims description 3
- 229920006395 saturated elastomer Polymers 0.000 claims description 3
- 238000001816 cooling Methods 0.000 claims description 2
- 238000013021 overheating Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 description 5
- IJDNQMDRQITEOD-UHFFFAOYSA-N sec-butylidene Natural products CCCC IJDNQMDRQITEOD-UHFFFAOYSA-N 0.000 description 3
- 230000000505 pernicious effect Effects 0.000 description 2
- 238000003915 air pollution Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000009776 industrial production Methods 0.000 description 1
- 239000003317 industrial substance Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
Abstract
The utility model relates to a kind of maleic anhydride waste gas burning boiler systems, belong to technical field of waste gas treatment.A kind of maleic anhydride waste gas burning boiler system, it is characterised in that: including burner, Burning Room, combustion chamber, gas bag, blower, high-temperature preheater, economizer, low-temperature pre-heater and chimney;Wherein burner is connect with Burning Room, combustion chamber, high-temperature preheater, economizer, low-temperature pre-heater and chimney in order, maleic anhydride waste gas inputs the pipeline outside low-temperature pre-heater and high-temperature preheater, burner and Burning Room are further separated into after being heated it, after-flame after maleic anhydride waste gas in burner is mixed with natural gas and air, the flue gas that indoor maleic anhydride waste gas is generated through high-temperature process that burns are discharged after being cooled down by the first convection bank, high temperature superheater, the second convection bank, low temperature superheater, high-temperature preheater, economizer, low-temperature pre-heater from chimney.The present invention enables boiler system to handle within the unit time more maleic anhydride waste gas, it is ensured that its after-flame.
Description
Technical field
The utility model relates to a kind of maleic anhydride waste gas burning boiler systems, belong to technical field of waste gas treatment.
Background technique
In recent years, cis-butenedioic anhydride is as a kind of important industrial chemicals, and demand is higher and higher, at present industrialized production cis-butenedioic anhydride
It is main that small normal butane method is polluted using low in raw material price, production, and with the appearance of the Air Pollution Prevention Law, to organic
The improvement of exhaust gas require it is higher and higher, due to, containing the largely normal butane with calorific value and CO etc., generally being adopted in the industry in maleic anhydride waste gas
The exhaust gas generated when producing cis-butenedioic anhydride by normal butane method is handled with waste gas combustion furnace, the temperature of flammable pernicious gas
Degree is increased to reaction temperature, makes its oxygenolysis at H2O and CO2It is discharged again afterwards, avoids direct emission pernicious gas to environment
Pollution, meet environmental protection and labour protection requirement, while in order to which abundant energy conservation can be by setting heat exchange equipment to the waste heat of burning
It is used.
But the processing capacity of incinerator must match with generated exhausted air quantity in process of production, excessive exhaust gas
If having little time to burn in incinerator, it is easy that the accidents such as boiler flameout, explosion can occur.Currently used for being carried out to maleic anhydride waste gas
The boiler system of burning due to that, at 900 DEG C or so, can only handle 10 tons or less exhaust gas for ignition temperature control per hour, once it gives up
Tolerance increase just will appear situation that can not be completely burned off, and the situation big in face of exhausted air quantity just must be provided with more burned waste gas
How expensive furnace take up an area, it is difficult to be suitble to the needs of industrial production mass production.
Utility model content
The purpose of this utility model is aiming at the problems existing in the prior art, to provide a kind of maleic anhydride waste gas burning boiler system
System, by enabling boiler system within the unit time to more for exhaust gas pre-burning, burning, the integrated design of abundant after-flame
Maleic anhydride waste gas carries out processing after-flame, while meeting the needs for the energization that steams.
Technical solution is as follows:
A kind of maleic anhydride waste gas burning process and boiler system, including burner, extension are provided with precombustion chamber, and center is set
Ever-burning flame is set, simultaneously after-flame is lighted after the maleic anhydride waste gas of shunting is mixed with natural gas and air;Burning Room, to remaining after shunting
Maleic anhydride waste gas carries out high-temperature process;Combustion chamber passes through the first convection bank and high temperature superheater, the second convection bank and low temperature mistake
Hot device connection;Gas bag is mounted on combustion chamber top, provides natural gas by pipeline for burner;Blower is burning by pipeline
Device inputs combustion air;High-temperature preheater, economizer, low-temperature pre-heater and chimney;Wherein in burner, Burning Room and combustion chamber
It is equipped with temperature sensor and obtains internal temperature, valve is set on each pipeline;Burner in order with Burning Room, combustion chamber, height
Warm preheater, economizer, low-temperature pre-heater are connected with chimney, and maleic anhydride waste gas inputs the pipe outside low-temperature pre-heater and high-temperature preheater
Road is further separated into burner and Burning Room after being heated it, and the maleic anhydride waste gas in burner is mixed with natural gas and air
After-flame afterwards, the flue gas that indoor maleic anhydride waste gas is generated through high-temperature process that burns pass through the first convection bank, high temperature superheater, second
It is discharged after convection bank, low temperature superheater, high-temperature preheater, economizer, low-temperature pre-heater cooling from chimney.
