CN208183551U - Positioning device for the installation of bridge pile foundation steel reinforcement cage - Google Patents

Positioning device for the installation of bridge pile foundation steel reinforcement cage Download PDF

Info

Publication number
CN208183551U
CN208183551U CN201820682822.6U CN201820682822U CN208183551U CN 208183551 U CN208183551 U CN 208183551U CN 201820682822 U CN201820682822 U CN 201820682822U CN 208183551 U CN208183551 U CN 208183551U
Authority
CN
China
Prior art keywords
installation
pile foundation
reinforcement cage
steel reinforcement
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820682822.6U
Other languages
Chinese (zh)
Inventor
周泽林
孙兴华
杜承波
秦晓波
夏孝军
王定泽
程树稳
李忠红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201820682822.6U priority Critical patent/CN208183551U/en
Application granted granted Critical
Publication of CN208183551U publication Critical patent/CN208183551U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model is used for the positioning device of bridge pile foundation steel reinforcement cage installation, belongs to field of bridge construction, it is therefore an objective to improve the accuracy of pile foundation steel bar cage installation.Including fixing seat, it is provided in fixing seat and is penetrated through by one end to the installation region of the other end;The limiting device being connected with fixing seat is provided in installation region, the limit channels passed through along installation region axially through the appearance pile foundation steel bar cage of limiting device are provided with, and are provided with the vertical adjustment structure for adjusting the radial dimension of radiai adjustment structure of limit channels and adjusting limit channels vertical position;The bottom of limit channels is provided with hoisting structure and top tune binding structure.The utility model limits verticality by limit channels;And by the adjustment structure of the hoisting structure of limit channels bottom and top, fix the plan-position of steel reinforcement cage, while pile body surrounding protection layers thickness can be made uniform;The use of the positioning device accelerates lifting speed, has evaded construction risk and saved artificial.

Description

Positioning device for the installation of bridge pile foundation steel reinforcement cage
Technical field
The utility model belongs to field of bridge construction, particularly the positioning device for the installation of bridge pile foundation steel reinforcement cage.
Background technique
Currently, Bridge Pile Foundation Construction, which mainly comprises the processes of pile foundation pore-forming, borehole cleaning → lifting steel reinforcement cage →, pours pile body coagulation Soil.Due to bridge pile foundation pore-forming either manually digging hole or mechanical hole building, there is certain expending die, pile foundation steel bar cage exists How guarantor accuracy, the verticality of steel reinforcement cage axial centerline, and control pile body main reinforcement on the outside of is ensured in hoisting process Covering thickness always is the problem of construction.Currently, being substantially by controlling lifting by manpower auxiliary and micro-judgment Cage body position in decentralization process cooperates manpower and the mechanical method pulled to adjust cage body position again after cage body decentralization in place, It is aligned steel reinforcement cage center with design stake holes position center.The limitation of the conventional method shows themselves in that
1. being unable to control the decentralization verticality of cage body during pile foundation reinforcement cage hoisting;
2. the plan-position poor accuracy after pile foundation steel bar cage decentralization often deviates several centimetres of even several tens cms;
3. the method for judging with artificial ocular estimate and adjusting reinforcing bar cage location is empirical strong, construction quality is not high;
4. need hand fit in reinforcing bar cage hoisting operating process, there are construction safety risk, and integral construction efficiency compared with It is low.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of positioning dresses for the installation of bridge pile foundation steel reinforcement cage It sets, to improve the accuracy of pile foundation steel bar cage installation.
The technical solution adopted in the utility model is: for the positioning device of bridge pile foundation steel reinforcement cage installation, including fixation Seat, is provided in fixing seat and is penetrated through by one end to the installation region of the other end;Limiting device is provided in installation region, The limiting device is connected with fixing seat, and the appearance along installation region axially through limiting device is provided in the limiting device The limit channels that pile foundation steel bar cage passes through, and be provided with to adjust the radial dimension of radiai adjustment structure of limit channels and adjust and limit The vertical adjustment structure of bit port vertical position;The bottom of limit channels be provided be installed on limiting device hoisting structure and Top tune binding structure.
Further, the limiting device includes that muti-piece vertically positions lath;It is circumferentially uniform that muti-piece vertically positions lath Distribution;The limit channels are that muti-piece vertically positions the region for surrounding and being formed on the inside of lath.
Further, every block of vertical positioning lath is connected by telescopic horizontal slide rail with fixing seat;The level Sliding rail one end is connected with fixing seat, and the other end extends radially inwardly on the outside of vertical positioning lath along limit channels, and with it is perpendicular It is fixedly connected on the outside of to positioning lath;The radiai adjustment structure is made of the horizontal slide rail.
Further, the inner wall of fixing seat is provided with the vertical chute corresponding with horizontal slide rail;The vertical chute edge Installation region it is axially extending;One end and the vertical chute that the horizontal slide rail is connected with fixing seat are slidably connected, and The locking mechanism of locking horizontal slide rail position is provided between horizontal slide rail and the vertical chute;By the vertical chute and locking mechanism Constitute vertical adjustment structure.
Further, the hoisting structure include be set to it is each it is vertical positioning lath inside bottom it is radially recessed Sunken mounting groove and the supporting leg being adapted to mounting groove being set in mounting groove, described supporting leg one end are and vertical positioning The hinged hinged end of lath, the other end are to move freely end;For supporting leg.
Further, the lifting region of the supporting leg is provided with radially being recessed inwardly and surround supporting leg one week Groove;The lifting region is hinged end and one section of region moveing freely between end.
Further, the top tune binding structure includes the tensioning aperture and ten being set at the top of each vertical positioning lath Word steel cable, the end of cross steel cable are installed on corresponding tensioning aperture.
Further, the fixing seat includes cylinder and the mounting structure for being set to cylinder periphery bottom;The installing zone Domain is the hollow region of cylinder interior.
Further, the mounting structure includes hydraulic jack and junction steel plate;The hydraulic jack is located at cylinder Lower section, and be arranged radially along cylinder;Cylinder periphery bottom is fixed in described junction steel plate one end, and the other end is fixed on hydraulic thousand Jin top.
The beneficial effects of the utility model are: the positioning dress disclosed by the utility model for the installation of bridge pile foundation steel reinforcement cage It sets, the verticality of reinforcing bar cage hoisting to designated position is limited by limit channels;And pass through the hoisting structure of limit channels bottom With the adjustment structure at top, the plan-position of steel reinforcement cage is fixed, while pile body surrounding protection layers thickness can be made uniform, mentioned High pile body protective layer qualification rate;The adjustment of reinforcing bar cage location is completed in the use of the positioning device in hoisting process, saves Construction time is coupled without worker, accelerates lifting speed, has evaded construction risk and saved labour cost.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is partial enlarged view at the A of Fig. 1;
Fig. 4 is the schematic diagram under hoisting structure working condition;
Fig. 5 is that the utility model uses schematic diagram.
In figure, fixing seat 1, cylinder 11, mounting structure 12, hydraulic jack 121, junction steel plate 122, installation region 13, Limiting device 2, tensioning aperture 211, cross steel cable 212, limit channels 22, horizontal slide rail 23, is vertically slided vertical positioning lath 21 Slot 24, hoisting structure 25, mounting groove 250, supporting leg 251, groove 252, steel reinforcement cage 3.
Specific embodiment
The utility model is described further with reference to the accompanying drawings and examples as follows:
As depicted in figs. 1 and 2, the positioning device for the installation of bridge pile foundation steel reinforcement cage, including fixing seat 1, in fixing seat 1 On be provided with and penetrated through by one end to the installation region of the other end 13;Limiting device 2, the limit are provided in installation region 13 Position device 2 is connected with fixing seat 1, and the appearance along installation region 13 axially through limiting device 2 is provided in the limiting device 2 The limit channels 22 that pile foundation steel bar cage 3 passes through, and be provided with adjust the radial dimension of radiai adjustment structure of limit channels 22 and Adjust the vertical adjustment structure of 22 vertical position of limit channels;It is provided in the bottom of limit channels 22 and is installed on limiting device 2 Scalable hoisting structure 25.
In use, as shown in figure 5, the positioning device is installed on the lock of the pile foundation at the stake holes mouth of pile foundation by fixing seat 1 The outside of mouth adjusts the radial dimension of limit channels 22 by radiai adjustment structure, it is made to have about 2-between steel reinforcement cage 3 The spacing of 3mm also makes the positioning device be able to use the stake of piles with different diameter to prevent from detent occur in 3 hoisting process of steel reinforcement cage Base steel reinforcement cage 3 lifts;The vertical position that hoisting structure 25 is adjusted by vertical adjustment structure is in it in the lifting initial stage The top surface of pile foundation;When lifting, steel reinforcement cage 3 is transferred along limit channels 22, can ensure that steel reinforcement cage 3 is transferred vertical by limit channels 22 Straight degree;After the decentralization in place of steel reinforcement cage 3, hoisting structure 25 is opened, lifts and fix the plan-position of steel reinforcement cage 3, and pass through Adjustment radiai adjustment structure is overlapped the center of steel reinforcement cage 3 with the pile foundation center of measurement and positioning;Then pile foundation concrete is poured;Most After remove this positioning device.
Positioning device disclosed by the utility model for the installation of bridge pile foundation steel reinforcement cage limits steel by limit channels 22 Muscle cage 3 is lifted to the verticality of designated position;And pass through the hoisting structure 25 of 22 bottom of limit channels and the adjustment structure at top, The plan-position of steel reinforcement cage 3 is fixed, while pile body surrounding protection layers thickness can be made uniform, it is qualified to improve pile body protective layer Rate;The adjustment of 3 position of steel reinforcement cage is completed in hoisting process, has saved the construction time for the use of the positioning device, is not necessarily to work People is coupled, and accelerates lifting speed, has evaded construction risk and saved labour cost.
Limiting device 2 can be one group or multiple groups anchor ear being vertically arranged, or cylinder etc.;But anchor ear It is inconvenient for use, and barrel sizes are fixed, unadjustable, a kind of cylinder of specification may be only available for the pile foundation steel bar cage of a kind of diameter 3, adaptability is lower.
As depicted in figs. 1 and 2, optimal, the limiting device 2 includes that muti-piece vertically positions lath 21;Muti-piece is vertically fixed Position lath 21 is circumferentially uniformly distributed;The limit channels 22 are that muti-piece vertically positions the region that formation is surrounded on the inside of lath 21.
The limit channels 22 formed are surrounded by vertically positioning lath 21, inner wall is axially consecutive along limit channels 22, does not have It is jagged, it, can 3 bite of effective steel reinforcement cage in the hoisting process of steel reinforcement cage 3;Also, there is no spell for each section of limit channels 22 Position is connect, can ensure that each transversal cross-section of limit channels 22 is coaxial, further increases the accuracy of the lifting of steel reinforcement cage 3;And muti-piece Vertical positioning lath 21 forms, and more conducively adjusts the radial dimension of limit channels 22, can adapt to the pile foundation of piles with different diameter Steel reinforcement cage 3.
Preferably, every block of vertical positioning lath 21 is connected by telescopic horizontal slide rail 23 with fixing seat 1;The water Smooth 23 one end of rail is connected with fixing seat 1, and the other end extends radially inwardly to outside vertical positioning lath 21 along limit channels 22 Side, and be fixedly connected on the outside of lath 21 with vertical position;The radiai adjustment structure is constituted by the horizontal slide rail 23.
The radial dimension of limit channels 22 is adjusted by horizontal slide rail 23, structure is simple, easy to use.Horizontal slide rail 23 can Think that dove-tail form sliding slot cooperates with sliding block;Or sleeve is set with loop bar;It can also be nut and screw rod spiral shell Line is formed by connecting.
Vertical adjustment structure can be the thread matching structure being set between the inner wall of fixing seat 1 and horizontal slide rail 23, Being made by thread matching structure can be along the circumferentially opposed spiral of fixing seat 1 between the inner wall and horizontal slide rail 23 of fixing seat 1 Rotation, to push limiting device 2 to move up and down along the axial direction of fixing seat 1.But in the hoisting process of steel reinforcement cage 3, rotation limit The driving force of position device 2 is larger, inconvenient for use.
Preferably, the inner wall of fixing seat 1 is provided with the vertical chute 24 corresponding with horizontal slide rail 23;The vertical chute 24 along the axially extending of installation region 13;One end and the vertical chute 24 that the horizontal slide rail 23 is connected with fixing seat 1 are slided It is cooperatively connected, and is provided with the locking mechanism of locking 23 position of horizontal slide rail between horizontal slide rail 23 and the vertical chute 24;By The vertical chute 24 and locking mechanism constitute vertical adjustment structure.Locking mechanism can be locking nut etc..
Hoisting structure 25 can be the support plate for being installed on positioning 21 bottom of lath, and still, support plate area occupied is big, no Convenient for shrinking, the disassembly of the positioning device after the completion of pouring is influenced.
Preferably, as shown in Figure 3 and Figure 4, the bottom setting in each vertical 21 inside of positioning lath is radially recessed Sunken mounting groove 250, is provided with the supporting leg 251 being adapted to it in mounting groove 250, and described 251 one end of supporting leg is and erects The hinged end hinged to positioning lath 21, the other end are to move freely end.
Hinged by supporting leg 251 and vertical positioning lath 21, when not in use, supporting leg 251 is contracted to mounting groove 250 It is interior, avoid supporting leg 251 that steel reinforcement cage 3 is interfered to move in limit channels 22;When it is desired to be used, supporting leg 251 turn to 251 axis of supporting leg is vertical, with spacer bar cage 3.
It is limited to be constituted to steel reinforcement cage 3, avoids steel reinforcement cage 3 from moving in limit channels 22 along supporting leg 251, preferably , the lifting region of the supporting leg 251 is provided with radially being recessed inwardly and surround 251 1 weeks grooves of supporting leg 252;The lifting region is hinged end and one section of region moveing freely between end.
In order in the flatness of top adjustment steel reinforcement cage 3, it is preferred that be provided with and open at the top of each vertical positioning lath 21 Aperture 211 is drawn, and is provided with cross steel cable 212, the end of cross steel cable 212 is installed on corresponding tensioning aperture 211.Pass through ten Word rope 212 adjusts the flatness at 3 top of steel reinforcement cage, has the function that check and adjusts the plan-position of steel reinforcement cage 3.To cross rope 212 the plan-position of steel reinforcement cage 3 is adjusted after again by steel reinforcement cage 3
Fixing seat 1 can be bracket etc., still, in order to simplify structure, be easily installed production, it is preferred that the fixing seat 1 Including cylinder 11 and the mounting structure 12 for being set to 11 periphery bottom of cylinder;The installation region 13 is hollow inside cylinder 11 Region.
For the ease of being connected and fixed for fixing seat 1 and the pile foundation fore shaft at the stake holes mouth of pile foundation, and guarantee the secured of connection Reliability, it is preferred that the mounting structure 12 includes hydraulic jack 121 and junction steel plate 122;The hydraulic jack 121 It is arranged radially positioned at the lower section of cylinder 11, and along cylinder 11;11 periphery bottom of cylinder is fixed in described 122 one end of junction steel plate, The other end is fixed on hydraulic jack 121.

Claims (9)

1. the positioning device for the installation of bridge pile foundation steel reinforcement cage, it is characterised in that: including fixing seat (1), on fixing seat (1) It is provided with the installation region (13) penetrated through by one end to the other end;Limiting device (2), institute are provided in installation region (13) Limiting device (2) is stated to be connected with fixing seat (1), be provided in the limiting device (2) along installation region (13) axially through The limit channels (22) that the appearance pile foundation steel bar cage of limiting device (2) passes through, and be provided with and adjust limit channels (22) radial dimension Radiai adjustment structure and adjust limit channels (22) vertical position vertical adjustment structure;In the bottom of limit channels (22) It is provided with the hoisting structure (25) for being installed on limiting device (2) and top tune binding structure.
2. the positioning device for the installation of bridge pile foundation steel reinforcement cage as described in claim 1, it is characterised in that: the limit dress Setting (2) includes that muti-piece vertically positions lath (21);Muti-piece vertically positions lath (21) and is circumferentially uniformly distributed;The limit channels (22) region for surrounding and being formed on the inside of lath (21) is vertically positioned for muti-piece.
3. the positioning device for the installation of bridge pile foundation steel reinforcement cage as claimed in claim 2, it is characterised in that: every piece vertical fixed Position lath (21) is connected by telescopic horizontal slide rail (23) with fixing seat (1);Described horizontal slide rail (23) one end and solid Reservation (1) is connected, and the other end extends radially inwardly on the outside of vertical positioning lath (21) along limit channels (22), and with it is vertical It is fixedly connected on the outside of positioning lath (21);The radiai adjustment structure is constituted by the horizontal slide rail (23).
4. the positioning device for the installation of bridge pile foundation steel reinforcement cage as claimed in claim 3, it is characterised in that: in fixing seat (1) inner wall is provided with the vertical chute (24) corresponding with horizontal slide rail (23);The vertical chute (24) is along installation region (13) axially extending;One end that the horizontal slide rail (23) is connected with fixing seat (1) is slidably matched with the vertical chute (24) Connection, and the locking mechanism for locking horizontal slide rail (23) position is provided between horizontal slide rail (23) and the vertical chute (24); Vertical adjustment structure is constituted by the vertical chute (24) and locking mechanism.
5. the positioning device for the installation of bridge pile foundation steel reinforcement cage as described in claim 2-4 any one claim, Be characterized in that: the hoisting structure (25) is including being set to the radially recessed of each vertical positioning lath (21) inside bottom Sunken mounting groove (250) and the supporting leg (251) being adapted to mounting groove (250) being set in mounting groove (250), the branch Support leg (251) one end is the hinged end hinged with vertical positioning lath (21), and the other end is to move freely end;For supporting leg (251)。
6. the positioning device for the installation of bridge pile foundation steel reinforcement cage as claimed in claim 5, it is characterised in that: the supporting leg (251) lifting region is provided with radially being recessed inwardly and surround (251) one weeks grooves (252) of supporting leg;It is described Lifting region is hinged end and one section of region moveing freely between end.
7. the positioning device for the installation of bridge pile foundation steel reinforcement cage as described in claim 2-4 any one claim, Be characterized in that: the top tune binding structure include be set to it is each it is vertical positioning lath (21) at the top of tensioning aperture (211) and Cross steel cable (212), the end of cross steel cable (212) are installed on corresponding tensioning aperture (211).
8. the positioning device for the installation of bridge pile foundation steel reinforcement cage as described in claim 1-4 any one claim, Be characterized in that: the fixing seat (1) includes cylinder (11) and the mounting structure (12) for being set to cylinder (11) periphery bottom;It is described Installation region (13) is cylinder (11) internal hollow region.
9. the positioning device for the installation of bridge pile foundation steel reinforcement cage as claimed in claim 8, it is characterised in that: the installation knot Structure (12) includes hydraulic jack (121) and junction steel plate (122);The hydraulic jack (121) is located under cylinder (11) Side, and be arranged radially along cylinder (11);Cylinder (11) periphery bottom is fixed in described junction steel plate (122) one end, and the other end is solid Due to hydraulic jack (121).
CN201820682822.6U 2018-05-07 2018-05-07 Positioning device for the installation of bridge pile foundation steel reinforcement cage Active CN208183551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820682822.6U CN208183551U (en) 2018-05-07 2018-05-07 Positioning device for the installation of bridge pile foundation steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820682822.6U CN208183551U (en) 2018-05-07 2018-05-07 Positioning device for the installation of bridge pile foundation steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN208183551U true CN208183551U (en) 2018-12-04

Family

ID=64429264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820682822.6U Active CN208183551U (en) 2018-05-07 2018-05-07 Positioning device for the installation of bridge pile foundation steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN208183551U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396933A (en) * 2019-07-25 2019-11-01 张卫国 A kind of bridge construction template erection device and erection method
CN111906709A (en) * 2020-07-19 2020-11-10 杭州盛通科技有限公司 Communication base station stake fixing device with locating component
CN112195788A (en) * 2020-09-25 2021-01-08 中国一冶集团有限公司 Bridge pier column steel bar positioning, butting and fixing device and using method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396933A (en) * 2019-07-25 2019-11-01 张卫国 A kind of bridge construction template erection device and erection method
CN111906709A (en) * 2020-07-19 2020-11-10 杭州盛通科技有限公司 Communication base station stake fixing device with locating component
CN111906709B (en) * 2020-07-19 2022-01-25 河北卓思通信器材有限公司 Communication base station stake fixing device with locating component
CN112195788A (en) * 2020-09-25 2021-01-08 中国一冶集团有限公司 Bridge pier column steel bar positioning, butting and fixing device and using method

Similar Documents

Publication Publication Date Title
CN208183551U (en) Positioning device for the installation of bridge pile foundation steel reinforcement cage
US8887451B2 (en) Pivoting bracket for foundation support system
US9644337B1 (en) Systems and methods for positioning and anchoring columns
CN202125074U (en) Double cone floorslab reserved-hole die
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN109706939A (en) Deep basal pit prestressing combination bracing members and construction method
CN211898341U (en) Structure for controlling upward floating of bored pile reinforcement cage
CN110485713B (en) Roofing cornice and escape canal once only pour template reinforcing apparatus
CN109518980A (en) Prefabricated concrete structure column lifts absolute altitude and perpendicularity regulating device and its construction method
CN215629897U (en) Prevent stop device and construction structures of steel reinforcement cage come-up
CN203905472U (en) Adjustable stand column support
CN209040119U (en) The dado template support frame of artificial digging pile
CN208563968U (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus
CN110886332A (en) Wall foundation underpinning device and construction method thereof
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN212613754U (en) Pipeline well casing positioning tool
CN211666301U (en) Steel constructs straightness control stop device that hangs down of post
CN212176500U (en) Adjustable reducing type open caisson safety operation platform
CN211547749U (en) Inner supporting structure for foundation pit
CN206554506U (en) A kind of concrete floor pre-buried pipe collar bi-directional adjustable fixing mould
KR200408472Y1 (en) Height adjustable device for concrete form panel
CN219952690U (en) Telescopic paying-off Kong Zhimo device
CN214144690U (en) Center drawing plate device for slip form construction
KR101598061B1 (en) Manhole repair device