CN208167718U - The construction platform device of cast-in-situ bored pile - Google Patents

The construction platform device of cast-in-situ bored pile Download PDF

Info

Publication number
CN208167718U
CN208167718U CN201820310903.3U CN201820310903U CN208167718U CN 208167718 U CN208167718 U CN 208167718U CN 201820310903 U CN201820310903 U CN 201820310903U CN 208167718 U CN208167718 U CN 208167718U
Authority
CN
China
Prior art keywords
casing
hole
cast
bored pile
situ bored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820310903.3U
Other languages
Chinese (zh)
Inventor
张帆
任文会
刘旭
郑传奇
尹泉
仇春慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820310903.3U priority Critical patent/CN208167718U/en
Application granted granted Critical
Publication of CN208167718U publication Critical patent/CN208167718U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of construction platform devices of cast-in-situ bored pile, including:Operating platform includes:For the pedestal being sheathed on casing;And the detachably connected operating platform on pedestal and with pedestal, operating platform, which is equipped with, wears for tremie and corresponds to the through-hole for being connected to casing, and the diameter of through-hole, which is less than the diameter of casing and stays between the edge of through-hole and the edge of casing, sets certain spacing.When installing tremie; tremie is plugged in casing by through-hole; tremie is limited using through-hole; so that tremie falls along through-hole; so as to prevent that tremie from colliding steel reinforcement cage during lifting and falling and caused by destroy problem, the quality of effective protection steel reinforcement cage.Furthermore construction personnel can carry out filling concrete absolute altitude monitoring on construction platform device.

Description

The construction platform device of cast-in-situ bored pile
Technical field
The utility model relates to the realm of building construction, espespecially a kind of construction platform device of cast-in-situ bored pile.
Background technique
In the realm of building construction, cast-in-situ bored pile has been most commonly seen one of base form because of its higher applicability. Because of the presence of the unfavorable factors such as engineering geology is changeable, construction site limitation, casing is inserted into underground during bored pile construction Depth changed greatly with geological conditions, also result in casing top opening go out constructing operation face height it is different, to subsequent construction it is outstanding It is that filling concrete construction causes certain obstruction.When casing top opening is higher by construction personnel's reasonable operation ranges, casing top Mouth and ground distance >=1.2m, construction personnel are difficult to transfer tremie and reliably be controlled, and easily concrete are caused to be led Guan Yuyi displays steel reinforcement cage collision in place and steel reinforcement cage is caused to destroy;Also responsible measures can not be taken to guarantee the mark of tremie Height adapts to current stake holes depth to meet filling concrete requirement;Personnel can not fill concrete without reliable operation platform simultaneously Note height is monitored, and then can not rationally promote tremie, further increases pile foundation concrete pile quality risk.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of operation platform dress of cast-in-situ bored pile It sets, solves the problems, such as to destroy steel reinforcement cage when tremie decentralization in the prior art.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of construction platform device of cast-in-situ bored pile, is installed on casing, the operating platform Including:
For the pedestal being sheathed on the casing;And
The detachably connected operating platform on the pedestal and with the pedestal, the operating platform, which is equipped with, to be supplied Tremie is worn and the corresponding through-hole for being connected to the casing, the diameter of the through-hole be less than the diameter of the casing and It is stayed between the edge of the through-hole and the edge of the casing and sets certain spacing.
The beneficial effect of the construction platform device of the utility model cast-in-situ bored pile:
The construction platform device of the utility model cast-in-situ bored pile is by the way that base sheath to be set on casing, so that operation is flat Platform is placed on casing, when installing tremie, tremie is plugged in casing by through-hole, utilizes through-hole pair Tremie is limited, so that tremie falls along through-hole, so as to prevent tremie under lifting Steel reinforcement cage is collided during falling and caused by destroy problem, the quality of effective protection steel reinforcement cage.Furthermore construction personnel can be The monitoring of filling concrete absolute altitude is carried out on construction platform device, is determined that conduit promotes time point according to monitoring result, is further protected Pile quality is demonstrate,proved, operating efficiency is promoted and guarantees construction personnel's safety operation.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that,
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that, the operating platform is hinged with A pair of of cover board of docking, the pair of cover board offer the through-hole being adapted to the tremie.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that, the cover board be equipped with handle.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that,
The operating platform is equipped with multiple connecting holes;
The pedestal is fixed with multiple connecting plates corresponding to the connecting hole, and the connecting plate is equipped with pin hole;
By the way that the connecting plate is inserted in the connecting hole and wears the pin hole by bolt, thus realize by The pedestal and the operating platform are detachably connected.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that, the operating platform includes:
Branch is set to the frame on the pedestal;And
It is layed in the bottom plate of the frame.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that,
The pedestal is the casing being sheathed on the casing.
The construction platform device of the utility model cast-in-situ bored pile further improvement lies in that,
It further include erecting the guard bar structure for being fixed on the operating platform opposite sides.
Detailed description of the invention
Fig. 1 is the top view of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 2 is the side view of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 3 is the cross-sectional view of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 4 is the top view of the pedestal of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 5 is the side view of the pedestal of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 6 is the top view of the location structure of the construction platform device of the utility model cast-in-situ bored pile.
Fig. 7 is the side view of the location structure of the construction platform device of the utility model cast-in-situ bored pile.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it is shown that the top view of the construction platform device of the utility model cast-in-situ bored pile.Referring to Fig.2, display The side view of the construction platform device of the utility model cast-in-situ bored pile.Refering to Fig. 3, it is shown that the utility model drill-pouring The cross-sectional view of the construction platform device of stake.In conjunction with shown in Fig. 1, Fig. 2 and Fig. 3, cast-in-situ bored pile, which refers to, passes through machine in engineering site The means such as tool drilling, steel pipe soil compaction or manpower excavation form stake holes in foundation soil, bury casing, and reinforcing bar is placed in it Cage, concrete perfusion and the stake being made into.Using coagulation soil hopper and tremie to stake holes concrete perfusion, in this process In, lifting tremie is easy to shake and collide steel reinforcement cage when falling, and influences pile quality.The utility model cast-in-situ bored pile Construction platform device be installed on casing, the present apparatus includes:For the pedestal 20 being sheathed on casing 10;And it is set to pedestal 20 The upper and operating platform 30 detachably connected with pedestal 20, operating platform 30, which is equipped with, to be worn for tremie and corresponding connects Pass through the through-hole 40 of casing 10, the diameter of through-hole 40 is less than the diameter of casing 10 and the edge of through-hole 40 and the edge of casing 10 Between stay and set certain spacing.
The construction platform device of the utility model cast-in-situ bored pile is by the way that base sheath to be set on casing, so that operation is flat Platform is placed on casing, when installing tremie, tremie is plugged in casing by through-hole, utilizes through-hole pair Tremie is limited, so that tremie falls along through-hole, so as to prevent tremie under lifting Steel reinforcement cage is collided during falling and caused by destroy problem, the quality of effective protection steel reinforcement cage.Furthermore construction personnel can be The monitoring of filling concrete absolute altitude is carried out on construction platform device, is determined that conduit promotes time point according to monitoring result, is further protected Pile quality is demonstrate,proved, operating efficiency is promoted and guarantees construction personnel's safety operation.
One better embodiment of the construction platform device as the utility model cast-in-situ bored pile.Refering to Fig. 4, it is shown that The top view of the pedestal of the construction platform device of the utility model cast-in-situ bored pile.Refering to Fig. 5, it is shown that the utility model drilling The side view of the pedestal of the construction platform device of bored concrete pile.In conjunction with shown in Fig. 1 to Fig. 5, pedestal 20 is to be sheathed on casing 10 Casing.The diameter of casing is slightly larger than the diameter of casing 10, and the height dimension of casing is decided according to the actual requirements.
One better embodiment of the construction platform device as the utility model cast-in-situ bored pile.In conjunction with Fig. 1 to Fig. 5 institute Show, operating platform 30 includes:Branch is set to the frame on pedestal 20;And it is layed in the bottom plate of frame, so that construction personnel can be The monitoring of filling concrete absolute altitude is carried out on construction platform device, is determined that conduit promotes time point according to monitoring result, is further protected Demonstrate,prove pile quality.In the present embodiment, frame is rectangular frame, and the width of rectangular frame is less than the diameter of casing 10.Bottom plate is Rectangular slab.The size of frame and bottom plate, shape and material can be depending on the needs of practice of construction.
One better embodiment of the construction platform device as the utility model cast-in-situ bored pile, in conjunction with Fig. 2, Fig. 4 and Shown in Fig. 5, operating platform 30 is equipped with multiple connecting holes 31;Pedestal 20 is fixed with multiple connecting plates 21 corresponding to connecting hole 31, Connecting plate 21 is equipped with pin hole 22;By the way that connecting plate 21 is inserted in connecting hole 31 and wears pin hole by bolt, thus real It is now that pedestal 20 and operating platform 30 is detachably connected.
In the present embodiment, four places that casing is connected with frame are equipped with connecting plate 21, and connecting plate 21 is rectangular slab. The opposite sides of frame, which is spaced apart, is equipped with connecting hole 31, so as to by the way that connecting plate 21 is plugged in different connecting holes 31, It is able to carry out the position of adjusting sleeve pipe.
One better embodiment of the construction platform device as the utility model cast-in-situ bored pile, refering to Fig. 6, it is shown that The top view of the location structure of the construction platform device of the utility model cast-in-situ bored pile.Refering to Fig. 7, it is shown that the utility model The side view of the location structure of the construction platform device of cast-in-situ bored pile.In conjunction with shown in Fig. 6 and Fig. 7, operating platform 30 is hinged with A pair of of cover board 41 of docking, a pair of of cover board 41 offer the through-hole 40 being adapted to tremie.
In the present embodiment, cover board 41 is articulated with operating platform 30 by hinge pin 43, to realize articulated connection.Pass through Cover board 41 is rectangular slab, and each rectangular slab offers semicircle, so that a pair of of rectangular slab docks to form a circular through hole.Cover board 41 Equipped with handle 42, pass through 42 rotating plate 41 of handle so as to convenient.
One better embodiment of the construction platform device as the utility model cast-in-situ bored pile, the utility model also wrap Include the guard bar structure 50 for erecting and being fixed on 30 opposite sides of operating platform.Guard bar structure 50 plays the role of protection.
The utility model additionally provides the construction method of the construction platform device using cast-in-situ bored pile, including constructs as follows Step:
Pedestal 20 is lifted and is sheathed on casing 10, so that the correspondence of through-hole 40 is connected to casing 10;And
Tremie is provided, tremie is lifted and is vertically plugged in casing 10 by through-hole 40.
Specifically, during bored pile construction, after steel reinforcement cage is placed, using crane by this complete reality of spelling It is hung with the construction platform device of Novel drilling bored concrete pile in the top opening of casing 10, pedestal 20 is sheathed on casing 10 and is incited somebody to action Pedestal 20 is engaged stabilization with casing 10.Coagulation soil hopper and tremie are then hung, tremie passes through through-hole 40 Through-hole is vertically fallen into stake holes, is limited by the through-hole of through-hole 40, and conduit is dropped downward into along stake holes center substantially, is avoided and reinforcing bar Cage collision, effective protection steel reinforcement cage quality.Construction personnel can carry out filling concrete in the present apparatus during filling concrete Absolute altitude monitoring determines that conduit promotes time point according to monitoring result, is further ensured that pile quality.
One better embodiment of the construction method of the construction platform device as the utility model cast-in-situ bored pile, operation Platform 30 is hinged with a pair of of cover board 41 of docking, and a pair of of cover board 41 offers the through-hole 40 being adapted to tremie;In coagulation After native conduit use finishes, rotating opening a pair of cover board 41 cancels limit of the through-hole to tremie, and then lifting is promoted Tremie improves construction efficiency to prevent the obstruction of tremie lifting process cover plate 41.
One better embodiment of the construction method of the construction platform device as the utility model cast-in-situ bored pile, operation Platform 30 is equipped with multiple connecting holes 31;Pedestal 20 is fixed with multiple connecting plates 21 corresponding to connecting hole 31, and connecting plate 21 is equipped with Pin hole;After lifting promotes tremie, bolt is taken from taking-up in pin hole and from connecting hole connecting plate 21 Out, thus by casing and the disassembly separation of operating platform 30.In this way, after the completion of construction, it is easy to disassemble to be used in turn, it improves Construction efficiency.
The construction platform device of the utility model cast-in-situ bored pile has the beneficial effect that:
The construction platform device of the utility model cast-in-situ bored pile is by the way that base sheath to be set on casing, so that operation is flat Platform is placed on casing, and when installing tremie, tremie is passed through the through-hole of the location structure on operating platform It plugs in casing, tremie is limited using through-hole, so that tremie falls along through-hole, due to through-hole Edge be located within the edge of casing, so as to prevent tremie lift fall during collide steel reinforcement cage Problem, the quality of effective protection steel reinforcement cage are destroyed caused by and.Furthermore construction personnel can carry out coagulation on construction platform device Soil perfusion absolute altitude monitoring, determines that conduit promotes time point according to monitoring result, is further ensured that pile quality, promotes operating efficiency And guarantee construction personnel's safety operation.
Combine figure embodiment that the utility model is described in detail above, those skilled in the art can root Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not constitute practical to this Novel restriction, the utility model will be using the ranges that the appended claims define as the protection scope of the utility model.

Claims (7)

1. a kind of construction platform device of cast-in-situ bored pile, is installed on casing, which is characterized in that the cast-in-situ bored pile is applied Work stage apparatus includes:
For the pedestal being sheathed on the casing;And
The detachably connected operating platform on the pedestal and with the pedestal, the operating platform are equipped with for coagulation Native conduit is worn and the corresponding through-hole for being connected to the casing, and the diameter of the through-hole is less than the diameter of the casing and described It is stayed between the edge of through-hole and the edge of the casing and sets certain spacing.
2. the construction platform device of cast-in-situ bored pile as described in claim 1, which is characterized in that the operating platform is hinged with A pair of of cover board of docking, the pair of cover board offer the through-hole being adapted to the tremie.
3. the construction platform device of cast-in-situ bored pile as claimed in claim 2, which is characterized in that the cover board is equipped with handle.
4. the construction platform device of cast-in-situ bored pile as described in claim 1, which is characterized in that
The operating platform is equipped with multiple connecting holes;
The pedestal is fixed with multiple connecting plates corresponding to the connecting hole, and the connecting plate is equipped with pin hole;
By the way that the connecting plate is inserted in the connecting hole and wears the pin hole by bolt, so that realizing will be described Pedestal and the operating platform are detachably connected.
5. the construction platform device of cast-in-situ bored pile as described in claim 1, which is characterized in that the operating platform includes:
Branch is set to the frame on the pedestal;And
It is layed in the bottom plate of the frame.
6. the construction platform device of cast-in-situ bored pile as described in claim 1, which is characterized in that the pedestal is is sheathed on State the casing on casing.
7. the construction platform device of cast-in-situ bored pile as described in claim 1, which is characterized in that further include erecting to be fixed on institute State the guard bar structure of operating platform opposite sides.
CN201820310903.3U 2018-03-07 2018-03-07 The construction platform device of cast-in-situ bored pile Expired - Fee Related CN208167718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820310903.3U CN208167718U (en) 2018-03-07 2018-03-07 The construction platform device of cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820310903.3U CN208167718U (en) 2018-03-07 2018-03-07 The construction platform device of cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN208167718U true CN208167718U (en) 2018-11-30

Family

ID=64385705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820310903.3U Expired - Fee Related CN208167718U (en) 2018-03-07 2018-03-07 The construction platform device of cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN208167718U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385672A (en) * 2018-03-07 2018-08-10 中国建筑第八工程局有限公司 The construction platform device and its construction method of cast-in-situ bored pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385672A (en) * 2018-03-07 2018-08-10 中国建筑第八工程局有限公司 The construction platform device and its construction method of cast-in-situ bored pile
CN108385672B (en) * 2018-03-07 2024-07-26 中国建筑第八工程局有限公司 Construction platform device for bored pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN108385672A (en) The construction platform device and its construction method of cast-in-situ bored pile
CN106284314B (en) Karst landform spiral-digging pore cast-in-place pile construction method
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN208167718U (en) The construction platform device of cast-in-situ bored pile
CN110144899A (en) Shallow foundation building foundation pit Deformation control structure and construction method are closed in a kind of soft soil layer underground parking
CN114837088A (en) Construction method of bearing platform on highway
CN207057520U (en) A kind of filling pile head bar straightening instrument
CN110616716B (en) Foundation pit net hanging anchoring guniting construction process and construction identification plate
JP2019148070A (en) Construction method of underground structure
CN109371961B (en) Steel pipe column for subway station and construction process thereof
CN106968252A (en) Pile pulling recharge method and pile pulling recharge system
CN206902712U (en) Pile pulling recharge system
CN115404880A (en) Supporting pile construction process
CN209211478U (en) A kind of lattice tower crane
CN108005083A (en) Anchor cable processing method in the range of a kind of foundation pit enclosure structure
CN207525752U (en) Antiskid pile concreting protective device
CN203834484U (en) Multifunctional protection cage
CN203438406U (en) Chute device for concrete mixing station discharge
CN208857711U (en) A kind of high-altitude integral hoisting formula operating platform
CN112796690A (en) Mud anti-splash device for punching cast-in-place pile construction and construction method
CN217501687U (en) Grouting device for tunnel construction
CN219410859U (en) Detachable pile hole protection device
JP2020002670A (en) Bridge pier removal method
CN109706848A (en) A kind of construction method using centre-hole jack jacking bridge and culvert
CN109356402A (en) A kind of active well pin-connected panel spiral stairway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

CF01 Termination of patent right due to non-payment of annual fee