Further, it burner and is burnt with the PLC programmable controller being connect with each hygrosensor and valve to leading to
The intake of the exhaust gas inlet and blower of burning room is controlled and is adjusted.
Further, the heating temperature range of burner is 1200 DEG C -1300 DEG C.
Further, after 254 DEG C of saturated vapors being passed through the pipeline outside the low temperature superheater and high temperature superheater successively,
420 DEG C of superheated steams can be exported
Further, boiler system is 35t per hour to the processing capacity of maleic anhydride waste gas.
The utility model has the advantages that
1) the utility model is by enabling boiler system in list for exhaust gas pre-burning, burning, the integrated design of abundant after-flame
More maleic anhydride waste gas are handled in the time of position, it is ensured that its after-flame.
2) it is controlled and is adjusted using the exhaust gas of PLC programmable controller pair and air inlet, it is ensured that boiler is stablized
Burning.
3) a certain amount of superheated steam is generated using burner exhaust heat, using by oneself, it is suitable to sell two.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of maleic anhydride waste gas burning boiler system;
Wherein: 1 being burner, 2 be Burning Room, 3 be combustion chamber, 31 be the first convection bank, 32 be high temperature superheater, 33
It is low temperature superheater for the second convection bank, 34,4 be gas bag, 5 be blower, 61 be high-temperature preheater, 7 be economizer, 62 is low
Warm preheater, 8 are chimney.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments:
Including burner 1, extension is provided with precombustion chamber, and ever-burning flame is arranged in center, by the maleic anhydride waste gas and day of shunting
Simultaneously after-flame is lighted after right gas and air mixing;Burning Room 2 carries out high-temperature process to maleic anhydride waste gas remaining after shunting;Combustion chamber
3, it is connect by the first convection bank 31 with high temperature superheater 32, the second convection bank 33 with low temperature superheater 34;Gas bag 4, peace
It is that burner 1 provides natural gas by pipeline mounted in 3 top of combustion chamber;Blower 5 is that burner 1 inputs combustion-supporting sky by pipeline
Gas;High-temperature preheater 61, economizer 7, low-temperature pre-heater 62 and chimney 8;Wherein in burner 1, Burning Room 2 and combustion chamber 3
Internal temperature is obtained equipped with temperature sensor, valve is set on each pipeline;Burner 1 in order with Burning Room 2, combustion chamber 3, high
Warm preheater 61, economizer 7, low-temperature pre-heater 62 and chimney 8 connect, and maleic anhydride waste gas inputs low-temperature pre-heater 62 and high temperature preheating
Pipeline outside device 61 is further separated into burner 1 and Burning Room 2 after being heated it, the maleic anhydride waste gas in burner 1 and natural
After-flame after gas and air mixing, the flue gas that the maleic anhydride waste gas in combustion chamber 3 is generated through high-temperature process pass through the first convection bank 31,
High temperature superheater 32, the second convection bank 33, low temperature superheater 34, high-temperature preheater 61, economizer 7, low-temperature pre-heater 62 drop
Wen Houcong chimney 5 is discharged.
Using the PLC programmable controller being connect with each hygrosensor and valve to leading to burner 1 and Burning Room 2
The intake of exhaust gas inlet and blower 5 is controlled and is adjusted, and the elastic oscillation of maleic anhydride waste gas amount when coping with production is protected
Extra exhaust gas is shunted after card exhaust gas combustion-supporting quantity.
The heating temperature range of burner 1 is 1200 DEG C -1300 DEG C.
By 254 DEG C of saturated vapor after the low temperature superheater 33 and high temperature superheater 32,420 DEG C of overheats can be exported
Steam.
Boiler system is 35t per hour to the processing capacity of maleic anhydride waste gas.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the principle and spirit of utility model
Protection scope within.
Claims (5)
1. a kind of maleic anhydride waste gas burning boiler system, it is characterised in that: including burner (1), extension is provided with precombustion chamber,
Ever-burning flame is arranged in center, and simultaneously after-flame is lighted after the maleic anhydride waste gas of shunting is mixed with natural gas and air;
Burning Room (2) carries out high-temperature process to maleic anhydride waste gas remaining after shunting;
Combustion chamber (3) passes through the first convection bank (31) and high temperature superheater (32), the second convection bank (33) and cryogenic overheating
Device (34) connection;
Gas bag (4) is mounted on combustion chamber (3) top, is that burner (1) provides natural gas by pipeline;
Blower (5) is that burner (1) inputs combustion air by pipeline;
High-temperature preheater (61), economizer (7), low-temperature pre-heater (62) and chimney (8);
Wherein burner (1), be equipped with temperature sensor in Burning Room (2) and combustion chamber (3) and obtain internal temperature, on each pipeline
Valve is set;Burner (1) is pre- with Burning Room (2), combustion chamber (3), high-temperature preheater (61), economizer (7), low temperature in order
Hot device (62) and chimney (8) connection, maleic anhydride waste gas input the pipeline of low-temperature pre-heater (62) and high-temperature preheater (61) outside, make it
Burner (1) and Burning Room (2) are further separated into after being heated, the maleic anhydride waste gas in burner (1) and natural gas and air mix
After-flame after conjunction, the flue gas that the maleic anhydride waste gas in combustion chamber (3) is generated through high-temperature process pass through the first convection bank (31), high temperature mistake
Hot device (32), the second convection bank (33), low temperature superheater (34), high-temperature preheater (61), economizer (7), low-temperature pre-heater
(62) it is discharged after cooling down from chimney (8).
2. maleic anhydride waste gas burning boiler system as described in claim 1, it is characterised in that: use and each hygrosensor and valve
Air inlet of the PLC programmable controller of connection to the exhaust gas inlet and blower (5) of leading to burner (1) and Burning Room (2)
Amount is controlled and is adjusted.
3. maleic anhydride waste gas burning boiler system as described in claim 1, it is characterised in that: the heating temperature of the burner (1)
Range is 1200 DEG C -1300 DEG C.
4. maleic anhydride waste gas burning boiler system as described in claim 1, it is characterised in that: pass through 254 DEG C of saturated vapors successively
After the pipeline of the low temperature superheater (34) and high temperature superheater (32) outside, 420 DEG C of superheated steams can be exported.
5. maleic anhydride waste gas burning boiler system as described in claim 1, it is characterised in that: the boiler system is to maleic anhydride waste gas
Processing capacity is 35t per hour.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820541271.1U CN208186297U (en) | 2018-04-17 | 2018-04-17 | A kind of maleic anhydride waste gas burning boiler system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820541271.1U CN208186297U (en) | 2018-04-17 | 2018-04-17 | A kind of maleic anhydride waste gas burning boiler system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208186297U true CN208186297U (en) | 2018-12-04 |
Family
ID=64433885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820541271.1U Withdrawn - After Issue CN208186297U (en) | 2018-04-17 | 2018-04-17 | A kind of maleic anhydride waste gas burning boiler system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208186297U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108426242A (en) * | 2018-04-17 | 2018-08-21 | 上海四方锅炉集团工程成套股份有限公司 | A kind of maleic anhydride waste gas burning process and boiler system |
-
2018
- 2018-04-17 CN CN201820541271.1U patent/CN208186297U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108426242A (en) * | 2018-04-17 | 2018-08-21 | 上海四方锅炉集团工程成套股份有限公司 | A kind of maleic anhydride waste gas burning process and boiler system |
CN108426242B (en) * | 2018-04-17 | 2023-11-10 | 上海四方锅炉集团工程成套股份有限公司 | Maleic anhydride waste gas incineration process and boiler system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101576313B (en) | Method for controlling automatic ignition of tube furnace | |
CN2893437Y (en) | Waste liquid and/or waste gas incinerator | |
CN201706511U (en) | Incinerator for waste liquid and/or waste gas | |
CN103884101A (en) | Plate-type gas combustion condensing water boiler | |
CN208186297U (en) | A kind of maleic anhydride waste gas burning boiler system | |
CN108426242A (en) | A kind of maleic anhydride waste gas burning process and boiler system | |
CN206269163U (en) | A kind of negative pressure is ignited heat exchange preheating device | |
CN206882776U (en) | A kind of pre-heated Ladle-casting apparatus of combustion air split | |
CN203586231U (en) | Waste gas incineration treatment system | |
CN203385194U (en) | Porous medium smoke hot blast stove capable of combusting low-grade fuel | |
CN206648075U (en) | A kind of gas-oil hybrid ratio combustion control system | |
SE8306852L (en) | PROCEDURE AND DEVICE FOR IN PARTICULAR PROMOTION OF BLESTER AIR HEATERS FOR HOGUGES | |
CN106439803A (en) | Liquid light hydrocarbon fuel gasification and combustion system | |
CN208365549U (en) | A kind of coal hydrogen manufacturing decarburization resolution gas incinerating and treating device | |
CN208750738U (en) | A kind of processing system for burning combined steam overheat | |
CN208764914U (en) | A kind of burner | |
CN2163303Y (en) | Bottom igniting device of fluidized-bed boiler | |
CN105115312A (en) | Method for utilizing kiln flue gas to perform secondary mixed combustion | |
CN204513437U (en) | A kind of cold air heating device and boiler milling system | |
CN106765284A (en) | A kind of negative pressure is ignited heat exchange preheating device | |
CN206803189U (en) | A kind of new a variety of peculiar smell poisonous fume synchronization incinerators | |
CN214468612U (en) | Automatic tracking air distribution subsystem for burner of converter waste heat recovery boiler | |
CN209877381U (en) | Energy-saving gas module furnace for preheating secondary condensation | |
CN220670229U (en) | Device for simultaneously heating heat conduction oil and supplying steam by flue gas waste heat of electric calcining furnace | |
CN205245247U (en) | Energy -conserving furnace end with protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20181204 Effective date of abandoning: 20231110 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20181204 Effective date of abandoning: 20231110 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |