Prior art keywords
template
box
template box
piping lane
deformation joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820626338.1U
Other languages
Chinese (zh)
Inventor
赵世伟
黄巍
孙磊
牛乐
刘卫东
季文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201820626338.1U priority Critical patent/CN208183798U/en
Application granted granted Critical
Publication of CN208183798U publication Critical patent/CN208183798U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a piping lane movement joint template technical field discloses a template support system for piping lane movement joint. The utility model comprises a template box positioned in the deformation joint, a side wall template arranged outside the template box, and a supporting system for fixing the side wall template and the template box; the template box comprises a first template box and a second template box which are arranged in parallel, and a middle-buried water stop belt is clamped between the first template box and the second template box; the supporting system comprises a main back ridge erected outside the side wall template, a secondary back ridge arranged closely outside the main back ridge, and a tension bolt for fixing the side wall template and the template box. The utility model discloses it is strong to support the steadiness, and ann tears convenient open, simple structure, and the efficiency of construction is high, and the turnover is nimble.

Description

Form bracing system for piping lane deformation joint
Technical field
The utility model relates to piping lane deformation slit formwork technical fields, more particularly to a kind of mould for piping lane deformation joint Plate support system.
Background technique
Country just builds Urban Underground pipe gallery, according to requiring, the every 30m of pipe gallery energetically in China at present Length just must be provided with one of shear wall vertical deformation seam, may be shorter during practice of construction, on the top plate and bottom plate of piping lane Also setting horizontal distortion is required to stitch, and the quality of the concrete construction Forming Quality of deformation joint directly affects the anti-of deformation joint Water, effect of settling.
At present in construction market, deformation slit formwork is elongated to use plank sheathing or steel form, and the template on the inside of deformation joint adds Gu typically steel pipe or flitch shore connection, the mould on the inside of deformation joint as simple almost without succinct effective mode Slab supporting area is small, and supporting stability is poor, template system globality poor, and peace tears that process is complicated, difficulty of construction is big open, time-consuming and laborious, Also easily rise mould phenomenon when construction.
Utility model content
It is strong that the utility model provides a kind of support stability, and it is convenient that peace is torn open, and structure is simple, and construction efficiency is high, and turnover is flexible The form bracing system for piping lane deformation joint.
Technical problems to be solved are: existing deformation joint inner side template reinforcing mode supporting stability is poor, template system Globality poor, peace tears that process is complicated, difficulty of construction is big open, time-consuming and laborious, and when construction also easily rises mould phenomenon.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model is used for the form bracing system of piping lane deformation joint, including the template box being located in deformation joint, setting The support system of side wall template and fixed sidewall template and template box on the outside of template box;Template box includes laid out in parallel The first template box and the second template box, be folded with middle buried water stop between the first template box and the second template box;Support system System includes the main back cord that branch is located on the outside of side wall template, is close to the secondary back cord being arranged on the outside of main back cord and fixed sidewall template With the turnbuckle of template box.
The utility model is used for the form bracing system of piping lane deformation joint, further, the first template box and second Template box is all made of plank sheathing splicing composition of the thickness no more than 15mm.
The utility model is used for the form bracing system of piping lane deformation joint, further, the first template box and second The section of template box is rectangular, laid out in parallel, in the elongated vertical deformation seam that piping lane siding is arranged in.
The utility model is used for the form bracing system of piping lane deformation joint, further, the first template box and second Template box laid out in parallel, in the elongated horizontal distortion seam being arranged on piping lane top plate or bottom plate, the section of the first template box is side Shape, outwardly convex on the long side plate in side in the second template box section are formed and adaptable convex of tongue and groove reserved in horizontal distortion seam The portion of rising.
The utility model is used for the form bracing system of piping lane deformation joint, further, the first template box and second Inner supporting structure is provided in template box, the inner supporting structure includes the first wood reinforcement, first wood reinforcement It is arranged at the inside circumference end angle of template box, the elongated setting of the first wood reinforcement is fixed by screws in the side wall of template box On.
The utility model is used for the form bracing system of piping lane deformation joint, and further, the inner supporting structure also wraps Securing plate is included, the securing plate is arranged in parallel along the elongated setting of deformation joint with the short side in template box section, and both ends pass through screw point It is not fixed in opposite two long sides in template box section, length direction of the securing plate along the first template box section is intervally arranged.
The utility model is used for the form bracing system of piping lane deformation joint, and further, the inner supporting structure also wraps The second wood reinforcement is included, second wood reinforcement is arranged at lug boss inside corner, and elongated setting is fixed by screws in On the side wall of second template box.
The utility model is used for the form bracing system of piping lane deformation joint, further, the side wall template fitting setting On the outside of the first template box and the second template box, the plank sheathing of 15mm is not less than for thickness.
The utility model is used for the form bracing system of piping lane deformation joint, and further, the main back cord is long along deformation joint Spend the elongated setting in direction, the secondary back cord be arranged perpendicular to main back cord, turnbuckle sequentially passes through secondary back cord, template box protrude into In the concrete structure poured, external end is tight with chevron padlock.
The utility model is used for the form bracing system of piping lane deformation joint, and further, the main back cord is that side length is not small In the flitch of 50mm, the secondary back cord is the round steel pipe that outer diameter is not less than 45mm.
Form bracing system of the utility model for piping lane deformation joint has the following beneficial effects: compared with prior art
Form bracing system structure of the utility model for piping lane deformation joint is simple, easy to use, and peace tears that difficulty is small, work open Sequence is few, time saving and energy saving, and construction efficiency is high;It is inserted in deformation joints using two template boxes, and is wanted according to the design of the shape of deformation joint It asks and is designed to different cross sectional shapes, substantially increase the Forming Quality of deformation joint side wall;The template box of two laid out in parallel, will Middle buried water stop sandwiched is fixed, while it is fixed to solve the problems, such as waterstop, and ensures the logical straight of waterstop, is improved The accuracy of waterstop setting.Each component of the utility model is to be detachably connected, template box high recycling rate, scene turnover Flexibility is high.
The form bracing system for piping lane deformation joint of the utility model is described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the form bracing system in piping lane siding vertical deformation seam;
Fig. 2 is the structural schematic diagram of the form bracing system in the horizontal distortion seam on piping lane top plate or bottom plate.
Appended drawing reference:
1- the first template box;2- the second template box;21- lug boss;Buried water stop in 3-;4- side wall template;5- first Wood reinforcement;6- securing plate;The second wood reinforcement of 7-;The main back cord of 81-;82- back cord;9- turnbuckle.
Specific embodiment
Shown in as depicted in figs. 1 and 2, the utility model includes being located at deformation for the form bracing system of piping lane deformation joint The support system of the side wall template 4 on the outside of template box and fixed sidewall template 4 and template box is arranged in template box in seam.
Template box includes the first template box 1 and the second template box 2 of laid out in parallel, the first template box 1 and the second template box 2 It is elongated to be set in deformation joint, it is all made of plank sheathing splicing composition of the thickness no more than 15mm, the first template box 1 and the second template There are the gaps for being not more than 20mm between box 2, are folded with middle buried water stop 3 in gap.
The section of first template box 1 be it is rectangular, can be in no setting is required when in the vertical deformation that piping lane siding is arranged in is stitched Portion's support construction needs to add inner supporting structure when in the horizontal distortion seam being arranged on piping lane top plate or bottom plate;It is internal Support construction includes the first wood reinforcement 5 and securing plate 6, and the inside circumference end of the first template box 1 is arranged in the first wood reinforcement 5 At angle, the elongated setting of the first wood reinforcement 5 is fixed by screws on the side wall of the first template box 1;Securing plate 6 is along deformation joint Elongated setting is arranged in parallel with the short side in 1 section of the first template box, and both ends are separately fixed at the first template box 1 by screw and cut In opposite two long sides in face, length direction of the securing plate 6 along 1 section of the first template box is intervally arranged, between adjacent securing plate 6 Distance is not more than 100mm.
Second template box 2 is different according to the position of setting, and cross sectional shape is different, when the vertical deformation that piping lane siding is arranged in When in seam, the section of the second template box 2 is rectangular, internal no setting is required any inner supporting structure, when being arranged on piping lane top When in the horizontal distortion seam on plate or bottom plate, outwardly convex on the long side plate in side in 2 section of the second template box forms and becomes with horizontal The adaptable lug boss 21 of reserved tongue and groove in shape seam, while being internally provided with inner supporting structure;Inner supporting structure includes the The inside circumference end of the second template box 2 is arranged in one wood reinforcement 5, the second wood reinforcement 7 and securing plate 6, the first wood reinforcement 5 At angle, the second wood reinforcement 7 is arranged at 21 inside corner of lug boss, and the first wood reinforcement 5 and the second wood reinforcement 7 are elongated Setting, is fixed by screws on the side wall of the second template box 2;Securing plate 6 is along the elongated setting of deformation joint, with the second template box 2 The short side in section is arranged in parallel, and both ends are separately fixed in opposite two long sides in 2 section of the second template box by screw, securing plate 6 length direction along 2 section of the second template box is intervally arranged, and the distance between adjacent securing plate 6 is not more than 100mm.
The fitting of side wall template 4 setting is not less than the wood of 15mm for thickness in 2 outside of the first template box 1 and the second template box Template.
Support system includes the main back cord 81 that branch is located at 4 outside of side wall template, is close to the secondary back being arranged on the outside of main back cord 81 Stupefied 82 and turnbuckle 9;Main back cord 81 is not less than the flitch of 50mm for side length along the elongated setting of deformation joint length direction, secondary Back cord 82 is arranged perpendicular to main back cord 81, is not less than the round steel pipe of 45mm for outer diameter, turnbuckle 9 sequentially pass through time back cord 82, First template box 1 or the second template box 2 protrude into concrete structure to be poured, and external end is tight with chevron padlock.
Construction method of the utility model for the form bracing system of piping lane deformation joint, specifically includes the following steps:
Step 1: production template box: according to the design requirement of deformation joint, making the first template box 1 and the second template box 2;
Step 2: being placed in middle buried water stop 3 is clamped between the first template box 1 and the second template box 2 in deformation joint;
Step 3: the fitting setting side wall template 4 on the outside of the first template box 1 and the second template box 2;
Step 4: being orderly arranged outside each main back cord 81 and time back cord 82 in side wall template 4;
Step 5: turnbuckle 9 is passed through time back cord 82 and template box, protrude into concrete structure to be poured, outer end It is tight with chevron padlock;
Step 6: casting concrete;
Step 7: successively removing turnbuckle 9, secondary back cord 82, main back cord after concrete strength reaches collapsible die intensity 81, side wall template 4 and template box.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines In range.

Claims (10)

1. being used for the form bracing system of piping lane deformation joint, it is characterised in that: including the template box being located in deformation joint, setting exists The support system of side wall template (4) and fixed sidewall template (4) and template box on the outside of template box;Template box includes arranged side by side Arrangement the first template box (1) and the second template box (2), be folded between the first template box (1) and the second template box (2) in bury Formula waterstop (3);Support system includes the main back cord (81) that branch is located on the outside of side wall template (4), is close on the outside of main back cord (81) The turnbuckle (9) of the secondary back cord (82) and fixed sidewall template (4) and template box that are arranged.
2. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: first template Box (1) and the second template box (2) are all made of plank sheathing splicing of the thickness no more than 15mm and form.
3. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: first template The section of box (1) and the second template box (2) is rectangular, laid out in parallel, in the elongated vertical deformation seam that piping lane siding is arranged in.
4. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: first template Box (1) and second template box (2) laid out in parallel, it is elongated be arranged on piping lane top plate or bottom plate horizontal distortion seam in, the first mould The section of plate box (1) is rectangular, outwardly convex on the long side plate in side in second template box (2) section, is formed and is stitched with horizontal distortion The adaptable lug boss (21) of interior reserved tongue and groove.
5. the form bracing system according to claim 4 for piping lane deformation joint, it is characterised in that: first template Inner supporting structure is provided in box (1) and the second template box (2), the inner supporting structure includes the first wood reinforcement (5), First wood reinforcement (5) is arranged at the inside circumference end angle of template box, and the first wood reinforcement (5) elongated setting passes through Screw is fixed on the side wall of template box.
6. the form bracing system according to claim 5 for piping lane deformation joint, it is characterised in that: the internal support Structure further includes securing plate (6), and the securing plate (6) is arranged in parallel along the elongated setting of deformation joint with the short side in template box section, Both ends are separately fixed in opposite two long sides in template box section by screw, and securing plate (6) is along first template box (1) section Length direction is intervally arranged.
7. the form bracing system according to claim 5 for piping lane deformation joint, it is characterised in that: the internal support Structure further includes the second wood reinforcement (7), and second wood reinforcement (7) is arranged at lug boss (21) inside corner, elongated Setting, is fixed by screws on the side wall of the second template box (2).
8. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: the side wall template (4) fitting setting is not less than the plank sheathing of 15mm for thickness on the outside of the first template box (1) and the second template box (2).
9. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: the main back cord (81) along the elongated setting of deformation joint length direction, the secondary back cord (82) is arranged perpendicular to main back cord (81), the turnbuckle (9) sequentially pass through time back cord (82), template box protrudes into concrete structure to be poured, external end is tight with chevron padlock.
10. the form bracing system according to claim 1 for piping lane deformation joint, it is characterised in that: the main back cord (81) it is not less than the flitch of 50mm for side length, the secondary back cord (82) is the round steel pipe that outer diameter is not less than 45mm.
CN201820626338.1U 2018-04-28 2018-04-28 A template support system for piping lane movement joint Active CN208183798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820626338.1U CN208183798U (en) 2018-04-28 2018-04-28 A template support system for piping lane movement joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820626338.1U CN208183798U (en) 2018-04-28 2018-04-28 A template support system for piping lane movement joint

Publications (1)

Publication Number Publication Date
CN208183798U true CN208183798U (en) 2018-12-04

Family

ID=64431704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820626338.1U Active CN208183798U (en) 2018-04-28 2018-04-28 A template support system for piping lane movement joint

Country Status (1)

Country Link
CN (1) CN208183798U (en)

Similar Documents

Publication Publication Date Title
CN104196055B (en) Outer wall of basement lower die board construction method
CN108589767B (en) Turnbuckle single-sided vertical die inclined throwing and supporting device and construction method thereof
CN210712751U (en) Aqueduct trough body post-cast strip concrete formwork mounting structure
CN111472540A (en) Integrated formwork system suitable for concrete pouring of pool wall and construction method thereof
CN208183798U (en) A template support system for piping lane movement joint
CN212200076U (en) Formwork apparatus for wet joints
CN107700531B (en) A kind of erection method of chamfering set shaped steel formwork
CN208152107U (en) Steel-edged rubber water stop mounting device
CN110761553A (en) Constructional column formwork unit, constructional column formwork structure and constructional column construction method
CN206418775U (en) A kind of arm support and concrete spraying machine
CN203129572U (en) Prefabricated concrete formwork and prefabricated building formed by same
CN212478537U (en) Arc male and female corner template and arc male and female corner template combined supporting template
CN215055316U (en) Primary and secondary beam node post-cast section template device
CN111926857B (en) Template for construction joint of pipe gallery wall and construction method
CN209670154U (en) A kind of prefabricated superimposed sheet conveniently piled up
CN212715040U (en) Assembled settlement joint of reinforced concrete apron culvert
CN206753034U (en) The box-like inner corner trim overlap joint building template of tool group
CN206753039U (en) The box-like irregular corners building template of tool group
CN211313376U (en) Tool type constructional column template unit and constructional column template structure
CN211228618U (en) Fixing device for underground structure rectangular section water stop belt
CN209942229U (en) Constructional column formwork reinforcing apparatus
CN208121825U (en) Waterstop and construction joint water sealing structure including the waterstop
CN208949921U (en) Water stop fixing die
CN207194439U (en) Cornerite plywood form
CN207244479U (en) Culvert pipe deformation joint termination sizing mould bases

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant