CN208168163U - A kind of stirrup locator of bean column node hoop reinforcement - Google Patents
A kind of stirrup locator of bean column node hoop reinforcement Download PDFInfo
- Publication number
- CN208168163U CN208168163U CN201820369886.0U CN201820369886U CN208168163U CN 208168163 U CN208168163 U CN 208168163U CN 201820369886 U CN201820369886 U CN 201820369886U CN 208168163 U CN208168163 U CN 208168163U
- Authority
- CN
- China
- Prior art keywords
- stirrup
- locating rod
- locating
- abutment sleeve
- locator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000010627 Phaseolus vulgaris Nutrition 0.000 title claims abstract description 43
- 244000046052 Phaseolus vulgaris Species 0.000 title claims abstract description 43
- 230000002787 reinforcement Effects 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 8
- 230000008569 process Effects 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 5
- 239000010959 steel Substances 0.000 claims abstract description 5
- 230000000694 effects Effects 0.000 claims description 8
- 238000005452 bending Methods 0.000 claims description 3
- 230000000903 blocking effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 8
- 230000006872 improvement Effects 0.000 description 8
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 210000000078 claw Anatomy 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model provides a kind of stirrup locator of bean column node hoop reinforcement, multiple locating notches for disposing wait bind in the stirrup on column reinforcing bar wherein are equipped with so that a fixed spacing is axially spaced on the stack shell of abutment sleeve, the fixed link for connecting beam steel is also detachably installed on abutment sleeve;Positioning rod component includes being inserted in abutment sleeve and can be along the first locating rod of the axial movement of abutment sleeve, and be connected to the first locating rod and can open and close locating notch in the moving process of the first locating rod to confine the second locating rod of the stirrup being placed in locating notch;Positioning rod component further includes for mobile in place afterwards to the first locating rod and abutment sleeve into line-locked locking structure in the first locating rod.The quick accurate positioning of stirrup may be implemented using the stirrup locator in the utility model, while can avoid there are the technical problems such as interval is uneven, height is uneven between stirrup in the prior art, structure is simple, can be used in turn.
Description
Technical field
The utility model relates to the realm of building construction more particularly to a kind of stirrup of bean column node hoop reinforcement to position
Device.
Background technique
Construction pre-main phase, bean column node are the key positions of building structure, its destruction is difficult to repair, serious
Entire frame can be caused to collapse.Stress at frame joint is very complicated:Including the axis pressure that pillar transmits, moment of flexure and
Horizontal shear, the moment of flexure and vertical shear that beam transmits, there are also the local extrusion stresses of longitudinal reinforcement crotch, when beam is to pillar bias
When, can also torque be generated to the concrete at frame joint, further, since shrinking, temperature change and the subsidence of foundations etc. influence,
Stress and strain can be generated at frame joint.Therefore the specification installation of bean column node stirrup is most important.Existing bean column node
When the stirrup binding at place, usually first multiple stirrups to be bound are sheathed in advance on the column reinforcing bar at bean column node, then successively
The binding for carrying out stirrup from the bottom up, that there are stirrup binding spacing in above-mentioned process of binding is uneven, is uneven, stirrup overlapping heap
The problem being placed on above the beam column tension reinforcement intersected in length and breadth causes the positioning accuracy of stirrup to be bound lower;And due to beam
Reinforcing bar is intensive at Column border node position, narrow space, it is difficult to which the secondary adjustment for carrying out stirrup causes stirrup binding and do not meet construction
Code requirement.
Utility model content
In view of the foregoing, the utility model provides a kind of stirrup locator of bean column node hoop reinforcement.Using
Stirrup locator in the utility model can position stirrup according to the actually required lashing location of stirrup, guarantee phase
Neighbour is wait bind the positioning accuracy between stirrup.
To achieve the above object, the utility model discloses a kind of stirrup locator of bean column node hoop reinforcement, packets
It includes:
Abutment sleeve is equipped with for disposing wait bind on the stack shell of the abutment sleeve with a fixed spacing is axially spaced
In being also detachably equipped on multiple locating notches of the stirrup on column reinforcing bar, the abutment sleeve for connecting consolidating for beam steel
Fixed pole;
Positioning rod component, including being inserted in the abutment sleeve and can be along the first of the axial movement of the abutment sleeve
Locating rod, and be connected to first locating rod and the locating slot can be opened and closed in the moving process of first locating rod
Mouthful to confine the second locating rod of the stirrup being placed in the locating notch;The positioning rod component further include for
First locating rod is mobile in place afterwards to first locating rod and the abutment sleeve into line-locked locking structure.
The beneficial effects of the utility model are:
1. being fast implemented using the second locating rod being connected in the first locating rod by stirrup by mobile first locating rod
Confine in locating notch, completes the positioning to stirrup.
2. the first locating rod that can be will be moved into behind position by locking structure is locked together with abutment sleeve, guarantee stirrup
Stability when confinement, while not needing that the first locating rod is manually caught to carry out locking operation, it is applied when reducing stirrup positioning
The configuration of worker person.
3. structure is simple, convenient for carrying out positioning operation to stirrup.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, the positioning
The inside of sleeve is formed with for the movable activity space of the second locating rod, and the activity space is connected to the locating slot
Mouthful, the first end of second locating rod is connected to first locating rod, and the second end of second locating rod is to corresponding
Locating notch direction extends and opens and closes the locating notch with the movement of first locating rod.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, described second
The second end of locating rod is tilted to the direction towards the stirrup to be confined of second locating rod.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, described second
The second end of locating rod is bent to form the bending segment for blocking the locating notch.
A kind of further improvement of stirrup locator of bean column node hoop reinforcement of the utility model is, described the
The second end of two locating rods is sticked in the inner wall of the abutment sleeve.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, the locking
Structure include be installed on the abutment sleeve first end top plate, be resisted against the outside of the top plate and be bolted in described first
The rotating member of locating rod and be installed on the abutment sleeve second end bottom plate, offer on the top plate for described first
The through-hole that locating rod is worn offers the locating slot circumferentially rotated for limiting first locating rod on the bottom plate, described
First locating rod is equipped with the anti-transfer part being arranged in the locating slot.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, the positioning
The first end of sleeve is formed with the first opening, and first locating rod is inserted in the abutment sleeve by first opening
In, and the first end of first locating rod extends to the outside of first opening, the locking structure is described in hoop is set to
In the first end of first locating rod and outer diameter is greater than the clip of the bore of first opening.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, the positioning
Axial direction of the opening direction of notch perpendicular to the abutment sleeve.
A kind of stirrup locator of bean column node hoop reinforcement of the utility model further improvement lies in that, the positioning
Perforation is offered on the stack shell of sleeve, the fixed link wears and is fixed in the perforation.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the stirrup locator of bean column node hoop reinforcement of the utility model.
Fig. 2 is a kind of stirrup locator internal structure schematic diagram of bean column node hoop reinforcement of the utility model.
Fig. 3 is a kind of front schematic view of the stirrup locator of bean column node hoop reinforcement of the utility model.
Fig. 4 is a kind of side schematic view of the stirrup locator of bean column node hoop reinforcement of the utility model.
Fig. 5 is to be mounted with hoop in a kind of locating notch of the stirrup locator of bean column node hoop reinforcement of the utility model
Structural schematic diagram when muscle.
Fig. 6 is that structure when confining stirrup in a kind of stirrup locator of bean column node hoop reinforcement of the utility model is shown
It is intended to.
Fig. 7 is the structural schematic diagram of upright bar in a kind of stirrup locator of bean column node hoop reinforcement of the utility model.
Fig. 8 is a kind of structural schematic diagram of the stirrup locator insole board of bean column node hoop reinforcement of the utility model.
Fig. 9 is the structural schematic diagram of top plate in a kind of stirrup locator of bean column node hoop reinforcement of the utility model.
Figure 10 is the structure of internally threaded sleeve in a kind of stirrup locator of bean column node hoop reinforcement of the utility model
Schematic diagram.
Figure 11 is the structural schematic diagram of gasket in a kind of stirrup locator of bean column node hoop reinforcement of the utility model.
Figure 12 is the structural representation of fixed link in a kind of stirrup locator of bean column node hoop reinforcement of the utility model
Figure.
Specific embodiment
For the benefit of to the understanding of the utility model, it is illustrated with reference to the accompanying drawings and embodiments.
Refering to fig. 1 to Fig. 6 it is found that the utility model discloses a kind of stirrup locator of bean column node hoop reinforcement,
Including abutment sleeve 1 and positioning rod component, wherein:It is used on the stack shell of abutment sleeve 1 with axially spaced be equipped with of a fixed spacing
It is also detachably equipped with for connecting wait bind on multiple locating notches 11 of the stirrup 8 on column reinforcing bar, abutment sleeve 1 in disposing
Connect the fixed link 6 of beam steel;Positioning rod component includes being inserted in abutment sleeve 1 and can be along the axial movement of abutment sleeve 1
First locating rod 21, and be connected to the first locating rod 21 and locating notch can be opened and closed in the moving process of the first locating rod 21
Second locating rod 22 of 11 stirrups 8 being placed in locating notch 11 with confinement;Positioning rod component further includes for fixed first
Position bar 21 is mobile in place afterwards to the first locating rod 21 and abutment sleeve 1 into line-locked locking structure.Using being bound round in the present embodiment
Stirrup 8 to be bound is placed in the locating notch 11 of abutment sleeve 1 by muscle locator, then by the first locating rod 21 along fixed
Stirrup 8 is confined in locating notch 11 by the second locating rod 22, be can be completed to stirrup 8 by the axial movement of position sleeve 1
Quickly positioning, and can guarantee that the spacing between adjacent stirrup 8 meets actually required positioning requirements, there is preferable positioning accurate
Degree.In the present embodiment, the first locating rod 21 can be moved through along the axial movement of abutment sleeve 1 to avoid the first locating rod 21
It is glanced off in journey, guarantees the consistency of the relative position after positioning between adjacent stirrup 8 (i.e. to bit distribution).
Further, equal be spaced apart is equipped with multiple locating notches 11 on abutment sleeve 1;By by multiple locating notches 11 etc.
The equally spaced positioning to stirrup 8 may be implemented in interval setting, and then guarantees that the interval of stirrup 8 after binding is uniformly distributed.
As shown in Fig. 3, Fig. 5 to Fig. 7, the inside of abutment sleeve 1 is formed with for the movable activity space of the second locating rod 22,
Activity space is connected to locating notch 11, and the first end of the second locating rod 22 is connected to the first locating rod 21, the second locating rod 22
Second end extend to corresponding 11 direction of locating notch and open and close locating notch 11 with the movement of the first locating rod 21.This reality
It applies in example, the first locating rod 21 drives the second locating rod 22 to move along activity space during the axial movement of abutment sleeve 1,
Activity space is connected to locating notch 11, by guarantee 21 moving process of the first locating rod in, using the second locating rod 22 come
Complete the opening and closing to locating notch 11.Further, the second end of the second locating rod 22 is to the second locating rod 22 towards wait prohibit
The direction for the stirrup 8 pluged with molten metal tilts, as shown in Figure 2 and Figure 7;Further, the second end of the second locating rod 22 is bent to form useful
In the bending segment for blocking locating notch 11;The beneficial effect of the above two laying mode of second locating rod 22 is, passes through
The movement of a positioning rod 21 is dragged on the stirrup 8 for being placed in locating notch 11 bottom of locating notch 11 using the second locating rod 22
Portion guarantees stability when stirrup 8 is confined, while avoiding the first locating rod 21 when moving, and the second locating rod 22 will be placed in
Stirrup 8 in locating notch 11 squeezes out locating notch 11.Preferably, the second end of the second locating rod 22 is sticked in abutment sleeve 1
Inner wall.
The embodiment of two kinds of locking structures is disclosed in the utility model:
The first embodiment:As shown in Fig. 1, Fig. 8 to Figure 10, locking structure includes the first end for being installed on abutment sleeve 1
Top plate 4, the rotating member 5 that is resisted against the outside of top plate 4 and is bolted in the first locating rod 21 and be installed on the of abutment sleeve 1
The bottom plate 3 at two ends offers the through-hole 41 worn for the first locating rod 21 on top plate 4, is offered on bottom plate 3 for limiting first
The locating slot 31 that locating rod 21 circumferentially rotates, the first locating rod 21 are equipped with the anti-transfer part 211 being arranged in locating slot 31.Into one
Step, anti-transfer part 211 is U-shaped;Further, the spacing on the anti-transfer part 211 of U-shaped between the side lever of two sides is greater than fixed
The width of position slot 31 guarantees that the first locating rod 21 can not be had enough to meet the need.Specifically, rotating member 5 was rotated relative to the first locating rod 21
Journey is to be converted into the first locating rod by the rotation by rotating member relative to the first locating rod 21 against on the top plate 4 always
21 axial movement relative to abutment sleeve 1;In rotation process of the rotating member 5 relative to the first locating rod 21, the first positioning
Bar 21 will receive the tangential force that rotating member 5 acts in its structure, and the first locating rod 21 has an opposite rotation trend, lead to
It crosses and the anti-transfer part 211 in the first locating rod 21 is arranged in locating slot 31, can occur to avoid the first locating rod 21 circumferential
Rotation, so that the first locating rod 21 axial movements generated relative to abutment sleeve 1.
Further, the first locating rod 21 is equipped with external screw thread 212, is formed on rotating member 5 and is bolted in external screw thread 212
Internal thread hole.Further, rotating member 5 is inner thread sleeve, specifically selects nut, as shown in Figure 10.
Further, it is also equipped with gasket 7 between 5 top plate 4 of rotating member, as shown in figure 11.
Second of embodiment:The first end of abutment sleeve 1 is formed with the first opening, and the first locating rod 21 passes through the first opening
It is inserted in abutment sleeve 1, and the first end of the first locating rod 21 extends to the outside of the first opening, locking structure is that hoop is set to
In the first end of first locating rod 21 and outer diameter is greater than the clip of the bore of the first opening.By setting clip hoop in the present embodiment
In in the first locating rod 21 and its bore be greater than first opening bore, may be implemented to the first locating rod 21 and abutment sleeve 1
Locking.Further, the first end of the first locating rod 21 offers the multiple snap-ring grooves set for clip hoop;Specific adjacent card
The spacing for binding round slot is identical as the distance between corresponding adjacent positioned notch 11.Further, the first end installation of abutment sleeve 1
There is top plate, the first opening for being formed with and plugging for the first locating rod 21 is opened up on top plate.In the present embodiment, the outer diameter of clip is greater than
First opening bore and be less than abutment sleeve 1 outer diameter, and then by stirrup realization the first locating rod 21 and abutment sleeve 1 it
Between locking.
As shown in Fig. 3 and Figure 12, perforation 12 is offered on abutment sleeve 1, fixed link 6 wears and is fixed in perforation 12;
Further, perforation 12 is internal thread hole, is formed with the screw thread for being bolted in internal thread hole on the shaft of fixed link 6;Further,
Between perforation 12 and fixed link 6 by snap connection means;Specifically, fixed link 6 is equipped with claw, it is equipped with and supplies in perforation 12
The clamping mouth that claw card is set.As shown in figure 12, fixed link 6 is a round tube.Further, diameter of the perforation 12 along abutment sleeve 1
To laying.Axial direction of the opening direction of locating notch 11 perpendicular to abutment sleeve 1;Specifically, as shown in Figure 2 and Figure 4, working as positioning
When sleeve 1 is vertically laid, the opening direction of locating notch 11 is horizontal direction, and its object is to guarantee to confine in locating notch
Laying in horizontal direction wait bind in the stirrup 8 on column reinforcing bar in 11 avoids there is height after stirrup 8 is bound in the prior art
Uneven problem.
In the utility model, column reinforcing bar at diameter+bean column node of the spacing b=stirrup 8 between adjacent positioned notch 11
Thickness-the 2mm of protective layer;The length L=(number+1 of stirrup 8) of first locating rod 21 × 8 spacing+50mm+ of adjacent stirrup
20mm (length of external screw thread 212);Diameter+the 2mm of the height h=stirrup 8 of locating notch 11, the selection diameter of fixed link 6 are
The round steel pipe of 10mm, the angle between the first locating rod 21 and the second locating rod 22 are 70 °.
As shown in fig. 7, being equipped at intervals with multiple second locating rods 22 in the first locating rod 21 in the utility model;Specifically,
The setting corresponding with the locating notch 11 on abutment sleeve 1 of second locating rod 22.
The positioning to stirrup 8 can be fast implemented using the stirrup locator in the utility model, convenient for stirrup locator
Installation and removal, can be used in turn, and have well adapting to property.
A kind of beneficial effect of the stirrup locator of bean column node hoop reinforcement of the utility model includes:
1. the positioning for treating binding stirrup can be fast implemented, guarantee the positioning accuracy of stirrup;
2. efficiently solving, bean column node position stirrup binding spacing in the prior art is uneven, stirrup binding is uneven
And the technical issues of stirrup overlapping stacking.
3. structure is simple, convenient for the dismounting of stirrup locator and can be used in turn.
Combine accompanying drawings and embodiments that the utility model is described in detail above, those skilled in the art can
Many variations example is made to the utility model according to the above description.Thus, certain details in embodiment should not be constituted to this reality
With novel restriction, the utility model will be using the range that the appended claims define as the protection scope of the utility model.
Claims (9)
1. a kind of stirrup locator of bean column node hoop reinforcement, which is characterized in that including:
Abutment sleeve is equipped with for disposing wait bind in column on the stack shell of the abutment sleeve with a fixed spacing is axially spaced
Multiple locating notches of stirrup on reinforcing bar are also detachably equipped with the fixation for connecting beam steel on the abutment sleeve
Bar;
Positioning rod component, including being inserted in the abutment sleeve and can be positioned along the first of the axial movement of the abutment sleeve
Bar, and be connected to first locating rod and can be opened and closed in the moving process of first locating rod locating notch with
Confine the second locating rod of the stirrup being placed in the locating notch;The positioning rod component further includes for described
First locating rod is mobile in place afterwards to first locating rod and the abutment sleeve into line-locked locking structure.
2. the stirrup locator of bean column node hoop reinforcement according to claim 1, it is characterised in that:The positioning sleeve
The inside of cylinder is formed with for the movable activity space of the second locating rod, and the activity space is connected to the locating notch,
The first end of second locating rod is connected to first locating rod, and the second end of second locating rod is to corresponding positioning
Notch direction extends and opens and closes the locating notch with the movement of first locating rod.
3. the stirrup locator of bean column node hoop reinforcement according to claim 2, it is characterised in that:Described second is fixed
The second end of position bar is tilted to the direction towards the stirrup to be confined of second locating rod.
4. the stirrup locator of bean column node hoop reinforcement according to claim 2, it is characterised in that:Described second is fixed
The second end of position bar is bent to form the bending segment for blocking the locating notch.
5. the stirrup locator of bean column node hoop reinforcement according to claim 3 or 4, it is characterised in that:Described
The second end of two locating rods is sticked in the inner wall of the abutment sleeve.
6. the stirrup locator of bean column node hoop reinforcement according to claim 1, it is characterised in that:The locking knot
Structure include be installed on the abutment sleeve first end top plate, be resisted against the outside of the top plate and to be bolted in described first fixed
The rotating member of position bar and be installed on the abutment sleeve second end bottom plate, it is fixed for described first to offer on the top plate
The through-hole that wears of position bar, offers the locating slot circumferentially rotated for limiting first locating rod on the bottom plate, and described the
A positioning rod is equipped with the anti-transfer part being arranged in the locating slot.
7. the stirrup locator of bean column node hoop reinforcement according to claim 1, it is characterised in that:The positioning sleeve
The first end of cylinder is formed with the first opening, and first locating rod is inserted in the abutment sleeve by first opening,
And the first end of first locating rod extends to the outside of first opening, the locking structure is that hoop is set to described first
In the first end of locating rod and outer diameter is greater than the clip of the bore of first opening.
8. the stirrup locator of bean column node hoop reinforcement according to claim 1, it is characterised in that:The locating slot
Axial direction of the opening direction of mouth perpendicular to the abutment sleeve.
9. the stirrup locator of bean column node hoop reinforcement according to claim 1, it is characterised in that:The positioning sleeve
Perforation is offered on the stack shell of cylinder, the fixed link wears and is fixed in the perforation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820369886.0U CN208168163U (en) | 2018-03-19 | 2018-03-19 | A kind of stirrup locator of bean column node hoop reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820369886.0U CN208168163U (en) | 2018-03-19 | 2018-03-19 | A kind of stirrup locator of bean column node hoop reinforcement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208168163U true CN208168163U (en) | 2018-11-30 |
Family
ID=64375221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820369886.0U Expired - Fee Related CN208168163U (en) | 2018-03-19 | 2018-03-19 | A kind of stirrup locator of bean column node hoop reinforcement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208168163U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316566A (en) * | 2018-03-19 | 2018-07-24 | 中国建筑第八工程局有限公司 | A kind of the stirrup locator and stirrup localization method of bean column node hoop reinforcement |
CN110439188A (en) * | 2019-08-22 | 2019-11-12 | 重庆镪镔实业股份有限公司 | A kind of the stirrup locator and stirrup localization method of bean column node hoop reinforcement |
CN112049327A (en) * | 2020-08-13 | 2020-12-08 | 浙江省建筑科学设计研究院有限公司 | Semi-grouting sleeve assembly and mounting method thereof |
-
2018
- 2018-03-19 CN CN201820369886.0U patent/CN208168163U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316566A (en) * | 2018-03-19 | 2018-07-24 | 中国建筑第八工程局有限公司 | A kind of the stirrup locator and stirrup localization method of bean column node hoop reinforcement |
CN108316566B (en) * | 2018-03-19 | 2023-10-13 | 中国建筑第八工程局有限公司 | Stirrup positioner and stirrup positioning method for beam-column joint stirrup encryption area |
CN110439188A (en) * | 2019-08-22 | 2019-11-12 | 重庆镪镔实业股份有限公司 | A kind of the stirrup locator and stirrup localization method of bean column node hoop reinforcement |
CN112049327A (en) * | 2020-08-13 | 2020-12-08 | 浙江省建筑科学设计研究院有限公司 | Semi-grouting sleeve assembly and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208168163U (en) | A kind of stirrup locator of bean column node hoop reinforcement | |
JP5382394B1 (en) | A method for linking and installing a reinforced steel bar and a reinforced steel frame for the same. | |
KR100675985B1 (en) | A bracing for reinforcing support | |
KR20190108740A (en) | Structure of rebar cage for cast in place pile | |
CN105696800A (en) | Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts | |
EP0976873B2 (en) | Injection- or prestressed ground anchor | |
CN107130628A (en) | The construction method of embedding anchor bolts flange and embedding anchor bolts | |
CN207987781U (en) | A kind of assembled cantilever bracket for bridge cast-in-place construction | |
EP1669681A2 (en) | Prefabricated heating/cooling module for use in a building element, especiallly a ceiling or a wall element, and method for making a building element | |
KR20150144398A (en) | Reinforced Concrete Walls by Triangular Reinforcing Bar Details and Construction Method Thereof | |
CN207260599U (en) | A kind of adjustable frame column bar spacer | |
DE102009001749B4 (en) | Connection device and method for creating a connection | |
CN113089657B (en) | Use method of built-in tubular pile connecting device | |
CN207420036U (en) | Steel bar template positions constructing structure in reinforced concrete member | |
JP6814680B2 (en) | Connection structure between reinforcing bar cage and column members | |
CN210712467U (en) | Simple support system for cast-in-situ curb formwork | |
CN108316566A (en) | A kind of the stirrup locator and stirrup localization method of bean column node hoop reinforcement | |
CN112411888A (en) | Steel bar positioning device and method of cast-in-place column connected with fabricated structure | |
CN110243262A (en) | A kind of reinforcing bar binding spacing card carpenters square | |
US20080072414A1 (en) | Concrete reinforcing guide and method of constructing concrete reinforcing guide | |
CN213115020U (en) | Concrete embedded part for civil engineering | |
CN213143141U (en) | Concrete floor jumps storehouse seam and uses instrument formula template fixing device | |
CN108756211A (en) | A kind of construction aluminum alloy pattern plate | |
CN209308283U (en) | A kind of non-post bar planting formula constructional column reinforcing steel bar connecting device and structure | |
CN207552931U (en) | A kind of road bridge construction prestressed anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |